CN206917094U - A kind of Simple positioning device for being used to control shear force wall reinforcing steel bar array pitch - Google Patents

A kind of Simple positioning device for being used to control shear force wall reinforcing steel bar array pitch Download PDF

Info

Publication number
CN206917094U
CN206917094U CN201720648916.7U CN201720648916U CN206917094U CN 206917094 U CN206917094 U CN 206917094U CN 201720648916 U CN201720648916 U CN 201720648916U CN 206917094 U CN206917094 U CN 206917094U
Authority
CN
China
Prior art keywords
gag lever
lever post
hook
wall
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720648916.7U
Other languages
Chinese (zh)
Inventor
赵勇
代跃强
李顺
吴梓桐
许仕达
耿东辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201720648916.7U priority Critical patent/CN206917094U/en
Application granted granted Critical
Publication of CN206917094U publication Critical patent/CN206917094U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model discloses a kind of Simple positioning device for being used to control shear force wall reinforcing steel bar array pitch, it is made up of device body, described device body is made up of limitting casing and hook, and the limitting casing includes gag lever post arranged in parallel, and support bar is vertically welded between the gag lever post;Uniform welding has hook on gag lever post described in both sides, and the hook crotch rushes to vertical welding equipment outwardly, and at the top of the both sides gag lever post of limitting casing, the hook vertical rod side flushes with gag lever post outside.The utility model is arranged between shear wall two panels reinforced mesh, is melted " support drawknot " and is integrated, be used cooperatively with cushion block of concrete bar protective layer, can efficiently control array pitch, position and the thickness of protection tier of wall steel bar.The device have the characteristics that it is simple in construction, processing, it is easy to use, cheap using engineering reinforcing bar leftover bits and pieces, energy-conserving and environment-protective, cost, suitable for double reinforcement shear wall.

Description

A kind of Simple positioning device for being used to control shear force wall reinforcing steel bar array pitch
Technical field
Architectural engineering cast-in-place structural reinforcement construction technology is the utility model is related to, is to be related to one kind to be used in particular Control the Simple positioning device of shear force wall reinforcing steel bar array pitch.
Background technology
Cast-in-place structural shear force wall reinforcing steel bar typically uses double arrangement of reinforcement.Shear wall general section is small, number of steel bars multi-density is big, The small poor rigidity of diameter, extruding, collision during model sheetinstallat to reinforcing bar, disturbance during disturbing concrete to reinforcing bar, hang draw and The influence of the factor such as plant, personnel in work progress, easily makes reinforcing bar produce displacement, and mainly bar-spacing set becomes Change, turn into construction quality common fault.It reduces structural elements bearing capacity, has a strong impact on architecture quality.Control shear wall steel at present The design measure of muscle array pitch is to set " drag hook ";Working measure typically uses " ladder muscle ".It is mainly used for controlling shear wall two The spacing of side steel bar stress, prevent from changing in work progress.It was verified that " drag hook " only controllable formative stage wall steel The array pitch of muscle, subsequent handling influence is not resisted but, displacement can be still deformed in the presence of external force." ladder muscle " is using rule Lattice are not less than the reinforcement fabrication of joist, and indulge muscle by both sides is equal to wall thickness with the length set perpendicular to vertical muscle, and spacing is equal to joist The horizontal bar of spacing is welded.It is divided into vertical " ladder muscle " and level " ladder muscle ", while is arranged on wall as additional bar Between the bar-mat reinforcement of both sides.Wherein vertical " ladder muscle " is highly the same as wall height;Arrangement spacing is 1.5m~2m.Horizontal " ladder muscle " arrangement Under wall reinforcing bar, in, top, every layer is elongated setting." ladder muscle " is for controlling wall steel bar position in work progress Effect is preferable.But because its amount of reinforcement is big, consider construction cost factor, it is only used for outside basement by most job sites The significant points such as wall, other shear force wall reinforcing steel bar positions still fail to be effectively controlled.
In the construction of high-rise or super-high building structure, the load that armored concrete vertical structure is born is very big, wherein As the reinforcing bar of skeleton, vital effect is played.And the position correctness of steel bar stress, it is directly connected to reinforcing bar effect Performance and structural elements bearing capacity, it is necessary to paid attention to and taken seriously.In view of setting " drag hook " for controlling shear wall steel The effect of muscle array pitch is limited, and " ladder muscle " is big because putting into, and cost is high, it is difficult to is generalized to bigger scope, at present shear force wall reinforcing steel bar Position dominates the situation still severe including array pitch, it would be highly desirable to release it is more applicable, effective, conveniently, economic solution.
Utility model content
The purpose of this utility model is to overcome deficiency of the prior art, there is provided one kind is used to control shear force wall reinforcing steel bar The Simple positioning device of array pitch, between shear wall two panels reinforced mesh, melt " support drawknot " and be integrated, protected with reinforcing bar Layer cushion block is used cooperatively, and can efficiently control array pitch, position and the thickness of protection tier of wall steel bar.The device has structure Simply, the features such as processing, be easy to use, using engineering reinforcing bar leftover bits and pieces, energy-conserving and environment-protective, cheap cost.
The purpose of this utility model is achieved through the following technical solutions.
A kind of Simple positioning device for being used to control shear force wall reinforcing steel bar array pitch of the present utility model, is made up of device body, Described device body is made up of limitting casing and hook, and the limitting casing includes gag lever post arranged in parallel, the gag lever post Between be vertically welded with support bar;Uniform welding has hook on gag lever post described in both sides, and the hook crotch rushes to vertical outwardly Welding equipment is at the top of the both sides gag lever post of limitting casing, and the hook vertical rod side outside gag lever post with flushing.
The support bar and gag lever post are formed by reinforcing bar of the diameter more than or equal to φ 16, and the support bar and spacing The diameter of bar is all higher than or the diameter equal to wall vertical reinforcement.
The spacing pole length=wall vertical reinforcement spacing × 2+100mm;External distance=wall erects between the gag lever post of both sides To the clear distance between reinforcing bar;External distance-spacing shank diameter × 2 between support pole length=both sides gag lever post;Supported on both sides bar is located at At spacing rod end 50mm.
The hook is made up of φ 6 or φ 8 reinforcing bar, height≤50mm, and one end processes≤180 ° of crotches, the flexual center of crotch Diameter=wall vertical reinforcement diameter+wall horizontal reinforcement diameter.
Spacing=wall vertical reinforcement spacing of the hook along gag lever post direction;Link up with away from spacing rod end size phase both sides Deng.
Compared with prior art, beneficial effect caused by the technical solution of the utility model is:
(1) the utility model overcomes tradition " drag hook " it only can control formed reinforcing steel bars stage position, it is impossible to prevent outside dry The limitation disturbed, melt " support drawknot " and be integrated, pass through the vertical reinforcement of limitting casing support shear wall thereon;Hook hook connects drawknot The horizontal reinforcement of shear wall, can limit that reinforcing bar is inside, outside deformation displacement simultaneously, reach and effectively controlled in whole work progress Array pitch, position and the thickness of protection tier of shear force wall reinforcing steel bar processed, it is ensured that shear force wall reinforcing steel bar construction quality;
(2) the utility model is used cooperatively with cushion block of concrete bar protective layer, can efficiently control shear force wall reinforcing steel bar skeleton entirety Position;Using hook hooking structure reinforcing bar, one-time-reach-place and installation is firm will not fall off;Limitting casing uses frame-shaped construction, rigidity Greatly, it is unlikely to deform;
(3) the utility model can utilize engineering reinforcing bar leftover bits and pieces processing and fabricating, so as to realize energy-conserving and environment-protective, further reduce Construction cost;Compared to " ladder muscle ", the apparatus structure is simple, and materials are few, makes, be easy for installation, quick, can largely save material Material, artificial, remarkable in economical benefits, while efficiency of construction is improved, accelerating construction progress, it is easier to popularize at the construction field (site), for Structural Engineering total quality is improved to be of universal significance.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is operation principle schematic diagram of the present utility model.
Reference:1 vertical reinforcement;2 horizontal reinforcements;3 hooks;
4 limitting casings;401 gag lever posts;402 support bars;.
Embodiment
The utility model will be further described below in conjunction with the accompanying drawings.
As depicted in figs. 1 and 2, a kind of Simple positioning device for being used to control shear force wall reinforcing steel bar array pitch of the present utility model, Including limitting casing 4 and hook 3, limitting casing 4 is located at the bottom of positioner.The limitting casing 4 includes limit arranged in parallel Position bar 401, is vertically welded with support bar 402 between the gag lever post 401.The gag lever post 401 and support bar 402 are by diameter Reinforcing bar more than or equal to φ 16 is formed, and the diameter of the support bar 402 and gag lever post 401 is all higher than or vertical equal to wall The diameter of reinforcing bar 1.The spacing pole length=wall vertical reinforcement spacing × 2+100mm, ensure gag lever post 401 with three vertically Reinforcing bar 1 contacts;Clear distance between the gag lever post of both sides between external distance=wall vertical reinforcement;Support pole length=both sides gag lever post it Between external distance-spacing shank diameter × 2.It is located between adjacent gag lever post 401 at least provided with two support bars 402, supported on both sides bar 402 At the end 50mm of gag lever post 401.
Uniform welding has hook 3 on gag lever post 401 described in both sides, and two hooks 3 are at least welded on every gag lever post 401. The hook 3 is made up of φ 6 or φ 8 reinforcing bar, height≤50mm ,≤180 ° of crotches of one end processing, and the Bend diameter of crotch= Wall vertical reinforcement diameter+wall horizontal reinforcement diameter, crotch flat segments vertical rod length is can hook wall horizontal reinforcement 2 i.e. Can, it is unsuitable long.Spacing=wall vertical reinforcement spacing of the hook along gag lever post direction;Both sides hook 3 is away from gag lever post 401 Hold equal sized.3 crotches of the hook rush to vertical welding equipment outwardly in the top of both sides gag lever post 401 of limitting casing 4, the hook 3 vertical rod sides flush with the outside of gag lever post 401.
Positioner of the present utility model is arranged between shear wall two panels bar-mat reinforcement, along the longitudinal direction of wall and vertically presses plum blossom Shape arranges that spacing control (determines) in 1.2m~2m according to wall reinforcement size.During installation, limitting casing 4 is located at the bottom of device; Hook 3 is located at the top of device, the crotch for linking up with 3 tops is hooked on the horizontal reinforcement 2 in the outside of wall vertical reinforcement 1, and The wall horizontal reinforcement 2 or the banding fixed of vertical reinforcement 1 that 3 crotch and the gag lever post 401 of limitting casing 4 will be linked up with intersected.Point Wall both sides bar-mat reinforcement relative shift is not limited by the support of limitting casing 4 and hook 3, drawknot, and then controls dead bar-spacing set, and with Protective layer cushion block is cooperated, and framework of steel reinforcement integral position and protective layer thickness are controlled in whole work progress.
Embodiment:
Exemplified by using double arrangement of reinforcement using position shear wall, the specification of wall vertical reinforcement 1 is φ 16, spacing 150mm, The clear distance of vertical reinforcement 1 is 114mm;The specification of wall horizontal reinforcement 2 is φ 12, spacing 200mm;Design calculates bar-spacing set positioning Plant bulk.Other different sizes, size double reinforcement shear wall bar-spacing set positioner can be by that analogy.
First, the preparation of material, equipment:
(1) reinforcing bar:Material is using φ 16 and φ 6 or the reinforcing bars of φ 8 is not less than, under caused during utilizing works are constructed as far as possible Heel, such as not solderable enough the spreading of length.
(2) welding rod:The welding rod used using job site.
(3) equipment:Use the steel bar processing machinery of job site, electric welding machine.
2nd, the making of the utility model positioner:
(1) limitting casing 4 is welded using the steel bar meter not less than φ 16.Wherein, gag lever post 401 is arranged to two, spacing Pole length=wall vertical reinforcement spacing × 2+100mm=150mm × 2+100mm=400mm;External distance between the gag lever post of both sides= Clear distance=114mm between wall vertical reinforcement;External distance-spacing shank diameter × 2=between support pole length=both sides gag lever post 114mm-16mm × 2=82mm;Support bar 402 is arranged to two, and support bar 402 is located between both sides gag lever post 401 and away from limit At the end 50mm of bar 401 of position, the vertical inner side of support top gag lever post 401 is welded.
(2) 3 quantity are linked up with each positioner as four, 180 ° of crotches are processed using φ 6 or the reinforcing bar one end of φ 8, hung Hook height=50mm, Bend diameter=wall vertical reinforcement diameter+horizontal reinforcement diameter=16mm+12mm=28mm of crotch.
(3) when positioner assembles, limitting casing 4 is located at bottom, and hook 3 is arranged on 4 liang of lateral spacing vvvvv of limitting casing, often Two are set on root gag lever post 401.Spacing=wall vertical reinforcement spacing=150mm of the hook along gag lever post direction;Hook is away from limit Position rod end size=(400mm-150mm)/2=125mm.Link up with 3 crotches rush to outwardly vertical welding equipment in the gag lever post of limitting casing 4 401 tops, 3 vertical rod sides of hook flush with the outside of gag lever post 401.
3rd, the use of the utility model positioner:
Positioner is arranged between shear wall two panels bar-mat reinforcement, along the longitudinal direction of wall and vertically presses quincuncial arrangement, spacing Control is in 1.5m.Specific installation steps are as follows:
(1) positioner installation site and absolute altitude are marked on shear wall vertical reinforcement.Positioner is laterally with limitting casing Wall vertical reinforcement 1 corresponding to gag lever post midpoint positions;
(2) colligation shear wall horizontal reinforcement 2 from bottom to top., will be fixed at the complete installed height mark of colligation after both sides horizontal reinforcement 2 Between position device is placed in shear wall two panels bar-mat reinforcement by hook 3 in direction upper, that limitting casing 4 is under, both sides hook 3 is hooked on On shear wall both sides horizontal reinforcement 2 at installed height mark;
(3) it is with galvanized wire that the hook 3 on positioner and the shear wall horizontal reinforcement 2 hooked is strapped, and by limitting casing 4 Gag lever post 401 and the shear wall vertical reinforcement 1 intersected are strapped.
Although function of the present utility model and the course of work are described above in conjunction with accompanying drawing, the utility model is simultaneously Above-mentioned concrete function and the course of work are not limited to, above-mentioned embodiment is only schematical, rather than limitation Property, one of ordinary skill in the art, will not departing from the utility model aims and right under enlightenment of the present utility model Ask under protected ambit, many forms can also be made, these are belonged within protection of the present utility model.

Claims (5)

1. a kind of Simple positioning device for being used to control shear force wall reinforcing steel bar array pitch, is made up of, it is characterised in that described device body Device body is made up of limitting casing (4) and hook (3), and the limitting casing (4) includes gag lever post (401) arranged in parallel, Support bar (402) is vertically welded between the gag lever post (401);Uniform welding has hook on gag lever post described in both sides (401) (3), described hook (3) crotch rushes to vertical welding equipment outwardly at the top of the both sides gag lever post (401) of limitting casing (4), the hook (3) vertical rod side outside gag lever post (401) with flushing.
2. the Simple positioning device according to claim 1 for being used to control shear force wall reinforcing steel bar array pitch, it is characterised in that described Support bar (402) and gag lever post (401) are formed by reinforcing bar of the diameter more than or equal to φ 16, and the support bar (402) and The diameter of gag lever post (401) is all higher than or the diameter equal to wall vertical reinforcement (1).
3. the Simple positioning device according to claim 1 for being used to control shear force wall reinforcing steel bar array pitch, it is characterised in that described Spacing pole length=wall vertical reinforcement spacing × 2+100mm;Between the gag lever post of both sides between external distance=wall vertical reinforcement Clear distance;External distance-spacing shank diameter × 2 between support pole length=both sides gag lever post;Supported on both sides bar (402) is located at away from gag lever post (401) hold at 50mm.
4. the Simple positioning device according to claim 1 for being used to control shear force wall reinforcing steel bar array pitch, it is characterised in that described Hook (3) is made up of φ 6 or φ 8 reinforcing bar, height≤50mm, one end processing≤180oCrotch, Bend diameter=wall of crotch Body vertical reinforcement diameter+wall horizontal reinforcement diameter.
5. the Simple positioning device according to claim 1 for being used to control shear force wall reinforcing steel bar array pitch, it is characterised in that described Spacing=wall vertical reinforcement spacing of the hook along gag lever post direction;It is equal sized away from gag lever post (401) end that (3) are linked up with both sides.
CN201720648916.7U 2017-06-06 2017-06-06 A kind of Simple positioning device for being used to control shear force wall reinforcing steel bar array pitch Expired - Fee Related CN206917094U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720648916.7U CN206917094U (en) 2017-06-06 2017-06-06 A kind of Simple positioning device for being used to control shear force wall reinforcing steel bar array pitch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720648916.7U CN206917094U (en) 2017-06-06 2017-06-06 A kind of Simple positioning device for being used to control shear force wall reinforcing steel bar array pitch

Publications (1)

Publication Number Publication Date
CN206917094U true CN206917094U (en) 2018-01-23

Family

ID=61313459

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720648916.7U Expired - Fee Related CN206917094U (en) 2017-06-06 2017-06-06 A kind of Simple positioning device for being used to control shear force wall reinforcing steel bar array pitch

Country Status (1)

Country Link
CN (1) CN206917094U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441018A (en) * 2018-12-26 2019-03-08 云南工程建设总承包股份有限公司 A kind of self-locking reinforcing bar limiting card and its application method
CN110805167A (en) * 2019-11-26 2020-02-18 中国十七冶集团有限公司 Construction method for binding shear wall reinforcing steel bars by adopting outer hook support
CN111485490A (en) * 2020-04-09 2020-08-04 苏交科集团股份有限公司 Wide prefabricated bridge deck and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441018A (en) * 2018-12-26 2019-03-08 云南工程建设总承包股份有限公司 A kind of self-locking reinforcing bar limiting card and its application method
CN110805167A (en) * 2019-11-26 2020-02-18 中国十七冶集团有限公司 Construction method for binding shear wall reinforcing steel bars by adopting outer hook support
CN111485490A (en) * 2020-04-09 2020-08-04 苏交科集团股份有限公司 Wide prefabricated bridge deck and construction method thereof

Similar Documents

Publication Publication Date Title
CN104153587B (en) A kind of built with ribbed bricks body of wall assembly construction method
CN103669655B (en) Deformation joint both walls body concrete pouring construction process
CN206917094U (en) A kind of Simple positioning device for being used to control shear force wall reinforcing steel bar array pitch
CN104790675B (en) Reinforced concrete block masonry structure assemblage construction method
CN104314095B (en) A kind of shaped steel buttress for the construction of super thick raft plate and valve plate and construction method
CN103046645B (en) A kind of whole casting structure and construction method of Large-span Precast
CN105839836B (en) A kind of precast concrete shear wall component and its construction method
CN106284663A (en) A kind of construction method of oval suspended-dome structure
CN106988485A (en) The construction method of structural transition layer Shaped Steel concrete beam
CN103670470A (en) Full coal roadway safe and speedy drivage supporting method
CN204001652U (en) The portable exterior wall operating platform of fabricated shear wall structure
CN109457872B (en) Cast-in-situ frame column reinforcement cage prefabricated construction device and construction method
CN203779015U (en) Reinforcement cage forming machine
CN105672690B (en) Load bearing wall reinforcing method
CN112900853A (en) High-altitude ultra-large heavy-load special-shaped overhanging cornice beam slab formwork construction method
CN206233600U (en) Overlength super large beams of concrete installs the apparatus capable of fluctuating of reinforcing bar
CN106012863B (en) A kind of hoisting gate frame and its application method in special-shaped antisymmetry steel Construction of Pylon
CN104652430A (en) Composite reinforcement partially prestressed concrete solid square pile and manufacturing method thereof
CN104563103A (en) Composite-reinforcement partially-prestressed concrete solid square pile and production method thereof
CN102979297A (en) Hanging type stairwell operating platform mechanism and construction method thereof
CN104164889B (en) Demountable tower crane foundation
CN202416824U (en) Steel structure movable type outer cantilever frame device
CN202866261U (en) Operation hanging rack for civil construction
CN103112766A (en) Construction elevator suspending over basement roof of building and construction method thereof
CN203200719U (en) Hanging type slope pouring template device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180123