CN208483998U - Interior trim formed by integrally casting prefabricated toilet - Google Patents
Interior trim formed by integrally casting prefabricated toilet Download PDFInfo
- Publication number
- CN208483998U CN208483998U CN201820547674.7U CN201820547674U CN208483998U CN 208483998 U CN208483998 U CN 208483998U CN 201820547674 U CN201820547674 U CN 201820547674U CN 208483998 U CN208483998 U CN 208483998U
- Authority
- CN
- China
- Prior art keywords
- main wall
- wall body
- top cover
- interior trim
- framework
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Residential Or Office Buildings (AREA)
- Sanitary Device For Flush Toilet (AREA)
Abstract
The utility model relates to a kind of interior trim formed by integrally casting prefabricated toilets, including base foundation and the molding main wall body of base foundation formed by integrally casting and top cover, it supports interior trim wall brick and the external mould of main wall and top cover internal model to form top by main wall internal mould and pours type chamber for open top cover, the top cover, which pours type chamber and pours type chamber with main wall body, to be connected to, type chamber is poured in top cover and main wall body pours type chamber casting concrete and forms main wall body and top cover, is embedded with water pipe and conduit members in main wall body and top cover and base foundation.The utility model interior trim be integrally formed, water pipe, spool formed by integrally casting are in wall, low cost, reduce later period decoration cost, work progress is simple, to construction personnel's technical level require it is low, speed of application, it is safe the advantages that.Replicability industrialized standard work production can be achieved, not only saved a large amount of human and material resources, realized the green building theory of energy-saving and environmental protection, and substantially increased the overall performance of toilet.
Description
Technical field
The utility model belongs to technical field of buildings, more particularly to a kind of interior trim formed by integrally casting prefabricated toilet.
Background technique
With the continuous development of society, building such as assembled-type house has slowly become the mainstream of dwelling construction.Toilet
As the essential a part of assembled-type house, with the development of technology, then toilet can be transported to ground by pre-production
Disk in-site installation.However, most of prefabricated toilet in the related technology is not integral prefabricated, usually it is transported in prefabricated toilet
Domain in-site installation, it is also necessary to the equipment such as water power pipeline and closet are further installed in prefabricated toilet.
Toilet is generally built using following two method: first is that directly in construction site cast-in-place concrete frame and step by step tray
Toilet is built to block, this is most traditional and toilet that is generally using method of construction, this traditional toilet method of construction
Long construction period, high construction cost, and cannot be obtained using the nonstandard quality standard for leading to toilet due to construction material
Guarantee to good.Second is that the self-contained toilet that is prefabricated in the factory, is then transported to building site and is installed.Prefabrication type is defended at present
When being installed at the scene between life, it is installed on toilet wall board in relation to water pipe and spool, conventional pipe is largely all made of and is fixed on wall
Siding after installing to integral vacuum toilet, fills hot water pipe and spool in the construction channel reserved.This method waste is empty
Between, and in use process, there is water pipe and pipe fitting failure, is both needed to destroy ready-made external siding of decorateing, into construction channel
Interior maintenance;Therefore, no matter install and repair and be inconvenient, a kind of interior trim integrated molding, water pipe, spool one are provided thus
It is cast in wall, reduces later period decoration cost, improve that efficiency of construction, the interior trim formed by integrally casting that improves service life are prefabricated to be defended
Between life.
Summary of the invention
The utility model is to solve technical problem present in well-known technique and provide a kind of interior trim integrated molding, water
Pipe, spool formed by integrally casting are in wall, low cost, reduce later period decoration cost, work progress is simple, to construction personnel's technology water
Flat to require low, speed of application is fast, and using co-layer draining, the interior trim formed by integrally casting for solving problems of the prior art is pre-
Toilet processed.
The utility model is adopted the technical scheme that solve technical problem present in well-known technique:
A kind of interior trim formed by integrally casting prefabricated toilet, including base foundation and the molding master of base foundation formed by integrally casting
Wall and top cover, the base foundation is the open body structure in top, including pedestal, with the molding basis of pedestal formed by integrally casting
Wall, the pedestal is interior to be equipped with pedestal framework of steel reinforcement;Main sewer is fixed on the pedestal interior base framework of steel reinforcement, draining is total
Pipe connects closet collector nozzle, hand basin collector nozzle and floor drain collector nozzle by branch pipe respectively;Positioned at the pedestal steel of foundation wall
Tendons skeleton stretch out foundation wall upper surface, and with main wall body formed by integrally casting;The main wall body includes main wall body framework of steel reinforcement, interior
Decorative wall brick;Water inlet manifold is fixed on main wall body framework of steel reinforcement, the water inlet manifold connects closet water inlet by branch pipe and connects
Head, hand basin water supply connector, shower water supply connector, and formed by integrally casting is on main wall body;The interior trim wall brick passes through main wall body
Internal model is supported on the medial surface of main wall body framework of steel reinforcement, and the lateral surface of main wall body framework of steel reinforcement is equipped with the external mould of main wall, main wall body
Internal model and the external mould of main wall constitute main wall body and pour type chamber, and the pedestal framework of steel reinforcement for stretching out foundation wall upper surface is inserted into main wall
It is intracavitary that body pours type, and is fixedly connected with main wall body framework of steel reinforcement;Motor circuit spool, institute are also embedded in the main wall body
State motor circuit spool connection power jack terminal box;The top cover includes interior trim wallboard and top cover framework of steel reinforcement, the top
Integrated circuit spool is fixed on lid framework of steel reinforcement, the integrating device mounting hole that super bath, illumination, ventilation are integrated on top cover,
Integrated circuit spool connects the integrating device terminal box for installing integrating device, and the integrated circuit spool extends to main wall body
To pour type intracavitary and connect with switch connection box;It pours that type is intracavitary to be fixedly connected with main wall body steel skeleton in main wall body, opens
Terminal box is closed together with main wall body formed by integrally casting;The top cover framework of steel reinforcement is fixedly connected with main wall body framework of steel reinforcement;Pass through
Main wall internal mould support interior trim wall brick and the external mould of main wall and top cover internal model form top and pour type chamber for open top cover,
The top cover, which pours type chamber and pours type chamber with main wall body, to be connected to, and pours type chamber in top cover and main wall body pours type chamber casting concrete
Form main wall body and top cover.
The utility model can also use following technical measures:
The excircle of the main sewer is fixed with baffle.
The main wall outer side formed by integrally casting has outer wall heat insulating and decorating plate.
The utility model has the advantages and positive effects of: the utility model is integrally formed using interior trim, water pipe, line
Pipe formed by integrally casting has low cost in wall, reduces later period decoration cost, work progress is simple, to construction personnel's technology water
Flat to require low, speed of application is fast, using co-layer draining, solves problems of the prior art;The utility model is used
Mold, be easy to integral disassembly, assembly, good integrity, shock resistance it is strong, without splicing seams.Furthermore unitary mould ensure that Components Shape, ruler
Very little and mutual alignment correctness, the surfacing of unitary mould, piece are tight, not will cause spillage and can satisfy construction
In enough intensity, rigidity and stability.The utility model can realize replicability industrialized standard work production, not only save
A large amount of human and material resources, realize the green building theory of energy-saving and environmental protection, and substantially increase the overall performance of toilet.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of prefabricated toilet;
Fig. 2 is base foundation structural schematic diagram;
Fig. 3 is base foundation mold structure diagram;
Fig. 4 is base foundation pouring structure schematic diagram;
Fig. 5 is the external mode structure schematic diagram of main wall;
Fig. 6 is mode structure schematic diagram in main wall body;
Fig. 7 is bottom, mould bases attachment structure schematic diagram in top and intermediate main wall body;
Fig. 8 is T-type card structure schematic diagram;
Fig. 9 is that wedge shape pre-tightens block structure schematic diagram;
Figure 10 is that wedge shape pre-tightens block and T-type card mated condition structural schematic diagram;
Figure 11 is main sewer structural schematic diagram;
Figure 12 is that prefabricated toilet pours status architecture schematic diagram;
Figure 13 is interior trim wall brick fixing piece using sucker attachment structure schematic diagram.
In figure: 1, base foundation;1-1, pedestal;1-2, foundation wall;1-3, pedestal framework of steel reinforcement;1-4, main sewer;
1-40, baffle;1-5, closet collector nozzle;1-6, hand basin collector nozzle;1-7, floor drain collector nozzle;2, main wall body;2-1, main wall body
Framework of steel reinforcement;2-2, interior trim wall brick;2-3, water inlet manifold;2-4, closet water supply connector;2-5, hand basin water supply connector;2-6,
Take a shower water supply connector;2-7, motor circuit spool;2-8, power jack terminal box;3, top cover;3-1, interior trim wallboard;3-2,
Top cover framework of steel reinforcement;3-3, integrated circuit spool;3-4, integrating device mounting hole;3-5, switch connection box;4, base foundation mould
Tool;4-1, bracket;4-2, bottom plate;4-20, vertical reinforcing bar mounting hole;4-3, mold core;4-30, main sewer locating slot;4-4, chamber
Body basis exterior sheathing;4-5, hoisting ring;5, the external mould of main wall;The external template of 5-1, main wall;5-2, door opening;6, main wall internal mould;
Mould bases in 6-1, bottom main wall body;6-10, bottom upper beam;6-11, bottom lower beam;6-12, the left vertical beam in bottom;6-13, bottom
The right vertical beam in portion;Vertical beam among 6-14, bottom;Vertical beam monomer among 6-15, bottom;6-16, footing support;6-17, footing adjustment
Bolt;Mould bases in 6-2, top main wall body;6-20, top upper beam;6-21, top lower beam;6-22, top left vertical beam;6-
23, top right vertical beam;6-24, top center vertical beam;6-25, top center vertical beam monomer;Mould bases in 6-3, intermediate main wall body;6-
30, intermediate upper beam;6-31, intermediate lower beam;6-32, intermediate left vertical beam;6-33, intermediate right vertical beam;6-34, intermediate vertical beam;
6-35, intermediate vertical beam monomer;6-4, prefabricated doorframe;7, top cover internal model;7-1, top cover mould bases;7-2, cylindrical type mold core;8, it connects
Piece;9, interior trim wall brick fixing piece;9-10, T-type card;9-11, rectangular straight slot;9-12, wedge shape pre-tighten block;10, prefabricated toilet
Hoisting ring.
Specific embodiment
For the invention, features and effects that can further appreciate that the utility model, the following examples are hereby given, and cooperates
Detailed description are as follows for attached drawing:
Referring to Fig. 1, a kind of interior trim formed by integrally casting prefabricated toilet, including base foundation 1, integrally pour with base foundation
Molding main wall body 2 and top cover 3 are built, the base foundation is the open body structure in top, including pedestal 1-1, with pedestal one
The foundation wall 1-2 of body pouring molding, the pedestal is interior to be equipped with pedestal framework of steel reinforcement 1-3;The pedestal interior base framework of steel reinforcement
On be fixed with main sewer 1-4, main sewer respectively by branch pipe connect closet collector nozzle 1-5, hand basin collector nozzle 1-6 and
Floor drain collector nozzle 1-7;Positioned at foundation wall 1-2 pedestal framework of steel reinforcement 1-3 stretch out foundation wall upper surface, and with main wall body
2 formed by integrally casting;The main wall body 2 includes main wall body framework of steel reinforcement 2-1, interior trim wall brick 2-2;It is solid on main wall body framework of steel reinforcement
Surely have water inlet manifold 2-3, the water inlet manifold can be enterprising water, or lower water inlet, remanufacture be it is general both can more than
Water inlet can also descend water inlet, carry out selection use according to the position at practical water source, convenient and efficient, and the water inlet manifold is connected by branch pipe
Access toilet water supply connector 2-4, hand basin water supply connector 2-5, shower water supply connector 2-6 (including cold water water supply connector and hot water into
Water swivel), and formed by integrally casting is on main wall body 2;The interior trim wall brick 2-2 is supported on main wall body steel by main wall internal mould
The lateral surface of the medial surface of tendons skeleton 2-1, main wall body framework of steel reinforcement 2-1 is equipped with the external mould of main wall, main wall internal mould and main wall body
External mold constitutes main wall body and pours type chamber, and the pedestal framework of steel reinforcement for stretching out foundation wall upper surface is inserted into main wall body and pours type chamber
It is interior, and be fixedly connected with main wall body framework of steel reinforcement 2-1;Motor circuit spool 2-7 is also embedded in the main wall body, it is described dynamic
Power circuit spool connects power jack terminal box 2-8;The top cover 3 includes interior trim wallboard 3-1 and top cover framework of steel reinforcement 3-2,
Integrated circuit spool 3-3 is fixed on the top cover framework of steel reinforcement, the integrated dress that super bath, illumination, ventilation are integrated on top cover
Mounting hole 3-4 is set, integrated circuit spool 3-3 connection is for installing the integrating device terminal box 3-4 of integrating device, the integrated electricity
Route pipe 3-3 extend to main wall body to pour type intracavitary and connect with switch connection box 3-5;Main wall body pour type it is intracavitary with
Main wall body steel skeleton is fixedly connected, and switch connection box 3-5 is together with main wall body 2-1 formed by integrally casting;The top cover framework of steel reinforcement
3-2 is fixedly connected with main wall body framework of steel reinforcement 2-1;Interior trim wall brick and the external mould of main wall and top are supported by main wall internal mould
Lid internal model forms top and pours type chamber for open top cover, and the top cover, which pours type chamber and pours type chamber with main wall body, to be connected to, and is pushing up
Lid pours type chamber and main wall body pours type chamber casting concrete and forms main wall body 2 and top cover 3.Above-mentioned closet water supply connector 2-4,
Hand basin water supply connector 2-5, shower water supply connector 2-6, integrating device terminal box 3-4, switch connection box 3-5 are according to practical need
It is preset, is not unique position in attached drawing 1.
The present invention can also use following technical measures:
In order to improve the secured intensity and leakproofness of main sewer and pedestal, the excircle of the main sewer is fixed with
Baffle 1-40.
In order to expand use scope of the invention, it is applied to have exterior wall in the main wall outer side formed by integrally casting in outdoor
Heat insulating decorative board.
Fig. 2 to Figure 12 is please referred to, the invention further relates to the shaping moulds based on above-mentioned interior trim formed by integrally casting prefabricated toilet
Tool, including base foundation mold 4, the external mould 5 of main wall and main wall internal mould 6, top cover internal model 7;The wherein bottom benchmark mold 4
Including bracket 4-1, the upper surface of the bracket is fixedly connected with bottom plate 4-2, and the center of the bottom plate is fixedly connected with mold core 4-3,
The mold core is equipped with draft angle;Cavity basis exterior sheathing 4-4 is fixedly installed on the surrounding bottom plate of mold core 4-3;The mold core
Chamber is poured with foundation wall exterior sheathing formation base wall, pours bottom plate described in chamber position equipped with pedestal reinforcing bar in foundation wall
The vertical reinforcing bar mounting hole 4-20 of frame;The upper surface for the mold core that the foundation wall exterior sheathing is higher by forms the pedestal of footing foundation
Chamber is poured, is poured in pedestal and is symmetrically arranged with hoisting ring 4-5 on intracavitary pedestal framework of steel reinforcement;
The external mould 5 of main wall is higher by top cover internal model 7, and the external mold support in four faces is enclosed by the external template 5-1 of four pieces of main walls
It closes, one of external template of main wall is equipped with door opening 5-2;
Four internal model supporting surfaces of the main wall internal mould 6 are by mould bases 6-1 in the main wall body of bottom, the main wall internal mould in top
Mould bases 6-3 is enclosed in main wall body among frame 6-2 and several piece;Mould bases, adjacent top master in adjacent bottom main wall body
The main wall internal mould of mould bases and top in mould bases and adjacent bottom main wall body in wall internal mould frame, adjacent intermediate main wall body
Frame passes through that connection sheet 8 is removable to be fixedly connected;Four internal model supporting surfaces correspond to the external mould doorway positions of main wall equipped with prefabricated door
Frame 6-4;
Mould bases 6-1 is by bottom upper beam 6-10, the left vertical beam of bottom lower beam 6-11 and bottom in the bottom main wall body
6-12 and bottom, right vertical beam 6-13 are enclosed, and vertical beam among array bottom is installed between bottom upper beam and bottom lower beam
6-14, every group of bottom centre vertical beam include vertical beam monomer 6-15 among two bottoms disposed in parallel, are stood among two bottoms
The gap for placing interior trim wall brick fixing piece 9 is equipped between beam monomer;The bottom lower beam connects footing support 6-16,
Footing adjustment bolt 6-17 is installed on the footing support;
Mould bases 6-2 is by top upper beam 6-20, top lower beam 6-21 and top left vertical beam in the top main wall body
6-22 and top right vertical beam 6-23 are enclosed, and install array top center vertical beam between crossbeam and top lower beam on the top
6-24, every group of top center vertical beam include two top center vertical beam monomer 6-25 disposed in parallel, and two top centers are vertical
The gap for placing interior trim wall brick fixing piece is equipped between beam monomer;
Mould bases 6-3 is by intermediate upper beam 6-30, intermediate lower beam 6-31, and intermediate left vertical beam in the intermediate main wall body
6-32 and intermediate right vertical beam 6-33 are enclosed, and install vertical beam 3- among array between intermediate upper beam and intermediate lower beam
34, every group of centre vertical beam includes two intermediate vertical beam monomer 6-35 disposed in parallel, is equipped between two intermediate vertical beam monomers
For placing the gap of interior trim wall brick fixing piece;
Top cover internal model 7 is spliced by several piece top cover mould bases 7-1;The top cover mould bases by four top cover forms set a roof beam in place enclosing and
At;It is fixedly connected between adjacent top cover mould bases by the way that connection sheet 8 is removable;On the top cover mould bases at 7 center of top cover internal model
It is fixed with the cylindrical type mold core 7-2 to form integrating device mounting hole.
Following technical measures can also be used:
In order to guarantee to correspond to main sewer position in the positioning poured in the upper surface of the mold core 4-3 and be equipped with draining always
Pipe locating slot 4-30.
The interior trim wall brick fixing piece 9 is T-type card 9-10, and the vertical plate of the T-type is equipped with rectangular straight slot 9-11, institute
It states and is fitted with wedge shape preload block 9-12 in rectangular straight slot, be equipped with snap slot 9-13 in the root of T-type vertical plate.
The interior trim wall brick fixing piece 9 is sucker 9-20, and sucker can use prior art pressing suction cup structure, lead to
The exterior facing of sucker suction interior trim wall brick is crossed, the removable connection of mould bases in interior trim wall brick and main wall body is realized, such as schemes
13。
The present invention also provides a kind of productions using above-mentioned molding die production interior trim formed by integrally casting prefabricated toilet
Method, comprising the following steps:
1), using the prefabricated base foundation 1 of inverted mode:
1.1), intracavitary put is poured in the mold core 4-3 of base foundation mold and foundation wall exterior sheathing 4-4 formation base wall
Enter pedestal framework of steel reinforcement 1-3, and the vertical reinforcing bar of pedestal framework of steel reinforcement is made to install the mounting hole 4-20 of bottom plate;
1.2) it, is poured in pedestal on intracavitary pedestal framework of steel reinforcement and fixes hoisting ring 4-5;
1.3) main sewer 1-4, is placed;
1.4) chamber, is poured to foundation wall and pedestal pours intracavitary fill concrete, and vibration keeps its closely knit;Steaming oxygen condition
Lower curing concrete intensity is up to 80% or more;
1.5), concrete strength is hung out prefabricated base foundation using lifting appliance lifting hoisting ring up to after 80% or more,
Put down foundation wall on level table upward the base foundation hung out overturning, the prefabricated completion of base foundation;
2) main wall body 2 and top cover 3, are poured:
2.1), in the assembled main wall internal mould 6 in the inside of foundation wall: mould bases 6-1, top master first in the main wall body of bottom
Pass through the fixed interior trim wall brick 2- of interior trim wall brick fixing piece 9 on mould bases 6-3 in wall internal mould frame 6-2 and intermediate main wall body
2;Then the mould bases in bottom main wall body of the supporting surface installation in inside with interior trim wall brick of base foundation, and pass through footing tune
Whole bolt 6-17 makes mould bases in the main wall body of bottom be in a horizontal state;The top assembly of mould bases 6-1 is with interior in the main wall body of bottom
Mould bases 6-3 in the intermediate main wall body of decorative wall brick, and connected by connection sheet with bolt fastening;The mould bases in intermediate main wall body
Top assembly is fixedly connected by connection sheet with bolt with mould bases 6-2 in the top main wall body of interior trim wall brick;
2.3) water route and circuit arrangement map, are drawn;
2.4) main wall body framework of steel reinforcement 2-1, is made, it is fixed on main wall body framework of steel reinforcement according to the water route layout of drafting
Water inlet manifold 2-3 and the branch pipe being connected to water inlet manifold and closet water supply connector 2-4, hand basin water supply connector 2-5, shower
Water supply connector 2-6;Motor circuit spool 2-7, power jack are fixed on main wall body framework of steel reinforcement according to circuit arrangement map simultaneously
Terminal box 2-8, integrated circuit spool 3-3 and switch connection box 3-5;Top cover framework of steel reinforcement 3-2 is made, is existed according to circuit arrangement map
Securing integrated circuit spool 3-3 and integrating device terminal box 3-4 on top cover framework of steel reinforcement, it is prefabricated for the ease of pouring completion movement
Toilet is equipped with prefabricated toilet hoisting ring 10 on top cover framework of steel reinforcement;
2.5), according to above-mentioned closet water supply connector 2-4, hand basin water supply connector 2-5, shower water supply connector 2-6, power are inserted
The seated connection position wire box 2-8 opens up mounting hole on interior decorative wall brick;According to the position of integrating device terminal box 3-4 in interior decorative wall
Mounting hole is opened up on plate 3-1;
2.6), in the upper end assembly top cover interior mould bases 7-1 of main wall internal mould 6, wherein having the top of cylindrical type mold core 7-2
Lid interior mould bases are centrally located;Adjacent top cover interior mould bases are connected by connection sheet with bolt fastening, and top cover internal model is formed;?
The top of top cover internal model is laid with interior trim wallboard;
2.7) the external mould 5 of main wall, main wall body after the external mould installation of main wall, are installed in the outside of above-mentioned prefabricated foundation wall
External mold 5 and main wall internal mould 6 form main wall body and pour chamber;The external mould 5 of main wall forms top cover with top cover internal model 7 and pours chamber;
2.8) intracavitary placement main wall body framework of steel reinforcement 2-1, is poured in main wall body, and by closet water supply connector, hand basin
Water supply connector, shower water supply connector, power jack terminal box, switch connection box are matched with the mounting hole on corresponding interior trim wall brick
Dress;Intracavitary placement top cover framework of steel reinforcement is poured in top cover, and integrating device terminal box and the peace on corresponding interior trim wallboard
It is equipped to fill hole;
2.9) chamber, is poured to main wall body and top cover pours intracavitary fill concrete, and vibration keeps its closely knit;Under the conditions of steaming oxygen
Curing concrete intensity is up to 80% or more;
2.10), concrete strength dismantles the external mould of main wall up to after 80% or more;Meanwhile being entered in main wall body by door opening
Top cover internal model, mould bases in the main wall body of top, the main wall internal mould of mould bases and bottom in intermediate main wall body are successively dismantled from top to bottom in portion
Frame, prefabricated toilet molding is completed after dismantling;
2.11), manufactured prefabricated toilet is conserved under field conditions (factors) to intensity up to 95% or more.
Preferred based on the above method, before casting concrete, in closet water supply connector, hand basin water inlet is connect
Head, shower water supply connector, power jack terminal box, Illumination wiring box outer wall be enclosed with sealing element or smear sealant.
It is preferred based on the above method, the inside installation external thermal insulation decoration of the external mould of main wall in step 2.7)
Interior trim wall brick on plate, the external heat preservation decorative board and main wall internal mould forms main wall body and pours chamber.
The advantages and positive effects of the present invention are: the present invention is integrally formed using interior trim, water pipe, spool are integrally poured
It builds in wall, there is low cost, reduce later period decoration cost, work progress is simple, and it is low to the requirement of construction personnel's technical level,
Speed of application is fast, using co-layer draining, solves problems of the prior art;Mold of the present invention is easy to whole
Body dismounting, good integrity, shock resistance be strong, without splicing seams.Furthermore unitary mould ensure that Components Shape, size and mutual alignment
Correctness, the surfacing of unitary mould, piece are tight, not will cause spillage and can satisfy construction in enough intensity, just
Degree and stability.Replicability industrialized standard work production can be achieved in the present invention, has not only saved a large amount of human and material resources, real
Show the green building theory of energy-saving and environmental protection, and substantially increases the overall performance of toilet.
The above is only the preferred embodiments of the present invention, and is not intended to limit the present invention in any form,
Any simple modification made to the above embodiment according to the technical essence of the invention, equivalent variations and modification, belong to
In the range of technical solution of the present invention.
Claims (3)
1. a kind of interior trim formed by integrally casting prefabricated toilet, it is characterised in that: including base foundation and base foundation formed by integrally casting
Molding main wall body and top cover, the base foundation are the open body structure in top, including pedestal, with pedestal formed by integrally casting at
The foundation wall of type, the pedestal is interior to be equipped with pedestal framework of steel reinforcement;It is total that draining is fixed on the pedestal interior base framework of steel reinforcement
Pipe, main sewer connect closet collector nozzle, hand basin collector nozzle and floor drain collector nozzle by branch pipe respectively;Positioned at foundation wall
Pedestal framework of steel reinforcement stretch out foundation wall upper surface, and with main wall body formed by integrally casting;The main wall body includes main wall body steel
Tendons skeleton, interior trim wall brick;Water inlet manifold is fixed on main wall body framework of steel reinforcement, the water inlet manifold is connected just by branch pipe
Device water supply connector, hand basin water supply connector, shower water supply connector, and formed by integrally casting is on main wall body;The interior trim wall brick is logical
The medial surface that main wall internal mould is supported on main wall body framework of steel reinforcement is crossed, it is external that the lateral surface of main wall body framework of steel reinforcement is equipped with main wall
Mould, main wall internal mould and the external mould of main wall constitute main wall body and pour type chamber, stretch out the pedestal framework of steel reinforcement of foundation wall upper surface
Being inserted into main wall body, to pour type intracavitary, and is fixedly connected with main wall body framework of steel reinforcement;It is also pre-buried dynamic in the main wall body
Circuit spool, the motor circuit spool connect power jack terminal box;The top cover includes interior trim wallboard and top cover reinforcing bar
Skeleton is fixed with integrated circuit spool on the top cover framework of steel reinforcement, and super bath, illumination, ventilation are integrated integrated on top cover
Device mounting hole, integrated circuit spool connect the integrating device terminal box for installing integrating device, the integrated circuit spool
Extend to main wall body to pour type intracavitary and connect with switch connection box;Main wall body to pour type intracavitary with main wall body steel skeleton
It is fixedly connected, switch connection box is together with main wall body formed by integrally casting;The top cover framework of steel reinforcement and main wall body framework of steel reinforcement are solid
Fixed connection;Interior trim wall brick and the external mould of main wall and top cover internal model is supported to form top as open top by main wall internal mould
Lid pours type chamber, and the top cover, which pours type chamber and pours type chamber with main wall body, to be connected to, and pours type chamber in top cover and pours type with main wall body
Chamber casting concrete forms main wall body and top cover.
2. interior trim formed by integrally casting prefabricated toilet according to claim 1, it is characterised in that: outside the main sewer
Circumference is fixed with baffle.
3. interior trim formed by integrally casting prefabricated toilet according to claim 1, it is characterised in that: the main wall outer side one
Body has poured outer wall heat insulating and decorating plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820547674.7U CN208483998U (en) | 2018-04-17 | 2018-04-17 | Interior trim formed by integrally casting prefabricated toilet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820547674.7U CN208483998U (en) | 2018-04-17 | 2018-04-17 | Interior trim formed by integrally casting prefabricated toilet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208483998U true CN208483998U (en) | 2019-02-12 |
Family
ID=65252302
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820547674.7U Active CN208483998U (en) | 2018-04-17 | 2018-04-17 | Interior trim formed by integrally casting prefabricated toilet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208483998U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108312308A (en) * | 2018-04-17 | 2018-07-24 | 廊坊卓锐建材有限公司 | Interior trim formed by integrally casting prefabricated toilet and molding die and production method |
CN110159006A (en) * | 2019-05-31 | 2019-08-23 | 湖南建工集团有限公司 | A kind of structure, pipeline, heat preservation, decoration integrated assembled toilet |
CN113389303A (en) * | 2021-06-07 | 2021-09-14 | 福建旅享宿文化旅游发展有限公司 | Manufacturing method of bathroom table board of mobile vacation house |
-
2018
- 2018-04-17 CN CN201820547674.7U patent/CN208483998U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108312308A (en) * | 2018-04-17 | 2018-07-24 | 廊坊卓锐建材有限公司 | Interior trim formed by integrally casting prefabricated toilet and molding die and production method |
CN110159006A (en) * | 2019-05-31 | 2019-08-23 | 湖南建工集团有限公司 | A kind of structure, pipeline, heat preservation, decoration integrated assembled toilet |
CN113389303A (en) * | 2021-06-07 | 2021-09-14 | 福建旅享宿文化旅游发展有限公司 | Manufacturing method of bathroom table board of mobile vacation house |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208483998U (en) | Interior trim formed by integrally casting prefabricated toilet | |
CN108312308A (en) | Interior trim formed by integrally casting prefabricated toilet and molding die and production method | |
CN204645727U (en) | A kind of prefabricated toilet | |
KR20000017883A (en) | Incremental launching method type pc box girder bridge making mold system and segment making method thereof | |
CN208179885U (en) | Interior trim formed by integrally casting prefabricated toilet molding die | |
CN102230338A (en) | Prefabricated toilet and construction method and installation method thereof | |
CN110644814A (en) | Integrated bathroom and assembling method thereof | |
CN215717576U (en) | Kitchen structure body integrally built by assembled formwork | |
CN109779322A (en) | A kind of co-layer draining hard-cover integral vacuum toilet of inner wall provided pipe line groove hole | |
CN215888951U (en) | Prefabricated double-rib external wall panel | |
CN109016093A (en) | A kind of assembled wallboard formwork erection casting platform | |
CN211922959U (en) | Integral prefabricated balcony module suitable for through-beam type steel frame | |
CN209228121U (en) | A kind of structure-integrated prefabricated integral vacuum toilet | |
CN209394930U (en) | A kind of assembled wallboard formwork erection casting platform | |
KR200189326Y1 (en) | Incremental launching method type pc box girder bridge making mold system | |
CN220301602U (en) | Prefabricated floor slab for assembled toilet | |
CN113123465A (en) | Assembled building beam column node | |
KR101069563B1 (en) | A hybrid type smc water proof floor for unit bath room and construction method thereof | |
CN220499469U (en) | Prefabricated bathroom forming die | |
CN216587897U (en) | Precast concrete bathroom chassis | |
CN216968144U (en) | Prefabricated apron template with embedded rings | |
CN210032752U (en) | Integral kitchen and bathroom structure | |
CN220225864U (en) | Structure-heat preservation-floor heating integrated floor slab | |
CN109779310A (en) | A kind of co-layer draining blank integral vacuum toilet of outer wall provided pipe line groove hole | |
CN209457385U (en) | Forming steel frame upward-returning table template system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |