CN208666154U - Go up and down room formula underground garbage station - Google Patents
Go up and down room formula underground garbage station Download PDFInfo
- Publication number
- CN208666154U CN208666154U CN201821506112.4U CN201821506112U CN208666154U CN 208666154 U CN208666154 U CN 208666154U CN 201821506112 U CN201821506112 U CN 201821506112U CN 208666154 U CN208666154 U CN 208666154U
- Authority
- CN
- China
- Prior art keywords
- lifting
- room
- floor
- top cover
- lifting cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Refuse Collection And Transfer (AREA)
Abstract
The utility model discloses a kind of lifting room formula underground garbage station, dustbin is set to receive fortune more efficient, and equipment is easy to maintain.Including melt pit, setting goes up and down room in melt pit, and lifting room includes room body, room body lifting device, and room body includes top cover, floor and several pillars, and floor includes that ground plate body and crossbeam, the both ends of the surface of crossbeam are respectively equipped with coaster;Melt pit side wall is vertically equipped with walking guide rail compatible with coaster, room body lifting device includes the pumping plant of the lifting cylinder being erected in pillar and driving lifting cylinder, lifting cylinder is passed down through floor and crossbeam, melt pit bottom surface is equipped with pedestal corresponding with lifting cylinder, the piston rod of lifting cylinder is supported on corresponding pedestal, the prefabricated steel construction rectangle frame compatible with room body top cover in the top edge of melt pit, the inward flange of rectangle frame is equipped with sealing strip, sealing strip with top cover lower edge for being bonded, form sealing, the upper surface location of top cover, the equal liftable of the upper surface location on floor is to concordant with ground.
Description
Technical field
The utility model relates to refuse depot technical fields, more particularly to a kind of lifting room formula underground garbage station.
Background technique
Problem of the existing technology is:
Underground garbage station is not necessarily to hydraulic device garbage throwing, but relies on the gravity of rubbish itself since occupied area is small
Garbage throwing cartonning, and environmental protection, are to build residential neighborhoods in, city central area is preferably selected.Existing buried type garbage
Compressor station mainly carries out lifting to the platform for placing dustbin or directly lifting garbage case, lifting device is fixed in foundation pit,
The driving device of dustbin lifting is introduced by melt pit.It is primarily present two aspect problems and inhibits the popularization and use of underground garbage station:
1. to compress to the rubbish in dustbin, one must be made in trash compactor and dustbin.It is domestic at present
The more of external application is will to move compression dustbin to be placed in underground garbage station.Use transfer car(buggy) dustbin together with pressure after filling rubbish
The entrucking together of contracting machine.It is inefficient to receive fortune since compressor is in dustbin for this mode.Cast hopper and dustbin use rubber
Adhesive plaster docking is easy pollution cabinet.Another is that compressor is placed in storage dustbin, and compressor is to pouring into rubbish storage case
In rubbish compressed, then lifting garbage storage box is to transporting height of wagon, then compressed garbage is docked and is packed into transfer car(buggy)
Dustbin in.This mode, environmental pollution is serious when garbage butt conveying, and compression compressing head contact area is big, to rubbish
Compaction force weaken significantly, the height of dustbin is short, and ram movement stroke is very long, and operational efficiency is very low, thus single treatment
Quantity of refuse is few.
2. lifting device is fitted into melt pit, when system when something goes wrong, especially dustbin jacking system in melt pit goes out
When existing problem, maintenance difficulty is quite big.Since melt pit humidity is big, rubbish causes equipment to be also easy damage the corrosiveness of equipment
It is bad, it is not easy to find the problem, this, which is many users, is unwilling the major reason of investment to underground garbage station.
Utility model content
The purpose of the utility model is to overcome the deficiencies in the prior art, provide a kind of lifting room formula underground garbage station, make
With the utility model, so that dustbin is received fortune more efficient, while improving the working environment of lifting cylinder and pipeline, equipment is also easy
In maintenance.Garbage house can not be built and be installed on open air, occupied area is small, pollute it is small, can reduce refuse depot build a station cost and
Operating cost.It is designed due to using room body structure, the installation and debugging of package unit are all completed in the factory, are substantially reduced existing
Field construction part, improves installation and debugging efficiency, ensure that installation and debugging quality.
Purpose of the utility model is realized as follows:
A kind of lifting room formula underground garbage station, including melt pit, the melt pit interior setting lifting room, the lifting room includes room
Body and it is set to the intracorporal room body lifting device in room, the room body includes top cover, floor and be supported between top cover, floor
Several pillars, the floor include that ground plate body and crossbeam, the front and back end of described ground plate body lower end surface are connected separately with the crossbeam,
The both ends of the surface of each crossbeam are respectively equipped with coaster;The melt pit side wall is vertically equipped with walking guide rail compatible with coaster, the room body
Lifting device includes the pumping plant of the lifting cylinder being erected in pillar and driving lifting cylinder, and the lifting cylinder is passed down through ground
Plate and crossbeam, the melt pit bottom surface are equipped with pedestal corresponding with lifting cylinder, and each pedestal is in same level, the lifting
The piston rod of oil cylinder is supported on corresponding pedestal, the prefabricated steel construction square compatible with room body top cover in the top edge of the melt pit
Shape frame, the inward flange of the rectangle frame are equipped with sealing strip, and the sealing strip with top cover lower edge for being bonded, formation sealing,
The upper surface location of the top cover, the floor the equal liftable of upper surface location to concordant with ground.
Preferably, the room body walking guide rail is molded as one with corresponding pedestal.
Preferably, lifting cylinder one end adjacent with cylinder cap is arranged ring flange, on the ring flange and the crossbeam
The ring flange being correspondingly arranged is bolted to connection.
It since lifting cylinder cylinder body is fixed on crossbeam, is supported only by piston rod, relative to lifting cylinder branch
The structure in top cover and melt pit hole bottom is supportted, the length of support is shorter, and stability is more preferable.
Preferably, the position of the piston rod of the base supports lifting cylinder is equipped with bogey or weighing device, uses
It weighs in support room body or to room body.
Preferably, the upper end of the pedestal is equipped with the cavity radially limited for the piston rod to lifting cylinder, institute
The piston rod for stating lifting cylinder is contacted with the bottom of chamber of respective cavities, forms limited support, when lifting room is integrally located in melt pit,
On the base, the end of the piston rod of the lifting cylinder does not contact cavity bottom for the lifting room support, keeps lifting cylinder living
Stopper rod is not subject to support force, and the end of lifting cylinder piston rod is contained in cavity.
Preferably, the corner location of the room body is respectively equipped with the pillar, and the pillar of room body corner location is interior
It is equipped with the lifting cylinder.
Preferably, the floor of the room body is equipped with dustbin walking guide rail, the entrance of the dustbin walking guide rail
It is provided with the dustbin guide rail swingable into room.
Preferably, the fixed pumping plant, the top cover are equipped with the cover board for safeguarding pumping plant below the top cover.
Preferably, the input end in the lifting room is provided with mounting device, for installing Split garbage compressor or throwing
Hopper, the mounting device include upper cover, and the top cover is equipped with the resigning mouthful of corresponding upper cover, are arranged on the upper lid and feed intake
Door, the upper cover lower section are the installation site of Split garbage compressor or cast hopper, and the two sides of the upper cover are respectively fixed with
Crane forms dustbin access way between the crane of upper cover two sides, and the crane includes two elevating levers erected,
Supporting beam is fixed between two elevating lever tops, two elevating lever clearance fits are covered in two liftings fixed on floor,
It is fixed with lower supporting beam between two lifting sets, fixes lifting hydraulic cylinder between the upper supporting beam, lower supporting beam.
Preferably, the top cover upper end is fixed with multiple small dustbins of the classification for feeding intake, and fixes on the floor
Multiple small dustbins of classification are corresponded to equipped with multiple big dustbins of docking.
By adopting the above-described technical solution, the utility model has the following beneficial effects:
The utility model optimizes the lifting device of underground garbage station, enhances the purposes of underground garbage station, energy-saving and environmental protection
Effect is obvious, and is able to achieve the function that rubbish is collected in weight calculation.It is small to go up and down room occupied area, is not take up the space on ground, very
Convenient for the environmental protection treatment of refuse depot.Foundation is simple.All facilities are fully integrated into lifting room body, and room body enters conveniently,
Therefore, maintenance is more convenient.Different facilities is integrated in lifting room, constitutes various types of refuse depots, such as:
Lifting integrates split type compressor in room, constitutes split type compressor ground-buried garbage compressor station;It integrates and throws in lifting room room
Expect hopper, constitutes the mobile box underground garbage station of compression;Refuse classification barrel, placement pair in room body are integrated on small-sized lifting room
Bulky refuse bucket is connect, garbage classification formula underground garbage station etc. is constituted.
The utility model can be used on buried type garbage compressor station, can be also used for garbage classification refuse depot, garbage classification
Gathering station, rubbish grind up the refuse on station.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that embodiment one goes up and down room (no melt pit, without dustbin) raising state;
Fig. 2 is the structural schematic diagram that embodiment one goes up and down room (no melt pit, without dustbin) contraction state;
Fig. 3 is the structural schematic diagram that embodiment one goes up and down that (there is melt pit in room, has dustbin) raising state;
Fig. 4 is the structural schematic diagram that embodiment one goes up and down that (there is melt pit in room, has dustbin) contraction state;
Fig. 5 is the structural schematic diagram that Fig. 4 opens feeding door;
Fig. 6 is that one dustbin of embodiment transports schematic diagram from lifting room;
Fig. 7 is the structural schematic diagram that embodiment two goes up and down room raising state;
Fig. 8 is the structural schematic diagram that embodiment two goes up and down room contraction state.
Appended drawing reference
In attached drawing, 1 is the cover board for going up and down room pumping plant, and 2 be top cover, and 3 be feeding door, and 4 be pillar, and 5 be swingable guide rail,
6 be ground plate body, and 7 be floor crossmember, and 8 be the piston rod of room body lifting cylinder, and 9 be supporting arrangement or weighing device, and 10 be pedestal,
11 be mounting device, and 12 walk track for room body, and 13 be dustbin walking guide rail, and 14 be split type compressor or cast hopper, 15
It is the small dustbin of classification for dustbin, 16,17 is dock big dustbin, and 18 be upper cover, and 19 be elevating lever, and 20 cover for lifting, and 21
For lifting hydraulic cylinder.
Specific embodiment
Embodiment one
Referring to Fig. 1-Fig. 6, a kind of lifting room formula underground garbage station, including melt pit, the melt pit interior setting lifting room are described
Lifting room includes room body and is set to the intracorporal room body lifting device in room, and the room body includes top cover, floor and is supported in top
The floor of several pillars between lid, floor, the room body is equipped with dustbin walking guide rail, the dustbin walking guide rail
Entrance is provided with the dustbin guide rail swingable into room.The floor includes ground plate body and crossbeam, described ground plate body lower end surface
Front and back end be connected separately with the crossbeam, the both ends of the surface of each crossbeam are respectively equipped with coaster;The melt pit side wall is vertically equipped with and slides
The compatible walking guide rail of vehicle.
The room body lifting device includes the pumping plant of the lifting cylinder being erected in pillar and driving lifting cylinder, the top
The fixed pumping plant in lid lower section, the top cover are equipped with the cover board for safeguarding pumping plant.In the present embodiment, the quadrangle of the room body
Position is respectively equipped with the pillar, and the pillar of room body corner location is built-in with the lifting cylinder.The lifting cylinder
It is passed down through floor and crossbeam, ring flange, the ring flange and the cross is arranged in lifting cylinder one end adjacent with cylinder cap
The ring flange being correspondingly arranged on beam is bolted to connection.The melt pit bottom surface is equipped with pedestal corresponding with lifting cylinder, institute
Room body walking guide rail is stated to be molded as one with corresponding pedestal.Each pedestal is in same level, the work of the lifting cylinder
Stopper rod is supported on corresponding pedestal, and the position of the piston rod of the base supports lifting cylinder is equipped with bogey or again
Device is used to support room body or weighs to room body, it is preferable that the upper end of the pedestal is equipped with for the piston rod to lifting cylinder
The cavity radially limited, the piston rod of the lifting cylinder are contacted with the bottom of chamber of respective cavities, form limited support, the two
Connectionless relationship, convenient for disassembly, maintenance lifting oil cylinder out of lifting room.When lifting room is integrally located in melt pit, the lifting
Room supports on the base, and the end of the piston rod of the lifting cylinder does not contact cavity bottom, holds lifting cylinder piston rod not
It is contained in cavity by the end of support force, lifting cylinder piston rod.The top edge of the melt pit is prefabricated mutually to fit with room body top cover
The steel construction rectangle frame matched, the inward flange of the rectangle frame are equipped with sealing strip, and the sealing strip is used to paste with top cover lower edge
Close, form sealing, the upper surface location of the top cover, the floor the equal liftable of upper surface location to concordant with ground.
The input end in the lifting room is provided with mounting device, for installing Split garbage compressor or cast hopper, institute
Stating mounting device includes upper cover, and the top cover is equipped with the resigning mouthful of corresponding upper cover, is arranged feeding door on the upper lid, it is described on
Lid lower section is the installation site of Split garbage compressor or cast hopper, and the two sides of the upper cover are respectively fixed with crane, on
Dustbin access way is formed between the crane of lid two sides, the crane includes two elevating levers erected, two liftings
Supporting beam is fixed between bar top, two elevating lever clearance fits are in two liftings set fixed on floor, two liftings
It is fixed with lower supporting beam between set, fixes lifting hydraulic cylinder between the upper supporting beam, lower supporting beam.
The composition of the present embodiment is as shown in Fig.1 and Fig.2.Lifting room is placed in melt pit, and dustbin is put into lifting house floor
On, as shown in Figure 3.Lifting room is sunken to underground, and roof cap upper surface is concordant with ground, and when not working, full station equipment is in close
Envelope state, waste odours do not leak, as shown in Figure 4.When to be dumped rubbish, feeding door is opened, as shown in figure 5, rubbish passes through
Split type compressor or cast hopper are fitted into dustbin.After rubbish fills dustbin, dustbin is promoted to by lifting device
Then top cap is promoted to certain height with split type compressor or cast hopper again by ground together, then will with hook arm vehicle
Dustbin is removed from lifting house floor, as shown in Figure 6.
Embodiment two
Referring to Fig. 7, Fig. 8, the top cover upper end is fixed with multiple small dustbins of the classification for feeding intake, on the bottom plate
It is fixed with multiple big dustbins of docking and corresponds to multiple small dustbins of classification.After classifying worker to garbage classification, directly launches and arrive
In corresponding bucket, as shown in Figure 7.When lifting room sinks to underground, the refuse classification worker on ground has bigger space to rubbish
It is sorted, is particularly suitable for artificial and automation equipment garbage-sorting, as shown in Figure 8.The sorting rubbish station, it is also mountable in public affairs
Collecting region altogether, for resident's sorting rubbish, such as: it build the garbage classification etc. of cell underground parking garage in.The present embodiment omits reality
The mounting device and cover board in example one are applied, other features are the same as example 1.
Finally, it is stated that preferred embodiment above is merely intended for describing the technical solutions of the present application, but not for limiting the present application, to the greatest extent
Pipe has been described in detail the utility model by above preferred embodiment, but those skilled in the art should manage
Solution, can make various changes, without departing from the utility model claims book institute to it in the form and details
The range of restriction.
Claims (10)
1. a kind of lifting room formula underground garbage station, including melt pit, which is characterized in that setting lifting room, the liter in the melt pit
Drop room include room body and be set to the intracorporal room body lifting device in room, the room body include top cover, floor and be supported in top cover,
Several pillars between floor, the floor include that ground plate body and crossbeam, the front and back end of described ground plate body lower end surface are separately connected
There is the crossbeam, the both ends of the surface of each crossbeam are respectively equipped with coaster;The melt pit side wall is vertically equipped with walking compatible with coaster and leads
Rail, the room body lifting device include the pumping plant of the lifting cylinder being erected in pillar and driving lifting cylinder, the lifting oil
Cylinder is passed down through floor and crossbeam, and the melt pit bottom surface is equipped with pedestal corresponding with lifting cylinder, and each pedestal is in same level
On face, the piston rod of the lifting cylinder is supported on corresponding pedestal, and the top edge of the melt pit is prefabricated with room body top cover phase
The rectangle frame of adaptation, the inward flange of the rectangle frame are equipped with sealing strip, and the sealing strip with top cover lower edge for being bonded, shape
At sealing, the upper surface location of the top cover, the floor the equal liftable of upper surface location to concordant with ground.
2. a kind of lifting room formula underground garbage station according to claim 1, which is characterized in that the room body walking guide rail with
Corresponding pedestal is molded as one.
3. a kind of lifting room formula underground garbage station according to claim 1, which is characterized in that the lifting cylinder and cylinder cap
Ring flange is arranged in adjacent one end, and the ring flange being correspondingly arranged on the ring flange and the crossbeam is bolted to connection.
4. a kind of lifting room formula underground garbage station according to claim 1, which is characterized in that the base supports lifting oil
The position of the piston rod of cylinder is equipped with bogey or weighing device, is used to support room body or weighs to room body.
5. a kind of lifting room formula underground garbage station according to claim 1, which is characterized in that the upper end of the pedestal is equipped with
For the cavity that the piston rod to lifting cylinder is radially limited, the piston rod of the lifting cylinder and the bottom of chamber of respective cavities
Contact forms limited support, and when lifting room is integrally located in melt pit, on the base, the lifting is oily for the lifting room support
The end of the piston rod of cylinder does not contact cavity bottom, and lifting cylinder piston rod is made to be not subject to support force, lifting cylinder piston rod
End is contained in cavity.
6. a kind of lifting room formula underground garbage station according to claim 1, which is characterized in that the corner location of the room body
It is respectively equipped with the pillar, the pillar of room body corner location is built-in with the lifting cylinder.
7. a kind of lifting room formula underground garbage station according to claim 1, which is characterized in that set on the floor of the room body
There is dustbin walking guide rail, the entrance of the dustbin walking guide rail is provided with the dustbin guide rail swingable into room.
8. a kind of lifting room formula underground garbage station according to claim 1, which is characterized in that fixed institute below the top cover
Pumping plant is stated, the top cover is equipped with the cover board for safeguarding pumping plant.
9. a kind of lifting room formula underground garbage station according to claim 1, which is characterized in that the input end in the lifting room
It is provided with mounting device, for installing Split garbage compressor or cast hopper, the mounting device includes upper cover, the top cover
Be equipped with the resigning mouthful of corresponding upper cover, feeding door be set on the upper lid, be below the upper cover Split garbage compressor or
The installation site of cast hopper, the two sides of the upper cover are respectively fixed with crane, form rubbish between the crane of upper cover two sides
Case access way, the crane include two elevating levers erected, are fixed with supporting beam between two elevating lever tops, and two
Root elevating lever clearance fit in two liftings set fixed on floor, two liftings cover between be fixed with lower supporting beam, it is described on
Lifting hydraulic cylinder is fixed between supporting beam, lower supporting beam.
10. a kind of lifting room formula underground garbage station according to claim 1, which is characterized in that the top cover upper end is fixed
Equipped with multiple small dustbins of the classification for feeding intake, it is fixed with multiple big dustbins of docking on the floor and corresponds to multiple classification
Small dustbin.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821506112.4U CN208666154U (en) | 2018-09-14 | 2018-09-14 | Go up and down room formula underground garbage station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821506112.4U CN208666154U (en) | 2018-09-14 | 2018-09-14 | Go up and down room formula underground garbage station |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208666154U true CN208666154U (en) | 2019-03-29 |
Family
ID=65842550
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821506112.4U Active CN208666154U (en) | 2018-09-14 | 2018-09-14 | Go up and down room formula underground garbage station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208666154U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108792380A (en) * | 2018-09-14 | 2018-11-13 | 重庆科技学院 | Lift room formula underground garbage station |
-
2018
- 2018-09-14 CN CN201821506112.4U patent/CN208666154U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108792380A (en) * | 2018-09-14 | 2018-11-13 | 重庆科技学院 | Lift room formula underground garbage station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105346899B (en) | A kind of automatic garbage collection device for suppressing airborne dust | |
CN201923576U (en) | Dedicated hoisting dust cart for deep-lying garbage collection barrel | |
CN101306753A (en) | Refuse transfer station equipment | |
CN201914650U (en) | Movable trash compactor | |
CN108792380A (en) | Lift room formula underground garbage station | |
CN206954964U (en) | Lifting platform formula is buried to hook arm dustbin | |
CN208666154U (en) | Go up and down room formula underground garbage station | |
CN201217555Y (en) | Movable garbage compression apparatus | |
CN110342161A (en) | Mobile garbage compressor station and its control method | |
CN202046644U (en) | Vertical-compression multi-position intelligent movable garbage compression station | |
CN205616037U (en) | Horizontal rubbish compressor of ground formula | |
CN200942963Y (en) | Environment-friendly type pit horizontal garbage compression transfer station | |
CN201272613Y (en) | Garbage transfer station apparatus | |
CN208963832U (en) | A kind of side hanging dustbin refuse depot | |
CN208499387U (en) | Small-sized rubbish transfer station | |
CN103407714B (en) | Storable type pollution-free waste briquetting machine | |
CN201942237U (en) | Compressible and folding underearth garbage storeroom | |
CN201411206Y (en) | Automatic tipping device of garbage transfer equipment | |
CN213084327U (en) | Garbage transfer system | |
CN205114233U (en) | Horizontal compression rubbish transfer equipment | |
CN205467497U (en) | Fixed platform formula removes perpendicular rubbish compression station | |
CN2564509Y (en) | Refuse compression treater | |
CN204916823U (en) | Automobile from loading and unloading rubbish | |
CN209684523U (en) | From lift ground-buried garbage collecting vessel | |
CN206857477U (en) | Vertical trash railway carriage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210421 Address after: No.18 Fengsheng Road, Jinfeng Town, Jiulongpo District, Chongqing Patentee after: CHONGQING YUJIE SANITATION FACILITIES Co.,Ltd. Address before: 401331 Shapingba University District, Chongqing City Road, No. 20 Patentee before: Chongqing University of Science & Technology |
|