CN209099209U - The novel prefabricated plate in embankment two sides - Google Patents
The novel prefabricated plate in embankment two sides Download PDFInfo
- Publication number
- CN209099209U CN209099209U CN201821583109.2U CN201821583109U CN209099209U CN 209099209 U CN209099209 U CN 209099209U CN 201821583109 U CN201821583109 U CN 201821583109U CN 209099209 U CN209099209 U CN 209099209U
- Authority
- CN
- China
- Prior art keywords
- plate
- main body
- concrete layer
- plain
- rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 27
- 239000010959 steel Substances 0.000 claims abstract description 27
- 239000004567 concrete Substances 0.000 claims abstract description 26
- 239000002689 soil Substances 0.000 claims description 3
- 230000015271 coagulation Effects 0.000 claims description 2
- 238000005345 coagulation Methods 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 3
- 239000004568 cement Substances 0.000 description 3
- 238000009413 insulation Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000005299 abrasion Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses the novel prefabricated plates in embankment two sides, including main body concrete layer, the main body concrete layer is equipped with sound absorbing layer above and below, the one side of the main body concrete layer is equipped with T-rail, opposite flank is equipped with the T connected in star matched with the T-rail of another prefabricated board, package is equipped with steel plate on the T-rail, the steel plate, which extends to, is equipped with plain plate one and plain plate two in main body concrete layer, several doughnut-shaped steel plates are equipped between the plain plate one and plain plate two, the doughnut-shaped steel plate is arranged through the width of main body concrete layer.The advantages of the utility model: have many advantages, such as that structure is simple, secure and reliable connection, sound-absorbing effect is preferable, intensity is enough.
Description
Technical field
The utility model relates to prefabricated plates technical field, in particular to the novel prefabricated plates in embankment two sides.
Background technique
Prefabricated board is exactly the floor in early stage building, is exactly the module or plate to be used of engineering.Because being pre-
Field processed produces and processes molding precast concrete, directly transports to construction site and is installed, so being prefabricated board.It makes prefabricated
When plate, first hollow parts are filled with cement, are waited dry after the hollow part of model is distributed upper reinforcing bar with planking nail hollow mould
Knock-off plank afterwards, remaining is exactly prefabricated board.There are many use of the prefabricated board in building, as covered on the ditch beside highway
Cement plate, to do the cement plate of thermal insulation layer on roof be all prefabricated board.
When in use, sound insulation, sound-absorbing effect are bad, and intensity is inadequate for the existing prefabricated plate in embankment two sides, easily occur
Damage;Having again is exactly that connection reliability between every two prefabricated board is inadequate, is easy to appear loosening, or even fracture.
Utility model content
The utility model is above-mentioned various in order to solve the problems, such as, provides that a kind of structure is simple, secure and reliable connection, sound-absorbing
Effect is preferable, the enough novel prefabricated plates in embankment two sides of intensity.
In order to solve the above technical problems, technical solution provided by the utility model are as follows: novel embankment two sides are prefabricated
Plate, including main body concrete layer, the main body concrete layer are equipped with sound absorbing layer, the main body concrete above and below
The one side of layer is equipped with T-rail, and opposite flank is equipped with the T connected in star matched with the T-rail of another prefabricated board, institute
Package is equipped with steel plate on the T-rail stated, and the steel plate, which extends to, is equipped with plain plate one and plain plate in main body concrete layer
Two, several doughnut-shaped steel plates are equipped between the plain plate one and plain plate two, the doughnut-shaped steel plate runs through main body coagulation
The width of soil layer is arranged.
As an improvement, being equipped with through-hole on the plain plate one and plain plate two and between doughnut-shaped steel plate.
As an improvement, the length of the T-rail and T connected in star is equal with the width of main body concrete layer.
As an improvement, the plain plate one, plain plate two and doughnut-shaped steel plate are formed by gap, to be cast with reinforcing bar mixed
Solidifying soil.
The utility model compared with prior art the advantages of be: when the utility model is used, the setting of sound absorbing layer can
Make the utility model when in use can the noise well to running automobile on road absorb, so as not to influencing week
Enclose the normal life of resident;The setting of T-rail and T connected in star can make the connection between every two the utility model more firm
Reliably, it is less prone to loosening;The setting of steel plate can make the connection between T-rail and T connected in star more smooth, not will cause
Big abrasion;On the one hand the setting of plain plate one, plain plate two and doughnut-shaped steel plate can reduce the dosage of concrete, on the other hand
The stress intensity that the utility model can be enhanced is less prone to damage, long service life;The setting of through-hole can make the utility model exist
While proof strength, the materials of plain plate one and plain plate two can be reduced, to save production cost.
Detailed description of the invention
Fig. 1 is the connection status figure of the novel prefabricated plate in embankment two sides of the utility model.
Fig. 2 is the overlooking structure diagram of the novel prefabricated plate in embankment two sides of the utility model.
It is as shown in the figure: 1, main body concrete layer;2, sound absorbing layer;3, T-rail;4, T connected in star;5, steel plate;6, plain plate
One;7, plain plate two;8, doughnut-shaped steel plate;9, through-hole.
Specific embodiment
The following describes the utility model in further detail with reference to the accompanying drawings.
In conjunction with attached drawing 1 and attached drawing 2, the novel prefabricated plate in embankment two sides, including main body concrete layer 1, the master
Body concrete layer 1 is equipped with sound absorbing layer 2 above and below, and the one side of the main body concrete layer 1 is equipped with T-rail 3,
Opposite flank is equipped with the T connected in star 4 matched with the T-rail 3 of another prefabricated board, wraps up and being equipped on the T-rail 3
Steel plate 5, the steel plate 5, which extends to, is equipped with plain plate 1 and plain plate 27, the plain plate one in main body concrete layer 1
Several doughnut-shaped steel plates 8 are equipped between 6 and plain plate 27, the doughnut-shaped steel plate 8 is set through the width of main body concrete layer 1
It sets.
Through-hole 9 is equipped on the plain plate 1 and plain plate 27 and between doughnut-shaped steel plate 8.
The length of the T-rail 3 and T connected in star 4 is equal with the width of main body concrete layer 1.
Plain plate 1, plain plate 27 and the doughnut-shaped steel plate 8 is formed by gap and is cast with armored concrete.
Specific embodiment of the present utility model: when the utility model is used, passing through T between every two the utility model
Shape guide rail 3 and T connected in star 4 it is in mating connection;Noise caused by road vehicle crosses will be absorbed by sound absorbing layer 2
Fall;On the one hand the setting of plain plate one, plain plate two and doughnut-shaped steel plate can reduce the dosage of concrete, on the other hand can enhance
The stress intensity of the utility model is less prone to damage, long service life;The setting of through-hole can be such that the utility model is guaranteeing by force
While spending, the materials of plain plate one and plain plate two can be reduced, to save production cost.
The utility model and embodiments thereof are described above, this description is no restricted, shown in attached drawing
Be also one of the embodiments of the present invention, actual structure is not limited to this.All in all if this field
Those of ordinary skill is enlightened by it, without deviating from the purpose of the present invention, not inventively design with
The similar frame mode of the technical solution and embodiment, all should belong to the protection range of the utility model.
Claims (4)
1. the novel prefabricated plate in embankment two sides, it is characterised in that: including main body concrete layer (1), the main body coagulation
Soil layer (1) is equipped with sound absorbing layer (2) above and below, and the one side of the main body concrete layer (1) is equipped with T-rail
(3), opposite flank is equipped with the T connected in star (4) matched with the T-rail (3) of another prefabricated board, the T-rail (3)
Upper package is equipped with steel plate (5), and the steel plate (5), which extends to, is equipped with plain plate one (6) and plain plate in main body concrete layer (1)
Two (7) are equipped with several doughnut-shaped steel plates (8), the doughnut-shaped steel plate between the plain plate one (6) and plain plate two (7)
(8) width through main body concrete layer (1) is arranged.
2. the novel prefabricated plate in embankment two sides according to claim 1, it is characterised in that: the plain plate one
(6) and on plain plate two (7) and between doughnut-shaped steel plate (8) through-hole (9) are equipped with.
3. the novel prefabricated plate in embankment two sides according to claim 1, it is characterised in that: the T-rail (3)
It is equal with the width of main body concrete layer (1) with the length of T connected in star (4).
4. the novel prefabricated plate in embankment two sides according to claim 1, it is characterised in that: the plain plate one
(6), plain plate two (7) and doughnut-shaped steel plate (8) are formed by gap and are cast with armored concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821583109.2U CN209099209U (en) | 2018-09-27 | 2018-09-27 | The novel prefabricated plate in embankment two sides |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821583109.2U CN209099209U (en) | 2018-09-27 | 2018-09-27 | The novel prefabricated plate in embankment two sides |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209099209U true CN209099209U (en) | 2019-07-12 |
Family
ID=67153740
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821583109.2U Expired - Fee Related CN209099209U (en) | 2018-09-27 | 2018-09-27 | The novel prefabricated plate in embankment two sides |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209099209U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110374629A (en) * | 2019-09-03 | 2019-10-25 | 中车建设工程有限公司 | A kind of sqouynd absorption lowering noise tunnel duct piece and its method for prefabricating |
-
2018
- 2018-09-27 CN CN201821583109.2U patent/CN209099209U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110374629A (en) * | 2019-09-03 | 2019-10-25 | 中车建设工程有限公司 | A kind of sqouynd absorption lowering noise tunnel duct piece and its method for prefabricating |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20130145720A1 (en) | Mounting rail | |
CN209924233U (en) | Assembled building floor structure | |
CN2883532Y (en) | Partition board connection structure-centipede type locking tenon | |
CN101497215B (en) | Modular reinforced concrete acoustical barrier and method for producing the same | |
CN107447901A (en) | Anti-seismic prefabricated floor and floor antidetonation splicing construction | |
CN209179247U (en) | A kind of novel precast reinforced concrete shearing force wall connection structure | |
CN209099209U (en) | The novel prefabricated plate in embankment two sides | |
CN113152339A (en) | Concrete guardrail attached type fixed die pouring construction method | |
CN207567571U (en) | A kind of attachment device at plate stitch between adjacent floating plate | |
CN104818670B (en) | The water proof structure of high speed railway fragments-free concrete bridge continuous concrete guidance tape system | |
CN203890868U (en) | Hollow slab bridge with joints with corresponded grooves | |
CN205804237U (en) | A kind of recycling roadbed concrete guardrail | |
CN108547198A (en) | A kind of method that building or be transformed assembled platform and special precast module group | |
CN206360172U (en) | A kind of assembled subtracts vermex concrete laminated floor slab | |
CN210561803U (en) | Double-sided sound absorption board | |
CN106836623A (en) | The construction and the practice of a kind of quadrate steel pipe column tongue and groove bridge cutoff type anti-seismic heat-preservation integrated wallboard structure | |
CN106836641A (en) | Side sticking steel plate formula Combined concrete coupling beam | |
KR20180091582A (en) | Composite through bridge and the construction method thereof | |
CN208395602U (en) | Steel joint structure of assembled road surface | |
CN206681261U (en) | A kind of side sticking steel plate formula Combined concrete coupling beam | |
CN204663571U (en) | A kind of for the fire-fighting evacuation platform outside subway tunnel | |
CN211713557U (en) | Reinforced concrete crossing plate and level crossing structure | |
CN209798521U (en) | Bridge expansion joint protection architecture | |
CN106193407A (en) | A kind of Cast-in-place concrete precast hollow superimposed sheet | |
CN201077959Y (en) | Integral acoustical barrier sound absorbing baffle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190712 |
|
CF01 | Termination of patent right due to non-payment of annual fee |