[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN207988098U - A kind of road oozes drainage system - Google Patents

A kind of road oozes drainage system Download PDF

Info

Publication number
CN207988098U
CN207988098U CN201820301584.XU CN201820301584U CN207988098U CN 207988098 U CN207988098 U CN 207988098U CN 201820301584 U CN201820301584 U CN 201820301584U CN 207988098 U CN207988098 U CN 207988098U
Authority
CN
China
Prior art keywords
road
kerbstone
section
greening
drainage system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820301584.XU
Other languages
Chinese (zh)
Inventor
刘颖聪
王志雄
杜梦颖
郑敏章
徐拓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan WISCO Green City Technology Development Co.,Ltd.
WUHAN WISCO SPONGE CITY CONSTRUCTION PROJECT INVESTMENT Co.,Ltd.
Original Assignee
Wuhan Wuhan Steel Sponge City Construction Project Investment Co Ltd
Wuhan Green City Construction And Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Wuhan Steel Sponge City Construction Project Investment Co Ltd, Wuhan Green City Construction And Development Co Ltd filed Critical Wuhan Wuhan Steel Sponge City Construction Project Investment Co Ltd
Priority to CN201820301584.XU priority Critical patent/CN207988098U/en
Application granted granted Critical
Publication of CN207988098U publication Critical patent/CN207988098U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)
  • Sewage (AREA)

Abstract

The utility model is related to a kind of roads to ooze drainage system, road includes greening section and non-greening section, it includes kerbstone filtration module and inlet for stom water drain assembly to ooze drainage system, and kerbstone filtration module is set to the side in greening section, and between green belt and greening section road surface;Inlet for stom water drain assembly is set to the side in non-greening section;Kerbstone filtration module includes cutting dirty slot and kerbstone, cuts the side that dirty slot is set to greening section road surface, and kerbstone, which is set to, to be cut between dirty slot and green belt;There is permeable structure, permeable structure to be connected to dirty slot is cut in kerbstone.The road oozes drainage system and the different drainage systems that oozes is respectively set to the different disposal demand of rainwater for non-greening section and greening section, road is absorbed water in lower rainwater, water storage, infiltration, water purification, use is irrigated by the water stored " release " when needing and for roadside greening area, the pollution of area source abatement and rainfall runoff control for sponge city play the role of good.

Description

A kind of road oozes drainage system
Technical field
The application belongs to road drainage systems technology field, and in particular to a kind of road oozes drainage system, is applied to sea Continuous urban construction.
Background technology
With greatly developing for city, urban development is faced with huge environment and resource pressure, in city development construction While, the ecosystem is destroyed to a certain extent, has upset hydrology function, and city is caused to be only capable of relying on when facing heavy showers City planting ductwork drain, cause effectiveness factors to take place frequently, runoff pollution it is serious, bring Ecology destruction, water security risk, water environment The problems such as pollution and shortage of water resources, therefore " sponge city " construction theory is come into being.
Construction theory based on sponge city, urban road, which should at least have, oozes drain function.To realize road infiltration, Using permeable cement, laying water-permeable brick when pavement of road is constructed, so that surface gathered water quickly penetrates into below road surface in soil layer.For reality Existing road drainage, inlet for stom water, construction inconvenience is arranged in trepanning on road kurb stone, and also needs to interrupt open kerbstone sometimes Mouthful, influence road beauty.
Although can realize " infiltration " and " draining " function using the above-mentioned urban road for oozing discharge structure, it is the absence of pair " storing " and " recycling " function of rainwater, and good sponge urban road should be able in lower rainwater water suction, water storage, ooze Water, water purification by the water stored " release " and are used when needing, and irrigate and use for roadside greening area.
Invention content
In order to solve the above technical problems, the utility model, which provides a kind of road, oozes drainage system, can be inhaled in lower rainwater Water, water storage, infiltration, water purification by the water stored " release " and are used when needing, and irrigate and use for roadside greening area.
Technical solution is used by realizing the utility model aim, and a kind of road oozes drainage system, and the road includes Section and non-greening section are afforested, at least side in the greening section is equipped with green belt;
The drainage system that oozes includes kerbstone filtration module and inlet for stom water drain assembly, and the kerbstone filtration module is set It is placed in the side in the greening section, and between the green belt and the greening section road surface;The inlet for stom water row Water assembly is set to the side in the non-greening section;
The kerbstone filtration module includes cutting dirty slot and kerbstone, and described section of dirty slot is set to the greening section road surface Side, the kerbstone is set to described cut between dirty slot and the green belt;
There is permeable structure, the permeable structure to be connected to described section of dirty slot in the kerbstone.
Preferably, the kerbstone upper edge short transverse offers spout hole and osculum, the spout hole and institute successively Osculum is stated to be connected to described section of dirty slot.
Preferably, the cell wall close to the green belt side of described section of dirty slot thickeies, and is provided with a cavity, institute Kerbstone is stated to be installed in the cavity.
Preferably, overflow deflector hole and draining deflector hole, institute are offered in the cell wall of the thickening successively along short transverse It states overflow deflector hole to be connected to the spout hole, the draining deflector hole is connected to the osculum.
Preferably, it is mounted on filter screen at the communication port of the spout hole and the osculum on described section of dirty slot.
Preferably, the spout hole is not less than the soil surface of the green belt.
Preferably, the green belt is greenbelt, sunk type greenery patches or Rain Garden.
Preferably, it is covered with double-edged fine-toothed comb on described section of dirty slot.
Preferably, the kerbstone is slag-based permeable road kerb, and dirty slot is cut in the top of the kerbstone higher than described;Institute The road surface for stating greening section and/or the non-greening section is infiltration road surface.
Preferably, described section of dirty slot is set to the low-lying place of the greening section road surface side, is arranged in described section of dirty slot There is Prefabricated combined septic tank.
Compared with prior art, road provided by the utility model oozes drainage system, for road non-greening section and Greening section be correspondingly arranged respectively two sets it is different ooze drainage system, the side setting inlet for stom water in specially non-greening section drains Component, inlet for stom water drain assembly use existing inlet for stom water drainage pipeline networks structure, realize road drainage.The side in greening section is set Kerbstone filtration module is set, in lower rainwater water storage, water purification, is irrigated the water stored " release " for roadside greening area when fine day needs It uses.
The kerbstone filtration module includes cutting dirty slot and kerbstone, cuts the side that dirty slot is set to the greening section road surface Side, the rainfall runoff on road surface, which flows directly into, when raining cuts in dirty slot, plays the role of rainwater accumulation and precipitated mud and sand impurity.Road Kerb, which is set to, to be cut between dirty slot and green belt, is had the permeable structure being connected to section dirty slot in kerbstone, is cut in dirty slot and accumulate Rainwater green belt is entered by permeable structure, play the role of irrigate green belt.
