Wall water stop device for wall-passing well Download PDF

Info

Publication number
CN206592659U
CN206592659U CN201720162683.XU CN201720162683U CN206592659U CN 206592659 U CN206592659 U CN 206592659U CN 201720162683 U CN201720162683 U CN 201720162683U CN 206592659 U CN206592659 U CN 206592659U
Authority
CN
China
Prior art keywords
wall
pipeline
insulation construction
fixedly connected
bellows
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720162683.XU
Other languages
Chinese (zh)
Inventor
陈丽辉
武顺表
刘启明
魏剑
赵晓海
温杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinhuangdao Kongtak Pipe Industry Co Ltd
Original Assignee
Qinhuangdao Kongtak Pipe Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinhuangdao Kongtak Pipe Industry Co Ltd filed Critical Qinhuangdao Kongtak Pipe Industry Co Ltd
Priority to CN201720162683.XU priority Critical patent/CN206592659U/en
Application granted granted Critical
Publication of CN206592659U publication Critical patent/CN206592659U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Thermal Insulation (AREA)

Abstract

The utility model is related to a kind of wall water stop device for wall-passing well, is arranged on the part that pipeline passes through the borehole wall, including along the radial direction insulation construction, bellows and the outer sleeve that set gradually from the inside to the outside of pipeline;The outer wall of outer sleeve is fixedly connected with Well-wall sealer, has gap between the two ends of outer sleeve and the outer wall of insulation construction;One end of bellows and the backwater end of outer sleeve are tightly connected, and the other end of bellows is sealedly and fixedly connected by the outer wall of sealing structure and pipeline;The first, second tubular insulation construction that insulation construction is set up in parallel by the axial direction along pipeline is constituted, and first, second tubular insulation construction is sealedly and fixedly connected with sealing structure, sealed envelope of the shape twin conduit through the outer wall of the part of the borehole wall.The utility model can effectively prevent underground water from flowing into build inside well, the heating facility in well is built in destruction, is significantly reduced the rate of breakdown of heating system, is that heat supply company saves maintenance replacement cost the good sealing effect at pipeline through-wall.

Description

Wall water stop device for wall-passing well
Technical field
The utility model is related to borehole wall seepage control technique field through walls, more particularly to a kind of wall water stop device for wall-passing well.
Background technology
In heating system, some parts such as valve, compensator etc. need to build well.When pipeline is by the borehole wall of building well Underground water can be built in well by entering at pipeline through-wall.Underground water can cause a certain degree of broken to heating facility over time It is bad, cause heating system failure.
Utility model content
For technical problem present in above-mentioned prior art, the utility model provides a kind of simple in construction, sealing effect Really good wall water stop device for wall-passing well, can effectively prevent underground water from flowing into build inside well, and the heat supply that intrusion, destruction are built in well is set Apply.
The technical solution of the utility model is:A kind of wall water stop device for wall-passing well, is arranged on the part that pipeline passes through the borehole wall, bag Include the insulation construction set gradually from the inside to the outside along the radial direction of the pipeline, bellows and outer sleeve;
The outer wall of the outer sleeve is fixedly connected with the Well-wall sealer, the outer sleeve on the outside of the borehole wall one Hold as end facing water, the one end of the outer sleeve on the inside of the borehole wall is backwater end, the end facing water and backwater of the outer sleeve End has gap between the outer wall of the insulation construction;
One end of the bellows is the first sealed end, and the other end of the bellows is the second sealed end, the ripple First sealed end of pipe is tightly connected with the backwater end of the outer sleeve, and the second sealed end of the bellows passes through sealing structure It is sealedly and fixedly connected with the outer wall of the pipeline;
The the first tubular insulation construction and the second tubular that the insulation construction is set up in parallel by the axial direction along the pipeline are protected Warm structure composition, the first tubular insulation construction and the second tubular insulation construction one end close to each other with the sealing Sealing structure is fixedly connected, and forms the sealed envelope of the outer wall for the part that the borehole wall is passed through to the pipeline, and is worn in the pipeline Cross after the borehole wall installation, the other end of the first tubular insulation construction stretches out the outside of the borehole wall, second tubular The other end of insulation construction stretches out the inner side of the borehole wall.
As preferred:The sealing structure includes connection board, and the connection board is annular plate-like structure, the connection Riser is set on the pipeline and is sealedly and fixedly connected with the outer wall of the pipeline, the connection board and the outer sleeve There is gap between inwall, the first tubular insulation construction and the second tubular insulation construction respectively with the connection board two Side seal is fixedly connected.
As preferred:The first tubular insulation construction set gradually from the inside to the outside by the radial direction along the pipeline first Heat-insulation layer and the first protection sleeve pipe composition;
The second heat-insulation layer that the second tubular insulation construction is set gradually by the radial direction along the pipeline from the inside to the outside and Second protection sleeve pipe is constituted.
As preferred:The sealing structure also includes corresponding with first protection sleeve pipe and the second protection sleeve pipe respectively Two annular sealed connecting components, two sealed connecting components are sealedly and fixedly connected in the both sides of the connection board, remote respectively From annular link slot is offered on the end face of the connection board respectively, first protection sleeve pipe and the second protection sleeve pipe are close One end of the connection board insert respectively correspondence sealed connecting component annular link slot in, and with corresponding sealed connecting component it Between be sealedly and fixedly connected.
As preferred:The sealing structure also includes two seals for being separately positioned on the connection board both sides, its In a seal be filled in the outer wall of the pipeline, the wherein side of the connection board, first heat-insulation layer and wherein In the first cavity that one sealed connecting component is enclosed, another seal is filled in the outer wall of the pipeline, the connection In the second cavity that the opposite side of riser, second heat-insulation layer and another sealed connecting component are enclosed.
As preferred:The bellows-sheathed is located at the outside of the second tubular insulation construction, the second of the bellows Sealed end is arranged with the second fixed cylinder for sealing against and being fixedly connected, and second fixed cylinder and the connection board are towards described The side of second tubular insulation construction is sealedly and fixedly connected.
As preferred:First sealed end of the bellows is arranged with the first fixed cylinder for sealing against and being fixedly connected, institute The outer wall for stating the first fixed cylinder is sealedly and fixedly connected by the backwater end of the second shrouding and the outer sleeve.
As preferred:The inwall of first fixed cylinder is fixedly connected with the 3rd shrouding of annular, the 3rd shrouding The outer wall of annular inner wall and the second tubular insulation construction is slidably matched.
As preferred:The end facing water of the outer sleeve is provided with quill, and the outer wall of the quill passes through first Shrouding is sealedly and fixedly connected with the outer sleeve, is slided between the inwall of the quill and the first tubular insulation construction Coordinate.
As preferred:The reinforcement baffle plate of annular, the annular of the reinforcement baffle plate are arranged with the middle part of the outer wall of the outer sleeve It is sealedly and fixedly connected between the outer wall of inwall and the outer sleeve.
The beneficial effects of the utility model are:The utility model is simple in construction, can to the good sealing effect at pipeline through-wall Effectively to prevent underground water from flowing into build inside well, the heating facility in well is built in intrusion, destruction, greatly protects heat supply to set Apply, reduce the rate of breakdown of heating system, substantially increase heat power equipment and build the service life of well, be heat supply company section Maintenance replacement cost is saved.
The utility model is connected with outer sleeve and seal for pipe joints respectively by the two ends of bellows, and realization is worn to pipeline Sealing at wall, bellows has the absorption and self tuning performance to deformation quantity, makes it in pipeline because temperature change occurs When deformation or/and displacement, deformation and mobile deformation quantity are absorbed by bellows, without passing to outer sleeve, it is ensured that Absolute fixation between outer sleeve and the borehole wall, it is ensured that the excellent sealing between outer sleeve and the borehole wall.
The utility model is by insulation construction to isolating between pipeline and the borehole wall, it is to avoid heat donor fluid in pipeline Temperature is influenceed by borehole wall temperature, and reduces heating efficiency.
The utility model by the way of bellows and pipeline is directly fixed, and by insulation construction be arranged to segmented with Pipeline is attached fixation, it is ensured that the absolute fixation between the end of bellows and pipeline, also ensure that insulation construction and pipe Absolute fixation between road, so as to ensure that the utility model is protected to effective sealing at pipeline through-wall.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the accompanying drawing used required in description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, is not paying the premise of creative work Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of the present utility model installed in the borehole wall;
Fig. 2 is the half sectional view of the utility model embodiment;
Fig. 3 is the enlarged drawing at A in Fig. 2.
The 01- boreholes wall in figure;1- pipelines;2- the first tubular insulation constructions;The protection sleeve pipes of 201- first;202- first is incubated Layer;3- the second tubular insulation constructions;The protection sleeve pipes of 301- second;The heat-insulation layers of 302- second;4- quills;The shroudings of 5- first; 6- outer sleeves;7- seals;8- sealed connecting components;9- connection boards;10- strengthens baffle plate;11- bellowss;The shroudings of 12- second; The fixed cylinders of 13- first;The shroudings of 14- the 3rd;The fixed cylinders of 15- second.
Embodiment
, below will be to technology of the present utility model to make the purpose of this utility model, technical scheme and advantage clearer Scheme is described in detail.Obviously, described embodiment is only a part of embodiment of the utility model, rather than all Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not before creative work is made Resulting all other embodiment is put, the scope that the utility model is protected is belonged to.
It is connected with each other and is formed between the object for referring to two connections that is sealedly and fixedly connected mentioned in the utility model The fixation of relative position, and be the state being fully sealed in junction.
As shown in Figure 1 to Figure 3, a kind of wall water stop device for wall-passing well, is arranged on the part that pipeline 1 passes through the borehole wall 01, positioned at pipe Between the outer wall and the borehole wall 01 in road 1.The wall water stop device for wall-passing well includes the insulation set gradually from the inside to the outside along the radial direction of pipeline 1 Structure, bellows 11 and outer sleeve 6.
As shown in figure 1, the length of outer sleeve 6 is equal with the thickness of the borehole wall 01, and the outer wall of outer sleeve 6 is sealed with the borehole wall 01 It is fixedly connected.
Outer sleeve 6 is end facing water close to the one end in the outside of the borehole wall 01, and outer sleeve 6 is backwater close to one end of the inner side of the borehole wall 01 End.After outer sleeve 6 is connected with the borehole wall 01, the end facing water of outer sleeve 6 is flushed with the lateral wall of the borehole wall 01, the back of the body of outer sleeve 6 Water end (W.E.) is flushed with the madial wall of the borehole wall 01.
The reinforcement baffle plate 10 of annular is arranged with the middle part of the outer wall of outer sleeve 6, strengthens the annular inner wall and overcoat of baffle plate 10 It is sealedly and fixedly connected between the outer wall of cylinder 6.In the present embodiment, strengthen between the annular inner wall of baffle plate 10 and the outer wall of outer sleeve 6 Sealing fixation is formed by welding.Because the borehole wall 01 is generally brick or concrete structure, increases in the outer wall of outer sleeve 6 and strengthen Baffle plate 10, on the one hand can increase the bonding strength between outer sleeve 6 and the borehole wall 01, on the other hand strengthen baffle plate 10 also with good Good dash effect.
Because pipeline 1 can be deformed or/and shifted as the temperature of its interior heat donor fluid changes.In meeting for outer sleeve 6 Water end (W.E.) and backwater end have gap between the outer wall of insulation construction.So, in pipeline 1 because temperature change deforms Or/and the connection between outer sleeve 6 and the borehole wall 01 will not be had undesirable effect during displacement.
As shown in Figures 2 and 3, in the present embodiment, outer sleeve 6 is the rounded cylindrical structure of open at both ends.In outer sleeve 6 End facing water be provided with quill 4, the outer wall of quill 4 is sealedly and fixedly connected by the first shrouding 5 and outer sleeve 6, living It is slidably matched between the inwall of moving sleeve 4 and the first tubular insulation construction 2.In the present embodiment, the first shrouding 5 respectively with movable sleeve Between 4 outer wall of cylinder and the inwall of outer sleeve 6 sealing fixation is formed by welding.
In the present embodiment, bellows 11 using flexible corrugated stainless steel tubing, its have it is corrosion-resistant, it is non-aging, use the longevity Order long advantage.In addition, the bellows 11 that bellows 11 can also be made of other flexible materials, such as rubber bellows.
One end of bellows 11 is the first sealed end, and the other end of bellows 11 is the second sealed end.The of bellows 11 The backwater end of one sealed end and outer sleeve 6 is tightly connected, and concrete structure is:
The first fixed cylinder 13 for sealing against and being fixedly connected, the first fixed cylinder 13 are arranged in the first sealed end of bellows 11 Outer wall be sealedly and fixedly connected by the backwater end of the second shrouding 12 and outer sleeve 6.In the present embodiment, bellows 11 and first is consolidated Form sealing by welding between safety barrel 13 and fix, the second shrouding 12 respectively with the outer wall of the first fixed cylinder 13 and outer sleeve 6 Between inwall sealing fixation is formed by welding.If bellows 11 uses rubber bellows, itself and the first fixed cylinder 13 are fixed by adhesive means formation sealing.
The inwall of first fixed cylinder 13 is fixedly connected with the 3rd shrouding 14 of annular, the annular outer wall of the 3rd shrouding 14 and the One fixed cylinder 13 is welded and fixed, and the outer wall of the 3rd edge sealing annular inner wall and the second tubular insulation construction 3 is slidably matched.
Second sealed end of bellows 11 is sealedly and fixedly connected by sealing structure and the outer wall of pipeline 1.Bellows 11 Two ends are sealedly and fixedly connected with outer sleeve 6 and pipeline 1 respectively, on the one hand play the sealed separation to the place through walls of pipeline 1;The opposing party Face, when pipeline 1 is deformed or/and shifted due to temperature change, deformation and mobile deformation quantity are inhaled by bellows 11 Receive, without being transferred to outer sleeve 6, it is ensured that the good seal performance between outer sleeve 6 and the borehole wall 01.
The first tubular insulation construction 2 and the second tubular insulation construction 3 that insulation construction is set up in parallel by the axial direction along pipeline 1 Composition.First tubular insulation construction 2 and the second tubular insulation construction 3 are located at the both sides of sealing structure respectively, and close to each other One end be sealedly and fixedly connected with sealing structure, shape twin conduit 1 through the borehole wall 01 part outer wall sealed envelope. After pipeline 1 is installed through the borehole wall 01, the other end of the first tubular insulation construction 2 stretches out the outside of the borehole wall 01, the insulation of the second tubular The other end of structure 3 stretches out the inner side of the borehole wall 01.
The first heat-insulation layer 202 and first that first tubular insulation construction 2 is set gradually from the inside to the outside by the radial direction along pipeline 1 Protection sleeve pipe 201 is constituted.The second heat-insulation layer that second tubular insulation construction 3 is set gradually from the inside to the outside by the radial direction along pipeline 1 302 and second protection sleeve pipe 301 constitute.
First tubular insulation construction 2 and the second tubular insulation construction 3 are fixed with the both sides sealing of connection board 9 respectively to be connected Connect.
Sealing structure includes connection board 9, sealed connecting component 8 and seal 7.
Connection board 9 is annular plate-like structure, and connection board 9 is set on pipeline 1 and seals fixation with the outer wall of pipeline 1 Connection.In the present embodiment, sealing fixation is formed by welding between the annular outer wall of connection board 9 and the outer wall of pipeline 1.
There is gap, to avoid deforming in pipeline 1 between the annular outer wall of connection board 9 and the inwall of outer sleeve 6 Or/and the connection between outer sleeve 6 and the borehole wall 01 is had undesirable effect during displacement.
Sealed connecting component 8 is two and corresponding with the first protection sleeve pipe 201 and the second protection sleeve pipe 301 respectively.Two close Envelope connector 8 is coaxially disposed with the first protection sleeve pipe 201 and the second protection sleeve pipe 301 in a ring and respectively.Two sealings connect Fitting 8 is sealedly and fixedly connected in the both sides of connection board 9 respectively.In the present embodiment, two sealed connecting components 8 are vertical respectively at connection The both sides of plate 9 form sealing fixation by welding.
Offer annular link slot, the first protection sleeve pipe 201 and the second protection respectively on the end face away from connection board 9 Sleeve pipe 301 close to one end of connection board 9 insert respectively correspondence sealed connecting component 8 annular link slot in, and with it is corresponding close It is sealedly and fixedly connected between envelope connector 8.First protection sleeve pipe 201 and the second protection sleeve pipe 301 can pass through welding, gluing etc. Mode is fixed with the formation sealing of corresponding sealed connecting component 8.
Seal 7 is also two, is separately positioned on the both sides of connection board 9.Seal 7 is by ultra-fine centrifugal fiber cotton Into.One of seal 7 is filled in the outer wall of pipeline 1, the wherein side of connection board 9, the first heat-insulation layer 202 and wherein one In the first cavity that individual sealed connecting component 8 is enclosed, another seal 7 is filled in the outer wall of pipeline 1, connection board 9 In the second cavity that opposite side, the second heat-insulation layer 302 and another sealed connecting component 8 are enclosed.
By sealed connecting component 8 and seal 7, it can prevent underground water from passing through between quill 4 and insulation construction Gap enters in outer sleeve 6, to the region between the first tubular insulation construction 2 and the second tubular insulation construction 3 and connection board 9 Cause to corrode.
In the present embodiment, bellows 11 is sheathed on the outside of the second tubular insulation construction 3, the second sealed end of bellows 11 The second fixed cylinder 15 for sealing against and being fixedly connected is arranged with, the second fixed cylinder 15 is incubated with connection board 9 towards the second tubular The side of structure 3 is sealedly and fixedly connected.
In the present embodiment, sealing is formed admittedly by welding between the second fixed cylinder 15 and bellows 11 and connection board 9 It is fixed.If bellows 11 uses rubber bellows, it can form sealing between the second fixed cylinder 15 by gluing mode It is fixed.
Insulation construction is arranged to segmented knot by by the direct fixation of bellows 11 and pipeline 1 by the utility model Structure is attached fixation with pipeline 1, it is ensured that the absolute fixation between the end of bellows 11 and pipeline 1, also ensure that insulation Absolute fixation between structure and pipeline 1.So as to ensure that the utility model is protected to effective sealing at the place through walls of pipeline 1.
It is described above, embodiment only of the present utility model, but protection domain of the present utility model do not limit to In this, any one skilled in the art can readily occur in change in the technical scope that the utility model is disclosed Or replace, it should all cover within protection domain of the present utility model.Therefore, protection domain of the present utility model should be with the power The protection domain that profit is required is defined.

Claims (10)

1. a kind of wall water stop device for wall-passing well, is arranged on the part that pipeline (1) passes through the borehole wall (01), it is characterised in that:Including along institute State insulation construction, bellows (11) and outer sleeve (6) that the radial direction of pipeline (1) is set gradually from the inside to the outside;
The outer wall of the outer sleeve (6) is sealedly and fixedly connected with the borehole wall (01), and the outer sleeve (6) is close to the borehole wall (01) one end on the outside of is end facing water, and the one end of the outer sleeve (6) on the inside of the borehole wall (01) is backwater end, described outer The end facing water of sleeve (6) and backwater end have gap between the outer wall of the insulation construction;
One end of the bellows (11) is the first sealed end, and the other end of the bellows (11) is the second sealed end, described The backwater end of first sealed end of bellows (11) and the outer sleeve (6) is tightly connected, and the second of the bellows (11) is close End-blocking is sealedly and fixedly connected by sealing structure and the outer wall of the pipeline (1);
The first tubular insulation construction (2) and the second tubular that the insulation construction is set up in parallel by the axial direction along the pipeline (1) Insulation construction (3) is constituted, and the first tubular insulation construction (2) and the second tubular insulation construction (3) are in one end close to each other It is sealedly and fixedly connected with the sealing structure, forms the sealing of the outer wall for the part that the borehole wall (01) is passed through to the pipeline (1) Parcel, and after the pipeline (1) is installed through the borehole wall (01), the other end of the first tubular insulation construction (2) is stretched Go out the outside of the borehole wall (01), the other end of the second tubular insulation construction (3) stretches out the inner side of the borehole wall (01).
2. wall water stop device for wall-passing well according to claim 1, it is characterised in that:The sealing structure includes connection board (9), the connection board (9) be annular plate-like structure, the connection board (9) be set on the pipeline (1) and with it is described The outer wall of pipeline (1) is sealedly and fixedly connected, and has gap, institute between the inwall of the connection board (9) and the outer sleeve (6) The both sides sealing of the first tubular insulation construction (2) and the second tubular insulation construction (3) respectively with the connection board (9) is stated to fix Connection.
3. wall water stop device for wall-passing well according to claim 2, it is characterised in that:The first tubular insulation construction (2) by The first heat-insulation layer (202) and the first protection sleeve pipe (201) composition set gradually from the inside to the outside along the radial direction of the pipeline (1);
The second heat-insulation layer that the second tubular insulation construction (3) is set gradually from the inside to the outside by the radial direction along the pipeline (1) (302) constituted with the second protection sleeve pipe (301).
4. wall water stop device for wall-passing well according to claim 3, it is characterised in that:The sealing structure also include respectively with institute State the first protection sleeve pipe (201) and the corresponding two annular sealed connecting components (8) of the second protection sleeve pipe (301), two sealings Connector (8) is sealedly and fixedly connected in the both sides of the connection board (9) respectively, in the end face away from the connection board (9) Upper to offer annular link slot respectively, first protection sleeve pipe (201) and the second protection sleeve pipe (301) are vertical close to the connection One end of plate (9) insert respectively correspondence sealed connecting component (8) annular link slot in, and with corresponding sealed connecting component (8) it Between be sealedly and fixedly connected.
5. wall water stop device for wall-passing well according to claim 4, it is characterised in that:The sealing structure also includes setting respectively Two seals (7) in the connection board (9) both sides, one of seal (7) is filled in the outer of the pipeline (1) Wall, the wherein side of the connection board (9), first heat-insulation layer (202) and one of sealed connecting component (8) enclose and Into the first cavity in, another seal (7) be filled in the outer wall of the pipeline (1), the connection board (9) it is another In the second cavity that side, second heat-insulation layer (302) and another sealed connecting component (8) are enclosed.
6. wall water stop device for wall-passing well according to claim 2, it is characterised in that:The bellows (11) is sheathed on described The outside of two tubular insulation constructions (3), the second sealed end of the bellows (11) is arranged with for sealing against and being fixedly connected Two fixed cylinders (15), second fixed cylinder (15) and the connection board (9) are towards the second tubular insulation construction (3) Side is sealedly and fixedly connected.
7. wall water stop device for wall-passing well according to claim 6, it is characterised in that:First sealed end of the bellows (11) The first fixed cylinder (13) for sealing against and being fixedly connected is arranged with, the outer wall of first fixed cylinder (13) passes through the second shrouding (12) the backwater end with the outer sleeve (6) is sealedly and fixedly connected.
8. wall water stop device for wall-passing well according to claim 7, it is characterised in that:The inwall of first fixed cylinder (13) is consolidated Surely the 3rd shrouding (14) of annular, annular inner wall and the second tubular insulation construction of the 3rd shrouding (14) are connected with (3) outer wall is slidably matched.
9. wall water stop device for wall-passing well as claimed in any of claims 1 to 8, it is characterised in that:The outer sleeve (6) End facing water be provided with quill (4), the outer wall of the quill (4) passes through the first shrouding (5) and the outer sleeve (6) It is sealedly and fixedly connected, is slidably matched between the inwall of the quill (4) and the first tubular insulation construction (2).
10. wall water stop device for wall-passing well as claimed in any of claims 1 to 8, it is characterised in that:The outer sleeve (6) the reinforcement baffle plate (10) of annular, the annular inner wall for strengthening baffle plate (10) and the outer sleeve are arranged with the middle part of outer wall (6) it is sealedly and fixedly connected between outer wall.
CN201720162683.XU 2017-02-22 2017-02-22 Wall water stop device for wall-passing well Active CN206592659U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720162683.XU CN206592659U (en) 2017-02-22 2017-02-22 Wall water stop device for wall-passing well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720162683.XU CN206592659U (en) 2017-02-22 2017-02-22 Wall water stop device for wall-passing well

Publications (1)

Publication Number Publication Date
CN206592659U true CN206592659U (en) 2017-10-27

Family

ID=60126724

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720162683.XU Active CN206592659U (en) 2017-02-22 2017-02-22 Wall water stop device for wall-passing well

Country Status (1)

Country Link
CN (1) CN206592659U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111623172A (en) * 2020-04-30 2020-09-04 江苏理想空间装饰工程股份有限公司 Anti-leakage structure for pipeline penetrating floor slab

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111623172A (en) * 2020-04-30 2020-09-04 江苏理想空间装饰工程股份有限公司 Anti-leakage structure for pipeline penetrating floor slab
CN111623172B (en) * 2020-04-30 2023-11-07 江苏理想空间装饰工程股份有限公司 Anti-leakage structure of floor penetrating pipeline

Similar Documents

Publication Publication Date Title
CN101858464A (en) Sealed elastic compensation sleeve
CN201462207U (en) Sealing device between protective well through hole and underground pipeline
CN201250957Y (en) Seal elastic compensation-type pipe wall bushing
CN210164243U (en) Wall bushing structure
CN101619779B (en) Sealing device for buried pipe connected with protective well
CN206592659U (en) Wall water stop device for wall-passing well
CN206555483U (en) A kind of flexible conduit control element
CN107345610A (en) Anti-corrosion direct-burried external-compression type expansion bellow
CN206784431U (en) Telescopic joint for underground pipe gallery
CN213598736U (en) Waterproof system for cable wall-penetrating pipeline
CN211624441U (en) Basement wall pipe waterproof construction
CN209818954U (en) PE water supply pipe capable of preventing joint from bursting
CN207599157U (en) A kind of wall pipe processing construction
CN107061914A (en) A kind of bellows expansion joint
CN202338716U (en) Telescopic type flexible compensator
CN104653879A (en) Sealing structure of wall well wall
CN201259025Y (en) Sealing device for buried pipe protection well
CN108679340A (en) A kind of steel made two-side casing expander
CN210920400U (en) Double-wall corrugated pipe
CN218762063U (en) Hydraulic joint for hydraulic valve
CN217815552U (en) Multiphase fluid high-pressure composite pipe
CN209354826U (en) Exhaust-valve mounting device
CN218762085U (en) Compound multilayer sealing direct-buried compensator of bellows sleeve
CN221723710U (en) Double-adhesive-tape sealed pipeline rush-repair device
CN201884838U (en) Flexible coupling for large diameter pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant