CN206976912U - A kind of transforming plant assembly type builds the new breaking of contact tank mounting structure of lightning protection - Google Patents

A kind of transforming plant assembly type builds the new breaking of contact tank mounting structure of lightning protection Download PDF

Info

Publication number
CN206976912U
CN206976912U CN201720854194.0U CN201720854194U CN206976912U CN 206976912 U CN206976912 U CN 206976912U CN 201720854194 U CN201720854194 U CN 201720854194U CN 206976912 U CN206976912 U CN 206976912U
Authority
CN
China
Prior art keywords
breaking
contact
profile steel
steel
lightning protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720854194.0U
Other languages
Chinese (zh)
Inventor
李琛
王坤
宇峰
曾海兵
张雯
徐硕
王颖
李晶晶
袁亚东
王陈杰
贾晓娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Huadian Engineering Consulting and Design Co Ltd
Mingguang Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
Anhui Huadian Engineering Consulting and Design Co Ltd
Mingguang Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Huadian Engineering Consulting and Design Co Ltd, Mingguang Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical Anhui Huadian Engineering Consulting and Design Co Ltd
Priority to CN201720854194.0U priority Critical patent/CN206976912U/en
Application granted granted Critical
Publication of CN206976912U publication Critical patent/CN206976912U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a kind of transforming plant assembly type to build the new breaking of contact tank mounting structure of lightning protection, including H profile steel, assembled wallboard is connected on the edge of a wing of H profile steel, it is fixedly connected with H profile steel using breaking of contact casing made of composite insulating material, it is prefabricated or be machined with through hole in H profile steel connection breaking of contact box location, breaking of contact casing is fixedly connected by bolt with H profile steel, earthing or grounding means in breaking of contact casing is extended to outside card case, and the earthing or grounding means is directly anchored in H profile steel, breaking of contact casing is provided with the electricity-leading device that the electricity in breaking of contact casing is led to horizontal grounding net.The utility model solves the problems, such as the misconnection between earth conductor and old-fashioned hull plate, it is ensured that the insulation between earth conductor and housing.And part band steel bending section is exposed to outer inaesthetic problem, it can be ensured that the stability of breaking of contact case installation.

Description

A kind of transforming plant assembly type builds the new breaking of contact tank mounting structure of lightning protection
Technical field
The present invention relates to power industry transformer station field, is specifically that a kind of transforming plant assembly type that is used for builds lightning protection system The new breaking of contact tank mounting structure of system.
Background technology
With the development of Chinese society economy and power grid construction, assembled architecture is showed using steel construction and composite board wall Assembling, the advantages that with short construction period, energy-conserving and environment-protective, is used in 35-110kV intelligent substations for nearly 2 years by large-scale popularization In construction.At the same time, the lightning protection of the transforming plant assembly type building lightning protection form special as one is concerned.
1st, several frequently seen building lightning protection form
Lightning protection earthing system is built mainly based on direct striking thunder prevention and the intrusion of lightning protection electric wave, so that it is guaranteed that building, equipment With the safety of personnel, common building lightning protection form has following 3 kinds:
(1) civil buildings (frame structure):Independent reinforcing bar downlead+foundation grounding net in roof lighting proof strip+post.It is civilian to build Middle frame structure is built using more, roof sets lighting proof strip, and independent reinforcing bar is as downlead using in post, due to civil buildings Grounded screen based on earthed system, sets breaking of contact case when downlead is connected with foundation grounding net, the general concealed installation of breaking of contact case exists Within the walls, the measurement of grounding resistance is facilitated.
(2) civil buildings (steel construction):Roof lighting proof strip+H profile steel downlead+foundation grounding net.Part civil buildings are adopted With steel structural form, steel building lightning protection uses steel construction (H profile steel) conduct when under roof setting lighting proof strip, lighting proof strip draw Downlead, due to grounded screen based on the earthed system of civil buildings, provided according to specification, during using foundation grounding net, steel knot Structure downlead is not provided with breaking of contact, and steel construction is directly welded by band steel to be connected with foundation grounding net, realizes that roof lighting proof strip draws Offline reliable ground.
(3) traditional transformer station's building (tower structure):Roof lighting proof strip+independent reinforcing bar downlead+foundation grounding net.Pass The building of system transformer station is generally tower structure, is built using armored concrete, roof lighting proof strip typically utilizes independent steel Muscle is as downlead, and downlead is away from breaking of contact case is set at ground 0.3-1.8 rice, breaking of contact case is typically using concealed installation in wall Interior, lighting proof strip downlead is connected by breaking of contact with horizontal grounding net, realizes the reliable ground of roof lighting proof strip.
2nd, intelligent substation assembled architecture lightning protection form
In novel intelligent power station, assembled architecture lightning protection form uses:Roof lighting proof strip+H profile steel downlead+level connects Earth mat.There is some difference with above 3 kinds of common lightning protection forms for this building lightning protection form, belongs to a kind of special Building lightning protection form, assembled architecture built using steel construction and combined wall board, roof lighting proof strip draw under when use steel Structure H profile steel, according to code requirement, uses as downlead, but because System in Substation is using horizontal grounding net ground connection When horizontal grounding net is grounded, downlead needs to install breaking of contact additional.Following table is 4 kinds of building lightning protection form contrasts:
4 kinds of building lightning protection form contrast tables
3rd, there is problem in transforming plant assembly type building lightning protection earthing system
In conventional frame formula structural construction, breaking of contact case takes concealed installation mode, and scheme of installation is shown in Fig. 1, but new In assembled architecture, using traditional breaking of contact case concealed installation when in steel construction and combined wall board (scheme of installation is shown in Fig. 2), mainly Following 4 be present:
The down conductor pad of H profile steel is located at web, when pad is connected with old-fashioned breaking of contact case, between the two Connection band steel to be bent by many places, and part band steel is outside the combined wall, complicated construction technique, unsightly;Installation Schematic diagram is shown in Fig. 2.
There is hidden danger in old-fashioned breaking of contact case concealed installation, easily loosen, cause upper end connection flat in combined wall board wall when fixed Steel rocks, and potential safety hazard be present;Scheme of installation is shown in Fig. 2.
There are Insulation Problems in old-fashioned breaking of contact tank shell material, easily cause steel plate shell between steel plate, with earth lead Misconnection between body and earth conductor, it can not be disconnected so as to cause to connect downlead and grounded screen.
Multilayer antirust paint is scribbled when H profile steel is dispatched from the factory, with being made during old-fashioned breaking of contact case Site Welding, it is necessary to destroy japanning of dispatching from the factory Into second painting and the problems such as welding is unreliable be present.
Utility model content
The purpose of this utility model is to be directed to the deficiency mentioned in background technology and provide a kind of new disconnecting output stacker Mounting structure, it is possible to achieve the reliable ground of transforming plant assembly type building roof lightning-protection system, construction technology is simple, safely may be used Lean on.
To achieve these goals, technical solution adopted in the utility model is:
A kind of transforming plant assembly type builds the new breaking of contact tank mounting structure of lightning protection, including H profile steel, assembled wallboard connection On the edge of a wing of H profile steel, it is fixedly connected with H profile steel using breaking of contact casing made of composite insulating material, connects in H profile steel It is prefabricated or be machined with through hole to connect breaking of contact box location, breaking of contact casing is fixedly connected by bolt with H profile steel, breaking of contact casing Interior earthing or grounding means is extended to outside card case, and the earthing or grounding means is directly anchored in H profile steel, and breaking of contact casing is provided with will be disconnected Electricity in output stacker body leads to the electricity-leading device of horizontal grounding net.
Described breaking of contact casing is arranged on the web between two edges of a wing of H profile steel.
Described breaking of contact casing is arranged between 0.5 meter -1.8 meters of ground.
Described earthing or grounding means is band steel, and the band steel is provided with through hole, and corresponding H profile steel is provided with and the through hole on band steel Corresponding mounting hole, is bolted and is welded as a whole between band steel and H profile steel.
The utility model contrasts with old-fashioned breaking of contact case, and advantage is as follows:
1. new breaking of contact case uses composite insulating material, solve connecting by mistake between earth conductor and old-fashioned hull plate Connect problem, it is ensured that the insulation between earth conductor and housing.
2. new breaking of contact case size combination H profile steel web size customization, the web being installed between two different edge of H profile steel On, when can avoid concealed installation in combined wall, the difficulty of construction brought of complicated bend of top connection band steel, and part are flat Steel bending section is exposed to outer inaesthetic problem.
3. during new breaking of contact case installation, directly it is fixed on bolt on terminal prefabricated before H profile steel is dispatched from the factory, can be true Protect the stability of breaking of contact case installation.
4. the grounding flat steel of new breaking of contact upper box part with drawing lower H profile steel weld, by ground terminal bolt consolidated by band steel The mode of fixed+welding is connected, and ground terminal is prefabricated before H profile steel is dispatched from the factory, and scene is welded after being fixed using bolt, it can be ensured that band steel Reliable welding between H profile steel.
Brief description of the drawings
Fig. 1 is the structural representation that background technology center posture builds breaking of contact case concealed installation;
Fig. 2 is Fig. 1 sectional view;
Fig. 3 is the structural representation that assembled architecture breaking of contact case is installed in background technology;
Fig. 4 is Fig. 3 sectional view;
Fig. 5 is structural representation of the present utility model;
Fig. 6 is Fig. 5 sectional view.
Embodiment
The utility model is described further with reference to embodiment.
Embodiment
A kind of transforming plant assembly type building new breaking of contact tank mounting structure of lightning protection as shown in Figure 5 and Figure 6, including H types Steel 1, rock wool assembled wallboard 2 are connected on the edge of a wing of H profile steel, are fixedly connected with and are adopted on the web between the edge of a wing of H profile steel two The breaking of contact casing 3 made of composite insulating material, breaking of contact casing are arranged between 0.5 meter -1.8 meters of ground.In H types Steel connection breaking of contact box location is prefabricated or is machined with through hole, and breaking of contact casing is fixedly connected by bolt with H profile steel, breaking of contact Earthing or grounding means 4 in casing is extended to outside card case, and the earthing or grounding means is directly anchored in H profile steel, described earthing or grounding means For band steel, the band steel is provided with through hole, and corresponding H profile steel is provided with the mounting hole corresponding with the through hole on band steel, band steel and H It is bolted and is welded as a whole between shaped steel.Breaking of contact casing is provided with and the electricity in breaking of contact casing is led into level connect The electricity-leading device 5 of earth mat.Electricity-leading device is electric conductor, and electricity-leading device can be band iron, be welded between lower end and earth mat.
The advantages of general principle of the present utility model, principal character and the utility model has been shown and described above.One's own profession The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification Simply illustrate principle of the present utility model, it is in the art common on the premise of the spirit and scope of the utility model is not departed from Technical staff simple change and replace all be within the scope of protection of the utility model.

Claims (4)

1. a kind of transforming plant assembly type builds the new breaking of contact tank mounting structure of lightning protection, including H profile steel, assembled wallboard are connected to On the edge of a wing of H profile steel, it is characterised in that:It is fixedly connected with H profile steel using breaking of contact casing made of composite insulating material, Prefabricated or be machined with through hole in H profile steel connection breaking of contact box location, breaking of contact casing is fixedly connected by bolt with H profile steel, Earthing or grounding means in breaking of contact casing is extended to outside card case, and the earthing or grounding means is directly anchored in H profile steel, breaking of contact casing It is provided with the electricity-leading device that the electricity in breaking of contact casing is led to horizontal grounding net.
2. a kind of transforming plant assembly type building new breaking of contact tank mounting structure of lightning protection according to claim 1, its feature It is:Described breaking of contact casing is arranged on the web between two edges of a wing of H profile steel.
3. a kind of transforming plant assembly type building new breaking of contact tank mounting structure of lightning protection according to claim 1, its feature It is:Described breaking of contact casing is arranged between 0.5 meter -1.8 meters of ground.
4. a kind of transforming plant assembly type building new breaking of contact tank mounting structure of lightning protection according to claim 1 or 2 or 3, It is characterized in that:Described earthing or grounding means is band steel, and the band steel is provided with through hole, corresponding H profile steel be provided with band steel The corresponding mounting hole of through hole, is bolted and is welded as a whole between band steel and H profile steel.
CN201720854194.0U 2017-07-14 2017-07-14 A kind of transforming plant assembly type builds the new breaking of contact tank mounting structure of lightning protection Active CN206976912U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720854194.0U CN206976912U (en) 2017-07-14 2017-07-14 A kind of transforming plant assembly type builds the new breaking of contact tank mounting structure of lightning protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720854194.0U CN206976912U (en) 2017-07-14 2017-07-14 A kind of transforming plant assembly type builds the new breaking of contact tank mounting structure of lightning protection

