[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN208899926U - Scaffolding structure with opening and closing type ceiling and opening and closing type ceiling - Google Patents

Scaffolding structure with opening and closing type ceiling and opening and closing type ceiling Download PDF

Info

Publication number
CN208899926U
CN208899926U CN201920189051.1U CN201920189051U CN208899926U CN 208899926 U CN208899926 U CN 208899926U CN 201920189051 U CN201920189051 U CN 201920189051U CN 208899926 U CN208899926 U CN 208899926U
Authority
CN
China
Prior art keywords
liang
canopy
ceiling
close mechanism
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920189051.1U
Other languages
Chinese (zh)
Inventor
方修政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xu Qianqian
Original Assignee
Beijing Yan Value Sports Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Yan Value Sports Technology Co Ltd filed Critical Beijing Yan Value Sports Technology Co Ltd
Priority to CN201920189051.1U priority Critical patent/CN208899926U/en
Application granted granted Critical
Publication of CN208899926U publication Critical patent/CN208899926U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model provides a kind of scaffolding structure with opening and closing type ceiling and opening and closing type ceiling.The scaffolding structure includes bracket and rack-mount opening and closing type ceiling, wherein the ceiling includes: the Ji Liang extended longitudinally being assemblied on bracket;The canopy open-and-close mechanism being connected on Ji Liang, the canopy open-and-close mechanism include the telescopic unit that can be stretched and the canopy cloth unit linkedly opened and closed with telescopic unit;Wherein, ceiling can cover at least part at the top of bracket in the deployed state.The ceiling of the scaffolding structure according to the present utility model can open and close, and the rigidity of Ji Liang is good, can be widely used in the place of various environment, various spans.The utility model makes increasing using the time for the cage type sport facility of large span that will improve the service efficiency in place by about one time, while the comfortable sexual experience of the movement for improving user.

Description

Scaffolding structure with opening and closing type ceiling and opening and closing type ceiling
Technical field
The utility model relates to scaffolding structures, more particularly to the scaffolding structure with opening and closing type ceiling and opening and closing type top Canopy.
Background technique
Cage type sport facility, especially cage-shaped football field and basketball court were very fast in China's urban development in recent years.It is led Want generally have building around athletic ground the reason is that urban land is nervous, pedestrian is also more, and cage type sport facility due to Purse seine (top is usually netting) is arranged at surrounding and top, flies out without worry ball and pounds glass of building outside the venue or injure by a crashing object People, thus have been favored by people.
But due to current cage type sport facility be all it is outdoor, northern (by taking Beijing as an example) annual rain day number nearly 3 months, winter, which also has nearly 3 months, was not suitable for outdoor play ball because of cold.That is, the reason of because of weather, at present Cage type sport facility have the time of almost half a year idle every year.It and is more than 4.5 in the annual rain day number in south (in Shanghai) A month, winter most cold 1.5 months, current cage type sport facility still had the time of almost half a year not busy every year in addition It sets.Although, because temperature is too high, comfort is poor in addition, summer high temperature can play ball.
In the prior art, what patent CN103089034B disclosed a kind of cage type sport facility builds technology;Patent CN101554527B discloses cage-shaped football field and builds technical solution.However, two kinds of building plans in above-mentioned patent are built Come cage type sport facility be all it is outdoor, rain, snow, be not available;Patent CN205019691U then discloses one kind and exists Film is simultaneously fixed on the top structure of court by cage-shaped football field top plastic covering film, while using spool scheme by football pitch two The lifting of curtain (similar) is rolled or put down to side plastic foil, but also describes in the program its patent book, encounters at the top of strong wind Plastic foil will be broken by the wind damage, therefore the program is also difficult to become a kind of solution party of cage type court persistently runed for a long time Case.
In addition, the frame with top is use scope very extensive a kind of facility, especially paulin room, in exhibition, tourist attraction Large-scale application is all obtained.
Patent CN 106400964A discloses a kind of paulin room structure;Patent CN 107687285A discloses a kind of reinforcement Paulin room structure.Paulin room structural top in above-mentioned patent uses PVC knife sheaing covering as top cloth, which cannot quickly open It closes and folds, needs qualified installation person to dismantle simultaneously, therefore when encountering strong wind, due to can not fast quick-detach PVC knife Sheaing top surface, strong wind may blow paulin roof cloth and cloth bad;Entire paulin room can may also be blown to obtain displacement, caused damages simultaneously The personnel of surrounding may be hurt.
Third, there are also some small-sized frame of shade cover, although top awning can stretch, surrounding is without quickly solid The structure for determining rain-proof cloth, when raining heavily or blowing hard, rain can float, wind can also be directly blown onto and be placed on paulin On article, people can be exposed to rain, and article may be blown down, and cause damages.In addition, these small-sized frames are (for example, the prior art In the generally flexible width of flexible sunshade (rain) paulin be 3.5 meters, maximum does not surpass 5 meters yet) structure type be only only applicable to it is small Size sunshade, if frame span is larger (for example span is more than 12 meters), such structure type cannot meet demand.
User's comfort can be met under the place of a variety of spans, a variety of environmental factors accordingly, there exist a kind of Scaffolding structure demand.
Utility model content
To solve the above problem in the prior art, the utility model is proposed.The utility model is intended to provide a kind of energy Enough it is widely used in the scaffolding structure with opening and closing type ceiling, the opening and closing type in the place of a variety of environmental conditions, a variety of spans Ceiling and its installation method.
It is according to the present utility model in a first aspect, providing a kind of scaffolding structure that ceiling can open and close, the scaffolding structure Including bracket and rack-mount opening and closing type ceiling, wherein the ceiling includes: to be assemblied on bracket along longitudinal direction The Ji Liang of extension;The canopy open-and-close mechanism being connected on Ji Liang, the canopy open-and-close mechanism include the telescopic unit that can be stretched and The canopy cloth unit linkedly opened and closed with telescopic unit.The ceiling of the scaffolding structure according to the present utility model can open and close, Ji Liang Rigidity it is good, can adapt to the place of various spans.
As a preferred option, the bracket includes pillar construction and the top for being arranged in pillar construction and by column knot The upper frame of structure support, the upper frame includes the purlin across the top beam of arrangement and with top beam arranged crosswise.Bracket is across direction On side viewing when shape be herringbone, arch, pointed arch, any one in polygon;Top beam watches from side viewing When shape be herringbone, arch, pointed arch, any one in polygon.
As a preferred option, the Ji Liang includes: base beam body;First connecting portion, setting base beam body bottom, At least one of top and side are upper and connect base beam body with bracket;And second connecting portion, it is arranged at base Base beam body is simultaneously connect by beam body side with canopy open-and-close mechanism.The base beam body of the Ji Liang uses the vertical of the upper frame along bracket To the metal structure of extension, truss structure is preferably used.The first connecting portion further includes for the Ji Liang of ceiling to be fixedly mounted with Base beam pedestal on bracket, the bottom of the base beam pedestal is connect with bracket and cross-sectional shape is U-shaped, inverted U, L-type One of with I type.It due to truss structure light weight, is easily installed, the case where the base beam body of Ji Liang uses truss structure Under, one section of one section of ground of truss can be connected to form truss structure, such structure simple installation, convenient transport, significantly Transport and installation cost are reduced, and is easy to the connection of the longitudinal direction Ji Liang.
As a preferred option, the canopy open-and-close mechanism further includes that telescopic unit and canopy cloth unit are installed to Ji Liang Installation part on two interconnecting pieces;The telescopic unit includes, with the flexible telescopic arm of folding mode or/and mode of traction and Telescopic arm driver;And the canopy cloth unit includes, canopy cloth that an at least ora terminalis is connect with telescopic arm, for folding shape The collector and storage driving mechanism of canopy cloth under state.
As a preferred option, the scaffolding structure further includes the fixation being arranged in at least part at the top of bracket Shelter, and the terminal edge of the canopy open-and-close mechanism under unfolded state is located above the fixation shelter.The band of the embodiment The scaffolding structure of fixed shelter can be applied to span than solving on the big sports facility obtained seldom after the expansion of single canopy open-and-close mechanism There cannot be the technical issues of upright supports canopy open-and-close mechanism among the biggish sports facility of span of having determined.
As a preferred option, the scaffolding structure further include in the enclosing being arranged in around bracket and cloth at least It is a kind of.Scaffolding structure according to the present utility model can be realized bracket surrounding can with Fast Installation dismantle cloth, enclosing, from And increasing using the time for sports facility (for example, cage type sport facility) is made the use in place will to be substantially increased by about one time Efficiency, while the comfortable sexual experience of movement for improving user.
As a preferred option, the ceiling of the scaffolding structure further includes the folding starter being electrically connected with ceiling, wherein It is described folding starter include: be mounted on the scaffolding structure outside and can be to the environment that environmental factor is detected Factor detector;And in the case where environmental factor detector detects that environmental factor reaches predetermined condition to the folding of ceiling Carry out the folding starting controller of starting control.Environmental factor detector can be to related with the environmental factors such as wind, light, rain Parameter detected, for example, wind speed, wind direction, luminous intensity, uitraviolet intensity, rainfall etc..Detecting burst when raining heavyly, or When person detects summer high fever, controller issues instruction, powers on, and controls ceiling Automatic-expanding.Detecting burst strong wind When, or when detecting proper temperature or not strong sunlight, control ceiling automatic retracting.It is very easy to use, improve user's body It tests.
As a preferred option, the ceiling of the scaffolding structure further include can control canopy open-and-close mechanism folding it is manual Rocking bar.In the case where no electricity, user can fold manually with the manual rocker or be unfolded canopy open-and-close mechanism.
As a preferred option, the assembly method of the ceiling includes single dress and assembly, described under single dress mode Ceiling is only being equipped with single Ji Liang on direction, and under the erection method, the ceiling is assembling on direction There are at least two Ji Liang.
As a preferred option, under single dress mode, the single Ji Liang is connected in the unilateral side on direction Canopy open-and-close mechanism, or canopy open-and-close mechanism is connected in the bilateral on direction.
As a preferred option, described assembled including being connected with canopy open-and-close mechanism to only unilateral along spelling and to spelling Each unilateral side connect Ji Liang carry out it is assembled in the case where, under along spelling mode, each Ji Liang is in ipsilateral connection canopy open-and-close mechanism, and right Under spelling mode, each Ji Liang connects canopy open-and-close mechanism in opposite side, meets Ji Liang in the unilateral side for being connected with canopy open-and-close mechanism to unilateral side In the case that the bilateral for being connected with canopy open-and-close mechanism with bilateral connects Ji Liang progress assembly, under along spelling mode, unilateral side meets Ji Liang and exists It is connect canopy open-and-close mechanism with the back side that bilateral connects the sides adjacent of Ji Liang, and under to spelling mode, unilateral side meets Ji Liang and connects with bilateral The sides adjacent of Ji Liang connects canopy open-and-close mechanism.
As a preferred option, the suitable packaging includes folded spell and spells with straight, wherein under the folded spelling mode, opens and closes in canopy Under the unfolded state of mechanism, the canopy open-and-close mechanism of the upstream end on vertical direction is at least with the Ji Liang at downstream in water Square overlap mutually upwards, under the straight spelling mode, under the unfolded state of canopy open-and-close mechanism, canopy open-and-close mechanism and mutually assembled The Ji Liang that canopy open-and-close mechanism is connected is not overlapped in the horizontal direction.
As a preferred option, under to spelling mode, the Ji Liang being located at vertical direction downstream for being mounted on bracket is also wrapped Base beam lifting member is included, the base beam lifting member is installed in the top of bracket and extends upwards.
As a preferred option, under along spelling mode, the same direction is pressed in the canopy open-and-close mechanism of the ipsilateral connection of each Ji Liang Expansion;And under to spelling mode, it is unfolded in the canopy open-and-close mechanism that the opposite side of each Ji Liang connects by relative direction.
As a preferred option, it under the straight spelling mode, is set in two canopy open-and-close mechanism phase stitching portions of adjacent assembly It is equipped with, along the up concave type gutter structure of bracket longitudinally extended, wherein the gutter structure and described two canopy open-and-close mechanism phases The Ji Liang of stitching portion is contacted, and contact surface passes through water-proofing treatment, and the terminal edge of canopy open-and-close mechanism in the deployed state is located at The top of gutter structure.By the gutter structure, water flows to the ground outside frame without flowing into frame from gutter longitudinal direction both ends In structure.
As a preferred option, it under described pair of spelling mode, is set in two canopy open-and-close mechanism phase stitching portions of adjacent assembly It is equipped with, along the up concave type gutter structure of bracket longitudinally extended, wherein the gutter structure is mounted on upper frame and in institute It states between the terminal edge of two canopy open-and-close mechanisms in the deployed state, and described two canopy open-and-close mechanisms are in the deployed state Terminal edge be located at the top of gutter structure.
As a preferred option, the first connecting portion further includes for the Ji Liang of ceiling and gutter structure to be mounted on branch Base beam pedestal on frame, wherein the bottom of base beam pedestal is connect with bracket and cross-sectional shape is U-shaped, inverted U, L-type and I One of type.The gutter structure further includes the gutter pedestal for gutter structure to be mounted on to bracket.To sum up, using this reality After above-mentioned splicing installation (also referred to as assembled) mode of novel provided open-close type ceiling, the utility model is fitted For large span athletic ground.This improve increasing using the time for the cage type sport facility of large span will by about one time The service efficiency in place, while the comfortable sexual experience of movement for improving user.
Second aspect according to the present utility model provides a kind of opening and closing type ceiling for bracket, the ceiling packet It includes: the Ji Liang extended longitudinally being assemblied on bracket;The canopy open-and-close mechanism being connected on Ji Liang, the canopy open-and-close mechanism include The telescopic unit that can be stretched and the canopy cloth unit linkedly opened and closed with telescopic unit.
As a preferred option, the Ji Liang includes: base beam body;First connecting portion, setting base beam body bottom, At least one of top and side are upper and connect base beam body with bracket;And second connecting portion, it is arranged at base Base beam body is simultaneously connect by beam body side with canopy open-and-close mechanism.
As a preferred option, the assembly method of the ceiling includes any one of single dress and assembly, wherein assembled packet It includes along spelling and to spelling.
As a preferred option, in the case where the bracket does not include upper frame, the ceiling further includes that can be assembled to branch Upper frame above frame, and the Ji Liang is assemblied on the upper frame.To sum up, according to the present utility model above-mentioned for bracket Opening and closing type ceiling can be adapted for folding open-close type ceiling when blowing hard in paulin room structure, and strong wind will not be paulin room knot The top cloth of structure blows bad;Entire paulin room structure will not more be blown to obtain displacement, the safety of the paulin room structure improved, using the time and Use scope.
The third aspect according to the present utility model provides a kind of installation method of scaffolding structure that ceiling can open and close, The installation method includes: setting support;Opening and closing type ceiling is installed on bracket, the opening and closing type ceiling includes being assemblied in The Ji Liang extended longitudinally on bracket, and the canopy open-and-close mechanism being connected on Ji Liang, the canopy open-and-close mechanism includes can Flexible telescopic unit and the canopy cloth unit linkedly opened and closed with telescopic unit;Wherein, described that ceiling is installed on bracket Step further comprises: Ji Liang is fixedly mounted on to the top of bracket;And the assembly of canopy open-and-close mechanism is made into ceiling on Ji Liang At least part at the top of bracket can be covered in the deployed state.The installation method, which is included in, carries out canopy open-and-close mechanism It is straight to spell and to installing gutter structure when spelling on bracket.
To sum up, scaffolding structure according to the present utility model is particularly suitable for the athletic ground of large span, practical new using this After splicing installation (also referred to as assembled) mode of open-close type ceiling provided by type, enable the utility model be suitable for greatly across Spend athletic ground.This will make increasing using the time for the cage type sport facility of large span that will improve making for place by about one time With efficiency, while the comfortable sexual experience of movement for improving user.
To sum up, scaffolding structure according to the present utility model can also be suitable in paulin room structure, by open-close type when blowing hard Ceiling folds, and strong wind will not blow the top cloth of paulin room structure bad;Entire paulin room structure will not more be blown to obtain displacement, improved The safety of paulin room structure uses time and use scope.
In addition, scaffolding structure according to the present utility model can also be suitable for small-sized frame, disclosed by the utility model four The cloth structure in week, will prevent rain from floaing when raining heavily or blowing hard, and also prevent wind and be directly blown onto be placed on On article under frame, the safety of personnel and article is protected.Meanwhile the scaffolding structure type of the utility model both be applicable in it is small Type frame is also applied for large-scale frame, improves the standardization level of production link, reduces the cost of product.
Detailed description of the invention
Figure 1A instantiates the schematic perspective view of the scaffolding structure according to the utility model first embodiment embodiment 1, Wherein, opening and closing type ceiling 2 is in collapse state;
Figure 1B instantiates the schematic perspective view of the scaffolding structure according to the utility model first embodiment embodiment 1, Wherein, opening and closing type ceiling 2 is in unfolded state;
Fig. 1 C instantiates the schematic side elevation of the scaffolding structure according to the utility model first embodiment embodiment 1, Wherein, opening and closing type ceiling 2 is in unfolded state;
Fig. 1 D is the enlarged drawing at the position T in Fig. 1 C;
Fig. 2A instantiates the schematic perspective view of the scaffolding structure according to the utility model first embodiment embodiment 2, Wherein, opening and closing type ceiling 2 is in collapse state;
Fig. 2 B is the enlarged drawing at the position C in Fig. 2A;
Fig. 2 C instantiates the schematic side elevation of the scaffolding structure according to the utility model first embodiment embodiment 2, Wherein, opening and closing type ceiling 2 is in unfolded state;
Fig. 3 A instantiates the schematic perspective view of the scaffolding structure according to the utility model second embodiment embodiment 1, Wherein, three Ji Liang longitudinally extended are schematically illustrated, to illustrate the arrangement relation of these three base beams 21;
Fig. 3 B instantiates the cross-sectional view of the A-A ' section of Fig. 3 A;
Fig. 4 A instantiates the schematic perspective view of the scaffolding structure according to the utility model second embodiment embodiment 2, Wherein, the arrangement relation of the base beam 21 that three longitudinally extend and gutter structure 4 is schematically illustrated;
Fig. 4 B instantiate Fig. 4 A, eliminate canopy open-and-close mechanism in the case where B-B ' section cross-sectional view;
Fig. 4 C is the enlarged drawing at the position F in Fig. 4 B;
Fig. 5 A instantiates the schematic side elevational view of the scaffolding structure according to the utility model second embodiment embodiment 3, Wherein, the base beam 21 of opening and closing type ceiling and the arrangement states of gutter structure 4 are only symbolically instantiated;
Fig. 5 B instantiates the enlarged drawing at the position D of Fig. 5 A;And
Fig. 6 A to Fig. 6 C instantiates the exemplary details figure of the structure of cloth 6 according to the present utility model.
Description of symbols:
1100,1200,2100,2200,2300 scaffolding structures
1 bracket, 11 pillar construction, 12 upper frame, 121 top beam, 122 purlin
2 ceilings 21,21a, 21b, 21c, 21a ', 211 base beam pedestal 22,22a of 21b ', 21c ' base beam, 22b, 22c, 22b ' 221 telescopic unit of canopy open-and-close mechanism, 222 canopy cloth unit, 223 installation part 24 opens and closes 25 manual rocker of starter, 216 base beam lifting member
3 fixed shelters
41 gutter pedestal of 4,4a, 4c gutter structure
5 enclosings
6 cloths
7 block pieces
Specific embodiment
The utility model is described in further detail referring to the drawings and in conjunction with specific embodiment.Embodiment is only It is the example explanation to the utility model, is not limitations of the present invention.About solution according to the present utility model The means of problem, it is not absolutely required to the whole combinations of the various aspects described according to following embodiments.Based in the utility model Embodiment, those skilled in the art's every other embodiment obtained without making creative work all belongs to In the range of the utility model protection.
In order to make it easy to understand, the term used in the present invention is briefly described." across direction " (or it is " horizontal Across ") refer to the width direction (for example, extending direction of top beam) of scaffolding structure, " longitudinal direction " refers to the length direction (example of scaffolding structure Such as, the extending direction of wingceltis item).[scaffolding structure of first embodiment]
Scaffolding structure according to the utility model first embodiment is a kind of scaffolding structure that ceiling can open and close, packet Include bracket and rack-mount opening and closing type ceiling.The assembly method of ceiling according to first embodiment is single dress, Single dress mode refers to that ceiling is only being equipped with single Ji Liang on direction.Under single dress mode, in the unilateral side of single Ji Liang or double Side is connected with one or two canopy open-and-close mechanism.
The scaffolding structure according to the utility model first embodiment is described in detail below with reference to Figure 1A to Fig. 2 C.With Under, with the upper frame of scaffolding structure using ogival, the base beam quantity of the ceiling of scaffolding structure be on direction it is single and The single Ji Liang is example there are two canopy open-and-close mechanism in bilateral connection, describes the utility model first embodiment.However, The first embodiment of the utility model is without being limited thereto, which can also only connect a canopy open-and-close mechanism unilateral. For example, in the case where the upper frame of scaffolding structure is flat roof type, for example, scaffolding structure upper frame be flat-top or/and it is unilateral tiltedly In the case where top, ceiling is arranged in a side or/and vertical not low side for scaffolding structure, and a canopy open-and-close mechanism is to canopy The other side of frame structure is flexible.
[embodiment 1]
Describe the canopy of the embodiment 1 according to the utility model first embodiment in detail below with reference to Figure 1A to Fig. 1 D Frame structure 1100.
The opening and closing type ceiling 2 for including bracket 1 according to the scaffolding structure 1100 of the present embodiment and being mounted on bracket 1.
Bracket 1 according to the present embodiment may include pillar construction 11 and the top for being arranged in pillar construction 11 and quilt The upper frame 12 of pillar construction support.Opening and closing type ceiling 2 is mounted on upper frame 12.According to the bracket 1 of the present embodiment across side Shape when upward side is watched is herringbone.However the utility model is without being limited thereto, bracket 1 is in the side on direction Shape when viewing can be any one in herringbone, arch, pointed arch, polygon.According to the column of the present embodiment Structure 11 is to erect arrangement.However the utility model is without being limited thereto, pillar construction 11 can both erect arrangement, can also tilt Arrangement, can also be the structure upwardly extended by arc, can also be connected by several sections and form broken line shape.Upper frame 12 can be with Including across arrangement top beam 121 and with the purlin 122 of top beam arranged crosswise.It is seen according to the top beam 121 of the present embodiment from side Shape when seeing is herringbone.However the utility model is without being limited thereto, shape when top beam 121 watches from side viewing can be arch Shape, pointed arch, any one in polygon.
Ceiling 2 according to the present embodiment may include: be assemblied on bracket 1 (such as be mounted on bracket 1 top, installation In the lower section of bracket 1, or be mounted on above and below bracket 1) the base beam 21 extended longitudinally;It is connected on Ji Liang Canopy open-and-close mechanism 22, canopy open-and-close mechanism 22 includes the telescopic unit 221 that can stretch and linkedly opens and closes with telescopic unit Canopy cloth unit 222.Ceiling 2 can cover the top of bracket 1 in the deployed state, as shown in Figure 1 C.Telescopic unit 221 can be with Including with the telescopic arm and telescopic arm driver that folding mode or/and mode of traction are flexible, according to the telescopic arm of the present embodiment It can be two.However, the utility model is without being limited thereto, telescopic arm can be three or more.Specifically, folding mode Flexible telescopic arm, which can be, for example cranks arm.The flexible telescopic arm of mode of traction includes the bar for being mounted on 222 end of canopy cloth unit Shape structure allows rod-like structure to fold or the traction unit that is unfolded and limits the guide rail that rod-like structure is moved according to rectilinear direction, Guide supporting and the both ends for limiting rod-like structure are folded or are unfolded with traction unit driving.Canopy cloth unit 222 can To include, the canopy cloth that an at least ora terminalis is connect with telescopic arm, the collector for storing the canopy cloth under collapse state and storage Driving mechanism.Although indicating the collector with appended drawing reference not in the drawings, it is easy to know, collector can be with It is the tubular structure on Ji Liang being connected in figure by manual rocker 25, being mounted on ceiling.However, the utility model is unlimited In this, collector can not be arranged or the collector of arbitrary shape is arranged, as long as can with the flexible canopy cloth of telescopic arm It is unfolded and folds.Canopy open-and-close mechanism 22 can be connect via installation part 223 with the second connecting portion of base beam 21, such as Fig. 1 D institute Show.
The ceiling 2 of the present embodiment can also include the mechanism for being driven or activating such as link mechanism, roller, motor, still In order to avoid obscuring the main points of the utility model, so the description of the known structure is omitted.
In the present embodiment, the end of the telescopic unit 221 of canopy open-and-close mechanism 22 can be more than upper frame one section of edge away from From the end of canopy cloth unit 222 can stretch out the edge of upper frame.Alternatively, the end of the telescopic unit 221 of canopy open-and-close mechanism 22 can To be no more than the edge of upper frame, and the end of canopy cloth unit 222 can stretch out the edge of upper frame.Above structure is not limited specifically System, as long as the end of canopy cloth unit 222 can form the structure of eaves, as shown in Figure 1 C, so that water (for example, rainwater) can be suitable The structure flow down.
In the following, will be described in the structure of base beam 21.In the present embodiment, base beam 21 may include: base beam body;First Interconnecting piece, setting is upper at least one of base beam body bottom, top and side and connects base beam body and top beam 121 It connects;And second connecting portion, it is arranged at base beam body side and connect base beam body with canopy open-and-close mechanism.First connects Socket part can be arranged at least one of bottom, top and side of base beam body, in order to by base beam body and top beam 121 are connected and fixed to together.For example, first connecting portion can be the structure with punching or screw hole in base beam body.Tool Body, first connecting portion can also include the base beam pedestal 211 for being packed in the base beam 21 of ceiling on bracket 1, wherein base The bottom of beam pedestal 211 is connect with bracket 1 and cross-sectional shape is one of U-shaped, inverted U, L-type and I type.In this implementation In example, base beam pedestal 211 is U-shaped seat, however the utility model is without being limited thereto, and base beam pedestal 211 can have arbitrary structure Or shape, for example, by the way of clamping, increasing the mode of reinforcer etc., as long as can be connected to base beam body with bracket Together.Second connecting portion can be the position for being attached base beam body and canopy open-and-close mechanism 22, and second connecting portion can To be arranged on the side of base beam body, in order to which base beam body and canopy open-and-close mechanism 22 are connected and fixed to together.For example, Second connecting portion can be the structure with punching or screw hole in base beam body, however the utility model is without being limited thereto, and second Interconnecting piece can have arbitrary structure or shape, for example, by the way of clamping, increasing the mode of reinforcer etc., as long as energy It is enough that base beam body and canopy open-and-close mechanism link together.However, the utility model is without being limited thereto, first connecting portion and The structure of two interconnecting pieces can be identical or different, as long as can be realized the base beam body company with bracket and canopy open-and-close mechanism respectively It connects.
Since ceiling 2 has certain quality, immobilizing foundation (i.e. Ji Liang) is located at the purlin position among scaffolding structure 1100 It sets, as shown in Figure 1A.Size of the purlin 122 of bracket 1 itself is small, intensity is weak, it is therefore desirable to be fixedly mounted one at the top of bracket 1 Root is used to fix the base beam 21 of canopy open-and-close mechanism 22.The base beam 21 using bolt or be weldingly fixed on bracket 1 across top The top of beam 121.
The base beam body to base beam 21 is described in detail below.
In the present invention, the base beam body of base beam 21 uses the truss knot of the upper frame 12 along bracket 1 longitudinally extended Structure.In the present embodiment, due to truss structure light weight, be easily installed, the base beam body of Ji Liang uses prolongs along longitudinal direction The truss structure stretched.In the case where the base beam body of Ji Liang uses truss structure, one section of one section of ground of truss can be connected Truss structure is formed, general truss is 3 meters or 2 meters one section, after truss structure is formed, reconnect above-mentioned canopy opening-closing machine Structure.Such structure simple installation, convenient transport greatly reduce transport and installation cost.However, the utility model is not limited to This, Ji Liang can be the structure with bracket one, such as bracket across beam or the longitudinal specific position quilt of purlin that extends It can be used as the Ji Liang for installing canopy open-and-close mechanism after reinforcement.
In addition, the scaffolding structure 1100 according to the present embodiment can also include, the waterproof material coating of base beam 21 is coated.Root According to the present embodiment, which covers the top surface and two sides of Ji Liang, so that the base beam of hollow out will not allow rain from top Or side leaks into place.However, the cladding mode and wrapped position of the waterproof material coating of cladding Ji Liang are without being limited thereto such as anti- Water material can be coated on the surrounding of Ji Liang.Waterproof material can be PVC cloth or other fluid-tight cloth, and preventing from raining leaks into Place.
In addition, can also include being arranged in around bracket 1 (hereinafter according to the scaffolding structure 1100 of the present embodiment Referred to as surrounding) enclosing 5 and at least one of cloth 6.
For example, as shown in Figure 1A, the scaffolding structure 1100 according to the present embodiment may include being arranged in around bracket 1 Enclosing 5.The enclosing is referred to as purse seine (such as hooking the mesh for spending net etc.), in scaffolding structure, making ball net Ball will not fly out and pound passing pedestrian.Enclosing 5 can be arranged in the inner circumferential of bracket 1 or be arranged in periphery.It can be with It is set as needed and is suitable for the structure that enclosing 5 is installed and arranged, such as setting is easily installed and arranges the hook of enclosing 5.Enclosing It can remove and be safeguarded or cleaned, not remove when in use generally, to hinder unexpected the ball of place that fly out Gear.
For example, by being described in detail referring to structure of Fig. 6 A to Fig. 6 C to enclosing 5 and cloth 6.Fig. 6 A is according to this reality With the partial schematic diagram of novel scaffolding structure, Fig. 6 B is that the part of the pillar construction 11 of bracket 1 according to the present utility model shows It is intended to, Fig. 6 C is the cross-sectional view of the pillar construction 11 of bracket 1 according to the present utility model.As shown in Fig. 6 A to Fig. 6 C, It can also include the cloth 6 (such as the sheaing of PVC knife) being arranged in around bracket 1 according to the scaffolding structure of the present embodiment.About The mounting means of cloth 6, such as card slot G can be set on the pillar construction 11 of bracket 1, after the edge of cloth 6 is lockstitched a border, A soft strip B (PVC or other materials) is worn on the side of cloth 6, and the strip of cloth 6 is then pierced into pillar construction In 11 card slot G.The arrangement of cloth 6 is fairly simple and practical, and cloth 6 can also both be opened using opening up and down using left and right. Both can be manual, it can also be electronic.Cloth 6 can be trapped among the outer/inner portion of enclosing and be used to keep warm by winter, and summer rolls for saturating Gas.In the present embodiment, cloth 6 is located at the inboard of enclosing 5, however the utility model is without being limited thereto, and cloth 6 can be separately provided On bracket.The shape of above-mentioned enclosing 5 and cloth 6 can be designed according to demand, for example, if only needing all round the horizon It fences up, is then designed that in the attached drawing such as the present embodiment, will all be enclosed including the Delta Region below herringbone beam if necessary Get up, then can carry out integration to enclosing 5 and cloth 6 or discretely design, can all enclose in the place of required encirclement Get up.
If it is considered that wind loading rating, scaffolding structure cloth scheme preferably described above.According to the present embodiment, by In surrounding increase can fast quick-detach cloth, being increased using the time for the facility that cage will be made to move will by about one time, greatly The service efficiency in place is improved greatly, while the comfortable sexual experience of the movement for improving player.
In addition, can also include the folding starter 24 being electrically connected with ceiling 2 according to the scaffolding structure 1100 of the present embodiment, Wherein, the folding starter 24 includes: to be mounted on the outside of the scaffolding structure and can detect to environmental factor Environmental factor detector;And in the case where environmental factor detector detects that environmental factor reaches predetermined condition to ceiling 2 folding carries out the folding starting controller of starting control.Specifically, environmental factor detector can be to various environmental factors The sensor detected.For example, can be can be to related with the environmental factors such as wind, light, rain for environmental factor detector Parameter detected, for example, the sensor detected to wind speed, wind direction, luminous intensity, uitraviolet intensity, rainfall etc..It is examining When measuring burst when raining heavyly, or detecting summer high fever, controller issues instruction, powers on, and controls ceiling Automatic-expanding. When detecting burst strong wind, or when detecting proper temperature or not strong sunlight, ceiling automatic retracting is controlled.It is above to be only Example is controlled, the specific Automatic-expanding or the condition folded of triggering can be set according to local actual conditions.
In addition, can also include that can control the flexible of canopy open-and-close mechanism 22 according to the scaffolding structure 1100 of the present embodiment Manual rocker 25.In the case where no electricity, user can fold or be unfolded canopy open-and-close mechanism manually with the manual rocker 25. Manual rocker 25 and above-mentioned folding starter 24 can be arranged simultaneously, and alternative one can also be arranged.Preferably, in frame knot On structure simultaneously manual rocker 25 and above-mentioned folding starter 24 is arranged, allow to either automatically or manually to canopy open-and-close mechanism into Row folding.
The scaffolding structure that the ceiling of the embodiment can open and close can be applied to cage type sport facility (for example, cage football Field, cage basketball court etc.) on, it solves under open-air atmosphere because winter, rainy season etc. cause athletic ground unnecessarily to leave unused Problem.Further, since top can automatically or manually open and close, while surrounding increases the enclosing of fast quick-detach, so that cage Being increased using the time for sports facility will substantially increase the service efficiency in place by about one time, while improve the fortune of sporter Move comfortable sexual experience.
In addition, the scaffolding structure that the ceiling of the embodiment can open and close can also be suitable in paulin room structure, when blowing hard The open-close type ceiling of the present embodiment is folded, strong wind will not blow the top cloth of paulin room structure bad;It more will not be entire paulin room knot Structure blows to obtain displacement, the safety of the paulin room structure improved, using time and use scope.
In addition, the scaffolding structure that the ceiling of the embodiment can open and close can also be suitable for small-sized frame, the utility model The cloth structure of disclosed surrounding will prevent rain from floaing, and also prevent wind and directly blow when raining heavily or blowing hard Onto the article being placed under frame, the safety of personnel and article is protected.Meanwhile the scaffolding structure type of the utility model was both Be applicable in small-sized frame, be also applied for large-scale frame, improve the standardization level of production link, reduce product at This.
Single dress mode of Ji Liang about the present embodiment refers to ceiling 2 in the arrangement for having single base beam 21 on direction. It is easily understood that the base beam 21 of ceiling 2 can also be attached (as shown in Figure 3A and Figure 3B) in a longitudinal direction, it will be under This is described in the embodiment in face.The screening for covering connecting portion can be set in the connecting portion of longitudinal direction Block piece 7 allows the water to flow to along block piece 7 on adjacent ceiling without flowing into inside scaffolding structure.
[embodiment 2]
Describe the canopy of the embodiment 2 according to the utility model first embodiment in detail below with reference to Fig. 2A to Fig. 2 C Frame structure 1200.In the following, for simplicity by the difference of main description and embodiment 1.
Specifically, at least one of the top of bracket 1 can be covered in the deployed state according to the ceiling of the present embodiment 2 Point, as shown in Figure 2 C.Ceiling 2 under unfolded state only covers at least part at the top of bracket 1, the top of bracket 1 Remainder is covered by the fixation shelter 3 for being arranged in cradle top.Specifically, which, which can at least cover, is in The top for the bracket 1 that ceiling 2 under unfolded state can not cover.Preferably, the terminal edge energy of the ceiling 2 under unfolded state Enough cover fixed shelter 3, or be more than fixed 3 a part of shelter so that flow through the canopy cloth unit 222 of ceiling 2 water (for example, Rainwater) ground can be flowed to along fixed shelter 3.Bracket 1 is fixed on span direction according to the fixation shelter 3 of the present embodiment Top on, when the side on direction is watched, the terminal edge of the canopy open-and-close mechanism under unfolded state is located at should Fixed 3 top of shelter.
It is bigger than after the expansion of canopy open-and-close mechanism that the scaffolding structure 1200 with fixed shelter 3 of the embodiment can be applied to span It obtains on sports facility seldom, pillar construction support canopy open-and-close mechanism cannot be had by solving among the biggish sports facility of span Technical problem.Due to having added one section of fixed shelter at the top of scaffolding structure, there is canopy to cover so meeting entire top upon deployment Lid, realizes keeping out wind and rain for place.Fixed shelter 3 can be using PVC folder screen cloth, knife sheaing etc., and fixed shelter 3 is fixed on top Both it can be fixed, can also be fixed using the card slot of top beam as above-mentioned cloth 6 using rope.The position of fixed shelter 3, Both it can be fixed on the edge at the top of bracket 1, as shown in Figure 2 A, any position at top can also be fixed on, as long as and canopy The whole that can cover the top of bracket 1 is combined together after open-and-close mechanism expansion.
In the present invention, span refers to following movement than the big sports facility obtained seldom after the expansion of canopy open-and-close mechanism Facility.Since the Extensible of the previous canopy open-and-close mechanism 22 of mesh is 3.5-5m, if upper frame 12 is being pushed up using herringbone top A canopy open-and-close mechanism 22 is respectively installed on both sides on portion's base beam 21, then maximum span be 10 meters (in the case of flat-top), so if across The few sports facility bigger than this range, such as 10 meters -12 meters of sports facility are spent, it can be using the fixed shelter of this band 3 scaffolding structure.The width that the width of fixed shelter 3 is set as scaffolding structure is subtracted to the scalable length of canopy open-and-close mechanism 22 Degree.
[scaffolding structure of second embodiment]
Scaffolding structure according to the utility model second embodiment is a kind of scaffolding structure that ceiling can open and close, packet Include bracket and rack-mount opening and closing type ceiling.Assembly method according to the ceiling of second embodiment is assembled. Erection method refers to that ceiling is being equipped at least two Ji Liang on direction.Upper frame with scaffolding structure is pinnacle, frame knot The Ji Liang of the ceiling of structure is three, the connection of the bilateral of mono- Ji Liang of these three bases Liang Zhongyou there are two canopy open-and-close mechanism and other two It is example that the unilateral side of a Ji Liang, which is connected with a canopy open-and-close mechanism, describes the utility model second embodiment, but this reality It is without being limited thereto with novel second embodiment, it can be in the case where one canopy open-and-close mechanism of unilateral connection of three Ji Liang It carries out assembled.For example, in the case where the upper frame of scaffolding structure is flat-top or/and unilateral oblique top, it is each to carry a canopy opening-closing machine Three ceilings of structure at the top of scaffolding structure to blocking.There can also be more Ji Liang, it can be according to the utility model The mode carries out assembly.The canopy according to the utility model second embodiment is described in detail below with reference to Fig. 3 A to Fig. 5 B Frame structure.For simplicity by the difference of main description and first embodiment, i.e., mainly to the assembly method of ceiling It is described in detail.
[scaffolding structure 2100 that embodiment 1 folds spelling mode]
Describe the canopy of the embodiment 1 according to the utility model second embodiment in detail below with reference to Fig. 3 A and Fig. 3 B Frame structure 2100, wherein Fig. 3 A is other than the bilateral for being connected with canopy open-and-close mechanism in addition to bilateral meets base beam 21b, also there are two tool Only the unilateral unilateral side for being connected with canopy open-and-close mechanism meets base beam 21a and 21c.As shown in Figure 3A, unilateral side connects base beam 21a and 21c arrangement Bracket lower section and meet Ji Liang with certain distance apart from bilateral.Such structure solve the excessive only one of span or The case where 2 canopy open-and-close mechanisms can not block entire cradle top, therefore such structure is set suitable for the movement of more large span It applies.Such as basketball court, the span of basketball court are 15m, longitudinal is 30m, so need 4 collapsing lengths to be on span direction The canopy open-and-close mechanism of 3.5-5m is stitched together, and needs 2 Ji Liang (it may also be said that prolonging longitudinally in longitudinal extension Stretch and need 2 canopy open-and-close mechanisms connecting with each Ji Liang on direction) it connects, it can just cover the whole at the top of bracket 1. In the present invention, longitudinal length of canopy open-and-close mechanism can determine that in general canopy is opened and closed according to the length of Ji Liang The longitudinal length of mechanism is advisable with being no more than 20 meters;The assembled quantity of horizontal span direction canopy open-and-close mechanism can be according to wait hide The span of the upper frame of the bracket covered determines.
Under the folded spelling mode of the present embodiment, unilateral side connects the sides adjacent that base beam 21a and 21c meet base beam 21b in bilateral respectively Back side connect canopy open-and-close mechanism.In the case where this folds spelling mode, the same direction is pressed in the canopy open-and-close mechanism of the ipsilateral connection of each Ji Liang Expansion.Under the unfolded state of canopy open-and-close mechanism, the canopy open-and-close mechanism terminal edge of the upstream end on vertical direction is at least Folded (not shown) is crossed in the horizontal direction with the Ji Liang being located at downstream.The open-close type ceiling of the embodiment to flow through upstream The water (for example, rainwater) of the canopy cloth unit 222 at place can be along the canopy cloth unit 222 in downstream side be flowed to, to not flow into In scaffolding structure.Specifically, base beam 21a and 21c are that unilateral side meets Ji Liang, base beam 21b is that bilateral meets Ji Liang.That is, unilateral side connects base Beam 21a connects canopy open-and-close mechanism in the back side that bilateral connects the sides adjacent of base Liang Jiliang 21b, i.e., left side connection canopy in figure 3 a is opened Close mechanism.Unilateral side meets base beam 21c and connects canopy open-and-close mechanism in the back side that bilateral connects the sides adjacent of base beam 21b, i.e., in figure 3 a Right side connects canopy open-and-close mechanism.
It can find out from Fig. 3 A and Fig. 3 B, the folded spelling mode of the Ji Liang about the present embodiment, in addition to the cloth on direction Outside the folded spelling mode for having set multiple base beam 21a, 21b and 21c, base beam 21a, 21b and 21c and base beam 21a ', 21b ' of ceiling 2 And 21c ' can also be attached in a longitudinal direction.As shown in the section position A-A ' of Fig. 3 A, in the interconnecting piece of longitudinal direction The block piece 7 for covering connecting portion can be set in position, allow the water to flow to along block piece 7 on adjacent ceiling and It may not flow into inside scaffolding structure.
[scaffolding structure that variation example folds spelling mode]
However, the present embodiment is without being limited thereto, along the base beam position for observing and being in upstream end at the center of direction of upper frame In the top of top beam 121, the Ji Liang at downstream can also be located at the top of top beam 121.For example, in canopy open-and-close mechanism Under unfolded state, the terminal edge of the canopy open-and-close mechanism of the upstream end on vertical direction at least be located at downstream at Ji Liang It crosses in the horizontal direction folded.It realizes that the taken measure of this construction can be to improve the Ji Liang in upstream end, so that The canopy open-and-close mechanism of upstream is in the top of the canopy open-and-close mechanism in downstream.Specifically, the canopy open-and-close mechanism in upstream end and position Ji Liang at downstream overlaps mutually or overlaps mutually with the canopy open-and-close mechanism being located at downstream.This construction is so that the variation example is opened Box-like ceiling makes the water (for example, rainwater) for the canopy cloth unit 222 for flowing through upstream end can be along flowing to the canopy in downstream side Cloth unit 222, to not flow into scaffolding structure.
[scaffolding structure 2200 that embodiment 2 directly spells mode]
Under straight spelling mode, under the unfolded state of canopy open-and-close mechanism, the canopy opening-closing machine of canopy open-and-close mechanism and adjacent assembly The Ji Liang that structure is connected is not overlapped in the horizontal direction.Under straight spelling mode, mutually spelled in two canopy open-and-close mechanisms of adjacent assembly The place of connecing is provided with, along the up concave type gutter structure of bracket longitudinally extended.Gutter structure is mutually spelled with described two canopy open-and-close mechanisms The Ji Liang contact at place is connect, contact surface passes through water-proofing treatment, and the terminal edge of canopy open-and-close mechanism in the deployed state is located at day The top of ditch structure.
Describe the canopy of the embodiment 2 according to the utility model second embodiment in detail below with reference to Fig. 4 A to Fig. 4 C Frame structure 2200 will mainly describe the difference of the embodiment 2 Yu above-mentioned second embodiment embodiment 1.In canopy opening-closing machine Under the unfolded state of structure, base the beam 21a and 21c that the terminal edge of canopy open-and-close mechanism is connect with the canopy open-and-close mechanism of mutually assembly exist It does not overlap but is crossed in the horizontal direction with gutter the structure 4a and 4c for being connected to base beam 21a and 21c folded in horizontal direction.It is single Base beam 21a and 21c is flanked to be arranged in the top of top beam 121 and meet base beam 21b with certain distance apart from bilateral.Such knot Structure solves the case where excessive only one canopy open-and-close mechanism of span can not block entire span, therefore such structure is suitable for more The sports facility of large span.Such as basketball court, the span of basketball court are 15m, longitudinal is 30m, so 4 are needed on span direction A collapsing length is that the canopy open-and-close mechanism of 3.5-5m is stitched together, and needs in longitudinal extension 2 Ji Liang (can also be with Say, 2 canopy open-and-close mechanisms connecting with each Ji Liang needed in longitudinal extension) it connects, it can just cover bracket 1 The whole at top.
More specifically, canopy open-and-close mechanism phase stitching portion is provided with, the up concave type extended longitudinally as shown in Fig. 4 A to Fig. 4 C Gutter structure 4.The gutter structure 4 is connected to unilateral one that connect base beam with bilateral adjacent meeting Ji Liang in which can be closely adhered to formula Side.The gutter structure 4 and base beam contact surface pass through water-proofing treatment, to prevent water from leaking into scaffolding structure by the contact surface.This is anti- Water process can be the processing of recited above plus block piece, packet waterproof cloth etc., as long as can prevent water from leaking into scaffolding structure ?.At this point, the first connecting portion of base beam 21a further includes for the base beam 21a of ceiling and gutter structure 4a to be mounted on bracket Base beam pedestal 211 on 1.The first connecting portion of base beam 21c further includes for installing the base beam 21c of ceiling and gutter structure 4c Base beam pedestal 211 on bracket 1, wherein the bottom of base beam pedestal 211 connect with bracket 1 and cross-sectional shape be U type, One of inverted U, L-type and I type.According to the side with gutter structure 4a and 4c respectively base the beam 21a and 21c of the present embodiment Wall is closely bonded, and is bolted to together.The terminal edge of canopy open-and-close mechanism 22 in upstream is located at gutter Above structure 4a and 4c, more specifically, canopy open-and-close mechanism 22 is overlapping with gutter structure 4a and 4c in the horizontal direction, so that flowing through The water energy of the canopy cloth unit 222 in upstream of ceiling 2 enough flows into gutter structure 4a and 4c, to rely on gutter structure 4a Water is set to flow to the ground outside frame without flowing into scaffolding structure from gutter longitudinal direction both ends with 4c.Gutter material can be engineering Plastics or metal, preferably aluminium alloy.
Furthermore, it is possible to find out from Fig. 4 A and Fig. 4 B, the straight spelling mode of the Ji Liang about the present embodiment, in addition to across direction On arrange outside the straight spelling mode of multiple base beam 21a, 21b and 21c, base beam 21a, 21b and 21c and base beam 21a ' of ceiling 2, 21b ' and 21c ' can also be attached in a longitudinal direction (shown in the section position B-B ' of such as Fig. 4 A).In the company of longitudinal direction A block piece 7 can be set in socket part position, and in this embodiment, the terminal edge of block piece 7 in the deployed state is located at gutter It allows the water to flow to along block piece 7 above structure in gutter structure and on adjacent ceiling, without flowing into frame knot Inside structure.For the sake of brevity, the detailed construction that canopy open-and-close mechanism 22 is not drawn out in Fig. 4 A and Fig. 4 B, it is practical in conjunction with this Novel other accompanying drawings could be aware that there is canopy open-and-close mechanism 22 etc. below block piece 7.
Two kinds of erection methods of above-described embodiment 1 and embodiment 2, i.e., it is folded to spell and directly spell, it may be collectively termed as along spelling mode.
[scaffolding structure 2300 of 3 pairs of embodiment spelling modes]
Under to spelling mode, it is provided in two canopy open-and-close mechanism phase stitching portions of adjacent assembly, the longitudinal direction along bracket is prolonged The up concave type gutter structure stretched.The gutter structure is mounted on upper frame and in described two canopy open-and-close mechanisms in expansion shape Between terminal edge under state, and the terminal edge of described two canopy open-and-close mechanisms in the deployed state is located at gutter structure Top.
Describe the scaffolding structure of the embodiment 3 according to the utility model second embodiment in detail below with reference to Fig. 5 A 2300, the difference of the embodiment Yu above-mentioned second embodiment embodiment 1 will be described mainly.As shown in Figure 5A, in addition to double The bilateral that side is connected with canopy open-and-close mechanism 22 connects except base beam, and also there are two the only unilateral unilateral side for being connected with canopy open-and-close mechanism to connect for tool The case where base beam.As shown in Figure 5A, it is connect above the unilateral marginal position for connecing the upper frame that Ji Liang is arranged in bracket and apart from bilateral Ji Liang has certain distance.Such structure, which solves the excessive only one canopy open-and-close mechanism of span, can not block the feelings of entire span Condition, therefore such structure is suitable for the sports facility of more large span.Such as basketball court, the span of basketball court are 15m, Zong Xiangwei 30m, so it is that the canopy open-and-close mechanism of 3.5-5m is stitched together, and prolongs longitudinally that 4 collapsing lengths are needed on span direction It stretches and needs 2 Ji Liang (it may also be said that needing 2 canopy open-and-close mechanisms connecting with each Ji Liang in longitudinal extension) on direction It connects, can just cover the whole at the top of bracket 1.
Under to spelling mode, the Ji Liang (21a and 21c) being located at vertical direction downstream for being mounted on bracket further includes base Beam lifting member 216, base beam lifting member 216 are installed in the top of bracket upright post structure and extend upwards.The base beam lifting member 216 By two unilateral side for being arranged in upper frame marginal position connect Ji Liang (i.e. base beam 21a and base beam 21c) promoted certain altitude, and this two A unilateral side meets Ji Liang (i.e. base beam 21a and base beam 21c) on sides adjacent (the i.e. right side of base beam 21a for meeting Ji Liang (base beam 21b) with bilateral The left side of side and base beam 21c) it is connected separately with canopy open-and-close mechanism (i.e. canopy open-and-close mechanism 22a and canopy open-and-close mechanism 22c), thus single The bilateral for flanking canopy open-and-close mechanism 22a that Ji Liang (such as base beam 21a) is connected and adjacent assembly connects the canopy opening-closing machine of base beam 21b Structure 22b presses relative direction expansion upon deployment, and unilateral side connect canopy open-and-close mechanism 22c that Ji Liang (such as base beam 21c) is connected with The canopy open-and-close mechanism 22b ' that the bilateral of adjacent assembly meets base beam 21b is extended by relative direction upon deployment.Such structure solves Insufficient problem, therefore such structure are being blocked across direction for the application only one canopy open-and-close mechanism of large span Sports facility suitable for more large span.
Lifting member described above is not limited to lift lever shown in Fig. 5 A, such as can be rack-mount The tripod etc. of side, as long as the position that can meet Ji Liang to unilateral side is promoted.
As shown in Figure 5 B, it is provided in two canopy open-and-close mechanism phase stitching portions of adjacent assembly, what is extended longitudinally is recessed Formula gutter structure 4 is to prevent leak-stopping rain.Gutter structure 4 further includes gutter pedestal 41.Gutter pedestal 41 is by bolt or is welded on On bracket.Specifically, 4 top of gutter structure is located to the terminal edge of two canopy open-and-close mechanisms 22 of spelling, so that flowing through ceiling 2 The water energy of canopy cloth unit 222 enough flow into gutter structure 4, to make water flow to from gutter longitudinal direction both ends by the gutter structure 4 Ground outside frame is without flowing into scaffolding structure.Gutter material can be engineering plastics or metal, and preferably aluminium closes Gold.
[the opening and closing type ceiling for bracket]
The utility model additionally provides a kind of opening and closing type ceiling for bracket, which includes: to be assemblied on bracket The Ji Liang extended longitudinally;The canopy open-and-close mechanism being connected on Ji Liang, the canopy open-and-close mechanism include can stretch it is flexible Unit and the canopy cloth unit linkedly opened and closed with telescopic unit;Wherein, ceiling can cover the top of bracket in the deployed state At least part in portion.
Opening and closing type ceiling according to the present utility model for bracket, Ji Liang include: base beam body;First connecting portion, It is arranged upper at least one of base beam body bottom, top and side and connect base beam body with bracket;And second Interconnecting piece is arranged at base beam body side and connect base beam body with canopy open-and-close mechanism.
The assembly method of ceiling according to the present utility model includes any one of single dress and assembly, wherein assembled includes suitable It spells and to spelling, includes straight spell along packaging and spelled with folded;When directly spelling and to spelling, ceiling further includes being located at canopy open-and-close mechanism lower edge Gutter structure.
In the case where bracket does not include upper frame, the ceiling further includes the upper frame that can be assembled to above bracket, and institute Ji Liang is stated to be assemblied on the upper frame.
Ceiling according to the present utility model can be used in any bracket structure, with sunshade or rain cover.No matter supporting structure Whether there is upper frame, ceiling provided by the utility model can be applied.
The ceiling of the utility model further includes that other structures described above or accessory are for simplicity omitted The description of above-mentioned identical structure or accessory.
[installation method for the scaffolding structure that ceiling can open and close]
The installation method for the scaffolding structure that ceiling according to the present utility model can open and close is simple to operation, and safety It is high.Specifically, the installation method for the scaffolding structure that ceiling according to the present utility model can open and close includes: setting support;It is propping up Opening and closing type ceiling is installed on frame, the opening and closing type ceiling includes the Ji Liang extended longitudinally being assemblied on bracket, and The canopy open-and-close mechanism being connected on Ji Liang, the canopy open-and-close mechanism include the telescopic unit that can be stretched and connect with telescopic unit The canopy cloth unit opened and closed dynamicly;Wherein, described to further comprise the step of ceiling is installed on bracket: Ji Liang is fixedly mounted on The top of bracket;And by the assembly of canopy open-and-close mechanism on Ji Liang, the top of bracket can be covered by making ceiling in the deployed state At least part.The installation method includes that gutter knot is installed on bracket when directly being spelled to canopy open-and-close mechanism and to spelling Structure.
Although the utility model is described referring to exemplary embodiment above, above-described embodiment is only to illustrate The technical ideas and features of the present invention do not limit the protection scope of the present invention.It is all practical new according to this Any equivalent variations or modification that type Spirit Essence is made, should be covered within the scope of the utility model.

Claims (26)

1. the scaffolding structure that a kind of ceiling can open and close comprising bracket (1) and rack-mount opening and closing type ceiling (2),
It is characterized in that, the ceiling (2) includes:
The Ji Liang (21) extended longitudinally being assemblied on bracket;
The canopy open-and-close mechanism (22) being connected on Ji Liang, the canopy open-and-close mechanism include the telescopic unit (221) that can stretch with And the canopy cloth unit (222) linkedly opened and closed with telescopic unit.
2. scaffolding structure according to claim 1, wherein the bracket includes pillar construction (11) and is arranged in column The top of structure and by pillar construction support upper frame (12), the upper frame (12) include across arrangement top beam (121) and with The purlin (122) of top beam arranged crosswise.
3. scaffolding structure according to claim 2, wherein
Shape of the bracket (1) when the side on direction is watched is herringbone, arch, pointed arch, appointing in polygon It anticipates one kind;
Shape when top beam (121) watches from side viewing is herringbone, arch, pointed arch, any one in polygon.
4. scaffolding structure according to claim 2, wherein the Ji Liang (21) includes:
Base beam body;
First connecting portion, setting at least one of base beam body bottom, top and side and by base beam body and are propped up Frame connection;And
Second connecting portion is arranged at base beam body side and connect base beam body with canopy open-and-close mechanism.
5. scaffolding structure according to claim 4, wherein the base beam body of the Ji Liang uses the vertical of the upper frame along bracket To the metal structure of extension.
6. scaffolding structure according to claim 5, wherein the metal structure is truss structure.
7. scaffolding structure according to claim 4, wherein the first connecting portion further includes for by the Ji Liang of ceiling (21) the base beam pedestal (211) being packed on bracket (1), the bottom of the base beam pedestal is connect with bracket and cross-sectional shape For one of U-shaped, inverted U, L-type and I type.
8. scaffolding structure according to claim 4, wherein
The canopy open-and-close mechanism further includes the installation part being installed to telescopic unit and canopy cloth unit in the second connecting portion of Ji Liang (223);
The telescopic unit includes, with the telescopic arm and telescopic arm driver that folding mode or/and mode of traction are flexible;And
The canopy cloth unit includes the canopy cloth that an at least ora terminalis is connect with telescopic arm, for storing the canopy cloth under collapse state Collector and storage driving mechanism.
9. scaffolding structure according to claim 1 or 2, wherein the scaffolding structure further includes the top for being arranged in bracket At least part on fixation shelter (3), and the terminal edge of the canopy open-and-close mechanism under the unfolded state is solid positioned at this Determine above shelter (3).
10. scaffolding structure according to claim 1 or 2, wherein the scaffolding structure further includes being arranged in around bracket Enclosing (5) and at least one of cloth (6).
11. scaffolding structure according to claim 1 or 2, wherein the ceiling of the scaffolding structure further includes being electrically connected with ceiling The folding starter (24) connect, wherein the folding starter includes:
It is mounted on the outside of the scaffolding structure and can be to the environmental factor detector that environmental factor is detected;And
Starting control is carried out to the folding of ceiling in the case where environmental factor detector detects that environmental factor reaches predetermined condition The folding of system starts controller.
12. scaffolding structure according to claim 1 or 2, wherein the ceiling of the scaffolding structure further includes that can control canopy The manual rocker (25) of the folding of open-and-close mechanism.
13. scaffolding structure according to claim 1 or 2, wherein the assembly method of the ceiling includes single dress and assembly, Under single dress mode, the ceiling is only being equipped with single Ji Liang on direction, and under the erection method, it is described Ceiling is being equipped at least two Ji Liang on direction.
14. scaffolding structure according to claim 13, wherein under single dress mode, the single Ji Liang across Unilateral side on direction is connected with canopy open-and-close mechanism, or is connected with canopy open-and-close mechanism in the bilateral on direction.
15. scaffolding structure according to claim 13, wherein it is described it is assembled include along spelling and to spelling,
In the case where connecing Ji Liang progress assembly to the only unilateral each unilateral side for being connected with canopy open-and-close mechanism, under along spelling mode, respectively For Ji Liang in ipsilateral connection canopy open-and-close mechanism, and under to spelling mode, each Ji Liang connects canopy open-and-close mechanism in opposite side,
The unilateral side that canopy open-and-close mechanism is connected with to unilateral side meet Ji Liang and bilateral be connected with canopy open-and-close mechanism bilateral connect Ji Liang into In the case that row is assembled, under along spelling mode, unilateral side meets Ji Liang and connect canopy folding in the back side for the sides adjacent for meeting Ji Liang with bilateral Mechanism, and under to spelling mode, unilateral side meets Ji Liang and connect canopy open-and-close mechanism in the sides adjacent for meeting Ji Liang with bilateral.
16. scaffolding structure according to claim 15, wherein the suitable packaging includes folded spell and spells with straight, wherein
Under the folded spelling mode, under the unfolded state of canopy open-and-close mechanism, the canopy of the upstream end on vertical direction is opened and closed Mechanism at least be located at downstream at Ji Liang cross in the horizontal direction it is folded,
Under the straight spelling mode, under the unfolded state of canopy open-and-close mechanism, the canopy opening-closing machine of canopy open-and-close mechanism and adjacent assembly The Ji Liang that structure is connected is not overlapped in the horizontal direction.
17. scaffolding structure according to claim 15, wherein under to spelling mode, be mounted on bracket is located at vertical side The Ji Liang downstream located further includes base beam lifting member (216), the base beam lifting member (216) be installed in the top of bracket and upwards Fang Yanshen.
18. scaffolding structure according to claim 15, wherein
Under along spelling mode, it is unfolded in the canopy open-and-close mechanism of the ipsilateral connection of each Ji Liang by the same direction;And under to spelling mode, It is unfolded in the canopy open-and-close mechanism that the opposite side of each Ji Liang connects by relative direction.
19. scaffolding structure according to claim 16,
Wherein, it under the straight spelling mode, is provided in two canopy open-and-close mechanism phase stitching portions of adjacent assembly, along the vertical of bracket To the up concave type gutter structure (4) of extension,
Wherein, the gutter structure is contacted with the Ji Liang of described two canopy open-and-close mechanism phase stitching portions, and contact surface is by waterproof Reason, and the terminal edge of canopy open-and-close mechanism in the deployed state is located at the top of gutter structure.
20. scaffolding structure according to claim 15,
Wherein, it under described pair of spelling mode, is provided in two canopy open-and-close mechanism phase stitching portions of adjacent assembly, along the vertical of bracket To the up concave type gutter structure (4) of extension,
Wherein, the gutter structure (4) be mounted on upper frame and in described two canopy open-and-close mechanisms in the deployed state Between terminal edge, and the terminal edge of described two canopy open-and-close mechanisms in the deployed state is located at the top of gutter structure.
21. scaffolding structure according to claim 19, wherein the first connecting portion further includes for by the Ji Liang of ceiling (21) and gutter structure (4) is mounted on the base beam pedestal (211) on bracket (1),
Wherein, the bottom of base beam pedestal (211) is connect with bracket and cross-sectional shape is in U-shaped, inverted U, L-type and I type It is a kind of.
22. scaffolding structure according to claim 20, wherein the gutter structure (4) further includes for by gutter structure (4) the gutter pedestal (41) being mounted on bracket (1),
Wherein, the bottom of gutter pedestal (41) is connect with bracket and cross-sectional shape is one in U-shaped, inverted U, L-type and I type Kind.
23. a kind of opening and closing type ceiling for bracket, which is characterized in that the ceiling includes:
The Ji Liang extended longitudinally being assemblied on bracket;
The canopy open-and-close mechanism being connected on Ji Liang, the canopy open-and-close mechanism include the telescopic unit that can be stretched and with flexible list The canopy cloth unit that member linkedly opens and closes.
24. ceiling according to claim 23, wherein the Ji Liang includes:
Base beam body;
First connecting portion, setting at least one of base beam body bottom, top and side and by base beam body and are propped up Frame connection;And
Second connecting portion is arranged at base beam body side and connect base beam body with canopy open-and-close mechanism.
25. the ceiling according to claim 23 or 24, wherein the assembly method of the ceiling includes in single dress and assembly It is any, wherein assembled includes along spelling and to spelling.
26. the ceiling according to claim 23 or 24, wherein in the case where the bracket does not include upper frame, the top Canopy further includes the upper frame that can be assembled to above bracket, and the Ji Liang is assemblied on the upper frame.
CN201920189051.1U 2019-02-03 2019-02-03 Scaffolding structure with opening and closing type ceiling and opening and closing type ceiling Active CN208899926U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920189051.1U CN208899926U (en) 2019-02-03 2019-02-03 Scaffolding structure with opening and closing type ceiling and opening and closing type ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920189051.1U CN208899926U (en) 2019-02-03 2019-02-03 Scaffolding structure with opening and closing type ceiling and opening and closing type ceiling

Publications (1)

Publication Number Publication Date
CN208899926U true CN208899926U (en) 2019-05-24

Family

ID=66578563

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920189051.1U Active CN208899926U (en) 2019-02-03 2019-02-03 Scaffolding structure with opening and closing type ceiling and opening and closing type ceiling

Country Status (1)

Country Link
CN (1) CN208899926U (en)

Similar Documents

Publication Publication Date Title
CN111305384B (en) Assembled movable photosensitive adjustment quick-dismantling solar bionic landscape pavilion
CN111436306B (en) Multi-span greenhouse heat insulation space and multi-span greenhouse heat insulation method
US20090056779A1 (en) Auxiliary section for a canopy
CA2768812A1 (en) Vent for a tent or shelter
KR102012748B1 (en) Arched opening and closing type roof system
US6832448B2 (en) Greenhouse
CN103749220A (en) Application of sunshade net to agriculture rain shielding and fruit tree rain shed made of sunshade net
CN206699295U (en) A kind of staged automatic rainproof peanut seed drying frame
CN109667447A (en) Scaffolding structure with opening and closing type ceiling, opening and closing type ceiling and its installation method
CN204316412U (en) A kind of solar cell panel assembly
CN102144512B (en) Wind-resistant film type fruit tree rainproof facility
CN103993777A (en) Rapid sliding type rain-proof shed of furnace top
CN208899926U (en) Scaffolding structure with opening and closing type ceiling and opening and closing type ceiling
CN212153717U (en) Assembled movable photosensitive adjustment rapid dismantling solar bionic landscape pavilion
CN108522089B (en) Large-span multifunctional plastic greenhouse
CN216532928U (en) Automatic canopy that keeps off rain of fruit tree
CN210738217U (en) Frame type tent
CN212897791U (en) Pavilion structure with movable greening pitched roof
CN215684065U (en) Sheep canopy mounting structure
KR200386284Y1 (en) Large tent structure with tension regulating system of awning
AU2011100415B9 (en) Awning and frame assembly therefor
CN111264288A (en) Grape planting frame with movable awning
KR200386358Y1 (en) Tent having sunshade
CN219431520U (en) Multifunctional hidden tent
CN214424183U (en) Mongolian yurt type tent

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200330

Address after: No. 68, Jinbei industrial concentration zone, Jinhu County, Huai'an City, Jiangsu Province

Patentee after: Jinhu Jinhong Information Technology Co.,Ltd.

Address before: Room 1008, 10th floor, Block B, Longyu Center, Building 1, Zhongjie 1, Huilongguan, Changping District, Beijing

Patentee before: BEIJING YANZHIDANDANG SPORTS TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221115

Address after: No. 39, Group 3, Wangmao Village, Zhuji Township, Sheqi County, Nanyang City, Henan Province 473311

Patentee after: Xu Qianqian

Address before: No. 68, Jinbei Industrial Concentration Zone, Jinhu County, Huai'an City, Jiangsu Province, 211600

Patentee before: Jinhu Jinhong Information Technology Co.,Ltd.