CN207813015U - Floor slab preformed hole tool-typed formwork support construction - Google Patents

Floor slab preformed hole tool-typed formwork support construction Download PDF

Info

Publication number
CN207813015U
CN207813015U CN201721918772.9U CN201721918772U CN207813015U CN 207813015 U CN207813015 U CN 207813015U CN 201721918772 U CN201721918772 U CN 201721918772U CN 207813015 U CN207813015 U CN 207813015U
Authority
CN
China
Prior art keywords
preformed hole
hole
cover plate
upper cover
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721918772.9U
Other languages
Chinese (zh)
Inventor
何萍
陈国华
叶良浩
宋文
黄卫东
邹容
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN AEROSPACE CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
SICHUAN AEROSPACE CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN AEROSPACE CONSTRUCTION ENGINEERING Co Ltd filed Critical SICHUAN AEROSPACE CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201721918772.9U priority Critical patent/CN207813015U/en
Application granted granted Critical
Publication of CN207813015U publication Critical patent/CN207813015U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model is related to technical field of building construction, and in particular to a kind of floor slab preformed hole tool-typed formwork support construction;Including upper cover plate, lower cover, screw rod and casing, the diameter of the upper cover plate and the lower cover is all higher than the aperture of preformed hole, the upper cover plate is equipped with reserved coagulation pouring hole, the reserved concrete pouring hole is penetrated through with preformed hole, the upper cover plate is set to the upper end of preformed hole, the lower cover is set to the lower end of preformed hole, the center of the upper cover plate and the lower cover is equipped with circular hole, the screw rod is located in preformed hole and the both ends of the screw rod pass through the circular hole, the both ends that the screw rod stretches out the circular hole are equipped with nut, the nut and the upper cover plate, gasket is equipped between the lower cover, the part that the screw rod is located in preformed hole is arranged with casing, the height of described sleeve pipe and preformed hole it is highly consistent;Using the floor slab preformed hole tool-typed formwork support construction of technical solutions of the utility model, reasonable in design, construction method is simple, and monolithic concrete intensity can be ensured to the closure of preformed hole.

Description

Floor slab preformed hole tool-typed formwork support construction
Technical field
The utility model is related to technical field of building construction, and in particular to a kind of floor slab preformed hole tool-typed formwork support knot Structure.
Background technology
In the prior art, in construction, in order to which the construction operations such as formwork erection, form removal are convenient or other reasons, in coagulation Preformed hole, construction hole etc. are offered on soil structure landing slab.Preformed hole, construction hole are clear for payingoff construction, building waste Reason etc., usual aperture is larger.In practical applications, because of the convenience of construction, these reserving holes are occupied with rectangular or rectangle structure It is more, wait for that operation is completed, preformed hole, construction hole complete it using after function, need to be blocked, make original concrete structure Platform is integrally formed.
Block existing traditional method, technique and the concrete structure platform construction way, work of these preformed holes, hole of constructing Skill is identical, i.e., props up vertical end template at cavity in preformed hole, construction again, blocked to it, after the completion of waiting closure, then by the envelope The concrete bottom die blocked up out is removed.And Zhi Li has comparable troublesome process and prodigious workload with end template is removed.
Utility model content
The purpose of this utility model is to provide a kind of floor slab preformed hole tool-typed formwork support construction, structure design is closed Reason, construction method is simple, and monolithic concrete intensity can be ensured to the closure of preformed hole.
To achieve the goals above, the utility model provides a kind of floor slab preformed hole tool-typed formwork support construction, including The diameter of upper cover plate, lower cover, screw rod and casing, the upper cover plate and the lower cover is all higher than the aperture of preformed hole, described Upper cover plate is equipped with reserved coagulation pouring hole, and the reserved concrete pouring hole is penetrated through with preformed hole, and the upper cover plate is set to pre- The upper end boxed out, the lower cover are set to the lower end of preformed hole, and the center of the upper cover plate and the lower cover is equipped with circular hole, The screw rod is located in preformed hole and the both ends of the screw rod pass through the circular hole, and the both ends that the screw rod stretches out the circular hole are equipped with Nut, is equipped with gasket between the nut and the upper cover plate, the lower cover, the screw rod is located at the set of the part in preformed hole Equipped with casing, the height of described sleeve pipe and preformed hole it is highly consistent.
Preferably, the upper cover plate is the sector for offering reserved concrete pouring hole, the lower cover be with The consistent circle of the upper cover board diameter.
Preferably, described sleeve pipe is pvc pipe.
Preferably, the outer diameter of the gasket is more than the aperture of the circular hole, and the internal diameter of the gasket is equal to described The aperture of circular hole.
Preferably, the upper cover plate, the lower cover and the gasket are steel material.
Using the floor slab preformed hole tool-typed formwork support construction of above-mentioned technical proposal, there are following advantages:Upper cover plate is under Cover board can realize the closure to preformed hole upper and lower side, and set reserved concrete pouring hole is penetrated through with preformed hole on upper cover plate, It can realize the casting concrete into preformed hole;Upper cover plate and lower cover are pressed on preformed hole by the both ends of screw rod by nut Upper and lower side ensure that and be poured to preformed hole inner sealing, be convenient for concrete formation and the integrality to preformed hole closure;Due to spiral shell PVC casings are arranged with outside bar, the taking-up of screw rod can be facilitated after blocking operation and completing, casing is filled by foaming agent later The both ends of hole, casing are blocked with anti-crack and anti-seepage mortar, just complete the closure work of entire preformed hole, this structure design is closed Reason, construction method is simple, and monolithic concrete intensity can be ensured to the closure of preformed hole.
Description of the drawings
Fig. 1 is the mounting structure schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of upper cover plate in the utility model;
Fig. 3 is the structural schematic diagram of lower cover in the utility model.
Wherein:Upper cover plate 1;Lower cover 2;Screw rod 3;PVC casings 4;Preformed hole 5;Circular hole 6;Nut 7;Gasket 8;It is reserved mixed Solidifying soil pouring hole 9;Preformed hole projection 10.
Specific implementation mode
Technical solutions of the utility model are further illustrated with reference to the accompanying drawings and examples:
As shown in Figure 1 to Figure 3, the utility model provides a kind of floor slab preformed hole tool-typed formwork support construction, including upper The diameter of cover board 1, lower cover 2, screw rod 3 and casing, upper cover plate 1 and lower cover 2 is all higher than the aperture of preformed hole 5, and upper cover plate 1 is The sector of reserved concrete pouring hole 9 is offered, lower cover 2 is the circle consistent with 1 diameter of upper cover plate, reserves concreting Hole 9 and preformed hole 5 penetrate through, and upper cover plate 1 is set to the upper end of preformed hole 5, and lower cover 2 is set to the lower end of preformed hole 5, upper cover plate 1 with The center of lower cover 2 is equipped with circular hole 6, and screw rod 3 is located in preformed hole 5 and the both ends of the screw rod 3 pass through circular hole 6, screw rod 3 to stretch out The both ends of circular hole 6 are equipped with nut 7, and gasket 8 is equipped between nut 7 and upper cover plate 1, lower cover 2, and the outer diameter of gasket 8 is more than circular hole 6 Aperture, the internal diameter of gasket 8 is equal to the aperture of circular hole 6, and the part that screw rod 3 is located in preformed hole 5 is arranged with PVC casings 4, PVC The height of casing 4 is highly consistent with preformed hole 5, and upper cover plate 1, lower cover 2 and gasket 8 are steel material.
Upper cover plate 1 and lower cover 2 can realize the closure to 5 upper and lower side of preformed hole, set reserved coagulation on upper cover plate 1 Native pouring hole 9 is penetrated through with preformed hole 5, can realize the casting concrete into preformed hole 5;The both ends of screw rod 3 will be upper by nut 7 Cover board 1 is pressed on the upper and lower side of preformed hole 5 with lower cover 2, ensure that and is poured to 5 inner sealing of preformed hole, is convenient for concrete formation And the integrality to the closure of preformed hole 5;It, can be at the rear for blocking operation completion due to being arranged with PVC casings 4 outside screw rod 3 Just the taking-up of screw rod 3, later by 4 hole of foaming agent filled PVC casing, the both ends of PVC casings 4 are sealed with anti-crack and anti-seepage mortar It is stifled, the closure work of entire preformed hole 5 is just completed, this is reasonable in design, and construction method is simple, the closure to preformed hole 5 It can ensure monolithic concrete intensity.
Installation process be first install upper cover plate 1, screw rod 3,8 nut 7 of gasket, later the lower section of floor install lower cover 2, Screw rod 3,8 nut 7 of gasket, after installation is complete, cast concrete vibrating is closely knit, conserves form removal, foaming agent filled PVC casing 4 Hole, 4 both ends of PVC casings are blocked with anti-crack and anti-seepage mortar.
The above are merely preferred embodiments of the present invention, it is noted that for those skilled in the art, Under the premise of not departing from the utility model structure, several modifications and improvements can also be made, these should also be considered as this practicality Novel protection domain, these all do not interfere with the effect and patent practicability of the utility model implementation.

Claims (5)

1. a kind of floor slab preformed hole tool-typed formwork support construction, it is characterised in that:Including upper cover plate, lower cover, screw rod and set The diameter of pipe, the upper cover plate and the lower cover is all higher than the aperture of preformed hole, and the upper cover plate is equipped with reserved coagulation and pours Hole is built, the reserved concrete pouring hole is penetrated through with preformed hole, and the upper cover plate is set to the upper end of preformed hole, and the lower cover is set In the lower end of preformed hole, the center of the upper cover plate and the lower cover is equipped with circular hole, the screw rod be located at preformed hole it is interior and The both ends of the screw rod pass through the circular hole, the screw rod stretch out the circular hole both ends be equipped with nut, the nut with it is described on Gasket is equipped between cover board, the lower cover, the screw rod is located at the part in preformed hole and is arranged with casing, the height of described sleeve pipe It spends highly consistent with preformed hole.
2. floor slab preformed hole tool-typed formwork support construction according to claim 1, it is characterised in that:The upper cover plate is The sector of reserved concrete pouring hole is offered, the lower cover is the circle consistent with the upper cover board diameter.
3. floor slab preformed hole tool-typed formwork support construction according to claim 1, it is characterised in that:Described sleeve pipe is Pvc pipe.
4. floor slab preformed hole tool-typed formwork support construction according to claim 1, it is characterised in that:Outside the gasket Diameter is more than the aperture of the circular hole, and the internal diameter of the gasket is equal to the aperture of the circular hole.
5. floor slab preformed hole tool-typed formwork support construction according to claim 1, it is characterised in that:The upper cover plate, The lower cover and the gasket are steel material.
CN201721918772.9U 2017-12-29 2017-12-29 Floor slab preformed hole tool-typed formwork support construction Expired - Fee Related CN207813015U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721918772.9U CN207813015U (en) 2017-12-29 2017-12-29 Floor slab preformed hole tool-typed formwork support construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721918772.9U CN207813015U (en) 2017-12-29 2017-12-29 Floor slab preformed hole tool-typed formwork support construction

Publications (1)

Publication Number Publication Date
CN207813015U true CN207813015U (en) 2018-09-04

Family

ID=63329026

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721918772.9U Expired - Fee Related CN207813015U (en) 2017-12-29 2017-12-29 Floor slab preformed hole tool-typed formwork support construction

Country Status (1)

Country Link
CN (1) CN207813015U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110388058A (en) * 2019-06-14 2019-10-29 成都建工第二建筑工程有限公司 The construction method of floor delivering concrete pump line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110388058A (en) * 2019-06-14 2019-10-29 成都建工第二建筑工程有限公司 The construction method of floor delivering concrete pump line

Similar Documents

Publication Publication Date Title
CN104746639B (en) A kind of installation method that the prefabricated window that floats is installed in composite wallboard
CN104314314A (en) Grouting connection construction method
CN101487293A (en) Concrete pouring method for beam-column joints with different strength grades
CN208763204U (en) A kind of vertical connecting structure of low layer assembled architecture prefabricated panel
CN207813015U (en) Floor slab preformed hole tool-typed formwork support construction
CN106149878B (en) Concrete frame structure prefabricated post and the connection structure and method at beam slab node
CN106149877B (en) Concrete frame structure prefabricated post and the docking structure and method at beam slab node
CN215106098U (en) Prefabricated post connection structure
CN209491899U (en) A kind of reserved steel bar positioning punch die of assembled architecture prefabricated components
CN207633546U (en) Toilet concrete sealing prefabricated components
CN206752693U (en) A kind of assembled steel reinforced concrete column of stirrup encryption and post splicing node
CN207032862U (en) A kind of combined steel hangs mould
CN206220499U (en) Integrated die for reserved holes of water heating system
CN107975152A (en) The ductility connecting structure and construction method of first floor vertical member and basement roof
CN203514332U (en) Casing for blocking dewatering tube well of post-cast strip
CN107100197A (en) A kind of detachable water-stop opposite-pulling screw rod erecting device of large steel moulding plate
CN207419778U (en) A kind of free removal wall body casting template device
CN110439592A (en) Shield tunnel two serves as a contrast concrete structure and construction method
CN207228347U (en) A kind of connector, prefabricated component and prefabricated component and the connecting node on basis
CN206800665U (en) A kind of basement side wall late poured band structure
CN213625699U (en) Basement outer wall waterproof construction structure for reverse construction
CN206267523U (en) A kind of constructional column based on standard knot combination is poured uses template
CN211250563U (en) Pouring die for bearing wall board
CN108193706A (en) A kind of downward construction concrete pouring procedure of part contrary sequence method vertical structure
CN208918032U (en) Building concrete shear wall reserved opening plugging structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180904

Termination date: 20201229

CF01 Termination of patent right due to non-payment of annual fee