Publications (1)

Publication Number Publication Date
CN206976912U true CN206976912U (en) 2018-02-06

Family

ID=61402396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720854194.0U Active CN206976912U (en) 2017-07-14 2017-07-14 A kind of transforming plant assembly type builds the new breaking of contact tank mounting structure of lightning protection

Country Status (1)

Country Link
CN (1) CN206976912U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109004613A (en) * 2018-07-17 2018-12-14 山东城市建设职业学院 Energy-saving building roof lightning arrester
CN110700415A (en) * 2019-09-24 2020-01-17 中冶天工集团有限公司 Detachable lightning protection grounding down lead connecting method for steel module building

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109004613A (en) * 2018-07-17 2018-12-14 山东城市建设职业学院 Energy-saving building roof lightning arrester
CN109004613B (en) * 2018-07-17 2024-05-14 山东城市建设职业学院 Energy-saving building roof lightning arrester
CN110700415A (en) * 2019-09-24 2020-01-17 中冶天工集团有限公司 Detachable lightning protection grounding down lead connecting method for steel module building

Similar Documents

Publication Publication Date Title
CN206976912U (en) A kind of transforming plant assembly type builds the new breaking of contact tank mounting structure of lightning protection
CN102635240B (en) Construction method of indoor anti-static shielding mesh system
US20040139689A1 (en) Novel Low Cost Implementation of a High Efficiency Solar Electric System using existing Building Structures
CN103669955A (en) Data collection and emergency public broadcast upright column system suitable for being installed in the open
CN205882692U (en) Comprehensive lightning protection system of photovoltaic transformer substation
CN202866322U (en) Underground upper cover property complex grounding system
CN206379622U (en) The integrated active Initiative Defence System of direct lightning strike
CN108963948A (en) A kind of lightning protection device for super large formed steel construction radar
CN107610385A (en) A kind of safety warning-panel detected mobile object and automatic alarm and reminded
CN203434578U (en) Lightning protection device suitable for condensation prevention roof
CN206091406U (en) Adopt assembled transformer substation steel construction factory building of new ground connection form
CN206506036U (en) A kind of steel pipe pole protection against electric shock ground structure
CN206806964U (en) Steel construction indoor substation roof lightning band
CN210640557U (en) Safe and reliable's integrated block terminal
CN207069293U (en) One kind uses distribution framework made of composite insulating material
CN208380184U (en) A kind of architecture-integral photovoltaic bicycle shed applied to automobile logistics garden
CN104864953A (en) Lightening-proof method of electronic weighing instrument
CN206667471U (en) Lightning protection steel house
CN109921288A (en) The dedicated induction prevention eliminating needle of radar and the dedicated thunder installation structure that disappears of radar
CN206225578U (en) A kind of equipotential bonding terminal box
CN108964015A (en) A method of it is designed with electrical engineering height for low meter
CN205123211U (en) Transmission of electricity corridor is with multi -functional shaft tower of lightning protection
CN201598729U (en) Spliced container machine room
CN202990523U (en) Integrative single-pipe tower
CN113839311B (en) Lightning protection method for multifunctional intelligent pole

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant