CN206784393U - T-piece and underground pipe gallery foundation pit support system - Google Patents

T-piece and underground pipe gallery foundation pit support system Download PDF

Info

Publication number
CN206784393U
CN206784393U CN201720427487.0U CN201720427487U CN206784393U CN 206784393 U CN206784393 U CN 206784393U CN 201720427487 U CN201720427487 U CN 201720427487U CN 206784393 U CN206784393 U CN 206784393U
Authority
CN
China
Prior art keywords
steel sheet
sheet pile
piece
pipe gallery
underground pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720427487.0U
Other languages
Chinese (zh)
Inventor
戴向胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Ding Zhuo Geotechnical Technology Co Ltd
Original Assignee
Nanjing Ding Zhuo Geotechnical Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Ding Zhuo Geotechnical Technology Co Ltd filed Critical Nanjing Ding Zhuo Geotechnical Technology Co Ltd
Priority to CN201720427487.0U priority Critical patent/CN206784393U/en
Application granted granted Critical
Publication of CN206784393U publication Critical patent/CN206784393U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model provides a kind of T-piece and underground pipe gallery foundation pit support system, wherein, the underground pipe gallery foundation pit support system, it includes:First steel sheet pile, the second steel sheet pile, strengthen purlin beam, T-piece and to support;First steel sheet pile is oppositely arranged with the second steel sheet pile, it is described to strengthen purlin beam, T-piece and support is arranged between first steel sheet pile and the second steel sheet pile, some reinforcement purlin beams are respectively arranged with first steel sheet pile and the second steel sheet pile, the installing space of the T-piece is formed between each reinforcement purlin beam, one end of described pair of support is connected by the T-piece with first steel sheet pile, and the other end is connected by the T-piece with second steel sheet pile.The utility model rigidity is higher, and relatively wide to the spacing between support.In addition, underground pipe gallery foundation pit support system of the present utility model can reclaim completely, and it is easy to assembly, it has the advantages of energy-conserving and environment-protective, cost are low, the duration is fast.

Description

T-piece and underground pipe gallery foundation pit support system
Technical field
It the utility model is related to Foundation Pit Construction technical field, more particularly to a kind of T-piece and the ground using the T-piece Lower piping lane foundation pit support system.
Background technology
At present, the design and construction method of domestic underground pipe gallery foundation pit supporting project mainly includes:
(1) it is less than 3m foundation ditch to actual cutting depth, using the method for natural discharging slope, sloping coefficient is generally 1:0.5 ~1:1.The above method is domatic to smear 5cm solid cement mortars primarily directed to the good location of soil property, prevents rain drop erosion.
(2) foundation ditch to actual cutting depth between 3m-5m, is used above 1:1 slope, Larsen steel sheet pile is used below Go along with sb. to guard him.Wherein, Larsen steel plate design of pile top supports together, and support is from No. 32 double-vane I-steel, 609 × 16 steel pipes or 400 × 400 × 21 × 13H shaped steel, level interval are not more than 4m.
(3) it is more than 5m foundation ditch to actual cutting depth, using Larsen steel sheet pile enclosure, No. 32 double-vane I-shapeds are selected in support Steel, 609 × 16 steel pipes or 400 × 400 × 21 × 13H shaped steel, level interval are not more than 4m.Wherein, first of support and pipe Distance is generally 0.3m between corridor top plate, and second is supported typically in piping lane bottom 1m-1.5m.
Specifically, above-mentioned steel sheet pile needs to check on ground using crawler mounted excavator (band vibration hammer machine) injection before injection The situation of underground pipelines, structures, conscientiously release accurate support pile center line.Before piling, to steel sheet pile by root inspection, connection is rejected The serious steel sheet pile of fore shaft corrosion, deformation, just can be used after failure is to be trimmed.In addition before driving piles, in the fore shaft of steel sheet pile Interior grease, extraction is squeezed into facilitate.During inserting piling, the gradient of every piece of stake of measurement monitoring at any time is no more than 2%, works as deflection It is excessive can not with pull together method align when, pull up and beat again.Purlin of constructing support, the two-sided full soldering of purlin joint steel plate, All supports must keep vertical purlin to install, the processing of coupling part whole full weld;Using backacter according to limit length Staged and layered is excavated, and is set drip molding, sump, is set light well point in foundation ditch, well point is pulled out before shoveling;Accomplish during support With digging with support, support is torn open after elder generation's support replacement during dismounting.
And in the construction of underground pipe gallery, when taking cut and cover tunneling in most of surrounding enviroment and engineering geology Under the conditions of just need supporting;And existing construction method substantially rests on traditional Larsen steel sheet pile enclosure+I-steel, 609 × 16 steel pipes or the support form of H profile steel support, and the level interval supported is very close.This support form have it is following not Foot:(1) rigidity of Larsen steel sheet pile is smaller, and in the case that soil layer is softer or when cutting depth is deeper, the displacement of foundation ditch is larger; More support road number is needed when cutting depth is deeper;(2) bracing members are too close, hinder the construction of underground pipe gallery structure.
Therefore, in view of the above-mentioned problems, being necessary to propose further solution.
Utility model content
The purpose of this utility model is the underground pipe gallery foundation pit support system for providing a kind of T-piece and the application T-piece, To overcome the deficiencies in the prior art.
To realize above-mentioned purpose of utility model, the utility model provides a kind of T-piece, and it is applied to underground pipe gallery foundation ditch In construction, the T-piece includes:Horizontal part and vertical portion, one end of the vertical portion are connected to the interposition of the horizontal part Put, and it is vertical with horizontal part holding, and the horizontal part and vertical portion form a T-shaped structure, the horizontal part and vertical portion With mounting surface, the bolt hole of multigroup installation connection is arranged on the horizontal part and the mounting surface of vertical portion.
To realize above-mentioned purpose of utility model, the utility model provides a kind of underground pipe gallery foundation pit support system, and it includes: First steel sheet pile, the second steel sheet pile, strengthen purlin beam, T-piece and to support;
First steel sheet pile is oppositely arranged with the second steel sheet pile, described to strengthen purlin beam, T-piece and support is arranged at Between first steel sheet pile and the second steel sheet pile, it is respectively arranged with first steel sheet pile and the second steel sheet pile some described Strengthen purlin beam, the installing space of the T-piece is formed between each reinforcement purlin beam, one end of described pair of support passes through the T-shaped Part is connected with first steel sheet pile, and the other end is connected by the T-piece with second steel sheet pile.
As the improvement of the underground pipe gallery foundation pit support system of the present invention, on first steel sheet pile and the second steel sheet pile Strengthen purlin beam to be located in the same horizontal plane, and the length direction for strengthening purlin beam along steel sheet pile is set.
As the improvement of the underground pipe gallery foundation pit support system of the present invention, on first steel sheet pile and the second steel sheet pile The top edge for strengthening purlin beam close to steel sheet pile is set.
As the improvement of the underground pipe gallery foundation pit support system of the present invention, the T-piece includes horizontal part and vertical portion, institute State vertical portion to be installed in each installing space strengthened between purlin beam, the horizontal part is connected with described pair of support.
As the improvement of the underground pipe gallery foundation pit support system of the present invention, set between any group of T-piece being oppositely arranged Have it is multiple to support, it is the multiple that support is spaced and keeps being parallel to each other.
It is more between any group of T-piece being oppositely arranged as the improvement of the underground pipe gallery foundation pit support system of the present invention It is individual to being connected between support by fixed plate.
As the present invention underground pipe gallery foundation pit support system improvement, it is any described pair support with first steel sheet pile and Second steel sheet pile is perpendicular.
As the improvement of the underground pipe gallery foundation pit support system of the present invention, first steel sheet pile, strengthen purlin beam, T-shaped Part and to being connected between support by bolt hole.
As the improvement of the underground pipe gallery foundation pit support system of the present invention, second steel sheet pile, strengthen purlin beam, T-shaped Part and to being connected between support by bolt hole.
Compared with prior art, the beneficial effects of the utility model are:Underground pipe gallery pattern foundation pit supporting structure system of the present utility model Rigidity of uniting is higher and relatively wide to the spacing between support.In addition, underground pipe gallery foundation pit support system of the present utility model can be complete Full recovery, and it is easy to assembly, it has the advantages of energy-conserving and environment-protective, cost are low, the duration is fast.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only It is some embodiments described in the utility model, for those of ordinary skill in the art, is not paying creative work On the premise of, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the schematic perspective view of the embodiment of the utility model T-piece one;
Fig. 2 is the schematic perspective view of the embodiment of the utility model underground pipe gallery foundation pit support system one.
Embodiment
The utility model is described in detail shown each embodiment below in conjunction with the accompanying drawings, but it should explanation, These embodiments are not limitation of the utility model, and those of ordinary skill in the art are according to these embodiment institute works Energy, method or equivalent transformation or replacement in structure, are belonged within the scope of protection of the utility model.
As shown in figure 1, T-piece 40 of the present utility model can be applied in the construction of underground pipe gallery foundation ditch as connector. Specifically, the T-piece 40 includes:Horizontal part 41 and vertical portion 42, wherein, one end of the vertical portion 42 is connected to the water The centre position in flat portion 41, and keep vertical with the horizontal part 41, so as to which the horizontal part 41 and vertical portion 42 substantially form One T-shaped structure.
In order to improve the intensity of the T-type structure, the inside of the horizontal part 41 and vertical portion 42 be additionally provided with more plus Strengthening tendons 43, the reinforcement 43 in the horizontal part 41 are vertically arranged, and the reinforcement 43 in the vertical portion 42 is horizontally disposed.This Outside, also have can be with the mounting surface that other components are connected in foundation ditch, the mounting surface for the horizontal part 41 and vertical portion 42 For the horizontal part 41 and the side of vertical portion 42, the bolt hole 44 of multigroup installation connection is arranged at the He of horizontal part 41 On the mounting surface of vertical portion 42.
As shown in Fig. 2 underground pipe gallery foundation pit support system of the present utility model includes:First steel sheet pile 10, the second steel plate Stake 20, strengthen purlin beam 30, T-piece as described above 40 and to support 50.
First steel sheet pile 10 is oppositely arranged with the second steel sheet pile 20, the reinforcement purlin beam 30, T-piece 40 and right Support 50 is arranged between the steel sheet pile 20 of the first steel sheet pile 10 and second.Preferably, first steel sheet pile 10, reinforcement purlin Beam 30, T-piece 40 and to support 50 between can be connected by bolt hole.Further, second steel sheet pile 20, reinforcement are enclosed Purlin beam 30, T-piece 40 and to support 50 between can be connected by bolt hole.In this way, underground pipe gallery foundation ditch of the present utility model Support system combines convenient disassembly, and the recycling of support system can be achieved.
Specifically, some reinforcement purlin beams are respectively arranged with the steel sheet pile 20 of the first steel sheet pile 10 and second 30, the installing space of the T-piece 40 is respectively formed between reinforcement purlin beam 30.Preferably, first steel sheet pile 10 and second Reinforcement purlin beam 30 on steel sheet pile 20 is located in the same horizontal plane, and the length direction for strengthening purlin beam 30 along steel sheet pile Set.Meanwhile the reinforcement purlin beam 30 on the steel sheet pile 20 of the first steel sheet pile 10 and second is set close to the top edge of steel sheet pile Put.
One end of described pair of support 50 is connected by the T-piece 40 with first steel sheet pile 10, and the other end passes through institute T-piece 40 is stated with second steel sheet pile 20 to be connected.To realize above-mentioned connection purpose, the T-piece 40 include horizontal part and Vertical portion, the vertical portion are installed in each installing space strengthened between purlin beam 30, the horizontal part with it is described right Support 50 is connected.Preferably, any described pair of support 50 is perpendicular with the steel sheet pile 20 of the first steel sheet pile 10 and second.
Be provided between any group of T-piece 40 being oppositely arranged it is multiple to support 50, it is the multiple to support 50 be spaced and Holding is parallel to each other.So as to which each group can be carried out to the spacing between support 50 as needed to widen setting entering with convenient construction OK.Meanwhile in order to ensure multiple intensity to support 50 between any group of T-piece being oppositely arranged 40, it is each to passing through between support 50 Fixed plate 60 is connected.
In addition, underground pipe gallery foundation pit support system of the present utility model should meet testing for following intensity and amount of deflection progress Calculate:
1st, strength checking:
Wherein axial pressure N is purlin axle power, is the lateral earth pressure passed over by angle brace purlin;A is box purlin The sectional area of beam;MxIt is the maximal bending moment of strong axle;WxIt is the section modulus of the strong axle of box purlin beam;MyIt is the maximal bending moment of weak axle; WyIt is the section modulus of the weak axle of box purlin beam;[σ] is the intensity that material is allowed.
2nd, Bit andits control (amount of deflection) checks:
F is the maximum defluxion of purlin beam;NYYLIt is the prestressing force that steel strand wires are applied on purlin beam;E is steel strand wires to purlin The spacing of beam axis;E is the modulus of elasticity of purlin beam material steel;I is the section modulus of purlin beam;f0It is national foundation ditch specification institute The displacement range of permission.
In summary, underground pipe gallery foundation pit support system rigidity of the present utility model is higher, and to the spacing phase between support To wider.In addition, underground pipe gallery foundation pit support system of the present utility model can reclaim completely, and it is easy to assembly, it has energy-conservation Environmental protection, the advantages of cost is low, the duration is fast.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, it can realize that this practicality is new in other specific forms Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation Involved claim.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It is appreciated that other embodiment.

Claims (10)

1. a kind of T-piece, it is applied in the construction of underground pipe gallery foundation ditch, it is characterised in that the T-piece includes:Horizontal part And vertical portion, one end of the vertical portion are connected to the centre position of the horizontal part, and, institute vertical with horizontal part holding State horizontal part and vertical portion forms a T-shaped structure, the horizontal part and vertical portion have mounting surface, the spiral shell of multigroup installation connection Keyhole is arranged on the horizontal part and the mounting surface of vertical portion.
2. a kind of underground pipe gallery foundation pit support system, it is characterised in that the underground pipe gallery foundation pit support system includes:First steel Sheet pile, the second steel sheet pile, strengthen purlin beam, T-piece as claimed in claim 1 and to support;
First steel sheet pile is oppositely arranged with the second steel sheet pile, described to strengthen purlin beam, T-piece and support is arranged at described Between first steel sheet pile and the second steel sheet pile, some reinforcements are respectively arranged with first steel sheet pile and the second steel sheet pile Purlin beam, each installing space for strengthening forming the T-piece between purlin beam, one end of described pair of support by the T-piece with First steel sheet pile is connected, and the other end is connected by the T-piece with second steel sheet pile.
3. underground pipe gallery foundation pit support system according to claim 2, it is characterised in that first steel sheet pile and second Reinforcement purlin beam on steel sheet pile is located in the same horizontal plane, and the length direction for strengthening purlin beam along steel sheet pile is set.
4. underground pipe gallery foundation pit support system according to claim 3, it is characterised in that first steel sheet pile and second Reinforcement purlin beam on steel sheet pile is set close to the top edge of steel sheet pile.
5. underground pipe gallery foundation pit support system according to claim 2, it is characterised in that the vertical portion peace of the T-piece Loaded in each installing space strengthened between purlin beam, the horizontal part of the T-piece is connected with described pair of support.
6. underground pipe gallery foundation pit support system according to claim 2, it is characterised in that any group of T-shaped being oppositely arranged Be provided between part it is multiple to support, it is the multiple that support is spaced and keeps being parallel to each other.
7. underground pipe gallery foundation pit support system according to claim 6, it is characterised in that any group of T-shaped being oppositely arranged It is multiple to being connected between support by fixed plate between part.
8. underground pipe gallery foundation pit support system according to claim 6, it is characterised in that any described pair of support and described the One steel sheet pile and the second steel sheet pile are perpendicular.
9. underground pipe gallery foundation pit support system according to claim 2, it is characterised in that first steel sheet pile, strengthen Purlin beam, T-piece and to being connected between support by bolt hole.
10. the underground pipe gallery foundation pit support system according to claim 2 or 9, it is characterised in that second steel sheet pile, Strengthen purlin beam, T-piece and to being connected between support by bolt hole.
CN201720427487.0U 2017-04-22 2017-04-22 T-piece and underground pipe gallery foundation pit support system Expired - Fee Related CN206784393U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720427487.0U CN206784393U (en) 2017-04-22 2017-04-22 T-piece and underground pipe gallery foundation pit support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720427487.0U CN206784393U (en) 2017-04-22 2017-04-22 T-piece and underground pipe gallery foundation pit support system

Publications (1)

Publication Number Publication Date
CN206784393U true CN206784393U (en) 2017-12-22

Family

ID=60708747

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720427487.0U Expired - Fee Related CN206784393U (en) 2017-04-22 2017-04-22 T-piece and underground pipe gallery foundation pit support system

Country Status (1)

Country Link
CN (1) CN206784393U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113684834A (en) * 2021-08-11 2021-11-23 中国建筑第六工程局有限公司 Construction method of complex environment supporting system
CN115324103A (en) * 2022-07-26 2022-11-11 广州地铁设计研究院股份有限公司 Large-span assembly type underground station based on simply supported diaphragm wall and floor slab and construction method
CN115387378A (en) * 2022-07-26 2022-11-25 广州地铁设计研究院股份有限公司 Semi-pillarless assembly type station based on simply supported superposed side walls and floorslabs and method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113684834A (en) * 2021-08-11 2021-11-23 中国建筑第六工程局有限公司 Construction method of complex environment supporting system
CN113684834B (en) * 2021-08-11 2022-08-26 中国建筑第六工程局有限公司 Construction method of complex environment supporting system
CN115324103A (en) * 2022-07-26 2022-11-11 广州地铁设计研究院股份有限公司 Large-span assembly type underground station based on simply supported diaphragm wall and floor slab and construction method
CN115387378A (en) * 2022-07-26 2022-11-25 广州地铁设计研究院股份有限公司 Semi-pillarless assembly type station based on simply supported superposed side walls and floorslabs and method thereof
CN115387378B (en) * 2022-07-26 2023-11-24 广州地铁设计研究院股份有限公司 Semi-column-free assembled station based on superposed side walls and floor simple supports and method thereof
CN115324103B (en) * 2022-07-26 2023-11-24 广州地铁设计研究院股份有限公司 Large-span assembled underground station based on simply supported diaphragm wall and floor slab and construction method

Similar Documents

Publication Publication Date Title
CN102434717B (en) Construction method of joist steel pipe-jacking work pit
CN100580190C (en) Building foundation pit supporting construction
CN206784393U (en) T-piece and underground pipe gallery foundation pit support system
CN112832248B (en) Urban tunnel subway station construction method and deep and large foundation pit group construction dynamic monitoring and measuring method
CN102134853A (en) CT sealed steel pipe pile foundation pit water stop supporting device and construction method thereof
CN106609509A (en) Self-balancing foundation pit enclosure structure and construction method thereof
CN201250408Y (en) Recovery type steel structure foundation pit exterior-protected device
CN108149692B (en) Supporting construction suitable for non-closed foundation ditch
CN108708284B (en) A kind of steel trestle construction method for resisting flood discharge bed scour
CN205975658U (en) Steel platform tower crane foundation
CN106498957A (en) Steel sheet pile cofferdam construction platform and integral construction method
CN103643681A (en) Subway station foundation ditch inverse constructed supporting structure and construction method thereof
CN208280155U (en) A kind of steel trestle infrastructure structure for resisting the impact of flood discharge torrent speed
CN101509258A (en) Method for precontrolling subsidence slant of sinking well
CN106978814A (en) A kind of Fabricated Structure for Support of Excavation
CN103215965A (en) Laminate type high-rise platform pile tower crane foundation and construction method
CN211368731U (en) A foundation ditch construction high strength supporting beam for construction
CN205529843U (en) Landing stage anchor structure
CN103410155B (en) A kind of recyclable preposition assembling braced cuts structure and application process thereof
CN208870053U (en) Deep well dado steel construction supports
CN106602980A (en) Desert land root-type photovoltaic panel solar power generation device
CN213625676U (en) Combined anti-scour beach fan foundation
CN107940102B (en) Underground raw water pipeline protection construction method
CN205742125U (en) A kind of work platform for boring
CN214738107U (en) Cable pit supporting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171222

CF01 Termination of patent right due to non-payment of annual fee