CN207609397U - Slurry transportation system suitable for drilled grouting piles under water construction - Google Patents

Slurry transportation system suitable for drilled grouting piles under water construction Download PDF

Info

Publication number
CN207609397U
CN207609397U CN201721778469.3U CN201721778469U CN207609397U CN 207609397 U CN207609397 U CN 207609397U CN 201721778469 U CN201721778469 U CN 201721778469U CN 207609397 U CN207609397 U CN 207609397U
Authority
CN
China
Prior art keywords
slurry
mud
under water
transportation system
grouting piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721778469.3U
Other languages
Chinese (zh)
Inventor
吴小斌
余登文
孙琦
董承贺
罗运
李贤仰
黄忠满
张玉峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201721778469.3U priority Critical patent/CN207609397U/en
Application granted granted Critical
Publication of CN207609397U publication Critical patent/CN207609397U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model is related to technical field of bridge construction, a kind of slurry transportation system suitable for drilled grouting piles under water construction is referred specifically to, includes set on land mud pit, the slush pump being placed in pile foundation casing and the slurry being set on steel trestle platform, conveying ditch and supporting rack.The slush pump is connected to slurry can by pipeline, and the middle part of the slurry can is equipped with a grout outlet, and the conveying ditch tilting rack is connected on supporting rack and by grout outlet and mud pit.Slurry transportation system described in the utility model suitable for drilled grouting piles under water construction can convey the discarded slurry in different location pile foundation casing, and it is convenient to clean maintenance, part recyclable in mud can also be imported in the pile foundation casing not spudded in, can effectively reduce the conveying and cost recovery of mud.

Description

Slurry transportation system suitable for drilled grouting piles under water construction
Technical field
The utility model is related to technical field of bridge construction, refer specifically to a kind of mud suitable for drilled grouting piles under water construction Starch transport system.
Background technology
At present special allotment is used when the operation at sea region such as rivers, ocean, lake carries out bored pile construction For the mud gone out as drilling fluid, a used mud part can recycle in the casing of the new trepanning of injection that input makes again With another part can only then be discarded and put together carry out harmless treatment.Discarded slurry periodically must be transported and be focused on, If be discharged into water will water body environment cause it is serious pollution and destroy.Discarded slurry is generally first pumped on mud carrier and carries out Waterway transportation, then it is pumped to the interior progress overland transport of fortune slurry, finally it is transported to land specified storage point.Due to mud carrier Lease expenses is higher, can bring higher transportation cost.In addition mud carrier is marched into the arena and operation is easily by the factors shadow such as navigation channel and environment It rings, the turnaround time of discarded slurry is longer, can reduce conevying efficiency, influence the duration.
Invention content
The utility model aims to solve the problem that the problem of background technology, relies on existing water project structure setting one Set is suitable for the slurry transportation system of drilled grouting piles under water construction.
Slurry transportation system described in the utility model suitable for drilled grouting piles under water construction includes being set to land mud Stock tank, the slush pump being placed in pile foundation casing and the slurry being set on steel trestle platform, conveying ditch and supporting rack.Institute Slush pump is stated to be connected to by pipeline with slurry can, the middle part of the slurry can is equipped with a grout outlet, the conveying ditch tilting rack in It is connected on supporting rack and by grout outlet and mud pit.
It is connected to a defeated slurry hose at the grout outlet of the slush pump, is fixed on slurry can and an inlet pipe is housed, it is described into slurry One end of pipe is connected with defeated slurry hose, and the other end penetrates the top of slurry can.
The bottom of the slurry can is equipped with more pillars, and slurry can is provided with a mudhole, and the bolt at mudhole in bottom surface It is connected to a flange closure plate.
The slurry transportation system suitable for drilled grouting piles under water construction further includes that both ends are protected with two pile bases respectively The mud veclamation pipe of the top connection of cylinder.
Slurry transportation system described in the utility model suitable for drilled grouting piles under water construction can convey different location Discarded slurry in pile foundation casing, and it is convenient to clean maintenance, moreover it is possible to part recyclable in mud is imported to the pile foundation that do not spud in In casing, the conveying and cost recovery of mud can be effectively reduced.
Description of the drawings
Fig. 1:The structural schematic diagram of slurry transportation system suitable for drilled grouting piles under water construction;
Fig. 2:Enlarged structure schematic diagram in Fig. 1 at A.
Wherein:1- mud pits, 2- pile foundations casing, 3- steel trestles platform, 4- slush pumps, 5- slurry cans (51- grout outlets, 52- Inlet pipe, 53- pillars, 54- mudholes), 6- conveying ditch, 7- supporting racks, the defeated slurry hoses of 8-, 9- flanges closure plate, 10- mud veclamations Pipe, 11- waterborne traffic accidents, 12- checking bollards.
Specific implementation mode
In the following with reference to the drawings and specific embodiments to the mud described in the utility model suitable for drilled grouting piles under water construction Slurry transport system is described further.
As shown in Figure 1, 2, the slurry transportation system described in the utility model suitable for drilled grouting piles under water construction includes Set on land mud pit 1, the slush pump 4 being placed in pile foundation casing 2 and the slurry can 5 being set on steel trestle platform 3, Convey ditch 6 and supporting rack 7.Slush pump 4 is connected to slurry can 5 by pipeline, and the middle part of slurry can 5 is equipped with a grout outlet 51, defeated 6 tilting rack of ditch is sent to be connected on supporting rack 7 and by grout outlet 51 and mud pit 1.
The higher discarded slurry of bottom sediment charge is pumped to slurry can, storage slurry by the slush pump being placed in pile foundation casing Mud reach a certain height to overflow from grout outlet and flows into conveying ditch and then eventually arrive in mud pit in tank.Discarded slurry is logical It crosses pipeline and is conveyed by slush pump and the gravity of itself, without using mud carrier and fortune slurry vehicle, to significantly reduce Transportation cost, in addition open conveying ditch be also relatively easy to cleaning and maintenance, be not susceptible to block.
Operation at sea region can be connected by steel trestle platform as the common complementary engineering structure of over-water construction with land, It is nearby and firm in structure that mud pit can be extended to by land, can provide support for slurry transportation system.Slush pump can It relies on waterborne traffic accident to hang in pile foundation casing, can be suspended in midair slush pump by the way that specific structure is arranged on waterborne traffic accident It is fixed, such as overhanging type hanger.
It is connected to a defeated slurry hose 8 at the grout outlet of slush pump 4, is fixed on slurry can 5 and an inlet pipe 52, inlet pipe 52 is housed The connection of one end and defeated slurry hose 8, the other end penetrates the top of slurry can 5.Place is hung in the propulsion slush pump needs of engineering Discarded slurry is exported in the pile foundation casing of different location, and needs to be arranged different stock lines by slurry transportation to storing up slurry Tank.After stock line is split into fixed inlet pipe and removable and bending defeated slurry hose it is convenient for that different location will be in Slush pump is connect with slurry can.Defeated slurry hose is reusable, can also connect more defeated slurry hoses by flanged ends To realize the lengthening of pipeline.
The bottom of slurry can 5 is equipped with more pillars 53, and 5 bottom surface of slurry can is provided with a mudhole 54, and at mudhole 54 Bolt has a flange closure plate 9.The discarded slurry being temporarily stored into slurry can precipitate, the impurity such as contained heavy constituent and sandstone Slurry can bottom can be deposited to, needs periodically to be cleared up, is convenient for exporting in the mud of tank bottom in tank bottom setting mudhole.
The slurry transportation system suitable for drilled grouting piles under water construction further includes that both ends are protected with two pile bases respectively The mud veclamation pipe 10 that the top of cylinder 2 is connected.The mud density of pile foundation casing bottom is larger and impurity content is high, belongs to waste sludge Slurry, the mud density on top is smaller and impurity content is relatively low, can be directly transferred to reuse in the pile foundation casing not spudded in.It will Having spudded in, be connected to by mud veclamation pipe with the pile foundation casing top do not spudded in can easily will before extracting discarded slurry The recyclable part of mud imports in the pile foundation casing not spudded in the pile foundation casing to spud in, to effectively save between pile foundation casing The recycling of mud and transportation cost.
A checking bollard 12 is provided on operation platform 11 on the water in embodiment and by lying in the hanger rope on checking bollard 12 by mud Stock pump 4 is hung in pile foundation casing 2, and for the supporting rack 7 used for common full framing, cost is relatively low, convenient for building and can repeat It recycles.Mud veclamation pipe 10 is inclined to set, and is tilted down close to the one end for the pile foundation casing not spudded in so that mud energy It is enough more to be smoothly flowed therein by its own gravity in the pile foundation casing not excavated, it carries out that when bored pile construction mud should be closed Recovery tube 10, end to be onstructed need to release closing again when handling mud.

Claims (4)

1. a kind of slurry transportation system suitable for drilled grouting piles under water construction, which is characterized in that include set on land mud It is stock tank (1), the slush pump (4) being placed in pile foundation casing (2) and the slurry can (5) being set on steel trestle platform (3), defeated It send ditch (6) and supporting rack (7), the slush pump (4) to be connected to by pipeline with slurry can (5), is set in the middle part of the slurry can (5) There are a grout outlet (51), conveying ditch (6) tilting rack to be connected on supporting rack (7) and by grout outlet (51) and mud pit (1).
2. the slurry transportation system suitable for drilled grouting piles under water construction as described in claim 1, which is characterized in that described It is connected to a defeated slurry hose (8) at the grout outlet of slush pump (4), is fixed on slurry can (5) and an inlet pipe (52) is housed, it is described into slurry The one end and defeated slurry hose (8) for managing (52) are connected, and the other end penetrates the top of slurry can (5).
3. the slurry transportation system suitable for drilled grouting piles under water construction as claimed in claim 2, which is characterized in that described The bottom of slurry can (5) is equipped with more pillars (53), and slurry can (5) is provided with a mudhole (54) in bottom surface, and in mudhole (54) bolt has a flange closure plate (9) at.
4. the slurry transportation system for being suitable for drilled grouting piles under water construction as described in any one of claims 1 to 3, It is characterized in that, further includes the mud veclamation pipe (10) that both ends are connected to the top of two pile base casings (2) respectively.
CN201721778469.3U 2017-12-15 2017-12-15 Slurry transportation system suitable for drilled grouting piles under water construction Expired - Fee Related CN207609397U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721778469.3U CN207609397U (en) 2017-12-15 2017-12-15 Slurry transportation system suitable for drilled grouting piles under water construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721778469.3U CN207609397U (en) 2017-12-15 2017-12-15 Slurry transportation system suitable for drilled grouting piles under water construction

Publications (1)

Publication Number Publication Date
CN207609397U true CN207609397U (en) 2018-07-13

Family

ID=62799168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721778469.3U Expired - Fee Related CN207609397U (en) 2017-12-15 2017-12-15 Slurry transportation system suitable for drilled grouting piles under water construction

Country Status (1)

Country Link
CN (1) CN207609397U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113738275A (en) * 2021-09-02 2021-12-03 中铁二十三局集团第四工程有限公司 Anti-pollution construction method for cast-in-situ bored pile in pile foundation engineering
CN114961600A (en) * 2022-05-13 2022-08-30 中国铁建大桥工程局集团有限公司 Deep-water large-diameter pile foundation mud recycling device and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113738275A (en) * 2021-09-02 2021-12-03 中铁二十三局集团第四工程有限公司 Anti-pollution construction method for cast-in-situ bored pile in pile foundation engineering
CN113738275B (en) * 2021-09-02 2024-02-27 中铁二十三局集团第四工程有限公司 Anti-pollution construction method for bored pile of pile foundation engineering
CN114961600A (en) * 2022-05-13 2022-08-30 中国铁建大桥工程局集团有限公司 Deep-water large-diameter pile foundation mud recycling device and construction method

Similar Documents

Publication Publication Date Title
CN207609397U (en) Slurry transportation system suitable for drilled grouting piles under water construction
CN109629561A (en) A kind of high trestle operation platform reacting cycle pile system of clean and environmental protection
CN103603339A (en) Method for long spiral drilling machine grouting retaining wall hole forming and system thereof
CN102877497A (en) River channel desilting method
CN109914399A (en) A kind of pile base construction method of environmental protection
CN103603364B (en) Deepwater suction-type gravity foundation and deepwater mounting device and deepwater mounting method thereof
CN112096450A (en) Device and method for preventing underground filling pipeline from cavitation erosion and vibration
CN203603145U (en) Long spiral drilling machine grouting retaining wall hole forming system
CN112709552A (en) Device and method for developing marine natural gas hydrate system based on hydrate method
CN105714863B (en) A kind of unmanned bagger and its method of work for handling industrial sludge
CN214993774U (en) Cast-in-place pile construction equipment with mud circulation, separation, scarfing cinder function
CN105776797B (en) Riverway sludge vacuum dehydration handles vehicle
CN102865105A (en) Mud discharging facility composed of water pump and mud discharging tank
CN111878162B (en) A method for dredging and discharging sewage of underground mine leakage filling mortar storage facilities
CN106013162A (en) Construction process for filling underwater concrete by injection method
CN105134125B (en) Annular space bottom end construction technology for plugging after gas vertical wall
CN112376641A (en) Reservoir deep water sediment cleaning method
CN217608300U (en) Middle-size and small-size hole formula tailing storehouse closed warehouse reclamation device
CN210025773U (en) Sinking type slurry storage and treatment system
CN203807254U (en) Equipment for recycling sewage for separating residual concrete sand and stone in concrete tanker
CN217470721U (en) Device for closed-warehouse reclamation of large pit-type tailing warehouse
CN114198038B (en) A high-position mud water tank device for a circulating drilling rig and a construction method thereof
CN213838675U (en) Device for preventing underground filling pipeline from cavitation and vibration
CN209483247U (en) Boring mud Sediment filter box for high trestle operation platform reacting cycle pile system
CN116040832A (en) Underground coal mine water treatment method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180713

CF01 Termination of patent right due to non-payment of annual fee