CN207553644U - A kind of rc-frame-beam column reinforcing joint - Google Patents

A kind of rc-frame-beam column reinforcing joint Download PDF

Info

Publication number
CN207553644U
CN207553644U CN201721584409.8U CN201721584409U CN207553644U CN 207553644 U CN207553644 U CN 207553644U CN 201721584409 U CN201721584409 U CN 201721584409U CN 207553644 U CN207553644 U CN 207553644U
Authority
CN
China
Prior art keywords
frame
reinforcing
column
shear stud
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721584409.8U
Other languages
Chinese (zh)
Inventor
洪燕瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721584409.8U priority Critical patent/CN207553644U/en
Application granted granted Critical
Publication of CN207553644U publication Critical patent/CN207553644U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a kind of rc-frame-beam column reinforcing joints, including Vierendeel girder and frame column, further include the strengthening steel slab for joint reinforcing, strengthening steel slab surrounds beam strengthening steel slab around Vierendeel girder and for connecting the reinforcement by connection steel plate between adjacent beams strengthening steel slab, beam strengthening steel slab forms the reinforcing module of closing with reinforcement by connection steel plate, the upper and lower surface for reinforcing module is provided with the main stress reinforcing bar being mutually parallel with frame column, reinforces in module and is additionally provided with shear stud;The reinforcing joint of the utility model is combined using section-increased method and reinforcement by sticking of sheets, the stress performance of node can not only be improved, the plastic deformation ability of node can also be significantly improved simultaneously, enhance the energy dissipation capacity of node, it can realize and frame joint is persistently constrained, reduce the shear-deformable of joint cores, increase overall stiffness, the anti-seismic performance of node is improved, there is preferable application prospect.

Description

A kind of rc-frame-beam column reinforcing joint
Technical field
The utility model is related to a kind of reinforcing joint, more particularly to a kind of rc-frame-beam column reinforcing joint.
Background technology
Frame structure has a large capacity and a wide range in China, with being continuously increased for service life and constantly carrying for Seismic Design Requirements There is the phenomenon that shock resistance is insufficient in height, original frame structure node;Many buildings will carry out due to various reasons simultaneously Add layer or transformation.This just needs to carry out consolidation process to frame structure.And the emphasis of general consolidation process just joins section in beam column Point, because beam column handing-over node is the core space of frame joint, stressing conditions are complicated, also easily destroy, and earthquake is occurring During effect, frame joint is the weak link of total.Therefore the weak link as Seismic Design of Reinforced Concrete Structure, node Reinforcing it is then significant.The defects of existing reinforcement means is relatively simple there are function, and consolidation effect is bad.
Utility model content
The purpose of the utility model is to overcome the defects of the prior art, provide a kind of rc-frame-beam column to reinforce Node, what the technical solution of the rc-frame-beam column reinforcing joint was realized in:
A kind of rc-frame-beam column reinforcing joint, including Vierendeel girder and frame column, Vierendeel girder includes four, respectively It is fixedly connected with the four sides of the frame column, the reinforcing joint further includes the strengthening steel slab for joint reinforcing, the reinforcing Steel plate surrounds beam strengthening steel slab around Vierendeel girder and for connecting the reinforcement by connection between adjacent beams strengthening steel slab Steel plate, the beam strengthening steel slab form the reinforcing module of closing with reinforcement by connection steel plate, and the upper and lower surface for reinforcing module is set The main stress reinforcing bar being mutually parallel with frame column is equipped with, shear stud, the shear stud are additionally provided in the reinforcing module Including first shear stud vertical with reinforcement by connection steel plate, further include and orthogonal second shearing resistance of Vierendeel girder and frame column Peg.
Preferably, the beam strengthening steel slab is fixed on by high-strength anchor bolt on the Vierendeel girder, the beam strengthening steel slab with The distance at the frame column edge is 200~300mm.
Preferably, reinforcement by connection steel plate outer surface is stretched out at the main stress reinforcing bar both ends and bent jointing adds in the connection Gu on steel plate.
Preferably, first shear stud includes 2 and takes root in long shear stud inside frame column and with being between it The short shear stud of quincuncial arrangement.
It is further preferred that first shear stud is welded to connect with reinforcement by connection steel plate, it is implanted into the length of frame column Meet 25 times of bar diameters, the length of the short shear stud is 100mm, between the long shear stud and short shear stud Spacing is 200mm.
Preferably, second shear stud resists including the vertical beam of the column shear stud and Vierendeel girder vertical with frame column Peg is cut, the length that second shear stud is implanted into respectively in the frame column and Vierendeel girder meets 10 times of bar diameters, outside Leakage length is 150mm.
Preferably, whole reinforcing joint is formed after the reinforcing inside modules casting concrete.
The reinforcing joint of the utility model is combined using section-increased method and reinforcement by sticking of sheets, can not only improve node Stress performance, while the plastic deformation ability of node can also be significantly improved, enhance the energy dissipation capacity of node, while can realize Frame joint is persistently constrained, the shear-deformable of joint cores is reduced, increases overall stiffness, improves the shock resistance of node Can, there is preferable application prospect.
Description of the drawings
Fig. 1 is the overall structure diagram of the utility model reinforcing joint;
Fig. 2 is the main stress steel bar plane schematic diagram of the utility model reinforcing joint;
Fig. 3 is the floor map of the shear stud of the utility model reinforcing joint.
Reference numeral:1- frame columns, 2- Vierendeel girders, 3- beam strengthening steel slabs, 4- reinforcement by connection steel plates, 5- main stress reinforcing bars, 6- shear studs, 7- anchor bolts, the first shear studs of 60-, 61- long shear studs, the short shear studs of 62-, 80- the second shearing resistance bolts Nail, 81- column shear studs, 82- beam shear studs.
Specific embodiment
The utility model is described in further detail in the following with reference to the drawings and specific embodiments.
As shown in Figures 1 to 3, a kind of rc-frame-beam column reinforcing joint, including Vierendeel girder 2 and frame column 1, frame Beam 2 includes four, and the four sides with the frame column 1 is fixedly connected respectively, and the reinforcing joint is further included for joint reinforcing Strengthening steel slab, the strengthening steel slab surround the beam strengthening steel slab 3 around Vierendeel girder and are reinforced for connecting adjacent beams Reinforcement by connection steel plate 4 between steel plate 3, the beam strengthening steel slab 3 form the reinforcing module of closing, institute with reinforcement by connection steel plate 4 The upper and lower surface for stating reinforcing module is provided with the main stress reinforcing bar 5 being mutually parallel with frame column 1, is also set up in the reinforcing module There is a shear stud 6, the shear stud 6 includes first shear stud 60 vertical with reinforcement by connection steel plate 4, further includes and frame 1 orthogonal second shear stud 80 of beam 2 and frame column.
When it is implemented, the beam strengthening steel slab 3 is fixed on by high-strength anchor bolt 7 on the Vierendeel girder 2, the beam is reinforced The distance at steel plate 3 and 1 edge of frame column is 200~300mm.
When it is implemented, 4 outer surface of reinforcement by connection steel plate is stretched out at 5 both ends of main stress reinforcing bar and bent jointing is in described On reinforcement by connection steel plate 4.
When it is implemented, first shear stud 60 include 2 take root in long shear stud 61 inside frame column and with It is in the short shear stud 62 of quincuncial arrangement between it.
When it is implemented, first shear stud 60 is welded to connect with reinforcement by connection steel plate 4, it is implanted into the length of frame column 1 Degree meets 25 times of bar diameters, and the length of the short shear stud 62 is 100mm, the long shear stud 61 and short shear stud Spacing between 60 is 200mm.
When it is implemented, second shear stud 80 includes the column shear stud 81 and Vierendeel girder 2 vertical with frame column 1 Vertical beam shear stud 82, the length that second shear stud 80 is implanted into respectively in the frame column 1 and Vierendeel girder 2 meet 10 times of bar diameters, leakage length are 150mm.
When it is implemented, form whole reinforcing joint after the reinforcing inside modules casting concrete.
The technology contents and technical characteristic of the utility model have revealed that as above those skilled in the art still may base The replacement and modification without departing substantially from the utility model in essence are made in the teaching of the utility model, therefore, the utility model protection Range is not limited to the revealed content of embodiment, also including various replacements and modification without departing substantially from the utility model in essence.

Claims (7)

1. a kind of rc-frame-beam column reinforcing joint, it is characterised in that:Including Vierendeel girder and frame column, Vierendeel girder includes Four, respectively the four sides with the frame column be fixedly connected, the reinforcing joint further includes the strengthening steel slab for joint reinforcing, The strengthening steel slab surrounds beam strengthening steel slab around Vierendeel girder and for connecting between adjacent beams strengthening steel slab Reinforcement by connection steel plate, the beam strengthening steel slab forms the reinforcing module of closing with reinforcement by connection steel plate, described to reinforce the upper of module Lower surface is provided with the main stress reinforcing bar being mutually parallel with frame column, and shear stud is additionally provided in the reinforcing module, described Shear stud includes first shear stud vertical with reinforcement by connection steel plate, further includes orthogonal with Vierendeel girder and frame column Second shear stud.
2. rc-frame-beam column reinforcing joint according to claim 1, it is characterised in that:The beam strengthening steel slab Be fixed on the Vierendeel girder by high-strength anchor bolt, the distance at the beam strengthening steel slab and the frame column edge for 200~ 300mm。
3. rc-frame-beam column reinforcing joint according to claim 1, it is characterised in that:The main stress reinforcing bar Reinforcement by connection steel plate outer surface is stretched out at both ends and bent jointing is on the reinforcement by connection steel plate.
4. rc-frame-beam column reinforcing joint according to claim 1, it is characterised in that:The first shearing resistance bolt Nail includes the 2 long shear studs taken root in inside frame column and the short shear stud between it being in quincuncial arrangement.
5. rc-frame-beam column reinforcing joint according to claim 4, it is characterised in that:The first shearing resistance bolt Nail is welded to connect with reinforcement by connection steel plate, and the length for being implanted into frame column meets 25 times of bar diameters, the length of the short shear stud It spends for 100mm, the spacing between the long shear stud and short shear stud is 200mm.
6. rc-frame-beam column reinforcing joint according to claim 1, it is characterised in that:The second shearing resistance bolt Nail includes the vertical beam shear stud of the column shear stud and Vierendeel girder vertical with frame column, and second shear stud is planted respectively Enter the length in the frame column and Vierendeel girder and meet 10 times of bar diameters, leakage length is 150mm.
7. rc-frame-beam column reinforcing joint according to claim 1, it is characterised in that:In the reinforcing module Whole reinforcing joint is formed after portion's casting concrete.
CN201721584409.8U 2017-11-23 2017-11-23 A kind of rc-frame-beam column reinforcing joint Expired - Fee Related CN207553644U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721584409.8U CN207553644U (en) 2017-11-23 2017-11-23 A kind of rc-frame-beam column reinforcing joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721584409.8U CN207553644U (en) 2017-11-23 2017-11-23 A kind of rc-frame-beam column reinforcing joint

Publications (1)

Publication Number Publication Date
CN207553644U true CN207553644U (en) 2018-06-29

Family

ID=62680693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721584409.8U Expired - Fee Related CN207553644U (en) 2017-11-23 2017-11-23 A kind of rc-frame-beam column reinforcing joint

Country Status (1)

Country Link
CN (1) CN207553644U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110094075A (en) * 2019-04-09 2019-08-06 西安工业大学 The reinforcement means of existing reinforced concrete composite structure truss construction dislocation
CN113389401A (en) * 2021-06-30 2021-09-14 中国建筑第八工程局有限公司 Construction method of newly-added column foundation of column-cap-free beam-column joint of basement top plate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110094075A (en) * 2019-04-09 2019-08-06 西安工业大学 The reinforcement means of existing reinforced concrete composite structure truss construction dislocation
CN113389401A (en) * 2021-06-30 2021-09-14 中国建筑第八工程局有限公司 Construction method of newly-added column foundation of column-cap-free beam-column joint of basement top plate

Similar Documents

Publication Publication Date Title
CN103147526B (en) Strip-shaped grate concrete filled steel tube combined structure shear wall and preparation method thereof
CN202831402U (en) Concrete filled steel tubular column with inner-connected circular pipe and outer-sleeved concrete filled steel tube
CN201679114U (en) Horizontal seam dissipating energy prestress shear wall structure
CN207003652U (en) A kind of compound concrete-filled tubular column and steel tube concrete beam composite frame structure
CN110067186B (en) Steel pipe stiffening web steel-concrete combined box girder
CN108589971A (en) A kind of closed-section steel deck combined concrete shear wall connecting node and production method
CN102251602A (en) Anti-seismic damper of shearing type opening soft steel building structure
CN103046766B (en) Method for lengthening columns, adding beams, resisting earthquakes and reinforcing for bottom frame structure
CN102758494B (en) Composite steel plate shear wall with angle steel
CN103074959A (en) Steel plate and high-strength concrete combination connecting beam
CN203546946U (en) Novel double-steel-plate concrete composite shear wall
CN107489212A (en) Exempt from the anti-shear buckling steel plate shear force wall of bearing capacity
CN207553644U (en) A kind of rc-frame-beam column reinforcing joint
CN203383522U (en) Reinforcing beam column joint
CN103711231A (en) Combined shear wall formed by steel pipe concrete frame, double-steel-plate shear wall and inside welded concealed bracing mild steel plates under equivalent steel
CN102776829A (en) Steel pipe concrete combined truss bridge
CN106836556B (en) Composite reinforcement cage truss supporting shear wall
CN104563333A (en) Exterior steel plate and in-fill concrete combined shear wall
CN207017483U (en) The full precast shear wall structural system of regenerative steel skeleton
CN102535747A (en) Multi-cavity concrete-filled steel tube column with angle bars bonded and welded at corners and reinforcing cages arranged in cavities and construction method of multi-cavity concrete-filled steel tube column
CN207597918U (en) A kind of damaged Concrete Filled Square Steel Tubular Frame mid-side node ruggedized construction
CN207660307U (en) A kind of frame structure beam column strengthening reconstruction node
CN206360399U (en) The existing reinforced concrete coupling beam bracing means of one species " doubly-linked beam "
CN203080799U (en) Coupling beam combining steel plates and high-strength concrete
CN204781309U (en) Roof beam plate -column structure of green ecological feasibility building system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180629