[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN206573847U - The projection bracket for the naval training simulator being easily installed - Google Patents

The projection bracket for the naval training simulator being easily installed Download PDF

Info

Publication number
CN206573847U
CN206573847U CN201621480051.XU CN201621480051U CN206573847U CN 206573847 U CN206573847 U CN 206573847U CN 201621480051 U CN201621480051 U CN 201621480051U CN 206573847 U CN206573847 U CN 206573847U
Authority
CN
China
Prior art keywords
supporting plate
fixed
fixed plate
plate
elevating lever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621480051.XU
Other languages
Chinese (zh)
Inventor
王艺
程小林
李智
李彩霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No63686 Troops Pla
Original Assignee
No63686 Troops Pla
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No63686 Troops Pla filed Critical No63686 Troops Pla
Priority to CN201621480051.XU priority Critical patent/CN206573847U/en
Application granted granted Critical
Publication of CN206573847U publication Critical patent/CN206573847U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Toys (AREA)

Abstract

The utility model is related to the projection bracket for the naval training simulator being easily installed, lower end rotary type including elevating lever is provided with supporting plate, the plane of rotation level of supporting plate, the lower end of elevating lever is provided with the first governor motion, the rod end that first governor motion driving arm plate is located at elevating lever is rotated, rotary type is gone back on supporting plate and is provided with fixed plate, the second governor motion is provided with supporting plate, second governor motion driving fixed plate, which is located on supporting plate, to be rotated, fixed plate is in frid shape, fixed case is provided with the notch position of fixed plate, the opening that projector equipment is passed through is provided with fixed case, the both sides box wall of fixed case is extended with support bar, support bar is plugged on fixed plate both sides cell wall and offered in interface, the bottom of fixed case and the trough floor of fixed plate are neighbouring.In the interface that the support bar of the both sides of fixed case is plugged on to fixed plate both sides cell wall, the installation to whole projector equipment is realized, it is easy for installation, quick.

Description

The projection bracket for the naval training simulator being easily installed
Technical field
The utility model is related to navigation modelling technique field, and in particular to a kind of naval training simulation being easily installed The projection bracket of device.
Background technology
Ship simulated training is relatively advanced ship operation training method in the world at present, can both improve ship officers and men Practical operation level and experience accumulation, completing real ship can not carry out and be difficult to concentrate the subject that runs into, can also reduce real ship Consumption, the long-term training cost of extension Ship Life, saving.
The training simulation for being currently used for training ship officers and men is actually that officers and men are arranged in training house, whole in training house The corridor that body is integrally provided with copy boat system, adjusting system, cab system, projection cabin and officers and men pass through, in training The simulation softward of the indoor marine true environment of setting simulation is big in projection cabin by scene Scene projection by projector equipment On screen, so that allow the navigation scene in officers and men's actual experience sea, but existing training house is generally fixed structure, it is impossible to The scene that actual experience marine waves roll hull, existing training aids is not good enough in experience sense, and officers and men's is true Experience effect is limited.
Improvement is made that to existing technology to this applicant, above-mentioned training house is arranged on rotating mechanism, is utilized Drive mechanism driving training house body is integrally overturn, the truth of the marine hull of angle and the speed simulation integrally stirred, from And the actual experience effect of simulation trainer is improved, above-mentioned simulation trainer is in actual use, because simulation hull is being turned over During turning, when projector equipment is to projection cabin projection image, there is a situation where deflection, influence the viewing of officers and men, existing skill The installation site of projector equipment in art is relatively fixed, it is impossible to be adjusted.
It is entitled that applicant applies on the same day《Projection bracket for naval training simulator》In disclose a kind of projection branch Frame, can realize the comprehensive regulation to projector equipment, but again there is the installation between projector equipment and realization projection Many inconvenience.
Utility model content
The purpose of this utility model is:A kind of projection bracket for the naval training simulator being easily installed, Neng Goufang are provided Just projector equipment is fixed in mounting bracket.
To achieve the above object, the technical solution adopted in the utility model is:
The projection bracket for the naval training simulator being easily installed, the naval training simulator includes simulation hull, institute State and copy cabin room is provided with simulation hull, tune cabin, crew department and projection cabin is led, the projection cabin is arranged on It is provided with the top of the front end of crew department, the crew department in supporting plate, the supporting plate and is provided with elevating lever, the liter The lower end rotary type of drop bar is provided with supporting plate, the plane of rotation level of the supporting plate, and the lower end of the elevating lever is provided with the One governor motion, the rod end that the first governor motion driving arm plate is located at elevating lever is rotated, and is also rotated on the supporting plate Formula is provided with fixed plate, the rotary shaft cord horizontal of the fixed plate and, the support vertical with the rotary shaft cored wire of supporting plate The second governor motion is provided with plate, the second governor motion driving fixed plate, which is located on supporting plate, to be rotated, and the fixed plate is in groove It is provided with tabular, the notch position of fixed plate on fixed case, the fixed case and is provided with the opening that projector equipment is passed through, it is described The both sides box wall of fixed case is extended with support bar, and the support bar is plugged on fixed plate both sides cell wall and offered in interface, institute State fixed case bottom and fixed plate trough floor it is neighbouring.
Also there are following characteristics in the utility model:
The opening side of the fixed case is provided with extension edge, and a side box wall of the fixed case away from opening is provided with light Line three-way hole, the projection lens that light through hole is used for projector equipment passes through.
The interface is large semi-circular.
The lower end junction of the supporting plate and elevating lever is provided with installing pipe, the installing pipe and is provided with bearing, institute The lower end for stating elevating lever is arranged in the through hole of the inner ring of bearing, and fixed lid is provided with the installing pipe, and the fixed lid is solid It is scheduled on the shaft of elevating lever, the upper surface of the inner ring of the bearing is provided with mounting hole, and the fixation, which is covered, is provided with installation Bolt is fixed with mounting hole.
The supporting plate generally channel-section steel frid shape, the fixed plate is arranged in the notch of supporting plate, the fixed plate Both sides cell wall above-mentioned have extension rod and rotary type is arranged on the both sides cell wall of fixed plate.
Second governor motion includes the second motor being arranged on supporting plate, the side cell wall of the fixed plate Extension rod end be provided with driven pulley, the output shaft of second motor is provided with driving wheel, the master of the second motor Driving wheel driving driven pulley is rotated.
First governor motion includes the first motor for being arranged on elevating lever lower end, the upper face of the supporting plate Annular rack is provided with, the output shaft of first motor is provided with drive gear and engaged with annular rack.
The 150 ° of rings curtain set in the projection cabin, the projection bracket is arranged on the circle central axis of 150 ° of rings curtain Position.
The crew department includes the observation window in face of ring curtain, and the observation window includes flat surface and positioned at described straight The polylith sightingpiston that surface both sides are drawn in.
Bridge system is provided with the crew department, the bridge system includes auto navigator, positioned at described The dynamic Control of the auto navigator left and right sides is with called station and signal console, on the outside of the dynamic Control and called station What comes into a driver's console and the pathfinder console on the outside of the signal console.
Compared with prior art, the technique effect that the utility model possesses is:Adjusted by first, second governor motion, So as to which the comprehensive regulation to projector equipment can be realized, to adapt to need of the projection in projection cabin diverse location Ask, above-mentioned projector equipment is placed in fixed case, projector equipment only needs to the opening through fixed case, you can realize to throwing The installation of shadow equipment, and the support bar of the both sides of fixed case is plugged in the interface of fixed plate both sides cell wall, you can it is real It is easy for installation, quick now to the installation of whole projector equipment.
Brief description of the drawings
Fig. 1 is the structural representation of naval training simulator;
Fig. 2 is naval training simulator structure schematic diagram of the present invention;
Fig. 3 is the plane projection schematic diagram after the projection cabin projection of naval training simulator of the present invention;