The road oozes drainage system and is set respectively to the different disposal demand of rainwater for non-greening section and greening section It sets and different oozes drainage system so that road can be in lower rainwater water suction, water storage, infiltration, water purification, the water that will be stored when needing " release " and use is irrigated for roadside greening area, the pollution of area source abatement and rainfall runoff control for sponge city play good Effect.
Description of the drawings
Fig. 1 is the structural schematic diagram that road provided by the utility model oozes drainage system;
Fig. 2 is the installation diagram of kerbstone filtration module in the utility model embodiment 1;
Fig. 3 is the installation diagram of kerbstone filtration module in the utility model embodiment 2.
Reference sign:The non-greening sections 100-;200- afforests section;300- inlet for stom water drain assemblies;400- curbs Stone filtration module;500- driveways;The pavements 600-, the green belt 61-, 62- water-permeable bricks;The road surfaces 10-;20- kerbstones, 21- overflow Discharge orifice, 22- osculums, 23- curb stone foundations;The flat stones of 30-;40- cuts dirty slot, 41- cavitys, 42- overflow deflector holes, 43- drainings Deflector hole;50- double-edged fine-toothed combs;60- filter screens;70- Prefabricated combined septic tanks;The flat grated inlets of 80-;90- inlet for stom water double-edged fine-toothed combs.
Specific implementation mode
In order to make the application the technical staff in the technical field be more clearly understood that the application, below in conjunction with the accompanying drawings, Technical scheme is described in detail by specific embodiment.
Embodiment 1:
Referring to Fig. 1, a kind of road oozes drainage system, which is urban road, including non-greening section 100 and afforests road Section 200, non-greening section 100 are generally the branch river conjunction for having vehicle to come in and go out;Afforest the setting of the interval of section 200, in one side or Person both sides are equipped with green belt 61.Non- greening section 100 and greening section 200 are including driveway 500 in road transverse direction With pavement 600, driveway 500 is equipped with flat stone mainly for motor-driven vehicle going, the i.e. road surface 10 of road, in the side on road surface 10 30, flat stone 30 is between main road face and kerbstone 20.The absolute altitude on pavement 600 is higher than driveway 500, and kerbstone 20 connects vehicle Trade 500 and pavement 600, it is step-like at level-one.Pavement 600 includes walking road and green belt 61, and walking road is by water-permeable brick 62 are laid with, and are travelled for pedestrian and non motorized vehicle;Green belt is specially greenbelt, and the interval between greenbelt is worn for pedestrian The soil surface of row, greenbelt is less than road surface 10.
For non-greening section 100 and greening section 200, it includes 300 He of inlet for stom water drain assembly to ooze drainage system correspondence Kerbstone filtration module 400.The installation place of inlet for stom water drain assembly 300 and kerbstone filtration module 400 is slightly below road surface 10, When raining, the rainfall runoff on road surface flows in the directions A along Fig. 1, and finally flows into and ooze drainage system.
Specifically, inlet for stom water drain assembly 300 is set to the side in non-greening section 100, using existing municipal rainwater Drainage pipeline networks structure, including flat grated inlet 80, flat grated inlet 80 are arranged on flat stone 30, access municipal drain Net installs inlet for stom water double-edged fine-toothed comb 90 in its opening, intercepts the big part drift such as branch, polybag.
Kerbstone filtration module 400 is set to the side in greening section 200, and positioned at green belt 61 and greening section Between 200 road surface 10.Kerbstone filtration module 400 includes cutting dirty slot 40 and kerbstone 20, cuts dirty slot 40 and is set to greening road The section low-lying place in 200 road surface, 10 side, is similarly positioned on flat stone 30, but the size in road transverse direction is more than flat grated inlet 80.It is adjacent with green belt 61 to cut dirty slot 40, for longer green belt 61, every 25~50m (depending on catchment area size) Setting one cuts dirty slot 40, cuts on dirty slot 40 and is covered with double-edged fine-toothed comb 50, and double-edged fine-toothed comb 50 is using common flat grated inlet double-edged fine-toothed comb.Kerbstone 20 are set to and cut between dirty slot 40 and green belt 61, and there is permeable structure, permeable structure to be connected to a dirt slot 40 is cut in kerbstone.
Referring to Fig. 2, in the present embodiment, 20 upper edge short transverse of kerbstone offers spout hole 21 and osculum successively 22;Spout hole 21 and osculum 22 are connected to a section dirty slot 40, and spout hole 21 is not less than the soil surface of green belt 61.
It is the slot structure made of impermeable material to cut dirty slot 40, directly apply at the low-lying place of 10 side of pavement of road and At specially:A pit is excavated at the low-lying place of 10 side of pavement of road, concrete, shape are smeared in pit cheats bottom and crater wall At can be with the slot structure of water storage.In the 4 face cell walls for cutting dirty slot 40, the cell wall close to 61 side of green belt thickeies, and wherein Equipped with a cavity 41, kerbstone 20 is installed in the cavity 41, and the width of cavity 41 is slightly larger than the thickness of kerbstone 20, with road Kerb 20 smoothly can install and install after will not double swerve be advisable.
Offer overflow deflector hole 42 and draining deflector hole 43, overflow deflector hole in the cell wall of thickening successively along short transverse 42 are connected to spout hole 21, form the overflow ducts of perforation, and overflow ducts are in the horizontal direction from dirty slot 40 is cut to green belt 61 are slightly slanted downwards, facilitate stormwater overflow, and stop that the rainwater put aside on green belt 61 blows back into and cut in dirty slot 40;Draining Deflector hole 43 is connected to osculum 22, forms the drainage channel of perforation, and the lowest point of drainage channel and the slot bottom for cutting dirty slot 40 are neat Flat, the convenient whole rainwater cut in dirty slot 40 flow into green belt 61.Overflow deflector hole 42 and draining deflector hole 43 are leaned on The nearly opening for cutting dirty slot 40, that is, spout hole 21 and osculum 22 are mounted on filter screen at the communication port on cutting dirty slot 40 60, prevent overflow ducts and drainage channel to be blocked.
To improve osmotic effect, kerbstone 20 is used slag-based permeable road kerb, is made using slag of primary raw material, internal With flourishing pore structure, there is good water penetration.The top of kerbstone 20 is higher than dirty slot 40 is cut, when rainfall crosses heavy rain Water diffuses out when cutting dirty slot 40, and the rainwater diffused out can be oozed out by kerbstone 20.
Embodiment 2:
Referring to Fig. 1, a kind of road oozes drainage system, which is parkway, including non-greening section 100 and afforests road Section 200, non-greening section 100 is the branch river conjunction to come in and go out for vehicle;Afforest the setting of the interval of section 200, in one side or Both sides are equipped with green belt 61.Non- greening section 100 and greening section 200 are including 500 He of driveway in road transverse direction Pavement 600, for driveway 500 mainly for motor-driven vehicle going, the i.e. road surface 10 of road, road surface 10 is infiltration road surface, and use is existing Sponge urban pavement permeable structure, be equipped with flat stone 30 in the side on road surface 10, flat stone 30 is located at main road face and curb Between stone 20.The absolute altitude on pavement 600 is higher than driveway 500, and kerbstone 20 connects driveway 500 and pavement 600, at level-one It is step-like.Pavement 600 includes walking road and green belt 61, and walking road is laid with by water-permeable brick 62, for pedestrian and non-maneuver Vehicle travels;Green belt 61 is specially sunk type greenery patches, and soil surface is less than road surface 10.
For non-greening section 100 and greening section 200, it includes 300 He of inlet for stom water drain assembly to ooze drainage system correspondence Kerbstone filtration module 400.Wherein, inlet for stom water drain assembly 300 is set to the side in non-greening section 100, and use is existing Municipal rain-water drainage pipe network structure, including flat grated inlet 80 and vertical grated inlet are (because Fig. 1 is vertical view, at this visual angle Under it is invisible), flat grated inlet 80 be arranged on flat stone 30, the risers exposed in kerbstone 20 are arranged in vertical grated inlet On, flat grated inlet 80 and vertical grated inlet access municipal drainage pipe network, and inlet for stom water double-edged fine-toothed comb is respectively mounted in its opening 90, intercept the big part drift such as branch, polybag.
Kerbstone filtration module 400 is set to the side in greening section 200, and positioned at green belt 61 and greening section Between 200 road surface 10.Kerbstone filtration module 400 includes cutting dirty slot 40 and kerbstone 20, cuts dirty slot 40 and is set to greening road The section low-lying place in 200 road surface, 10 side, is similarly positioned on flat stone 30, but the size in road transverse direction is more than flat grated inlet 80.It is adjacent with green belt 61 to cut dirty slot 40, for longer green belt 61, every 25~50m (depending on catchment area size) Setting one cuts dirty slot 40, cuts on dirty slot 40 and is covered with double-edged fine-toothed comb 50, and double-edged fine-toothed comb 50 is using common flat grated inlet double-edged fine-toothed comb.Kerbstone 20 are set to and cut between dirty slot 40 and green belt 61, and there is permeable structure, permeable structure to be connected to a dirt slot 40 is cut in kerbstone.
Referring to Fig. 3, in the present embodiment, 20 upper edge short transverse of kerbstone offers spout hole 21 and osculum successively 22;Spout hole 21 and osculum 22 are connected to a section dirty slot 40, and spout hole 21 is not less than the soil surface of green belt 61.It overflows It is mounted on filter screen 60 in the close opening for cutting dirty slot 40 of discharge orifice 21 and osculum 22, prevents spout hole 21 and osculum 22 are blocked.
Dirty slot 40 is cut to be spliced to form by 5 blocks of plates.Wherein 1 piece is made by impermeable material, as the slot bottom for cutting dirty slot 40; Remaining 4 pieces are made by seepy material, and as the cell wall for cutting dirty slot 40, kerbstone 20 is one of permeable plate, directly as The green belt side channel wall of dirty slot 40 is cut, double-edged fine-toothed comb 50 is wherein inserted into kerbstone 20 on one side.Curb ground mass is set below road Plinth 23 fixes kerbstone 20 using the backrest of curb stone foundation 23.Kerbstone 20 uses slag-based permeable road kerb, is with slag Primary raw material is made, and inside has flourishing pore system, has good water penetration.Remaining 3 face cell wall is direct with road surface 10 Contact, is equally made using slag of primary raw material accordingly.
A pit is excavated at the low-lying place of 10 side of pavement of road, is put into above-mentioned 5 blocks of plates, that is, being formed can be with the slot of water storage Structure.After installation, the top of kerbstone 20 needs, higher than dirty slot 40 is cut, when the excessive rainwater of rainfall, which diffuses out, cuts dirty slot 40, to overflow The rainwater gone out can be oozed out by kerbstone 20.It is also equipped with Prefabricated combined septic tank 70 in cutting dirty slot 40, is intercepted not by 50 mistake of double-edged fine-toothed comb Prefabricated combined septic tank 70 can be taken out, be reloaded after toppling over impurity therein when impurity is excessive in Prefabricated combined septic tank 70 by the impurity of filter It cuts in dirty slot 40.
By above-described embodiment, the utility model has the advantages that or advantage:
1) road provided by the utility model oozes drainage system, and the non-greening section and greening section for road are right respectively Should be arranged two sets it is different ooze drainage system, inlet for stom water drain assembly, inlet for stom water row is arranged in the side in specially non-greening section Water assembly uses existing inlet for stom water drainage pipeline networks structure, realizes road drainage.The side setting kerbstone for afforesting section permeates The water stored " release " is irrigated for roadside greening area in lower rainwater water storage, water purification, when fine day needs and is used, for sea by component The pollution of area source abatement in continuous city and rainfall runoff control are played the role of good.
2) road provided by the utility model oozes drainage system, and the green belt of road uses sunk type green belt, itself can To accommodate a certain amount of rainwater, and be conducive to the rain penetration of kerbstone filtration module, relief road oozes drainage system progress Water storage.
3) road provided by the utility model oozes drainage system, and kerbstone filtration module in pavement of road side by setting It sets and cuts a dirty slot, can carry out rainwater accumulation when rainy, provide irrigation water for green belt when fine day so that road is with water storage work( Energy.
4) road provided by the utility model oozes drainage system, and kerbstone filtration module passes through green in section dirty slot and road Slag-based permeable road kerb is arranged between area in change, which is made using slag of primary raw material, and inside has flourishing hole System has good water penetration so that road has water seepage function.
5) road provided by the utility model oozes drainage system, the kerbstone upper edge short transverse of kerbstone filtration module Spout hole and osculum are offered successively, and spout hole and osculum are connected to a section dirty slot, when rainfall is smaller, cuts in dirty slot and store Long-pending rainwater can flow into green belt by the osculum of bottom, irrigate afforestation vegetation;When rainfall is larger, rainwater reaches in section dirty slot , can be by spout hole overflow after certain altitude, since spout hole is not less than the soil surface of green belt, the rainwater of overflow directly flows Enter green belt, avoids cutting rainwater in dirty slot and diffuse out and cause road ponding so that road has the function of rainwater recycling.
6) road provided by the utility model oozes drainage system, and cutting on dirty slot for kerbstone filtration module is equipped with comb Son cuts in dirty slot and is equipped with Prefabricated combined septic tank, is respectively mounted filter screen on spout hole and osculum, by multiple filtration structure, layer by layer The impurity and pollutant carried secretly in filtering rainwater so that road has water purification function.
7) road provided by the utility model oozes drainage system, and the spout hole and osculum of kerbstone filtration module are It manually opens up, size is larger, is not easy to be blocked easily by silt, and can remove kerbstone when blocking, and dredges overflow Hole and osculum, therefore the maintenance of the kerbstone filtration module is relatively simple.
8) road provided by the utility model oozes drainage system, and kerbstone filtration module is due to the cell wall by cutting dirty slot Fixed kerbstone, therefore curb stone foundation used in existing road can be cancelled.
Although the preferred embodiment of the application has been described, one of ordinary skilled in the art once knows substantially Creative concept, then additional changes and modifications may be made to these embodiments.It is wrapped so the following claims are intended to be interpreted as It includes preferred embodiment and falls into all change and modification of the application range.
Obviously, those skilled in the art can carry out the application essence of the various modification and variations without departing from the application God and range.In this way, if these modifications and variations of the application belong to the range of the application claim and its equivalent technologies Within, then the application is also intended to include these modifications and variations.

Claims (10)

1. a kind of road oozes drainage system, the road includes greening section and non-greening section, and the greening section is at least Side is equipped with green belt, it is characterised in that:
The drainage system that oozes includes kerbstone filtration module and inlet for stom water drain assembly, and the kerbstone filtration module is set to The side in the greening section, and between the green belt and the greening section road surface;The inlet for stom water draining group Part is set to the side in the non-greening section;
The kerbstone filtration module includes cutting dirty slot and kerbstone, and described section of dirty slot is set to the side on the greening section road surface Side, the kerbstone are set to described cut between dirty slot and the green belt;
There is permeable structure, the permeable structure to be connected to described section of dirty slot in the kerbstone.
2. road as described in claim 1 oozes drainage system, it is characterised in that:The kerbstone upper edge short transverse is opened successively Equipped with spout hole and osculum, the spout hole and the osculum are connected to described section of dirty slot.
3. road as claimed in claim 2 oozes drainage system, it is characterised in that:The close green belt one of described section of dirty slot The cell wall of side thickeies, and is provided with a cavity, and the kerbstone is installed in the cavity.
4. road as claimed in claim 3 oozes drainage system, it is characterised in that:In the cell wall of the thickening along short transverse according to Secondary to offer overflow deflector hole and draining deflector hole, the overflow deflector hole is connected to the spout hole, the draining deflector hole It is connected to the osculum.
5. the road as described in claim 2 or 4 oozes drainage system, it is characterised in that:The spout hole and the osculum exist It is mounted on filter screen at communication port on described section of dirty slot.
6. road as claimed in claim 2 oozes drainage system, it is characterised in that:The spout hole is not less than the green belt Soil surface.
7. the road as described in claims 1 or 2 or 6 oozes drainage system, it is characterised in that:The green belt be greenbelt, under Heavy formula greenery patches or Rain Garden.
8. road as described in claim 1 oozes drainage system, it is characterised in that:It is covered with double-edged fine-toothed comb on described section of dirty slot.
9. the road as described in Claims 1-4,6, any one of 8 oozes drainage system, it is characterised in that:The kerbstone is Dirty slot is cut in the top of slag-based permeable road kerb, the kerbstone higher than described;The greening section and/or the non-greening road The road surface of section is infiltration road surface.
10. the road as described in Claims 1-4,6, any one of 8 oozes drainage system, it is characterised in that:Described section of dirty slot is set It is placed in the low-lying place of the greening section road surface side, Prefabricated combined septic tank is provided in described section of dirty slot.
CN201820301584.XU 2018-03-05 2018-03-05 A kind of road oozes drainage system Active CN207988098U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820301584.XU CN207988098U (en) 2018-03-05 2018-03-05 A kind of road oozes drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820301584.XU CN207988098U (en) 2018-03-05 2018-03-05 A kind of road oozes drainage system

Publications (1)

Publication Number Publication Date
CN207988098U true CN207988098U (en) 2018-10-19

Family

ID=63826279

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820301584.XU Active CN207988098U (en) 2018-03-05 2018-03-05 A kind of road oozes drainage system

Country Status (1)

Country Link
CN (1) CN207988098U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112939332A (en) * 2021-01-25 2021-06-11 中冶南方城市建设工程技术有限公司 Sponge urban road rainwater cuts dirty clean system
CN113550397A (en) * 2021-06-25 2021-10-26 深圳市建筑科学研究院股份有限公司 Road water storage and drainage system and road construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112939332A (en) * 2021-01-25 2021-06-11 中冶南方城市建设工程技术有限公司 Sponge urban road rainwater cuts dirty clean system
CN112939332B (en) * 2021-01-25 2024-02-20 中冶南方城市建设工程技术有限公司 Sponge urban road rainwater cuts dirty clean system
CN113550397A (en) * 2021-06-25 2021-10-26 深圳市建筑科学研究院股份有限公司 Road water storage and drainage system and road construction method

Similar Documents

Publication Publication Date Title
CN110249844B (en) Street tree pool with water storage and drainage device
CN210887246U (en) Roadbed slope protection structure
CN103088897A (en) Green community impact resistance rainwater ecological utilization system
CN110042724A (en) Collapsible Loess District road sponge facility rainwater catchment system and exhaust system
CN207988098U (en) A kind of road oozes drainage system
KR101510615B1 (en) Penetration type rainwater storage tank and construction method of the same
CN207062672U (en) A kind of permeable pavement structure
CN108625453A (en) Skyscraper sponge City complex system
CN209482092U (en) Suitable for the sponge city system of biological stranded belt is arranged outside town road red line
CN110965420A (en) Construction structure and construction method for road reconstruction and upgrading sponge city
CN214033246U (en) A road seepage prevention structure for sponge city design
CN207987674U (en) A kind of road kurb stone permeability apparatus and sponge urban road
CN112982072B (en) Green belt water storage and drainage curbstone system and water storage and drainage method
CN207700330U (en) A kind of concave herbaceous field grass-planting ecological ditch
CN210856844U (en) Sewage intercepting and draining system suitable for sunken type pedestrian ways beside greenbelts
CN108915063B (en) Shallow grass planting ditch with sewage intercepting and purifying functions for sponge city
CN214271526U (en) Road based on LID facility
JP2802282B2 (en) Rechargeable storage facility
CN208501715U (en) A kind of Rain Garden
KR101906075B1 (en) Road side ditch having seepage paving-material
CN212077506U (en) Construction structure of road transformation upgrading sponge city
CN213417454U (en) Permeable pavement
CN112538797A (en) Road based on LID facility can be applied to sponge city
CN211972951U (en) Municipal works road laying structure
CN211446456U (en) Multifunctional sponge structure under limited greenbelt condition

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200717

Address after: Gate 1, changqian, Qingshan District, Wuhan City, Hubei Province

Co-patentee after: WUHAN WISCO SPONGE CITY CONSTRUCTION PROJECT INVESTMENT Co.,Ltd.

Patentee after: Wuhan WISCO Green City Technology Development Co.,Ltd.

Address before: 430080 Wuhan, Heilongjiang Province, Qingshan District, metallurgical Road, No. 122, No.

Co-patentee before: WUHAN WISCO SPONGE CITY CONSTRUCTION PROJECT INVESTMENT Co.,Ltd.

Patentee before: BAOWU GREEN CITY CONSTRUCTION Co.,Ltd.