- CN208778011U CN208778011U CN201821239598.XU CN201821239598U CN208778011U CN 208778011 U CN208778011 U CN 208778011U CN 201821239598 U CN201821239598 U CN 201821239598U CN 208778011 U CN208778011 U CN 208778011U
- Authority
- CN
- China
- Prior art keywords
- bracket
- concrete
- side wall
- wall steel
- steel formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model relates to a kind of concrete- liner tunnel side wall steel formwork trolleys, comprising: bracket;The side of the bracket is arranged in template;Walking carriage, the bracket slide support are arranged on the walking carriage;With traversing component, traversing Component driver bracket sliding movement on walking carriage, the bracket includes multiple modular bracket assembled rigid units, and the bracket assembled rigid unit includes stringer, crossbeam and oblique pull beam, is provided with bridging between multiple bracket assembled rigid units.Cost is relatively low, structure is simple and reliable for the concrete- liner tunnel side wall steel formwork trolley at the utility model end, is readily transported using Modularized splice, and easy to operate, lining cutting depth is fast, concrete forming surface is good.
Description
Technical field
The utility model relates to concrete placings engineering field, in particular to a kind of concrete- liner tunnel side wall punching block for tunnel
Pallet vehicle.
Background technique
In recent years, with the rapid development of urbanization, to traffic especially rail traffic facility (such as railway, subway)
Demand is continuously increased, therefore in order to adapt to fast-developing requirement, has new requirement for the form of construction work in tunnel, for repairing
Built tunnel needs the concrete- liner trolley used, it was also proposed that new requirement;At present on the market used in be mostly it is all-hydraulic from
Dynamic walking lining trolley, it is desirable that door frame crossbeam is sufficiently high and is two sides wall while pouring, and telescoping steel form structural volume is whole
Larger, integral trolley is only used for the tunnel of correspondingly-sized, can not be suitable for the tunnel of other sizes, therefore be directed to other not
It then needs to separately design different trolleys with legal person tunnel, leads to that a large amount of manpower and material resources are lost.
Utility model content
The problem of the purpose of this utility model is the abutment wall progress concrete construction for tunnel and insufficient offer
A kind of cost is relatively low, structure is simple and reliable, is readily transported using Modularized splice, and it is easy to operate, can be continuous when pouring
Operation, the concrete- liner tunnel side wall steel formwork trolley for tunnel that lining cutting speed is fast, concrete forming surface is good.
In order to achieve the above objectives, it is adopted the technical scheme that:
A kind of concrete- liner tunnel side wall steel formwork trolley, comprising: bracket;The side of the bracket is arranged in template;Row
Trolley is walked, the bracket slide support is arranged on the walking carriage;With traversing component, the traversing Component driver bracket exists
Sliding movement on walking carriage.
The bracket includes multiple modular bracket assembled rigid units, the bracket assembled rigid unit include stringer, crossbeam and
Oblique pull beam is provided with bridging between multiple bracket assembled rigid units.
The bracket cross section is triangular in shape, and the height of the bracket is h, and bottom edge length is d, wherein d >=1/2h.
The template includes multiple template unit, and each modular unit matching is laid in the stent side portion, and adjacent
Fixation is bolted between two modular units.
The walking carriage matching setting is laid with multiple groups retractable support in walking carriage bottom on walking track
Leg.
Slip base is provided on the walking carriage, the frame bottom matching is slidably arranged in the slip base, institute
State traversing component be translation oil cylinder, the both ends of the translation oil cylinder respectively with the slip base and the bracket.
The translation oil cylinder is arranged on the downside of the slip base and bracket.
Brace is provided between the bracket and ground.
It is provided with ladder on the bracket, the cradle top is provided with station.
By adopting the above technical scheme, acquired beneficial effect is: the utility model uses modular each unit structure
At bracket, can work continuously when being poured, additionally it is possible to after the completion of unilateral side pours, facilitate mould unloading, convenient for template into
Row maintenance, clears up template;The transport of trolley is convenient in modular design simultaneously, and is directed to different environmental demands, can pass through
Assembling combination modular unit of different shapes forms bracket of different shapes to cope with various environment.
Bracket cross section in the utility model uses triangle, and the length on bottom edge is more than or equal to the half of height, not only
Material is saved, facilitates assembly, additionally it is possible to be able to maintain a relatively steady state in constructing tunnel, be not easy to topple over.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model concrete- liner tunnel side wall steel formwork trolley;
Fig. 2 is the side view of the utility model concrete- liner tunnel side wall steel formwork trolley;
Fig. 3 is the structural schematic diagram of the walking carriage walking beam of the utility model concrete- liner tunnel side wall steel formwork trolley;
Fig. 4 is the traversing components distribution figure of the utility model concrete- liner tunnel side wall steel formwork trolley;
Fig. 5 is interface chart under the bottom bracket of the utility model concrete- liner tunnel side wall steel formwork trolley;
Fig. 6 is the electrical schematic diagram of the utility model concrete- liner tunnel side wall steel formwork trolley;
Fig. 7 is the hydraulic schematic diagram of the utility model concrete- liner tunnel side wall steel formwork trolley.
Serial number 1 is bracket in figure, and 2 be template, and 3 be station, and 4 be brace, and 5 be traveling wheel, and 6 be translation oil cylinder, 7
It is ladder for telescopic support legs, 8,9 be power motor, and 10 be oil cylinder.
Specific embodiment
It elaborates below in conjunction with attached drawing to specific embodiment of the present utility model.
The utility model discloses a kind of concrete- liner tunnel side wall steel formwork trolleys, as shown in Fig. 1 ~ 7, the trolley by down toward
Upper includes walking carriage, traversing component, bracket 1 and the template 2 in stent side portion;
The self weight of coagulation earth lateral pressure and template 2 when wherein bracket is primarily subjected to pour comprising multiple modular
Bracket assembled rigid unit, each concatenation unit are the stereoscopic graticule that the multilayer platform connected and composed is combined by stringer, crossbeam and oblique pull beam
Lattice structure, bridging is provided between multiple bracket assembled rigid units for reinforcing, and each concatenation unit is trapezoidal, bottom edge from the bottom to top
Length is sequentially reduced, the section constitution triangle of bracket entirety, and the height of bracket is h, and bottom edge length is d, wherein d >=1/2h,
It is provided with ladder 8 on bracket, the cradle top is provided with station 3.
Wherein the side of the bracket 1, including multiple template unit and each modular unit matching cloth is arranged in template 2,
Fixation is bolted between adjacent two modular unit;Template 2 and bracket 1 can pass through the bracket and mould of setting disparate modules
Plate unit voluntarily adjusts whole height.
It is walking carriage below bracket 1, walking carriage includes traveling wheel 5 and walking beam, it is driven by power motor 9,
Walking carriage and branch, traversing component are provided between 1 for driving arm sliding movement on walking carriage, before traversing component,
In, after be each provided with it is a set of, as shown in figure 4, traversing component includes the slip base being arranged on walking carriage and translation oil cylinder 6, branch
1 bottom mating of frame is slidably arranged in slip base, and the both ends of translation oil cylinder 6 are pivotally connected with traversing seat and bracket 1 respectively, translation oil cylinder
6 are arranged on the downside of slip base and bracket.
Walking carriage matching setting is laid with multiple groups telescopic support legs 7 in walking carriage bottom on walking track.Branch
Brace 4 is provided between frame and ground.
Trolley in the utility model follows following steps during installation:
1, it determines the benchmark of installation: checking whether ground is smooth as required, guarantee the benchmark of installation.
2, be laid with track: track selects P43Kg/m shaped steel rail, is highly 140mm, is supported on the ground for pouring completion.
Track must be fixed;Orbit centre is not greater than 10mm away from that must reach design requirement, error;Track vertical error is not greater than
10mm;Orbit centre and tunnel errors of centration are not greater than 20mm;
3, the installation of running gear: walking carriage walking beam and bridging assemble first, adjust size, fasten spiral shell
Bolt.Traveling wheel is fixed on track, assembled good stringer is put into walking round frame using crane, using bolt fastening.
4, the installation of bracket: being put into the bracket of first layer on walking beam using crane, fixed using traversing slide piece block, on
Tight bolt, once mounting first layer bracket, centre connects bridging.According to highly needing to install the second layer, third layer.
5, installation template:
A, the straightness of bracket is adjusted
B, it is installed since trolley bracket end, lifts by crane template with crane, the lower part keel of template are put into bracket outrigger
On, the measurement module road clearance, template terrain clearance is adjusted with backing plate, reaches design requirement, template is fixed to clamping plate
It on bracket, successively installs, adjusts gap and faulting of slab ends.To increase counterweight in rack template relative direction position when the second layer is installed
Block, weight should be more slightly larger than template weight.
6, detect each design size: whether detection each significant dimensions of trolley reach design requirement.
Basic principles, main features, and advantages of the present invention has been shown and described above.Current row
The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments
Only the principles of the present invention, the utility model also has respectively on the premise of not departing from the spirit and scope of the utility model
Kind changes and improvements, these changes and improvements are both fallen in the range of claimed invention.The requires of the utility model
Protection scope defined by appended claims and its equivalent.
Claims (9)
1. a kind of concrete- liner tunnel side wall steel formwork trolley characterized by comprising
Bracket;
The side of the bracket is arranged in template;
Walking carriage, the bracket slide support are arranged on the walking carriage;
With traversing component, traversing Component driver bracket sliding movement on walking carriage.
2. concrete- liner tunnel side wall steel formwork trolley according to claim 1, which is characterized in that the bracket includes multiple
Modular bracket assembled rigid unit, the bracket assembled rigid unit include stringer, crossbeam and oblique pull beam, and multiple brackets are assembled single
Bridging is provided between member.
3. concrete- liner tunnel side wall steel formwork trolley according to claim 1 or 2, which is characterized in that the bracket cross section
Triangular in shape, the height of the bracket is h, and bottom edge length is d, wherein d >=1/2h.
4. concrete- liner tunnel side wall steel formwork trolley according to claim 1, which is characterized in that the template includes multiple
Modular unit, each modular unit matching is laid in the stent side portion, and is connected between adjacent two modular unit by bolt
Connect fixation.
5. concrete- liner tunnel side wall steel formwork trolley according to claim 1, which is characterized in that the walking carriage matching
Setting is laid with multiple groups telescopic support legs in walking carriage bottom on walking track.
6. concrete- liner tunnel side wall steel formwork trolley according to claim 1, which is characterized in that set on the walking carriage
It is equipped with slip base, the frame bottom matching is slidably arranged in the slip base, and the traversing component is translation oil cylinder, described
The both ends of translation oil cylinder respectively with the slip base and the bracket.
7. concrete- liner tunnel side wall steel formwork trolley according to claim 6, which is characterized in that translation oil cylinder is arranged in institute
It states on the downside of slip base and bracket.
8. concrete- liner tunnel side wall steel formwork trolley according to claim 1, which is characterized in that the bracket and ground it
Between be provided with brace.
9. concrete- liner tunnel side wall steel formwork trolley according to claim 1, it is characterised in that: be provided on the bracket
Ladder is provided with station in the cradle top.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821239598.XU CN208778011U (en) | 2018-08-02 | 2018-08-02 | Concrete- liner tunnel side wall steel formwork trolley |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821239598.XU CN208778011U (en) | 2018-08-02 | 2018-08-02 | Concrete- liner tunnel side wall steel formwork trolley |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208778011U true CN208778011U (en) | 2019-04-23 |
Family
ID=66155617
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821239598.XU Active CN208778011U (en) | 2018-08-02 | 2018-08-02 | Concrete- liner tunnel side wall steel formwork trolley |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208778011U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110789679A (en) * | 2019-09-25 | 2020-02-14 | 沪东中华造船(集团)有限公司 | Movable type ascending ladder frame for welding cushion blocks of supporting box of cabin cover of container ship |
-
2018
- 2018-08-02 CN CN201821239598.XU patent/CN208778011U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110789679A (en) * | 2019-09-25 | 2020-02-14 | 沪东中华造船(集团)有限公司 | Movable type ascending ladder frame for welding cushion blocks of supporting box of cabin cover of container ship |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205501818U (en) | Steel truss arch bridge maintenance car | |
CN106638687B (en) | A kind of accurate quick-assembling technique of precast assembly pipe gallery | |
WO2019080824A1 (en) | Novel track laying machine for urban rail transport project and construction method therefor | |
CN109653105B (en) | Main truss system of box girder bridge cantilever construction hanging basket and use method thereof | |
CN107956487B (en) | Automatic inner formwork equipment suitable for pipe gallery construction and construction method thereof | |
WO2022088053A1 (en) | Girder transporting vehicle, girder transporting system, steel box girder assembly system, and steel box girder assembly method | |
CN203021883U (en) | Wheel-track railway track laying unit | |
CN110230261B (en) | Mounting construction method for upper frame beam of double-layer synchronous beam | |
CN112323644B (en) | Beam transporting vehicle, beam transporting system, steel box beam assembling system and steel box beam assembling method | |
CN106869948A (en) | A kind of construction that technique on shield machine's station-crossing is realized using the delivery vehicle that misses the stop | |
CN111455852A (en) | Assembling method of movable formwork for bridge construction | |
CN103074829A (en) | Railway switch changing construction method and railway switch track laying unit thereof | |
CN101885206B (en) | Hydraulic internal mold truss type walking track system of high speed railway prefabricating box girder | |
CN208778011U (en) | Concrete- liner tunnel side wall steel formwork trolley | |
CN202064281U (en) | Slip form frame | |
CN107642089B (en) | Narrow space concrete pouring method | |
CN206245344U (en) | A kind of installation car assembled for precast assembly pipe gallery | |
CN109487646A (en) | Shield section and platform section running track traveling process become automatically across method | |
CN211819422U (en) | Lifting walking template trolley suitable for construction of curve tunnel | |
CN206035507U (en) | Rectangle box culvert and for tunnel construction platform truck | |
CN102071641A (en) | Integral bridge girder erection machine of distributed landing leg type transportation rack of concrete beam packing bridge crane and bridge girder erection engineering method thereof | |
CN112160773A (en) | Tunnel lining reinforcing steel bar trolley and lining reinforcing steel bar binding construction method | |
CN108004930A (en) | The construction method of vertical shift bowstring arch bridge | |
CN110817312A (en) | Rail-mounted hydraulic steel pipe transportation trolley | |
CN106192761A (en) | A kind of method disassembling mobile formwork in bridge tunnel narrow short transition time section |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |