CN208465198U - A kind of new pyridine extraction tower reboiler - Google Patents

A kind of new pyridine extraction tower reboiler Download PDF

Info

Publication number
CN208465198U
CN208465198U CN201821018891.3U CN201821018891U CN208465198U CN 208465198 U CN208465198 U CN 208465198U CN 201821018891 U CN201821018891 U CN 201821018891U CN 208465198 U CN208465198 U CN 208465198U
Authority
CN
China
Prior art keywords
reboiler
temperature
extraction tower
shell
steam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821018891.3U
Other languages
Chinese (zh)
Inventor
黄齐华
赵志华
张先龙
芮明
王婕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Guoxing Biochemistry Co Ltd
Original Assignee
Anhui Guoxing Biochemistry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Guoxing Biochemistry Co Ltd filed Critical Anhui Guoxing Biochemistry Co Ltd
Priority to CN201821018891.3U priority Critical patent/CN208465198U/en
Application granted granted Critical
Publication of CN208465198U publication Critical patent/CN208465198U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Extraction Or Liquid Replacement (AREA)

Abstract

The utility model provides a kind of new pyridine extraction tower reboiler, it is related to field of chemical equipment, mainly by reboiler shell, flow-stopping plate, tube sheet, tube bank and end socket composition, the end socket bottom is provided with the feed pipe being connected with extraction tower, the discharge pipe being connected to inside the extraction tower is provided at the top of the end socket, the discharge pipe is equipped with discharge port, the upper end of the reboiler shell is equipped with steam inlet tube, the lower end of the reboiler shell is equipped with condensed water outlet pipe, insulating layer is provided on the reboiler shell, because of the unstability of vapor (steam) temperature, spiral heating resistance wire, which is added, can guarantee that the temperature of gasification feed liquid is constant, reboiler steam inlet pipeline temperature indicator and resistive heater control valve are chain, material outlet pipe temperature indicator and the stop valve of outlet manifold pipeline are chain, it can guarantee that this is practical new Type timely, accurate and effective can function, while also avoid manual operation, save labour, material resources.

Description

A kind of new pyridine extraction tower reboiler
Technical field
The utility model relates to field of chemical equipment, and in particular to a kind of new pyridine extraction tower reboiler.
Background technique
With the enhancing that " energy-saving and emission-reduction, cost efficiency " is called, the chemical company as big power consumer is all actively being found Measure, Expand Thinking, to reduce enterprise energy consumption.And the energy consumption of feed separation is the breach that chemical company is found.
Reboiler is one kind of boiling heat transfer equipment in chemical process, general to produce loaded on extraction tower bottom for the tower bottom that gasifies A kind of dividing wall type heat exchanger of object, most of reboiler are pipe heat exchanger.Heat medium is usually steam, and a small amount of includes carrying The fluid or gas of heat.
The reboiler that uses of major part extraction tower at present, there is steam raising amounts when small, heat is unevenly distributed, heats Between long, pipeline easily blocks, reboiler service life is short problem.For the reboiler for requiring heat exchange amount big, equipment manufacturer is general Increase tube sheet diameter, tube bank quantity, the measures such as pipe range by taking, will lead to that reboiler volume is too fat to move, area occupied in this way Big feature;When the heat that reboiler provides boils when institute's calorific requirement less than or greater than tower bottoms completely, make tower reactor gas every time Body enters extraction tower from same column plate, and will lead to keeps the extraction efficiency of extraction tower low, and heat is not utilized completely;When tube wall with When wall temperature differs ambassador, tube bank can be made to generate thermal stress, lead to pipe deformation, loosen, or even scrap heat exchanger.
Utility model content
(1) the technical issues of solving
It is too fat to move for the pyridine workshop extraction tower reboiler volume of enterprise, it takes up a large area;Steam heat consumption is more and heats Unevenly, the disadvantages of thermal loss is more, thermal stress is strong now provide in a kind of warmed operating temperature Interval Set, feed tray section Handling big new pyridine extraction tower energy conservation reboiler.
(2) technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs:
A kind of new pyridine extraction tower reboiler, is mainly made of reboiler shell, flow-stopping plate, tube sheet, tube bank and end socket, The end socket bottom is provided with the feed pipe being connected with extraction tower, be provided at the top of the end socket with inside the extraction tower The discharge pipe of connection, the discharge pipe are equipped with discharge port, and the upper end of the reboiler shell is equipped with steam inlet tube, described The lower end of reboiler shell is equipped with condensed water outlet pipe, is provided with insulating layer on the reboiler shell.
Further, several tube banks are provided in the reboiler shell.
Further, spiral heating resistance wire is wound in the tube bank.
Further, discharge pipe shunting is arranged to 4 shunt conduits and is connected to the extraction tower.
Further, the steam inlet tube is equipped with vapor (steam) temperature indicator, and the spiral heating resistance wire is equipped with electricity Silk control valve is hindered, the vapor (steam) temperature indicator and the resistance wire control valve are chain.
Further, the shunt conduit is equipped with stop valve, and the discharge pipe is equipped with temperature of charge indicator, institute It states stop valve and the temperature of charge indicator is chain.
(3) beneficial effect
The utility model provides a kind of new pyridine extraction tower reboiler, has the advantages that
(1) because of the unstability of vapor (steam) temperature, spiral heating resistance wire, which is added, can guarantee that the temperature of gasification feed liquid is constant.
(2) different feed trays further ensures gasification materiel and enters the effect of extracting after extraction tower, while also can Avoid the thermal stress of the generation of tube bank inside and outside wall.
(3) reboiler steam inlet pipeline temperature indicator and resistive heater control valve are chain, material outlet pipeline temperature The stop valve for spending indicator and outlet manifold pipeline is chain, it is ensured that the performance function that the utility model can be timely, accurate and effective Can, while manual operation is also avoided, save labour, material resources.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of the utility model;
Figure label respectively represents:
1- feed pipe;2- tube bank;3- spiral heating resistance wire;4- steam inlet tube;5- vapor (steam) temperature indicator;6- resistance Silk control valve;7- discharge port;8- discharge pipe;9- temperature of charge indicator;10- stop valve;11- extraction tower;12- condensed water goes out Pipe;13- shunt conduit.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched The embodiment stated is the utility model a part of the embodiment, instead of all the embodiments.Based on the implementation in the utility model Example, every other embodiment obtained by those of ordinary skill in the art without making creative efforts belong to The range of the utility model protection.
A kind of new pyridine extraction tower reboiler, is mainly made of reboiler shell, flow-stopping plate, tube sheet, tube bank and end socket, End socket bottom is provided with the feed pipe being connected with extraction tower, and the discharge nozzle being connected to extraction tower inside is provided at the top of end socket Road, discharge pipe are equipped with discharge port, and the upper end of reboiler shell is equipped with steam inlet tube, and the lower end of reboiler shell is equipped with condensation Water outlet pipe is provided with insulating layer on reboiler shell.
Wherein, several tube banks are provided in reboiler shell.
Wherein, spiral heating resistance wire is wound in tube bank.
Wherein, discharge pipe shunting is arranged to 4 shunt conduits and is connected to extraction tower.
Wherein, steam inlet tube is equipped with vapor (steam) temperature indicator, and spiral heating resistance wire is equipped with resistance wire control valve, steams Stripping temperature indicator and resistance wire control valve are chain.
Wherein, shunt conduit is equipped with stop valve, and discharge pipe is equipped with temperature of charge indicator, stop valve and material temperature It is chain to spend indicator.
In order to preferably make person skilled in art understand the present invention, the utility model is further elucidated below.
A kind of more options feed tray energy conservation reboiler, tower reactor liquid material enter tube bank 2 by reboiler feed pipe 1, Tube bank 2 is wound with spiral heating resistance wire 3, and steam enters shell by reboiler steam inlet pipe 4, and steam walks shell side, and material walks pipe Journey, the two carry out heat exchange by tube bank partition, since vapor (steam) temperature indicator 5 and resistance wire control valve 6 have chain function Can, when 5 numerical value of feed vapors temperature indicator is lower than setting value, resistance wire control valve 6 can give spiral heating resistance wire 3 automatically It is powered, to meet the required heat of material gasification.The material of gasification enters discharge pipe 8, steam condensation by reboiler discharge port 7 Reboiler is discharged by condensed water outlet pipe 12 in liquid;The stop valve 10 on temperature of charge indicator 9 and shunt conduit on discharge pipe 8 Chain, temperature is passed to the stop valve 10 in each shunt conduit 13 by temperature of charge indicator 9, and stop valve 10 is according to different objects Material sets different temperature ranges, final to determine material enters extraction tower 14 by which block column plate.
This specific embodiment can embody a kind of working process and principle of novel reboiler: tower reactor liquid material is from again It boils device feed pipe 1 and enters tube bank 2, liquid material gasification temperature is 200 DEG C, and the displays temperature of vapor (steam) temperature indicator 5 is 180 DEG C, the temperature of setting value is 250 DEG C, i.e., show value is less than setting value, and resistance wire control valve 6 can give spiral heating resistance wire automatically 3 are powered, and become steam and the common heating of electricity from single steam heating.The material of gasification is entered by reboiler discharge port 7 to discharge Pipeline 8, when gasification materiel is overheated gas, temperature of charge indicator 9 and the stop valve 10 in the shunt conduit of lower section are chain, overheat Gas is entered by low level column plate;Cutting when gasification materiel is saturated gas, on temperature of charge indicator 9 and middle part shunt conduit Valve 10 is chain, and saturated gas is entered by middle position column plate;When gasification materiel is unsaturated gas, temperature indicator 9 and top are shunted Stop valve 10 on pipeline is chain, and unsaturated gas is entered by high-order column plate.
Because of the unstability of vapor (steam) temperature, spiral heating resistance wire 3, which is added, can guarantee that the temperature of gasification feed liquid is constant;No Same feed tray further ensures gasification materiel and enters the effect of extracting after extraction tower, while being also avoided that tube bank inside and outside wall Generation thermal stress.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
Above embodiments are only to illustrate the technical solution of the utility model, rather than its limitations;Although referring to aforementioned reality Example is applied the utility model is described in detail, those skilled in the art should understand that: it still can be to preceding Technical solution documented by each embodiment is stated to modify or equivalent replacement of some of the technical features;And these It modifies or replaces, the spirit and model of various embodiments of the utility model technical solution that it does not separate the essence of the corresponding technical solution It encloses.

Claims (6)

1. a kind of new pyridine extracts tower reboiler, mainly it is made of reboiler shell, flow-stopping plate, tube sheet, tube bank and end socket, It is characterized in that, the end socket bottom is provided with the feed pipe (1) being connected with extraction tower (11), is provided at the top of the end socket With the discharge pipe (8) being connected to inside the extraction tower (11), the discharge pipe (8) is equipped with discharge port (7), described to boil again The upper end of device shell is equipped with steam inlet tube (4), and the lower end of the reboiler shell is equipped with condensed water outlet pipe (12), the reboiler Insulating layer is provided on shell.
2. new pyridine as described in claim 1 extracts tower reboiler, which is characterized in that be provided in the reboiler shell Several tube banks (2).
3. new pyridine as claimed in claim 2 extracts tower reboiler, which is characterized in that be wound with spiral in the tube bank and add Hot water radiation wire (3).
4. new pyridine as claimed in claim 3 extracts tower reboiler, which is characterized in that the discharge pipe (8) shunts and sets 4 shunt conduits (13) are set to be connected to the extraction tower (11).
5. new pyridine as claimed in claim 4 extracts tower reboiler, which is characterized in that the steam inlet tube (4) is equipped with Vapor (steam) temperature indicator (5), the spiral heating resistance wire (3) are equipped with resistance wire control valve (6), the vapor (steam) temperature instruction Device (5) and the resistance wire control valve (6) are chain.
6. new pyridine as claimed in claim 5 extracts tower reboiler, which is characterized in that the shunt conduit (13) is equipped with Stop valve (10), the discharge pipe (8) are equipped with temperature of charge indicator (9), the stop valve (10) and the material temperature It is chain to spend indicator (9).
CN201821018891.3U 2018-06-27 2018-06-27 A kind of new pyridine extraction tower reboiler Active CN208465198U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821018891.3U CN208465198U (en) 2018-06-27 2018-06-27 A kind of new pyridine extraction tower reboiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821018891.3U CN208465198U (en) 2018-06-27 2018-06-27 A kind of new pyridine extraction tower reboiler

Publications (1)

Publication Number Publication Date
CN208465198U true CN208465198U (en) 2019-02-05

Family

ID=65212114

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821018891.3U Active CN208465198U (en) 2018-06-27 2018-06-27 A kind of new pyridine extraction tower reboiler

Country Status (1)

Country Link
CN (1) CN208465198U (en)

Similar Documents

Publication Publication Date Title
CN205262270U (en) Movable heat energy deposit device
CN208465198U (en) A kind of new pyridine extraction tower reboiler
CN108870519A (en) A kind of across season multi-level phase change heat reservoir suitable for high back pressure thermal power plant unit
CN204364915U (en) Thin-film distillation still
CN207162943U (en) For Chinese medicine production die heater parallel connection heating plant
CN104606910A (en) Heat pump rectifying device based on heat storage technology and starting method of heat pump rectifying device
CN204187599U (en) A kind of still kettle afterheat steam recycling device
CN203949348U (en) Continous way electric water-boiling device
CN205119567U (en) Be applied to secondary heat recovery's dynamic energy storage hot -water cylinder
CN209500843U (en) A kind of reboiler
CN204644673U (en) Dyeing apparatus energy recovery cycling and reutilization energy conserving system
CN204342466U (en) A kind of novel circulation-type water distillation apparatus
CN109595956B (en) Brewery heat energy recovery and utilization system and method
CN201569141U (en) Water heating device
CN207822756U (en) A kind of methanol distillation column
CN208803050U (en) Wine liquid circulation heat exchanger
CN206746011U (en) A kind of combined type hot water flash tank
CN206572486U (en) Steam condensate (SC) utilizes device
CN207527844U (en) A kind of multimode heat-accumulation type hot water installations
CN209688805U (en) A kind of steam condensate recovering device
CN103991917B (en) A kind of laboratory redistilled water device
CN214746048U (en) Vacuum water-heating combined type radiator
CN210057405U (en) Large-area film evaporation equipment
CN208042841U (en) A kind of oil heater
CN206965166U (en) A kind of dehydrating kettle of the butanediol diglycidyl ether of rectifying 1,4

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant