CN208649903U - A kind of fluting apparatus suitable for concrete beam body construction operation - Google Patents
A kind of fluting apparatus suitable for concrete beam body construction operation Download PDFInfo
- Publication number
- CN208649903U CN208649903U CN201821075219.8U CN201821075219U CN208649903U CN 208649903 U CN208649903 U CN 208649903U CN 201821075219 U CN201821075219 U CN 201821075219U CN 208649903 U CN208649903 U CN 208649903U
- Authority
- CN
- China
- Prior art keywords
- beam body
- lifter
- concrete beam
- construction operation
- body construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of fluting apparatus suitable for concrete beam body construction operation, including lifting controller, supporting mechanism, fixed mechanism and the hand-hold shearing unit set gradually from bottom to up;The supporting mechanism is fixedly mounted on lifting controller, and the fixed mechanism is arranged above supporting mechanism, and the fixed mechanism and supporting mechanism are fixedly connected by rotary screw, and the hand-hold shearing unit is installed on fixed mechanism.The utility model provides a kind of fluting apparatus suitable for concrete beam body construction operation, efficiently accurate in beam body can slot, easy for construction, easy to operate, safe operation, while realizing the turnover economic benefit that assembling one-time continuous uses.
Description
Technical field
The utility model relates to construction technical field of tools, in particular to a kind of beams of concrete body construction that is suitable for is made
The fluting apparatus of industry.
Background technique
With the development that Bridges in Our Country is built, nearly million bridge block in highway and city enter regularly detection and
Maintenance stage, construction task are very arduous.In the detection and maintenance construction of concrete beam body, because of construction process requirement, normal companion
With there is fluting operation.It, can when beam body fluting job engineering amount is smaller, required precision is lower, groove depth is shallower, length is shorter
To be considered as manually slotting;When beam body fluting job engineering amount is big, required precision is higher, slotting length is longer, using people
The generation for phenomena such as work fluting is not only difficult to ensure precision, and fluting deviation is more easily led to when slotting length is longer, project amount is big;
Worker's fatigue can also cause cutting machine landing simultaneously, cause various safety accidents.
It, manually can (groove width not easy to control) using hand-hold shearing unit in the case of short-period used;And it is applied for a long time
It is prolonged to lift hand fluting according to the mode of man-hour manually hand-held cutting machine fluting under the conditions of work, worker's degree of fatigue can sharply on
It rises;If continuing to construct under fatigue state, construction quality, efficiency decline are not only resulted in, it is easier to so that cutting machine is sliding from hand
It falls or faulty operation, causes safety accident.On the one hand, artificial fluting generally can not last longer, and once slot away from
From cannot be too long, it be easy to cause deviation, unstability, fluting apparatus can not be overweight;If the on the other hand prolonged fluting that comes back, work
People can wear more safety devices and avoid sucking excessive dust;Such that worker's burden is heavier, greatly reduces and apply
Work efficiency rate;More there is worker for convenience, slough safety device, not only suck more dust, endanger body, is also easy to because not wearing
Corresponding safety device is injured.
Utility model content
It is set in order to solve the above technical problems, the utility model provides a kind of fluting suitable for concrete beam body construction operation
It is standby, it efficiently accurate in beam body can slot, easy for construction, easy to operate, safe operation, while realizing that assembling one-time continuous uses
Turnover economic benefit.
The technology employed by the present utility model is
A kind of fluting apparatus suitable for concrete beam body construction operation, including the elevating control set gradually from bottom to up
Device, supporting mechanism, fixed mechanism and hand-hold shearing unit;The supporting mechanism is fixedly mounted on lifting controller, described solid
Determine mechanism to be arranged above supporting mechanism, the fixed mechanism and supporting mechanism are fixedly connected by rotary screw, described
Hand-hold shearing unit is installed on fixed mechanism.
As the preferred of the present embodiment, the lifting controller includes lifter pedestal and lifter top panel, described
There are two elevating mechanisms for installation between lifter pedestal and lifter top panel, and two elevating mechanisms are along lifter pedestal
Center symmetric setting, two elevating mechanisms are connected with lifter pedestal and lifter top panel.
As the preferred of the present embodiment, each elevating mechanism include the first connecting rod, the second connecting rod and
Lifting cylinder;Intersect in the middle part of the first connecting rod and the second connecting rod and is articulated and connected;One end of the lifting cylinder and liter
Drop device pedestal is connected, and the other end is connected with first connecting rod or the second connecting rod.
As the preferred of the present embodiment, the bottom of first connecting rod and lifter pedestal are carried out hingedly, first connecting rod
Top is equipped with idler wheel, and the idler wheel can slide left and right in the bottom of lifter top panel;The top of second connecting rod and liter
The bottom for dropping device top panel carries out hingedly, and the bottom of the second connecting rod is equipped with idler wheel, and the idler wheel can be enterprising in lifter pedestal
Row horizontally slips.
As the preferred of the present embodiment, the supporting mechanism includes bottom support rod, middle studdle and top supporting rod,
The bottom support rod, middle studdle and top supporting rod are welded together by vertical support rod, in vertical support rod
Two sides are equipped with reinforcing rib, and the reinforcing rib welds together with bottom support rod.
As the preferred of the present embodiment, the bottom support rod, middle studdle, top supporting rod, vertical support rod and
Reinforcing rib is all made of square steel and is welded.
As the preferred of the present embodiment, the fixed mechanism is anchor ear, is placed the fuselage of hand-hold shearing unit when use
It is by the fastening bolt on anchor ear that hand-hold shearing unit is fixed locked in anchor ear.
As the preferred of the present embodiment, rubber layer is equipped on the inner wall of the anchor ear.
Compared with prior art, the utility model has the beneficial effects that
1, a kind of fluting apparatus suitable for concrete beam body construction operation described in the utility model has applicability
By force, easy to operate, the advantages that safety is good, economical and practical, application prospect is wide, environmentally protective.
2, adaptable: fluting apparatus described in the utility model is not only suitable for the beam body of any specification, is also applied for growing
Distance fluting, and while guaranteeing length, it ensure that the precision of fluting.
3, easy to operate: fluting apparatus described in the utility model is that standard component is assembled, is operated relatively simple;Support
Mechanism can be according to construction operation site space size, in factory or live processing and fabricating, construction and using relatively simple;Using hand
Formula groover is held as fluting apparatus, is everyday devices, it is easy to operate;All use operations can be implemented by a people, phase
Pass structure, the Joining Technology of component are simple, and unskilled labour power can be competent at, and have preferable operability;All installations and dismounting
Work can be completed in any place, substantially increase the ability for adapting to engineering boundary condition.
4, safety is good: structure and material involved in fluting apparatus described in the utility model is general type, is led to
It crosses and selects product qualified in the market, complete structural checking computation and be reliably connected, guarantee that structure is used safely;By strictly implementing to apply
Engineering sequence and Operation Key, it is ensured that process safety;Fluting apparatus, which slides, caused by effectively avoiding simultaneously because of fatigue causes
The accident of disability has fundamentally prevented the generation of such event.
5, economical and practical: fluting apparatus described in the utility model using common process technique and common profile production and
At, assembling and the processing is simple, cost of manufacture is lower;Fluting apparatus uses simple process, and supporting mechanism is welded to each other, fixed device
With truss to be bolted;By the principle of similar lever when use, not only greatly reduces the auxiliary construction time, improves construction
Effect reduces the repeatedly expense of turnover assembly and the again expense of erection construction platform, even more ensure that whole construction
Precision.
6, application prospect is wide: fluting apparatus described in the utility model both can be applied to be opened in the arbitrary plane of beam body
Slot operation is also adapted to need the engineering of detection, maintenance and the reinforcing of fluting operation over long distances.
7, environmentally protective: fluting apparatus described in the utility model is effectively avoided to be caused because selecting dustless cutting machine
Machine it is overweight, the low problem of construction efficiency, four scattered dust when also reducing cutting operation improves whole construction effect
Rate also more effectively protects surrounding enviroment and the health of worker.
Detailed description of the invention
Fig. 1 shows for the structure of the fluting apparatus suitable for concrete beam body construction operation a kind of in the utility model embodiment
It is intended to;
Fig. 2 is the structural schematic diagram of the utility model lifting controller;
Fig. 3 is the decomposition diagram of the utility model lifting controller;
Fig. 4 is the side sectional view of the utility model fixed mechanism.
It is as shown in the figure: 1, lifting controller, 11, lifter pedestal, 121, first connecting rod, the 122, second connecting rod,
123, lifting cylinder, 124, idler wheel, 12, lifter top panel, 13, elevating mechanism, 2, supporting mechanism, 21, bottom support rod,
22, middle studdle, 23, top braces, 24, vertical support rod, 25, reinforcing rib, 3, fixed mechanism, 31, rubber layer, 4, rotation
Screw rod, 5, hand-hold shearing unit.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Referring to shown in Fig. 1 to 3, the utility model embodiment provides a kind of fluting suitable for concrete beam body construction operation
Equipment, including lifting controller 1, supporting mechanism 2, fixed mechanism 3 and the hand-hold shearing unit 5 set gradually from bottom to up;Its
In, supporting mechanism 2 is fixedly mounted on lifting controller 1, and fixed mechanism 3 is arranged above supporting mechanism 2, the fixed mechanism
3 are fixedly connected with supporting mechanism 2 by rotary screw 4, make hand-hold shearing unit 5 can be as lever by rotary screw 4
Equally lower movement on the vertical plane, hand-hold shearing unit 5 is installed on fixed mechanism 3.
Referring to fig. 2 to shown in 3, in the present embodiment, lifting controller 1 includes lifter pedestal 11 and lifter top panel
12, there are two elevating mechanism 13, two elevators for installation between the lifter pedestal 11 and lifter top panel 12
Center symmetric setting of the structure 13 along lifter pedestal 11, two elevating mechanisms 13 and lifter pedestal 11 and lifter top panel 13
It is connected.
Referring to fig. 2 to shown in 3, in the present embodiment, two elevating mechanisms 13 are in the vertical direction along lifter pedestal
11 are symmetrical arranged, and two 13 structures of elevating mechanism are identical, below we done just for one of elevating mechanism 13 it is detailed
Introduce: in the present embodiment, elevating mechanism 12 includes the first connecting rod 121, the second connecting rod 122 and lifting cylinder
123;Wherein, intersect and be articulated and connected in the middle part of first connecting rod 121 and the second connecting rod 122;One end of lifting cylinder 123 and liter
Drop device pedestal 11 is connected, and the other end is connected with first connecting rod 121 or the second connecting rod 122.Wherein, first connecting rod
121 bottom and lifter pedestal 11 carry out hingedly, and the top of first connecting rod 121 is equipped with idler wheel 124, and the idler wheel 124 can
It is slid left and right in the bottom of lifter top panel 12;The top of second connecting rod 122 and the bottom of lifter top panel 12
It carries out hingedly, the bottom of the second connecting rod 122 is equipped with idler wheel 124, and the idler wheel 124 can be controlled on lifter pedestal 11
Sliding.Lifting controller 1 described in the utility model is mounted on the underface of supporting mechanism 2, lifting controller 1 and supporting mechanism
It is fixedly connected between 2 by bolt.
Shown in Figure 1, in the present embodiment, supporting mechanism 2 includes bottom support rod 21, middle studdle 22 and top
Support rod 23, wherein bottom support rod 21, middle studdle 22 and top supporting rod 23 are welded on one by vertical support rod 24
It rises, forms whole fixed frame.Reinforcing rib 25, reinforcing rib 25 and bottom support rod 21 are equipped in the two sides of vertical support rod 24
Weld together, guarantees the integral strength of entire fixed frame.Wherein, bottom support rod 21, middle studdle 22, top braces
Bar 23, vertical support rod 24 and reinforcing rib 25 are all made of square steel and are welded, and assemble and the processing is simple, cost of manufacture is lower, whole
The design height of body frame can be according to construction site height appropriate adjustment.
Shown in Figure 4, the fixed mechanism 3 is anchor ear, and the fuselage of hand-hold shearing unit 5 is placed on anchor ear when use
It is interior, it is by the fastening bolt on anchor ear that hand-hold shearing unit 5 is fixed locked, rubber layer is equipped on the inner wall of the anchor ear
31, vibration when hand-hold shearing unit 5 is cut is reduced by rubber layer, and prevent hand-hold shearing unit from sliding.
The working principle of the utility model are as follows:
The height of lifting controller 1 is adjusted according to construction condition;Supporting mechanism 2 is fixed on lifter top panel
On 12;At the top of supporting mechanism 2 according to position, the direction of the selected movable fixed mechanism 3 in fluting direction, assembled fixed mechanism 2;
Hand-hold shearing unit 5 is installed to fixed mechanism 2, and tightens screw;It can be laid with track, on track route to guarantee to slot
Precision.If ground out-of-flatness, can be also laid on track route plank it is levelling or be laid with track;Adjust cutting machine blade number and
Size, to adapt to groove width and depth;Height, position are manually adjusted, fluting apparatus can be worked normally;Finally utilize fluting
Equipment underside device, similar lever principle, fluting apparatus end is depressed, tilt blade section, start to slot with hand
Operation.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (8)
1. a kind of fluting apparatus suitable for concrete beam body construction operation, it is characterised in that: including setting gradually from bottom to up
Lifting controller, supporting mechanism, fixed mechanism and hand-hold shearing unit;The supporting mechanism is fixedly mounted on lifting controller
On, the fixed mechanism is arranged above supporting mechanism, and the fixed mechanism and supporting mechanism are fixed by rotary screw
Connection, the hand-hold shearing unit are installed on fixed mechanism.
2. the fluting apparatus according to claim 1 suitable for concrete beam body construction operation, it is characterised in that: the liter
Drop controller includes lifter pedestal and lifter top panel, is equipped between the lifter pedestal and lifter top panel
Two elevating mechanisms, two elevating mechanisms two elevating mechanisms and rise along the center symmetric setting of lifter pedestal
Drop device pedestal is connected with lifter top panel.
3. the fluting apparatus according to claim 2 suitable for concrete beam body construction operation, it is characterised in that: Mei Yisuo
Stating elevating mechanism includes first connecting rod, the second connecting rod and lifting cylinder;In the first connecting rod and the second connecting rod
Portion intersects and is articulated and connected;One end of the lifting cylinder is connected with lifter pedestal, the other end and first connecting rod or the
Two connecting rods are connected.
4. the fluting apparatus according to claim 3 suitable for concrete beam body construction operation, it is characterised in that: first connects
The bottom of extension bar and lifter pedestal carry out hingedly, and the top of first connecting rod is equipped with idler wheel, and the idler wheel can be on lifter
The bottom of panel slides left and right;The top of second connecting rod and the bottom of lifter top panel carry out hinged, the second connection
The bottom of bar is equipped with idler wheel, and the idler wheel can slide left and right on lifter pedestal.
5. the fluting apparatus according to claim 1 suitable for concrete beam body construction operation, it is characterised in that: the branch
Support mechanism includes bottom support rod, middle studdle and top supporting rod, the bottom support rod, middle studdle and top branch
Strut is welded together by vertical support rod, is equipped with reinforcing rib, the reinforcing rib and bottom branch in the two sides of vertical support rod
Strut welds together.
6. the fluting apparatus according to claim 5 suitable for concrete beam body construction operation, it is characterised in that: bottom branch
Strut, middle studdle, top supporting rod, vertical support rod and reinforcing rib are all made of square steel and are welded.
7. the fluting apparatus according to claim 1 suitable for concrete beam body construction operation, it is characterised in that: described solid
Determining mechanism is anchor ear, and the fuselage of hand-hold shearing unit is placed in anchor ear by when use, by the fastening bolt on anchor ear by hand
It is fixed locked to hold formula cutting machine.
8. the fluting apparatus according to claim 7 suitable for concrete beam body construction operation, it is characterised in that: described
The inner wall of anchor ear is equipped with rubber layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821075219.8U CN208649903U (en) | 2018-07-09 | 2018-07-09 | A kind of fluting apparatus suitable for concrete beam body construction operation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821075219.8U CN208649903U (en) | 2018-07-09 | 2018-07-09 | A kind of fluting apparatus suitable for concrete beam body construction operation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208649903U true CN208649903U (en) | 2019-03-26 |
Family
ID=65783201
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821075219.8U Active CN208649903U (en) | 2018-07-09 | 2018-07-09 | A kind of fluting apparatus suitable for concrete beam body construction operation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208649903U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111822737A (en) * | 2020-07-16 | 2020-10-27 | 海南创启亿科技有限公司 | Portable plate groover |
CN112497523A (en) * | 2020-11-09 | 2021-03-16 | 黑龙江建筑职业技术学院 | Safety protection device for building electrical construction |
-
2018
- 2018-07-09 CN CN201821075219.8U patent/CN208649903U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111822737A (en) * | 2020-07-16 | 2020-10-27 | 海南创启亿科技有限公司 | Portable plate groover |
CN112497523A (en) * | 2020-11-09 | 2021-03-16 | 黑龙江建筑职业技术学院 | Safety protection device for building electrical construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5555953A (en) | Portable scaffolding attachment for front end loader or forklift | |
CN201395493Y (en) | Multifunctional wheeled mobile lifting control platform | |
CN208649903U (en) | A kind of fluting apparatus suitable for concrete beam body construction operation | |
WO2022037080A1 (en) | Removal and cleanup apparatus for vertical support structure | |
CN103787203B (en) | For installing the bracing frame of precast beam jack | |
KR102396543B1 (en) | Portal scraper having a load-bearing structure based on a framework structure | |
CN105256704A (en) | Machine-mounted bush hammer and concrete surface bush hammering method | |
CN202359504U (en) | Moveable detachable supporting device for assembling outward inclined segment of web of steel structure bridge | |
CN114289961B (en) | Gantry welding platform | |
EP3030719B1 (en) | Scaffold | |
CN205558915U (en) | Portable operation device | |
WO2024065963A1 (en) | Intelligent construction integrated platform and use method | |
CN115095269B (en) | Novel insulating operation platform | |
CN110005182A (en) | A kind of expanded type construction of lift well operation protective platform | |
CN208363559U (en) | A kind of hoistway operation platform level adjusting structure | |
CN210368639U (en) | Convenient multi-functional bridge construction of adjusting is with support frame | |
CN220643889U (en) | Bridge floor roughening tool | |
CN214456513U (en) | Crane rail mounting vehicle | |
JP4389200B2 (en) | Steel bracket and block mounting device for preventing falling bridges | |
CN221956527U (en) | Bridge construction's beam column formula support scissors support structure | |
CN116730224B (en) | Truss aqueduct auxiliary structure installation lifting equipment and use method | |
CN220336384U (en) | Scaffold frame | |
CN220377095U (en) | Simple mobile station for underbridge detection | |
CN221589312U (en) | Municipal bridge rush repair support frame | |
CN220184572U (en) | Worker safety arrangement in building engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: Room 2101-2104, 21 / F, unit a, block a, Hubei science and technology venture building, Xiaohongshan East District, Wuchang District, Wuhan City, Hubei Province, 430061 Patentee after: CCCC Road & Bridge Special Engineering Co.,Ltd. Address before: 430000 No. 2101-2104, 21 / F, unit a, block a, Hubei science and technology entrepreneurship building, Xiaohongshan East District, Wuchang District, Wuhan City, Hubei Province Patentee before: CCCC ROAD & BRIDGE SPECIAL ENGINEERING Co.,Ltd. |