CN209067023U - A kind of engineering enclosing - Google Patents
A kind of engineering enclosing Download PDFInfo
- Publication number
- CN209067023U CN209067023U CN201821753331.2U CN201821753331U CN209067023U CN 209067023 U CN209067023 U CN 209067023U CN 201821753331 U CN201821753331 U CN 201821753331U CN 209067023 U CN209067023 U CN 209067023U
- Authority
- CN
- China
- Prior art keywords
- enclosing
- water tank
- hydraulic pump
- pressure hydraulic
- cavity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Nozzles (AREA)
Abstract
The utility model relates to a kind of engineering enclosings, belong to technical field of building construction, solve the problems, such as construction site not and can effectively prevent dust diffusion.It includes enclosing ontology, enclosing ontology includes cross tube, sheer pole and column, cross tube and sheer pole are from top to bottom arranged between two root posts, spray assembly is provided on enclosing ontology, spray assembly includes water tank, high-pressure hydraulic pump, outlet pipe and atomizer, water tank is connected to the bottom of enclosing ontology and connect with high-pressure hydraulic pump, outlet pipe one end is connect with high-pressure hydraulic pump, the other end is connected with more branch pipes, the other end of every branch pipe is connect in the upper end of enclosing ontology with atomizer, and atomizer carries out sprinkling depositing dust towards the two sides of enclosing ontology.Start high-pressure hydraulic pump, the water in water tank is extracted out, is entered in branch pipe by outlet pipe, and carry out sprinkling depositing dust by two sides of the atomizer to enclosing ontology, does not need not only to facilitate, but also save manpower by manually carrying out spray dust.
Description
Technical field
The utility model relates to technical field of building construction more particularly to a kind of engineering enclosings.
Background technique
Currently, inevitably occurring a large amount of building in city with the continuous quickening that urban modernization is built
Building site often generates some dust pollutions on construction site, controls without construction site, and leaving, it flies upward everywhere, can be to building
The health for building the construction personnel at the resident around building site and scene impacts.
In existing technology, Authorization Notice No. is the Chinese patent of CN206722548U, discloses a kind of civil engineering and encloses
Gear.It includes two root posts, top rail, bottom rail, buckle, liner, flange and setscrew;The both ends of top rail and bottom rail
It is plugged in the upper and lower part of two root posts respectively, several buckles being set side by side are provided between top rail and bottom rail;Two
Liner is respectively arranged with inside root post, top rail and bottom rail.
Prior art among the above has the following deficiencies: the civil engineering enclosing, last together as construction site
Barrier cannot effectively completely cut off the dust that construction site generates.
Utility model content
The purpose of this utility model is to provide a kind of engineering enclosing, have the advantages that reduce the diffusion of construction site dust.
The above-mentioned purpose of the utility model has the technical scheme that
A kind of engineering enclosing, including enclosing ontology, the enclosing ontology include cross tube, sheer pole and column, it is described on
Cross bar and sheer pole are from top to bottom arranged between two root posts, the space setting that the cross tube, sheer pole and column surround
Have baffle, be provided with spray assembly on the enclosing ontology, the spray assembly include water tank, high-pressure hydraulic pump, outlet pipe and
Atomizer, the water tank are connected to the bottom of the enclosing ontology and connect with the high-pressure hydraulic pump, the outlet pipe one
End is connect with the high-pressure hydraulic pump, and the other end is connected with more branch pipes, and the other end of the every branch pipe is in the upper of enclosing ontology
End is connect with the atomizer, and the two sides of the atomizer towards the enclosing ontology carry out sprinkling depositing dust.
Implement above-mentioned technical proposal, when needing to carry out depositing dust processing in the installation place of engineering enclosing, reduces the diffusion of dust
When, construction personnel starts high-pressure hydraulic pump, and the water in water tank is extracted out, is entered in branch pipe by outlet pipe, and pass through atomization
Spray head carries out sprinkling depositing dust to the two sides of enclosing ontology, does not need not only to facilitate, but also save by manually carrying out spray dust
Manpower, while water tank is connect with enclosing ontology, after storing full water in water tank on ground, water tank increases enclosing sheet
The weight and stability of body reduce the case where enclosing ontology is fallen by wind.
The utility model is further arranged to, and the cross tube offers empty slot upward, and the column is internally provided with
One cavity, the sheer pole are internally provided with the second cavity, and first cavity one end is connected to the empty slot, the other end and institute
The connection of the second cavity is stated, the water tank is connected to by water inlet pipe with second cavity.
To implement above-mentioned technical proposal, is provided with empty slot upward on cross tube, empty slot is connected to the first cavity in column,
First cavity is connected to the second cavity on sheer pole, and the first cavity is connect by water inlet pipe with water tank, rainfall when
Wait, rainwater enters in the first cavity by empty slot, then by the first cavity into the second cavity, finally by water inlet pipe into
Enter into water tank, water tank is facilitated to be collected rainwater, and rainwater is subjected to depositing dust processing by spray assembly, saves water
Resource.
The utility model is further arranged to, and the empty slot adds inclined plate in its two sides along its length.
Implement above-mentioned technical proposal, adds inclined plate in empty slot two sides, when carrying out rainwater-collecting, increase collection rainwater
Surface area, enable more rainwater to be collected utilization.
The utility model is further arranged to, and the empty slot and the first cavity connectivity part covering are provided with strainer.
Implement above-mentioned technical proposal, the covering of the connectivity part of empty slot and the first cavity is provided with strainer, reduces in empty slot
The impurity of collection enters in water tank, eventually causes blocking, so that the case where atomizer not can be carried out water spray generation.
The utility model is further arranged to, and is provided with inlet valve on the water tank.
Implement above-mentioned technical proposal, when the water in water tank is inadequate or when the rainwater of water tank storage is inadequate, side
Just construction personnel injects enough waters into water tank, turns off inlet valve after injection by opening inlet valve.
The utility model is further arranged to, and water observation panel is provided on the water tank.
Implement above-mentioned technical proposal and facilitate staff when carrying out atomizing de-dusting by water observation panel, observes water storage
Whether the water in case is enough.
The utility model is further arranged to, and the junction of the outlet pipe and the high-pressure hydraulic pump is provided with check-valves.
Implement above-mentioned technical proposal, the junction of high-pressure hydraulic pump and outlet pipe is provided with check-valves, so that in water tank
Water by high-pressure hydraulic pump can only into outlet pipe one-way flow, prevent aqueous reflux in outlet pipe from returning in high-pressure hydraulic pump, cause
High-pressure hydraulic pump reversion.
The utility model is further arranged to, and is connected with solar cell module on the high-pressure hydraulic pump.
Implement above-mentioned technical proposal, by connecting solar cell module on high-pressure hydraulic pump, so that pouring component can be with
It realizes part self-power supply, saves electric power.
In conclusion the utility model has the following beneficial effects:
One, construction personnel starts water pump, and the water in water tank is extracted out, is entered in branch pipe by outlet pipe, and pass through
Atomizer carries out sprinkling depositing dust to the two sides of enclosing ontology, not only very convenient, but also saves manpower;
Two, the weight and stability that enclosing ontology is increased after water tank storage full water, reduce what enclosing ontology was fallen by wind
Situation;
Three, rainwater is entered in the first cavity by empty slot, then is entered in the second cavity by the first cavity, finally by
Water inlet pipe enters in water tank, and water tank is facilitated to be collected rainwater, and rainwater is carried out at depositing dust by spray assembly
Reason saves water resource;
Four, it by connecting solar cell module on high-pressure hydraulic pump, self is supplied so that pouring component and part may be implemented
Electricity saves electric power.
Detailed description of the invention
Fig. 1 is the part-structure sectional view of the utility model embodiment engineering enclosing;
Fig. 2 is the portion the A enlarged drawing in Fig. 1;
Fig. 3 is the portion the B enlarged drawing in Fig. 1;
Fig. 4 is the portion the C enlarged drawing in Fig. 1.
Appended drawing reference: 1, enclosing ontology;101, cross tube;102, sheer pole;103, column;2, baffle;3, spray assembly;
301, water tank;302, high-pressure hydraulic pump;303, outlet pipe;304, atomizer;4, branch pipe;5, empty slot;6, the first cavity;7,
Two cavitys;8, water inlet pipe;9, inclined plate;10, strainer;11, inlet valve;12, water observation panel;13, check-valves;14, solar-electricity
Pond component.
Specific embodiment
Below in conjunction with attached drawing, the technical solution of the utility model embodiment is described.
Embodiment
As shown in Figure 1, a kind of engineering baffle 2, including enclosing ontology 1, enclosing ontology 1 include cross tube 101, sheer pole
102 and column 103.In the present embodiment, the material of enclosing ontology 1 is made of PVC material.Cross tube 101 and sheer pole 102
From top to bottom side by side parallel glue is moulded between two root posts 103, the space that cross tube 101, sheer pole 102 and column 103 surround
Glue modeling has baffle 2.
Spray assembly 3 is provided on enclosing ontology 1 combined with Figure 1 and Figure 2, spray assembly 3 includes water tank 301, high pressure water
302, outlet pipe 303 and atomizer 304 are pumped, is provided on water tank 301 for the inlet valve 11 of moisturizing and convenient for observation water
The water observation panel 12 of amount, high-pressure hydraulic pump 302, which connects, is connected with solar cell module 14 for the storage on high-pressure hydraulic pump 302
Battery charging.Water tank 301 is bolted to the bottom of sheer pole 102 and connect with high-pressure hydraulic pump 302,303 one end of outlet pipe
Connect with high-pressure hydraulic pump 302, the junction of outlet pipe 303 and high-pressure hydraulic pump 302 is provided with check-valves 13, outlet pipe 303 it is another
One end is connected with two branch pipes 4, upper end and atomizer of the every one end of branch pipe 4 far from outlet pipe 303 in enclosing ontology 1
304 connections, branch pipe 4 are fixed on enclosing ontology 1 by pipe clamp.
In conjunction with Fig. 1 and Fig. 3, cross tube 101 offers empty slot 5 upward, and empty slot 5 has in the modeling of its two sides glue along its length
Inclined plate 9 increases the area of collection rain.Column 103 is internally provided with the first cavity 6, and sheer pole 102 is internally provided with the second cavity 7,
First cavity, 6 one end is connected to empty slot 5, and the other end is connected to the second cavity 7, and water tank 301 passes through water inlet pipe 8 and the second cavity
7 connections, facilitate water tank 301 to be collected rainwater.
In conjunction with Fig. 1 and Fig. 4, empty slot 5 and the covering of 6 connectivity part of the first cavity are provided with strainer 10, and reduction is collected in empty slot 5
Impurity enter in water tank 301, blocking is eventually caused, so that the case where atomizer 304 not can be carried out water spray generation.
Specific work process: when high-pressure hydraulic pump 302 is when unused, solar cell module 14 is on high-pressure hydraulic pump 302
Battery carry out electric power storage.When needing to carry out atomizing de-dusting, construction personnel starts high-pressure hydraulic pump 302, will be in water tank 301
Water extraction, is entered in branch pipe 4, and carry out spray drop to 1 two sides of enclosing ontology by atomizer 304 by outlet pipe 303
Dirt.After a period of time, staff again closes high-pressure hydraulic pump 302.Solar cell module 14 is after spray dust is complete
Continue accumulation of energy, to be powered when spray next time for high-pressure hydraulic pump 302, while when solar cell module 14 is high pressure
When the battery electric power storage of water pump 302 is inadequate, additional power source can also be carried out and be powered to high-pressure hydraulic pump 302.
When rainfall, rainwater is entered in the first cavity 6 by empty slot 5, then enters the second sky by the first cavity 6
It in chamber 7, is entered in water tank 301 finally by water inlet pipe 8, facilitates water tank 301 to be collected rainwater, and rainwater is led to
It crosses spray assembly 3 and carries out depositing dust processing.
Before being sprayed, for staff by water observation panel 12, whether the water observed in water tank 301 is enough.
When water is inadequate, staff carries out moisturizing to water tank 301 by opening the additional water source of inlet valve 11, after moisturizing, then will
Inlet valve 11 is closed, to ensure water supply when spray dust.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this
The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical
Within novel protection scope.
Claims (8)
1. a kind of engineering enclosing, including enclosing ontology (1), the enclosing ontology (1) includes cross tube (101), sheer pole (102)
With column (103), the cross tube (101) and sheer pole (102) are from top to bottom arranged between two root posts (103), described
The space that cross tube (101), sheer pole (102) and column (103) surround is provided with baffle (2), which is characterized in that the enclosing
It is provided on ontology (1) spray assembly (3), the spray assembly (3) includes water tank (301), high-pressure hydraulic pump (302), water outlet
Manage (303) and atomizer (304), the water tank (301) be connected to the bottom of the enclosing ontology (1) and with the high pressure
Water pump (302) connection, described outlet pipe (303) one end are connect with the high-pressure hydraulic pump (302), and the other end is connected with more branch pipes
(4), the other end of the every branch pipe (4) is connect in the upper end of enclosing ontology (1) with the atomizer (304), the mist
The two sides for changing spray head (304) towards the enclosing ontology (1) carry out sprinkling depositing dust.
2. a kind of engineering enclosing according to claim 1, which is characterized in that the cross tube (101) offers empty slot upward
(5), the column (103) is internally provided with the first cavity (6), and the sheer pole (102) is internally provided with the second cavity (7),
Described first cavity (6) one end is connected to the empty slot (5), and the other end is connected to second cavity (7), the water tank
(301) it is connected to by water inlet pipe (8) with second cavity (7).
3. a kind of engineering enclosing according to claim 2, which is characterized in that the empty slot (5) along its length its two
Side adds inclined plate (9).
4. a kind of engineering enclosing according to claim 2, which is characterized in that the empty slot (5) and first cavity (6) are even
Logical place's covering is provided with strainer (10).
5. a kind of engineering enclosing according to claim 1, which is characterized in that be provided with inlet valve on the water tank (301)
(11)。
6. a kind of engineering enclosing according to claim 1, which is characterized in that be provided with water sight on the water tank (301)
Cha Kou (12).
7. a kind of engineering enclosing according to claim 1, which is characterized in that the outlet pipe (303) and the high-pressure hydraulic pump
(302) junction is provided with check-valves (13).
8. a kind of engineering enclosing according to claim 1, which is characterized in that be connected with the sun on the high-pressure hydraulic pump (302)
It can battery component (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821753331.2U CN209067023U (en) | 2018-10-26 | 2018-10-26 | A kind of engineering enclosing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821753331.2U CN209067023U (en) | 2018-10-26 | 2018-10-26 | A kind of engineering enclosing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209067023U true CN209067023U (en) | 2019-07-05 |
Family
ID=67096380
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821753331.2U Expired - Fee Related CN209067023U (en) | 2018-10-26 | 2018-10-26 | A kind of engineering enclosing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209067023U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112211483A (en) * | 2020-10-12 | 2021-01-12 | 赵燕虎 | Assembled safety barrier for construction with supplementary dust fall function |
CN112957851A (en) * | 2021-02-04 | 2021-06-15 | 山东莱芜建设集团有限公司 | Environment-friendly building construction dust-settling method |
CN113006590A (en) * | 2021-01-27 | 2021-06-22 | 上海立高贸易有限公司 | Building encloses fender spray set |
CN113914706A (en) * | 2021-11-26 | 2022-01-11 | 上海宝冶集团有限公司 | Fender is enclosed in construction |
-
2018
- 2018-10-26 CN CN201821753331.2U patent/CN209067023U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112211483A (en) * | 2020-10-12 | 2021-01-12 | 赵燕虎 | Assembled safety barrier for construction with supplementary dust fall function |
CN113006590A (en) * | 2021-01-27 | 2021-06-22 | 上海立高贸易有限公司 | Building encloses fender spray set |
CN112957851A (en) * | 2021-02-04 | 2021-06-15 | 山东莱芜建设集团有限公司 | Environment-friendly building construction dust-settling method |
CN113914706A (en) * | 2021-11-26 | 2022-01-11 | 上海宝冶集团有限公司 | Fender is enclosed in construction |
CN113914706B (en) * | 2021-11-26 | 2023-09-19 | 上海宝冶集团有限公司 | Building construction encloses fender |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209067023U (en) | A kind of engineering enclosing | |
CN107013878A (en) | A kind of gardens with can water-collecting irrigation solar street light | |
CN208023507U (en) | A kind of protective slope structure of Novel water conservancy construction | |
CN205812973U (en) | A kind of rainwater of collecting is for the green house of vegetables irrigated | |
CN111188466A (en) | Green building integrated roof and use method | |
CN213897834U (en) | Sponge city green roof structure | |
CN106416951A (en) | Energy-saving and water-saving field irrigation device | |
CN208685534U (en) | A kind of hydraulic engineering earth-retaining device | |
CN206771236U (en) | A kind of gardens with can water-collecting irrigation solar street light | |
CN207269701U (en) | A kind of insect-killing device of gardens apparatus rain collecting function | |
CN206698164U (en) | A kind of generation of electricity by new energy device of water storage energy-conservation | |
CN206371234U (en) | A kind of plateau Kiwi berry planting unit | |
CN107683842A (en) | A kind of insect-killing device of gardens apparatus rain collecting function | |
CN213682876U (en) | Integrated roof of green building | |
CN215735962U (en) | Green roof for green building | |
CN209011044U (en) | Municipal works guardrail for road | |
CN205491936U (en) | Special big -arch shelter of chinese rhubarb planting of solar energy cooling | |
CN216088127U (en) | Mine ecological remediation is with novel multi-functional retaining equipment | |
CN212582564U (en) | Energy-saving water spraying device for rural highway maintenance | |
CN214995327U (en) | Based on BIM technique green building energy conservation roofing | |
CN206078082U (en) | Olive is planted and is used solar energy irrigation system | |
CN216392283U (en) | Integrated rainwater purification and recovery three-dimensional greening landscape type building | |
CN206586099U (en) | New type solar energy intelligent control spray irrigation system | |
CN216383959U (en) | Solar fountain lamp | |
CN219165356U (en) | Roof greening energy-saving drip irrigation device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190705 Termination date: 20211026 |