Utility model content
To solve the above problem in the prior art, the utility model is proposed.The utility model is intended to provide a kind of energy
Enough it is widely used in the scaffolding structure with opening and closing type ceiling, the opening and closing type in the place of a variety of environmental conditions, a variety of spans
Ceiling and its installation method.
It is according to the present utility model in a first aspect, providing a kind of scaffolding structure that ceiling can open and close, the scaffolding structure
Including bracket and rack-mount opening and closing type ceiling, wherein the ceiling includes: to be assemblied on bracket along longitudinal direction
The Ji Liang of extension;The canopy open-and-close mechanism being connected on Ji Liang, the canopy open-and-close mechanism include the telescopic unit that can be stretched and
The canopy cloth unit linkedly opened and closed with telescopic unit.The ceiling of the scaffolding structure according to the present utility model can open and close, Ji Liang
Rigidity it is good, can adapt to the place of various spans.
As a preferred option, the bracket includes pillar construction and the top for being arranged in pillar construction and by column knot
The upper frame of structure support, the upper frame includes the purlin across the top beam of arrangement and with top beam arranged crosswise.Bracket is across direction
On side viewing when shape be herringbone, arch, pointed arch, any one in polygon;Top beam watches from side viewing
When shape be herringbone, arch, pointed arch, any one in polygon.
As a preferred option, the Ji Liang includes: base beam body;First connecting portion, setting base beam body bottom,
At least one of top and side are upper and connect base beam body with bracket;And second connecting portion, it is arranged at base
Base beam body is simultaneously connect by beam body side with canopy open-and-close mechanism.The base beam body of the Ji Liang uses the vertical of the upper frame along bracket
To the metal structure of extension, truss structure is preferably used.The first connecting portion further includes for the Ji Liang of ceiling to be fixedly mounted with
Base beam pedestal on bracket, the bottom of the base beam pedestal is connect with bracket and cross-sectional shape is U-shaped, inverted U, L-type
One of with I type.It due to truss structure light weight, is easily installed, the case where the base beam body of Ji Liang uses truss structure
Under, one section of one section of ground of truss can be connected to form truss structure, such structure simple installation, convenient transport, significantly
Transport and installation cost are reduced, and is easy to the connection of the longitudinal direction Ji Liang.
As a preferred option, the canopy open-and-close mechanism further includes that telescopic unit and canopy cloth unit are installed to Ji Liang
Installation part on two interconnecting pieces;The telescopic unit includes, with the flexible telescopic arm of folding mode or/and mode of traction and
Telescopic arm driver;And the canopy cloth unit includes, canopy cloth that an at least ora terminalis is connect with telescopic arm, for folding shape
The collector and storage driving mechanism of canopy cloth under state.
As a preferred option, the scaffolding structure further includes the fixation being arranged in at least part at the top of bracket
Shelter, and the terminal edge of the canopy open-and-close mechanism under unfolded state is located above the fixation shelter.The band of the embodiment
The scaffolding structure of fixed shelter can be applied to span than solving on the big sports facility obtained seldom after the expansion of single canopy open-and-close mechanism
There cannot be the technical issues of upright supports canopy open-and-close mechanism among the biggish sports facility of span of having determined.
As a preferred option, the scaffolding structure further include in the enclosing being arranged in around bracket and cloth at least
It is a kind of.Scaffolding structure according to the present utility model can be realized bracket surrounding can with Fast Installation dismantle cloth, enclosing, from
And increasing using the time for sports facility (for example, cage type sport facility) is made the use in place will to be substantially increased by about one time
Efficiency, while the comfortable sexual experience of movement for improving user.
As a preferred option, the ceiling of the scaffolding structure further includes the folding starter being electrically connected with ceiling, wherein
It is described folding starter include: be mounted on the scaffolding structure outside and can be to the environment that environmental factor is detected
Factor detector;And in the case where environmental factor detector detects that environmental factor reaches predetermined condition to the folding of ceiling
Carry out the folding starting controller of starting control.Environmental factor detector can be to related with the environmental factors such as wind, light, rain
Parameter detected, for example, wind speed, wind direction, luminous intensity, uitraviolet intensity, rainfall etc..Detecting burst when raining heavyly, or
When person detects summer high fever, controller issues instruction, powers on, and controls ceiling Automatic-expanding.Detecting burst strong wind
When, or when detecting proper temperature or not strong sunlight, control ceiling automatic retracting.It is very easy to use, improve user's body
It tests.
As a preferred option, the ceiling of the scaffolding structure further include can control canopy open-and-close mechanism folding it is manual
Rocking bar.In the case where no electricity, user can fold manually with the manual rocker or be unfolded canopy open-and-close mechanism.
As a preferred option, the assembly method of the ceiling includes single dress and assembly, described under single dress mode
Ceiling is only being equipped with single Ji Liang on direction, and under the erection method, the ceiling is assembling on direction
There are at least two Ji Liang.
As a preferred option, under single dress mode, the single Ji Liang is connected in the unilateral side on direction
Canopy open-and-close mechanism, or canopy open-and-close mechanism is connected in the bilateral on direction.
As a preferred option, described assembled including being connected with canopy open-and-close mechanism to only unilateral along spelling and to spelling
Each unilateral side connect Ji Liang carry out it is assembled in the case where, under along spelling mode, each Ji Liang is in ipsilateral connection canopy open-and-close mechanism, and right
Under spelling mode, each Ji Liang connects canopy open-and-close mechanism in opposite side, meets Ji Liang in the unilateral side for being connected with canopy open-and-close mechanism to unilateral side
In the case that the bilateral for being connected with canopy open-and-close mechanism with bilateral connects Ji Liang progress assembly, under along spelling mode, unilateral side meets Ji Liang and exists
It is connect canopy open-and-close mechanism with the back side that bilateral connects the sides adjacent of Ji Liang, and under to spelling mode, unilateral side meets Ji Liang and connects with bilateral
The sides adjacent of Ji Liang connects canopy open-and-close mechanism.
As a preferred option, the suitable packaging includes folded spell and spells with straight, wherein under the folded spelling mode, opens and closes in canopy
Under the unfolded state of mechanism, the canopy open-and-close mechanism of the upstream end on vertical direction is at least with the Ji Liang at downstream in water
Square overlap mutually upwards, under the straight spelling mode, under the unfolded state of canopy open-and-close mechanism, canopy open-and-close mechanism and mutually assembled
The Ji Liang that canopy open-and-close mechanism is connected is not overlapped in the horizontal direction.
As a preferred option, under to spelling mode, the Ji Liang being located at vertical direction downstream for being mounted on bracket is also wrapped
Base beam lifting member is included, the base beam lifting member is installed in the top of bracket and extends upwards.
As a preferred option, under along spelling mode, the same direction is pressed in the canopy open-and-close mechanism of the ipsilateral connection of each Ji Liang
Expansion;And under to spelling mode, it is unfolded in the canopy open-and-close mechanism that the opposite side of each Ji Liang connects by relative direction.
As a preferred option, it under the straight spelling mode, is set in two canopy open-and-close mechanism phase stitching portions of adjacent assembly
It is equipped with, along the up concave type gutter structure of bracket longitudinally extended, wherein the gutter structure and described two canopy open-and-close mechanism phases
The Ji Liang of stitching portion is contacted, and contact surface passes through water-proofing treatment, and the terminal edge of canopy open-and-close mechanism in the deployed state is located at
The top of gutter structure.By the gutter structure, water flows to the ground outside frame without flowing into frame from gutter longitudinal direction both ends
In structure.
As a preferred option, it under described pair of spelling mode, is set in two canopy open-and-close mechanism phase stitching portions of adjacent assembly
It is equipped with, along the up concave type gutter structure of bracket longitudinally extended, wherein the gutter structure is mounted on upper frame and in institute
It states between the terminal edge of two canopy open-and-close mechanisms in the deployed state, and described two canopy open-and-close mechanisms are in the deployed state
Terminal edge be located at the top of gutter structure.
As a preferred option, the first connecting portion further includes for the Ji Liang of ceiling and gutter structure to be mounted on branch
Base beam pedestal on frame, wherein the bottom of base beam pedestal is connect with bracket and cross-sectional shape is U-shaped, inverted U, L-type and I
One of type.The gutter structure further includes the gutter pedestal for gutter structure to be mounted on to bracket.To sum up, using this reality
After above-mentioned splicing installation (also referred to as assembled) mode of novel provided open-close type ceiling, the utility model is fitted
For large span athletic ground.This improve increasing using the time for the cage type sport facility of large span will by about one time
The service efficiency in place, while the comfortable sexual experience of movement for improving user.
Second aspect according to the present utility model provides a kind of opening and closing type ceiling for bracket, the ceiling packet
It includes: the Ji Liang extended longitudinally being assemblied on bracket;The canopy open-and-close mechanism being connected on Ji Liang, the canopy open-and-close mechanism include
The telescopic unit that can be stretched and the canopy cloth unit linkedly opened and closed with telescopic unit.
As a preferred option, the Ji Liang includes: base beam body;First connecting portion, setting base beam body bottom,
At least one of top and side are upper and connect base beam body with bracket;And second connecting portion, it is arranged at base
Base beam body is simultaneously connect by beam body side with canopy open-and-close mechanism.
As a preferred option, the assembly method of the ceiling includes any one of single dress and assembly, wherein assembled packet
It includes along spelling and to spelling.
As a preferred option, in the case where the bracket does not include upper frame, the ceiling further includes that can be assembled to branch
Upper frame above frame, and the Ji Liang is assemblied on the upper frame.To sum up, according to the present utility model above-mentioned for bracket
Opening and closing type ceiling can be adapted for folding open-close type ceiling when blowing hard in paulin room structure, and strong wind will not be paulin room knot
The top cloth of structure blows bad;Entire paulin room structure will not more be blown to obtain displacement, the safety of the paulin room structure improved, using the time and
Use scope.
The third aspect according to the present utility model provides a kind of installation method of scaffolding structure that ceiling can open and close,
The installation method includes: setting support;Opening and closing type ceiling is installed on bracket, the opening and closing type ceiling includes being assemblied in
The Ji Liang extended longitudinally on bracket, and the canopy open-and-close mechanism being connected on Ji Liang, the canopy open-and-close mechanism includes can
Flexible telescopic unit and the canopy cloth unit linkedly opened and closed with telescopic unit;Wherein, described that ceiling is installed on bracket
Step further comprises: Ji Liang is fixedly mounted on to the top of bracket;And the assembly of canopy open-and-close mechanism is made into ceiling on Ji Liang
At least part at the top of bracket can be covered in the deployed state.The installation method, which is included in, carries out canopy open-and-close mechanism
It is straight to spell and to installing gutter structure when spelling on bracket.
To sum up, scaffolding structure according to the present utility model is particularly suitable for the athletic ground of large span, practical new using this
After splicing installation (also referred to as assembled) mode of open-close type ceiling provided by type, enable the utility model be suitable for greatly across
Spend athletic ground.This will make increasing using the time for the cage type sport facility of large span that will improve making for place by about one time
With efficiency, while the comfortable sexual experience of movement for improving user.
To sum up, scaffolding structure according to the present utility model can also be suitable in paulin room structure, by open-close type when blowing hard
Ceiling folds, and strong wind will not blow the top cloth of paulin room structure bad;Entire paulin room structure will not more be blown to obtain displacement, improved
The safety of paulin room structure uses time and use scope.
In addition, scaffolding structure according to the present utility model can also be suitable for small-sized frame, disclosed by the utility model four
The cloth structure in week, will prevent rain from floaing when raining heavily or blowing hard, and also prevent wind and be directly blown onto be placed on
On article under frame, the safety of personnel and article is protected.Meanwhile the scaffolding structure type of the utility model both be applicable in it is small
Type frame is also applied for large-scale frame, improves the standardization level of production link, reduces the cost of product.
Specific embodiment
The utility model is described in further detail referring to the drawings and in conjunction with specific embodiment.Embodiment is only
It is the example explanation to the utility model, is not limitations of the present invention.About solution according to the present utility model
The means of problem, it is not absolutely required to the whole combinations of the various aspects described according to following embodiments.Based in the utility model
Embodiment, those skilled in the art's every other embodiment obtained without making creative work all belongs to
In the range of the utility model protection.
In order to make it easy to understand, the term used in the present invention is briefly described." across direction " (or it is " horizontal
Across ") refer to the width direction (for example, extending direction of top beam) of scaffolding structure, " longitudinal direction " refers to the length direction (example of scaffolding structure
Such as, the extending direction of wingceltis item).[scaffolding structure of first embodiment]
Scaffolding structure according to the utility model first embodiment is a kind of scaffolding structure that ceiling can open and close, packet
Include bracket and rack-mount opening and closing type ceiling.The assembly method of ceiling according to first embodiment is single dress,
Single dress mode refers to that ceiling is only being equipped with single Ji Liang on direction.Under single dress mode, in the unilateral side of single Ji Liang or double
Side is connected with one or two canopy open-and-close mechanism.
The scaffolding structure according to the utility model first embodiment is described in detail below with reference to Figure 1A to Fig. 2 C.With
Under, with the upper frame of scaffolding structure using ogival, the base beam quantity of the ceiling of scaffolding structure be on direction it is single and
The single Ji Liang is example there are two canopy open-and-close mechanism in bilateral connection, describes the utility model first embodiment.However,
The first embodiment of the utility model is without being limited thereto, which can also only connect a canopy open-and-close mechanism unilateral.
For example, in the case where the upper frame of scaffolding structure is flat roof type, for example, scaffolding structure upper frame be flat-top or/and it is unilateral tiltedly
In the case where top, ceiling is arranged in a side or/and vertical not low side for scaffolding structure, and a canopy open-and-close mechanism is to canopy
The other side of frame structure is flexible.
[embodiment 1]
Describe the canopy of the embodiment 1 according to the utility model first embodiment in detail below with reference to Figure 1A to Fig. 1 D
Frame structure 1100.
The opening and closing type ceiling 2 for including bracket 1 according to the scaffolding structure 1100 of the present embodiment and being mounted on bracket 1.
Bracket 1 according to the present embodiment may include pillar construction 11 and the top for being arranged in pillar construction 11 and quilt
The upper frame 12 of pillar construction support.Opening and closing type ceiling 2 is mounted on upper frame 12.According to the bracket 1 of the present embodiment across side
Shape when upward side is watched is herringbone.However the utility model is without being limited thereto, bracket 1 is in the side on direction
Shape when viewing can be any one in herringbone, arch, pointed arch, polygon.According to the column of the present embodiment
Structure 11 is to erect arrangement.However the utility model is without being limited thereto, pillar construction 11 can both erect arrangement, can also tilt
Arrangement, can also be the structure upwardly extended by arc, can also be connected by several sections and form broken line shape.Upper frame 12 can be with
Including across arrangement top beam 121 and with the purlin 122 of top beam arranged crosswise.It is seen according to the top beam 121 of the present embodiment from side
Shape when seeing is herringbone.However the utility model is without being limited thereto, shape when top beam 121 watches from side viewing can be arch
Shape, pointed arch, any one in polygon.
Ceiling 2 according to the present embodiment may include: be assemblied on bracket 1 (such as be mounted on bracket 1 top, installation
In the lower section of bracket 1, or be mounted on above and below bracket 1) the base beam 21 extended longitudinally;It is connected on Ji Liang
Canopy open-and-close mechanism 22, canopy open-and-close mechanism 22 includes the telescopic unit 221 that can stretch and linkedly opens and closes with telescopic unit
Canopy cloth unit 222.Ceiling 2 can cover the top of bracket 1 in the deployed state, as shown in Figure 1 C.Telescopic unit 221 can be with
Including with the telescopic arm and telescopic arm driver that folding mode or/and mode of traction are flexible, according to the telescopic arm of the present embodiment
It can be two.However, the utility model is without being limited thereto, telescopic arm can be three or more.Specifically, folding mode
Flexible telescopic arm, which can be, for example cranks arm.The flexible telescopic arm of mode of traction includes the bar for being mounted on 222 end of canopy cloth unit
Shape structure allows rod-like structure to fold or the traction unit that is unfolded and limits the guide rail that rod-like structure is moved according to rectilinear direction,
Guide supporting and the both ends for limiting rod-like structure are folded or are unfolded with traction unit driving.Canopy cloth unit 222 can
To include, the canopy cloth that an at least ora terminalis is connect with telescopic arm, the collector for storing the canopy cloth under collapse state and storage
Driving mechanism.Although indicating the collector with appended drawing reference not in the drawings, it is easy to know, collector can be with
It is the tubular structure on Ji Liang being connected in figure by manual rocker 25, being mounted on ceiling.However, the utility model is unlimited
In this, collector can not be arranged or the collector of arbitrary shape is arranged, as long as can with the flexible canopy cloth of telescopic arm
It is unfolded and folds.Canopy open-and-close mechanism 22 can be connect via installation part 223 with the second connecting portion of base beam 21, such as Fig. 1 D institute
Show.
The ceiling 2 of the present embodiment can also include the mechanism for being driven or activating such as link mechanism, roller, motor, still
In order to avoid obscuring the main points of the utility model, so the description of the known structure is omitted.
In the present embodiment, the end of the telescopic unit 221 of canopy open-and-close mechanism 22 can be more than upper frame one section of edge away from
From the end of canopy cloth unit 222 can stretch out the edge of upper frame.Alternatively, the end of the telescopic unit 221 of canopy open-and-close mechanism 22 can
To be no more than the edge of upper frame, and the end of canopy cloth unit 222 can stretch out the edge of upper frame.Above structure is not limited specifically
System, as long as the end of canopy cloth unit 222 can form the structure of eaves, as shown in Figure 1 C, so that water (for example, rainwater) can be suitable
The structure flow down.
In the following, will be described in the structure of base beam 21.In the present embodiment, base beam 21 may include: base beam body;First
Interconnecting piece, setting is upper at least one of base beam body bottom, top and side and connects base beam body and top beam 121
It connects;And second connecting portion, it is arranged at base beam body side and connect base beam body with canopy open-and-close mechanism.First connects
Socket part can be arranged at least one of bottom, top and side of base beam body, in order to by base beam body and top beam
121 are connected and fixed to together.For example, first connecting portion can be the structure with punching or screw hole in base beam body.Tool
Body, first connecting portion can also include the base beam pedestal 211 for being packed in the base beam 21 of ceiling on bracket 1, wherein base
The bottom of beam pedestal 211 is connect with bracket 1 and cross-sectional shape is one of U-shaped, inverted U, L-type and I type.In this implementation
In example, base beam pedestal 211 is U-shaped seat, however the utility model is without being limited thereto, and base beam pedestal 211 can have arbitrary structure
Or shape, for example, by the way of clamping, increasing the mode of reinforcer etc., as long as can be connected to base beam body with bracket
Together.Second connecting portion can be the position for being attached base beam body and canopy open-and-close mechanism 22, and second connecting portion can
To be arranged on the side of base beam body, in order to which base beam body and canopy open-and-close mechanism 22 are connected and fixed to together.For example,
Second connecting portion can be the structure with punching or screw hole in base beam body, however the utility model is without being limited thereto, and second
Interconnecting piece can have arbitrary structure or shape, for example, by the way of clamping, increasing the mode of reinforcer etc., as long as energy
It is enough that base beam body and canopy open-and-close mechanism link together.However, the utility model is without being limited thereto, first connecting portion and
The structure of two interconnecting pieces can be identical or different, as long as can be realized the base beam body company with bracket and canopy open-and-close mechanism respectively
It connects.
Since ceiling 2 has certain quality, immobilizing foundation (i.e. Ji Liang) is located at the purlin position among scaffolding structure 1100
It sets, as shown in Figure 1A.Size of the purlin 122 of bracket 1 itself is small, intensity is weak, it is therefore desirable to be fixedly mounted one at the top of bracket 1
Root is used to fix the base beam 21 of canopy open-and-close mechanism 22.The base beam 21 using bolt or be weldingly fixed on bracket 1 across top
The top of beam 121.
The base beam body to base beam 21 is described in detail below.
In the present invention, the base beam body of base beam 21 uses the truss knot of the upper frame 12 along bracket 1 longitudinally extended
Structure.In the present embodiment, due to truss structure light weight, be easily installed, the base beam body of Ji Liang uses prolongs along longitudinal direction
The truss structure stretched.In the case where the base beam body of Ji Liang uses truss structure, one section of one section of ground of truss can be connected
Truss structure is formed, general truss is 3 meters or 2 meters one section, after truss structure is formed, reconnect above-mentioned canopy opening-closing machine
Structure.Such structure simple installation, convenient transport greatly reduce transport and installation cost.However, the utility model is not limited to
This, Ji Liang can be the structure with bracket one, such as bracket across beam or the longitudinal specific position quilt of purlin that extends
It can be used as the Ji Liang for installing canopy open-and-close mechanism after reinforcement.
In addition, the scaffolding structure 1100 according to the present embodiment can also include, the waterproof material coating of base beam 21 is coated.Root
According to the present embodiment, which covers the top surface and two sides of Ji Liang, so that the base beam of hollow out will not allow rain from top
Or side leaks into place.However, the cladding mode and wrapped position of the waterproof material coating of cladding Ji Liang are without being limited thereto such as anti-
Water material can be coated on the surrounding of Ji Liang.Waterproof material can be PVC cloth or other fluid-tight cloth, and preventing from raining leaks into
Place.
In addition, can also include being arranged in around bracket 1 (hereinafter according to the scaffolding structure 1100 of the present embodiment
Referred to as surrounding) enclosing 5 and at least one of cloth 6.
For example, as shown in Figure 1A, the scaffolding structure 1100 according to the present embodiment may include being arranged in around bracket 1
Enclosing 5.The enclosing is referred to as purse seine (such as hooking the mesh for spending net etc.), in scaffolding structure, making ball net
Ball will not fly out and pound passing pedestrian.Enclosing 5 can be arranged in the inner circumferential of bracket 1 or be arranged in periphery.It can be with
It is set as needed and is suitable for the structure that enclosing 5 is installed and arranged, such as setting is easily installed and arranges the hook of enclosing 5.Enclosing
It can remove and be safeguarded or cleaned, not remove when in use generally, to hinder unexpected the ball of place that fly out
Gear.
For example, by being described in detail referring to structure of Fig. 6 A to Fig. 6 C to enclosing 5 and cloth 6.Fig. 6 A is according to this reality
With the partial schematic diagram of novel scaffolding structure, Fig. 6 B is that the part of the pillar construction 11 of bracket 1 according to the present utility model shows
It is intended to, Fig. 6 C is the cross-sectional view of the pillar construction 11 of bracket 1 according to the present utility model.As shown in Fig. 6 A to Fig. 6 C,
It can also include the cloth 6 (such as the sheaing of PVC knife) being arranged in around bracket 1 according to the scaffolding structure of the present embodiment.About
The mounting means of cloth 6, such as card slot G can be set on the pillar construction 11 of bracket 1, after the edge of cloth 6 is lockstitched a border,
A soft strip B (PVC or other materials) is worn on the side of cloth 6, and the strip of cloth 6 is then pierced into pillar construction
In 11 card slot G.The arrangement of cloth 6 is fairly simple and practical, and cloth 6 can also both be opened using opening up and down using left and right.
Both can be manual, it can also be electronic.Cloth 6 can be trapped among the outer/inner portion of enclosing and be used to keep warm by winter, and summer rolls for saturating
Gas.In the present embodiment, cloth 6 is located at the inboard of enclosing 5, however the utility model is without being limited thereto, and cloth 6 can be separately provided
On bracket.The shape of above-mentioned enclosing 5 and cloth 6 can be designed according to demand, for example, if only needing all round the horizon
It fences up, is then designed that in the attached drawing such as the present embodiment, will all be enclosed including the Delta Region below herringbone beam if necessary
Get up, then can carry out integration to enclosing 5 and cloth 6 or discretely design, can all enclose in the place of required encirclement
Get up.
If it is considered that wind loading rating, scaffolding structure cloth scheme preferably described above.According to the present embodiment, by
In surrounding increase can fast quick-detach cloth, being increased using the time for the facility that cage will be made to move will by about one time, greatly
The service efficiency in place is improved greatly, while the comfortable sexual experience of the movement for improving player.
In addition, can also include the folding starter 24 being electrically connected with ceiling 2 according to the scaffolding structure 1100 of the present embodiment,
Wherein, the folding starter 24 includes: to be mounted on the outside of the scaffolding structure and can detect to environmental factor
Environmental factor detector;And in the case where environmental factor detector detects that environmental factor reaches predetermined condition to ceiling
2 folding carries out the folding starting controller of starting control.Specifically, environmental factor detector can be to various environmental factors
The sensor detected.For example, can be can be to related with the environmental factors such as wind, light, rain for environmental factor detector
Parameter detected, for example, the sensor detected to wind speed, wind direction, luminous intensity, uitraviolet intensity, rainfall etc..It is examining
When measuring burst when raining heavyly, or detecting summer high fever, controller issues instruction, powers on, and controls ceiling Automatic-expanding.
When detecting burst strong wind, or when detecting proper temperature or not strong sunlight, ceiling automatic retracting is controlled.It is above to be only
Example is controlled, the specific Automatic-expanding or the condition folded of triggering can be set according to local actual conditions.
In addition, can also include that can control the flexible of canopy open-and-close mechanism 22 according to the scaffolding structure 1100 of the present embodiment
Manual rocker 25.In the case where no electricity, user can fold or be unfolded canopy open-and-close mechanism manually with the manual rocker 25.
Manual rocker 25 and above-mentioned folding starter 24 can be arranged simultaneously, and alternative one can also be arranged.Preferably, in frame knot
On structure simultaneously manual rocker 25 and above-mentioned folding starter 24 is arranged, allow to either automatically or manually to canopy open-and-close mechanism into
Row folding.
The scaffolding structure that the ceiling of the embodiment can open and close can be applied to cage type sport facility (for example, cage football
Field, cage basketball court etc.) on, it solves under open-air atmosphere because winter, rainy season etc. cause athletic ground unnecessarily to leave unused
Problem.Further, since top can automatically or manually open and close, while surrounding increases the enclosing of fast quick-detach, so that cage
Being increased using the time for sports facility will substantially increase the service efficiency in place by about one time, while improve the fortune of sporter
Move comfortable sexual experience.
In addition, the scaffolding structure that the ceiling of the embodiment can open and close can also be suitable in paulin room structure, when blowing hard
The open-close type ceiling of the present embodiment is folded, strong wind will not blow the top cloth of paulin room structure bad;It more will not be entire paulin room knot
Structure blows to obtain displacement, the safety of the paulin room structure improved, using time and use scope.
In addition, the scaffolding structure that the ceiling of the embodiment can open and close can also be suitable for small-sized frame, the utility model
The cloth structure of disclosed surrounding will prevent rain from floaing, and also prevent wind and directly blow when raining heavily or blowing hard
Onto the article being placed under frame, the safety of personnel and article is protected.Meanwhile the scaffolding structure type of the utility model was both
Be applicable in small-sized frame, be also applied for large-scale frame, improve the standardization level of production link, reduce product at
This.
Single dress mode of Ji Liang about the present embodiment refers to ceiling 2 in the arrangement for having single base beam 21 on direction.
It is easily understood that the base beam 21 of ceiling 2 can also be attached (as shown in Figure 3A and Figure 3B) in a longitudinal direction, it will be under
This is described in the embodiment in face.The screening for covering connecting portion can be set in the connecting portion of longitudinal direction
Block piece 7 allows the water to flow to along block piece 7 on adjacent ceiling without flowing into inside scaffolding structure.
[embodiment 2]
Describe the canopy of the embodiment 2 according to the utility model first embodiment in detail below with reference to Fig. 2A to Fig. 2 C
Frame structure 1200.In the following, for simplicity by the difference of main description and embodiment 1.
Specifically, at least one of the top of bracket 1 can be covered in the deployed state according to the ceiling of the present embodiment 2
Point, as shown in Figure 2 C.Ceiling 2 under unfolded state only covers at least part at the top of bracket 1, the top of bracket 1
Remainder is covered by the fixation shelter 3 for being arranged in cradle top.Specifically, which, which can at least cover, is in
The top for the bracket 1 that ceiling 2 under unfolded state can not cover.Preferably, the terminal edge energy of the ceiling 2 under unfolded state
Enough cover fixed shelter 3, or be more than fixed 3 a part of shelter so that flow through the canopy cloth unit 222 of ceiling 2 water (for example,
Rainwater) ground can be flowed to along fixed shelter 3.Bracket 1 is fixed on span direction according to the fixation shelter 3 of the present embodiment
Top on, when the side on direction is watched, the terminal edge of the canopy open-and-close mechanism under unfolded state is located at should
Fixed 3 top of shelter.
It is bigger than after the expansion of canopy open-and-close mechanism that the scaffolding structure 1200 with fixed shelter 3 of the embodiment can be applied to span
It obtains on sports facility seldom, pillar construction support canopy open-and-close mechanism cannot be had by solving among the biggish sports facility of span
Technical problem.Due to having added one section of fixed shelter at the top of scaffolding structure, there is canopy to cover so meeting entire top upon deployment
Lid, realizes keeping out wind and rain for place.Fixed shelter 3 can be using PVC folder screen cloth, knife sheaing etc., and fixed shelter 3 is fixed on top
Both it can be fixed, can also be fixed using the card slot of top beam as above-mentioned cloth 6 using rope.The position of fixed shelter 3,
Both it can be fixed on the edge at the top of bracket 1, as shown in Figure 2 A, any position at top can also be fixed on, as long as and canopy
The whole that can cover the top of bracket 1 is combined together after open-and-close mechanism expansion.
In the present invention, span refers to following movement than the big sports facility obtained seldom after the expansion of canopy open-and-close mechanism
Facility.Since the Extensible of the previous canopy open-and-close mechanism 22 of mesh is 3.5-5m, if upper frame 12 is being pushed up using herringbone top
A canopy open-and-close mechanism 22 is respectively installed on both sides on portion's base beam 21, then maximum span be 10 meters (in the case of flat-top), so if across
The few sports facility bigger than this range, such as 10 meters -12 meters of sports facility are spent, it can be using the fixed shelter of this band
3 scaffolding structure.The width that the width of fixed shelter 3 is set as scaffolding structure is subtracted to the scalable length of canopy open-and-close mechanism 22
Degree.
[scaffolding structure of second embodiment]
Scaffolding structure according to the utility model second embodiment is a kind of scaffolding structure that ceiling can open and close, packet
Include bracket and rack-mount opening and closing type ceiling.Assembly method according to the ceiling of second embodiment is assembled.
Erection method refers to that ceiling is being equipped at least two Ji Liang on direction.Upper frame with scaffolding structure is pinnacle, frame knot
The Ji Liang of the ceiling of structure is three, the connection of the bilateral of mono- Ji Liang of these three bases Liang Zhongyou there are two canopy open-and-close mechanism and other two
It is example that the unilateral side of a Ji Liang, which is connected with a canopy open-and-close mechanism, describes the utility model second embodiment, but this reality
It is without being limited thereto with novel second embodiment, it can be in the case where one canopy open-and-close mechanism of unilateral connection of three Ji Liang
It carries out assembled.For example, in the case where the upper frame of scaffolding structure is flat-top or/and unilateral oblique top, it is each to carry a canopy opening-closing machine
Three ceilings of structure at the top of scaffolding structure to blocking.There can also be more Ji Liang, it can be according to the utility model
The mode carries out assembly.The canopy according to the utility model second embodiment is described in detail below with reference to Fig. 3 A to Fig. 5 B
Frame structure.For simplicity by the difference of main description and first embodiment, i.e., mainly to the assembly method of ceiling
It is described in detail.
[scaffolding structure 2100 that embodiment 1 folds spelling mode]
Describe the canopy of the embodiment 1 according to the utility model second embodiment in detail below with reference to Fig. 3 A and Fig. 3 B
Frame structure 2100, wherein Fig. 3 A is other than the bilateral for being connected with canopy open-and-close mechanism in addition to bilateral meets base beam 21b, also there are two tool
Only the unilateral unilateral side for being connected with canopy open-and-close mechanism meets base beam 21a and 21c.As shown in Figure 3A, unilateral side connects base beam 21a and 21c arrangement
Bracket lower section and meet Ji Liang with certain distance apart from bilateral.Such structure solve the excessive only one of span or
The case where 2 canopy open-and-close mechanisms can not block entire cradle top, therefore such structure is set suitable for the movement of more large span
It applies.Such as basketball court, the span of basketball court are 15m, longitudinal is 30m, so need 4 collapsing lengths to be on span direction
The canopy open-and-close mechanism of 3.5-5m is stitched together, and needs 2 Ji Liang (it may also be said that prolonging longitudinally in longitudinal extension
Stretch and need 2 canopy open-and-close mechanisms connecting with each Ji Liang on direction) it connects, it can just cover the whole at the top of bracket 1.
In the present invention, longitudinal length of canopy open-and-close mechanism can determine that in general canopy is opened and closed according to the length of Ji Liang
The longitudinal length of mechanism is advisable with being no more than 20 meters;The assembled quantity of horizontal span direction canopy open-and-close mechanism can be according to wait hide
The span of the upper frame of the bracket covered determines.
Under the folded spelling mode of the present embodiment, unilateral side connects the sides adjacent that base beam 21a and 21c meet base beam 21b in bilateral respectively
Back side connect canopy open-and-close mechanism.In the case where this folds spelling mode, the same direction is pressed in the canopy open-and-close mechanism of the ipsilateral connection of each Ji Liang
Expansion.Under the unfolded state of canopy open-and-close mechanism, the canopy open-and-close mechanism terminal edge of the upstream end on vertical direction is at least
Folded (not shown) is crossed in the horizontal direction with the Ji Liang being located at downstream.The open-close type ceiling of the embodiment to flow through upstream
The water (for example, rainwater) of the canopy cloth unit 222 at place can be along the canopy cloth unit 222 in downstream side be flowed to, to not flow into
In scaffolding structure.Specifically, base beam 21a and 21c are that unilateral side meets Ji Liang, base beam 21b is that bilateral meets Ji Liang.That is, unilateral side connects base
Beam 21a connects canopy open-and-close mechanism in the back side that bilateral connects the sides adjacent of base Liang Jiliang 21b, i.e., left side connection canopy in figure 3 a is opened
Close mechanism.Unilateral side meets base beam 21c and connects canopy open-and-close mechanism in the back side that bilateral connects the sides adjacent of base beam 21b, i.e., in figure 3 a
Right side connects canopy open-and-close mechanism.
It can find out from Fig. 3 A and Fig. 3 B, the folded spelling mode of the Ji Liang about the present embodiment, in addition to the cloth on direction
Outside the folded spelling mode for having set multiple base beam 21a, 21b and 21c, base beam 21a, 21b and 21c and base beam 21a ', 21b ' of ceiling 2
And 21c ' can also be attached in a longitudinal direction.As shown in the section position A-A ' of Fig. 3 A, in the interconnecting piece of longitudinal direction
The block piece 7 for covering connecting portion can be set in position, allow the water to flow to along block piece 7 on adjacent ceiling and
It may not flow into inside scaffolding structure.
[scaffolding structure that variation example folds spelling mode]
However, the present embodiment is without being limited thereto, along the base beam position for observing and being in upstream end at the center of direction of upper frame
In the top of top beam 121, the Ji Liang at downstream can also be located at the top of top beam 121.For example, in canopy open-and-close mechanism
Under unfolded state, the terminal edge of the canopy open-and-close mechanism of the upstream end on vertical direction at least be located at downstream at Ji Liang
It crosses in the horizontal direction folded.It realizes that the taken measure of this construction can be to improve the Ji Liang in upstream end, so that
The canopy open-and-close mechanism of upstream is in the top of the canopy open-and-close mechanism in downstream.Specifically, the canopy open-and-close mechanism in upstream end and position
Ji Liang at downstream overlaps mutually or overlaps mutually with the canopy open-and-close mechanism being located at downstream.This construction is so that the variation example is opened
Box-like ceiling makes the water (for example, rainwater) for the canopy cloth unit 222 for flowing through upstream end can be along flowing to the canopy in downstream side
Cloth unit 222, to not flow into scaffolding structure.
[scaffolding structure 2200 that embodiment 2 directly spells mode]
Under straight spelling mode, under the unfolded state of canopy open-and-close mechanism, the canopy opening-closing machine of canopy open-and-close mechanism and adjacent assembly
The Ji Liang that structure is connected is not overlapped in the horizontal direction.Under straight spelling mode, mutually spelled in two canopy open-and-close mechanisms of adjacent assembly
The place of connecing is provided with, along the up concave type gutter structure of bracket longitudinally extended.Gutter structure is mutually spelled with described two canopy open-and-close mechanisms
The Ji Liang contact at place is connect, contact surface passes through water-proofing treatment, and the terminal edge of canopy open-and-close mechanism in the deployed state is located at day
The top of ditch structure.
Describe the canopy of the embodiment 2 according to the utility model second embodiment in detail below with reference to Fig. 4 A to Fig. 4 C
Frame structure 2200 will mainly describe the difference of the embodiment 2 Yu above-mentioned second embodiment embodiment 1.In canopy opening-closing machine
Under the unfolded state of structure, base the beam 21a and 21c that the terminal edge of canopy open-and-close mechanism is connect with the canopy open-and-close mechanism of mutually assembly exist
It does not overlap but is crossed in the horizontal direction with gutter the structure 4a and 4c for being connected to base beam 21a and 21c folded in horizontal direction.It is single
Base beam 21a and 21c is flanked to be arranged in the top of top beam 121 and meet base beam 21b with certain distance apart from bilateral.Such knot
Structure solves the case where excessive only one canopy open-and-close mechanism of span can not block entire span, therefore such structure is suitable for more
The sports facility of large span.Such as basketball court, the span of basketball court are 15m, longitudinal is 30m, so 4 are needed on span direction
A collapsing length is that the canopy open-and-close mechanism of 3.5-5m is stitched together, and needs in longitudinal extension 2 Ji Liang (can also be with
Say, 2 canopy open-and-close mechanisms connecting with each Ji Liang needed in longitudinal extension) it connects, it can just cover bracket 1
The whole at top.
More specifically, canopy open-and-close mechanism phase stitching portion is provided with, the up concave type extended longitudinally as shown in Fig. 4 A to Fig. 4 C
Gutter structure 4.The gutter structure 4 is connected to unilateral one that connect base beam with bilateral adjacent meeting Ji Liang in which can be closely adhered to formula
Side.The gutter structure 4 and base beam contact surface pass through water-proofing treatment, to prevent water from leaking into scaffolding structure by the contact surface.This is anti-
Water process can be the processing of recited above plus block piece, packet waterproof cloth etc., as long as can prevent water from leaking into scaffolding structure
?.At this point, the first connecting portion of base beam 21a further includes for the base beam 21a of ceiling and gutter structure 4a to be mounted on bracket
Base beam pedestal 211 on 1.The first connecting portion of base beam 21c further includes for installing the base beam 21c of ceiling and gutter structure 4c
Base beam pedestal 211 on bracket 1, wherein the bottom of base beam pedestal 211 connect with bracket 1 and cross-sectional shape be U type,
One of inverted U, L-type and I type.According to the side with gutter structure 4a and 4c respectively base the beam 21a and 21c of the present embodiment
Wall is closely bonded, and is bolted to together.The terminal edge of canopy open-and-close mechanism 22 in upstream is located at gutter
Above structure 4a and 4c, more specifically, canopy open-and-close mechanism 22 is overlapping with gutter structure 4a and 4c in the horizontal direction, so that flowing through
The water energy of the canopy cloth unit 222 in upstream of ceiling 2 enough flows into gutter structure 4a and 4c, to rely on gutter structure 4a
Water is set to flow to the ground outside frame without flowing into scaffolding structure from gutter longitudinal direction both ends with 4c.Gutter material can be engineering
Plastics or metal, preferably aluminium alloy.
Furthermore, it is possible to find out from Fig. 4 A and Fig. 4 B, the straight spelling mode of the Ji Liang about the present embodiment, in addition to across direction
On arrange outside the straight spelling mode of multiple base beam 21a, 21b and 21c, base beam 21a, 21b and 21c and base beam 21a ' of ceiling 2,
21b ' and 21c ' can also be attached in a longitudinal direction (shown in the section position B-B ' of such as Fig. 4 A).In the company of longitudinal direction
A block piece 7 can be set in socket part position, and in this embodiment, the terminal edge of block piece 7 in the deployed state is located at gutter
It allows the water to flow to along block piece 7 above structure in gutter structure and on adjacent ceiling, without flowing into frame knot
Inside structure.For the sake of brevity, the detailed construction that canopy open-and-close mechanism 22 is not drawn out in Fig. 4 A and Fig. 4 B, it is practical in conjunction with this
Novel other accompanying drawings could be aware that there is canopy open-and-close mechanism 22 etc. below block piece 7.
Two kinds of erection methods of above-described embodiment 1 and embodiment 2, i.e., it is folded to spell and directly spell, it may be collectively termed as along spelling mode.
[scaffolding structure 2300 of 3 pairs of embodiment spelling modes]
Under to spelling mode, it is provided in two canopy open-and-close mechanism phase stitching portions of adjacent assembly, the longitudinal direction along bracket is prolonged
The up concave type gutter structure stretched.The gutter structure is mounted on upper frame and in described two canopy open-and-close mechanisms in expansion shape
Between terminal edge under state, and the terminal edge of described two canopy open-and-close mechanisms in the deployed state is located at gutter structure
Top.
Describe the scaffolding structure of the embodiment 3 according to the utility model second embodiment in detail below with reference to Fig. 5 A
2300, the difference of the embodiment Yu above-mentioned second embodiment embodiment 1 will be described mainly.As shown in Figure 5A, in addition to double
The bilateral that side is connected with canopy open-and-close mechanism 22 connects except base beam, and also there are two the only unilateral unilateral side for being connected with canopy open-and-close mechanism to connect for tool
The case where base beam.As shown in Figure 5A, it is connect above the unilateral marginal position for connecing the upper frame that Ji Liang is arranged in bracket and apart from bilateral
Ji Liang has certain distance.Such structure, which solves the excessive only one canopy open-and-close mechanism of span, can not block the feelings of entire span
Condition, therefore such structure is suitable for the sports facility of more large span.Such as basketball court, the span of basketball court are 15m, Zong Xiangwei
30m, so it is that the canopy open-and-close mechanism of 3.5-5m is stitched together, and prolongs longitudinally that 4 collapsing lengths are needed on span direction
It stretches and needs 2 Ji Liang (it may also be said that needing 2 canopy open-and-close mechanisms connecting with each Ji Liang in longitudinal extension) on direction
It connects, can just cover the whole at the top of bracket 1.
Under to spelling mode, the Ji Liang (21a and 21c) being located at vertical direction downstream for being mounted on bracket further includes base
Beam lifting member 216, base beam lifting member 216 are installed in the top of bracket upright post structure and extend upwards.The base beam lifting member 216
By two unilateral side for being arranged in upper frame marginal position connect Ji Liang (i.e. base beam 21a and base beam 21c) promoted certain altitude, and this two
A unilateral side meets Ji Liang (i.e. base beam 21a and base beam 21c) on sides adjacent (the i.e. right side of base beam 21a for meeting Ji Liang (base beam 21b) with bilateral
The left side of side and base beam 21c) it is connected separately with canopy open-and-close mechanism (i.e. canopy open-and-close mechanism 22a and canopy open-and-close mechanism 22c), thus single
The bilateral for flanking canopy open-and-close mechanism 22a that Ji Liang (such as base beam 21a) is connected and adjacent assembly connects the canopy opening-closing machine of base beam 21b
Structure 22b presses relative direction expansion upon deployment, and unilateral side connect canopy open-and-close mechanism 22c that Ji Liang (such as base beam 21c) is connected with
The canopy open-and-close mechanism 22b ' that the bilateral of adjacent assembly meets base beam 21b is extended by relative direction upon deployment.Such structure solves
Insufficient problem, therefore such structure are being blocked across direction for the application only one canopy open-and-close mechanism of large span
Sports facility suitable for more large span.
Lifting member described above is not limited to lift lever shown in Fig. 5 A, such as can be rack-mount
The tripod etc. of side, as long as the position that can meet Ji Liang to unilateral side is promoted.
As shown in Figure 5 B, it is provided in two canopy open-and-close mechanism phase stitching portions of adjacent assembly, what is extended longitudinally is recessed
Formula gutter structure 4 is to prevent leak-stopping rain.Gutter structure 4 further includes gutter pedestal 41.Gutter pedestal 41 is by bolt or is welded on
On bracket.Specifically, 4 top of gutter structure is located to the terminal edge of two canopy open-and-close mechanisms 22 of spelling, so that flowing through ceiling 2
The water energy of canopy cloth unit 222 enough flow into gutter structure 4, to make water flow to from gutter longitudinal direction both ends by the gutter structure 4
Ground outside frame is without flowing into scaffolding structure.Gutter material can be engineering plastics or metal, and preferably aluminium closes
Gold.
[the opening and closing type ceiling for bracket]
The utility model additionally provides a kind of opening and closing type ceiling for bracket, which includes: to be assemblied on bracket
The Ji Liang extended longitudinally;The canopy open-and-close mechanism being connected on Ji Liang, the canopy open-and-close mechanism include can stretch it is flexible
Unit and the canopy cloth unit linkedly opened and closed with telescopic unit;Wherein, ceiling can cover the top of bracket in the deployed state
At least part in portion.
Opening and closing type ceiling according to the present utility model for bracket, Ji Liang include: base beam body;First connecting portion,
It is arranged upper at least one of base beam body bottom, top and side and connect base beam body with bracket;And second
Interconnecting piece is arranged at base beam body side and connect base beam body with canopy open-and-close mechanism.
The assembly method of ceiling according to the present utility model includes any one of single dress and assembly, wherein assembled includes suitable
It spells and to spelling, includes straight spell along packaging and spelled with folded;When directly spelling and to spelling, ceiling further includes being located at canopy open-and-close mechanism lower edge
Gutter structure.
In the case where bracket does not include upper frame, the ceiling further includes the upper frame that can be assembled to above bracket, and institute
Ji Liang is stated to be assemblied on the upper frame.
Ceiling according to the present utility model can be used in any bracket structure, with sunshade or rain cover.No matter supporting structure
Whether there is upper frame, ceiling provided by the utility model can be applied.
The ceiling of the utility model further includes that other structures described above or accessory are for simplicity omitted
The description of above-mentioned identical structure or accessory.
[installation method for the scaffolding structure that ceiling can open and close]
The installation method for the scaffolding structure that ceiling according to the present utility model can open and close is simple to operation, and safety
It is high.Specifically, the installation method for the scaffolding structure that ceiling according to the present utility model can open and close includes: setting support;It is propping up
Opening and closing type ceiling is installed on frame, the opening and closing type ceiling includes the Ji Liang extended longitudinally being assemblied on bracket, and
The canopy open-and-close mechanism being connected on Ji Liang, the canopy open-and-close mechanism include the telescopic unit that can be stretched and connect with telescopic unit
The canopy cloth unit opened and closed dynamicly;Wherein, described to further comprise the step of ceiling is installed on bracket: Ji Liang is fixedly mounted on
The top of bracket;And by the assembly of canopy open-and-close mechanism on Ji Liang, the top of bracket can be covered by making ceiling in the deployed state
At least part.The installation method includes that gutter knot is installed on bracket when directly being spelled to canopy open-and-close mechanism and to spelling
Structure.
Although the utility model is described referring to exemplary embodiment above, above-described embodiment is only to illustrate
The technical ideas and features of the present invention do not limit the protection scope of the present invention.It is all practical new according to this
Any equivalent variations or modification that type Spirit Essence is made, should be covered within the scope of the utility model.