Fig. 4 is easy for the structural representation of the projection bracket for the naval training simulator installed;
Fig. 5 is easy for the cross-section structure view of the projection bracket for the naval training simulator installed;
Fig. 6 is the I enlarged drawings in 5;
Fig. 7 is the end face structure view of bearing;
Fig. 8 and Fig. 9 are the top view and side view of fixed plate;
Figure 10 to Figure 12 is three kinds of viewing angle constructions views of fixed case.
Embodiment
With reference to Fig. 1 to Figure 12, the utility model is further described:
The projection bracket for the naval training simulator being easily installed, the naval training simulator includes simulation hull 10, Copy cabin room 11 is provided with the simulation hull 10, tune cabin 12, crew department 13 and projection cabin 14 is led, it is described to throw Shadow cabin 14 is arranged on the front end of crew department 13, and the top of the crew department 13 is provided with supporting plate 20, the supporting plate Elevating lever 30 is provided with 20, the lower end rotary type of the elevating lever 30 is provided with supporting plate 40, the rotation of the supporting plate 40 Face level, the lower end of the elevating lever 30 is provided with the first governor motion, and the first governor motion driving arm plate 40 is located at The rod end of elevating lever 30 is rotated, and going back rotary type on the supporting plate 40 is provided with fixed plate 50, the rotary shaft of the fixed plate 50 Cord horizontal and vertical with the rotary shaft cored wire of supporting plate 40, is provided with the second governor motion on the supporting plate 40, second adjusts Save mechanism driving fixed plate 50 and be located at rotation on supporting plate 40, the fixed plate 50 is in frid shape, the notch position of fixed plate 50 Place, which is provided with fixed case 60, the fixed case 60, is provided with the opening 61 that projector equipment 70 is passed through, and the two of the fixed case 60 Side box wall is extended with support bar 62, and the support bar 62 is plugged on the both sides cell wall of fixed plate 50 and offered in interface 51, described The trough floor of the bottom of fixed case 60 and fixed plate 50 is neighbouring.
Adjusted by first, second governor motion, so that the comprehensive regulation to projector equipment 70 can be realized, to adapt to Projector equipment 70 is projected in the demand of the projection diverse location of cabin 14, and above-mentioned projector equipment 60 is placed in fixed case 60, Projector equipment 70 only needs to the opening 61 through fixed case 60, you can realize installation to projector equipment 70, and by fixed case The support bar 62 of 60 both sides is plugged in the interface 51 of the both sides cell wall of fixed plate 50, you can realized to whole projector equipment 70 Installation, it is easy for installation, quick.
As preferred scheme of the present utility model, the side of opening 61 of the fixed case 60 is provided with extension edge 63, described A side box wall of the fixed case 60 away from opening 61 is provided with light through hole 64, and light through hole 64 is used for the projection lens of projector equipment 70 Head passes through.
Above-mentioned projector equipment 70 is realized by the opening 61 of fixed case 60 using the extension edge 63 of the side of opening 61 Positioning to projector equipment 70, the Image lenses of projector equipment 70 are by light through hole 64, so that influence is delivered in projection cabin In room 14.
For convenience of the installation realized to fixed case 60, and arbitrarily dropping for fixed case 60 is avoided, the interface 51 is Large semi-circular.It is solid therefore, it is possible to avoid fixed case 60 from being located at because the trough floor of the bottom and fixed plate 50 of fixed case 60 is neighbouring Random rotation in fixed board 50.
Elevating lever 30 is connected in the installation of supporting plate 40 and rotation for convenience of realizing, the supporting plate 40 and elevating lever 30 lower end junction, which is provided with installing pipe 41, the installing pipe 41, is provided with bearing 80, and the lower end of the elevating lever 30 is set Put in the through hole of the inner ring of bearing 80, fixed lid 31 is provided with the installing pipe 41, the fixed lid 31 is fixed on lifting On the shaft of bar 30, the upper surface of the inner ring of the bearing 80, which is provided with mounting hole 81, the fixed lid 31, is provided with installation Bolt 32 is fixed with mounting hole 81.
Further, the supporting plate 40 generally channel-section steel frid shape, the fixed plate 50 is arranged on the groove of supporting plate 40 Intraoral, the both sides cell wall of the fixed plate 50 is above-mentioned extension rod and rotary type is arranged on the both sides cell wall of fixed plate 50.
To realize the regulation of the rotational angle to fixed plate 50, second governor motion includes being arranged on supporting plate 40 The second motor 42, the extension rod end of the side cell wall of the fixed plate 50 is provided with driven pulley 52, second driving The output shaft of motor 42 is provided with driving wheel 421, and the driving driven pulley 52 of driving wheel 421 of the second motor 42 is rotated.
To realize the regulation of the rotational angle to supporting plate 40, first governor motion includes being arranged under elevating lever 30 First motor 33 at end, the upper face of the supporting plate 40 is provided with annular rack 43, first motor 33 Output shaft is provided with drive gear 331 and engaged with annular rack 43.
The upper end that described elevating lever 30 stretches out supporting plate 20 is provided with the 3rd motor 90, the upper shaft of the elevating lever 30 Rack 34 is provided with, the output shaft of the 3rd motor 90 is provided with gear 91, the gear 91 and the kernel of rack 34, the 3rd Motor 90 is rotated, so as to realize the regulation of the above-below direction to elevating lever 30.
To realize the fixation to the 3rd motor 90 and the guiding to the vertical direction of elevating lever 30, the supporting plate 20 it is upper Side is provided with fixed guide plate 100.
With reference to shown in Fig. 1, the 150 ° of rings curtain 141 set in the projection cabin 14, the projection bracket is arranged on described The circle central axis position of 150 ° of ring curtains 141.
The crew department 13 include in face of ring curtain 141 observation window 136, the observation window 136 include flat surface and The polylith sightingpiston drawn in positioned at the flat surface both sides.
With reference to shown in Fig. 2, bridge system is provided with the crew department 13, the bridge system includes automatic behaviour Rudder instrument 131, the dynamic Control positioned at the left and right sides of auto navigator 131 and called station 132 and signal console 133, position In the what comes into a driver's console 134 in the dynamic Control and the outside of called station 132 and positioned at the outside of signal console 133 Pathfinder console 135.
Simulated training system of the present utility model is a set of multi-functional, highly integrated, comprehensive, networking training teaching system System, can meet under a variety of navigation conditions, a variety of navigation waters and the manipulation of a variety of ship panel operating personnel and sail training, The need for many ship coorinated trainings and the navigation of ship length manipulate commanding and training.
Wherein training object includes formation commander, ship length and related duty hand (pathfinder soldier, signalman, carriage clock, behaviour Rudder soldier).
By the setting of training program, simulated training system of the present utility model can complete ship's navigation, on duty, behaviour Vertical, collision prevention, communication simulation, ship tactical training, failure are emergent, the training in terms of Training valuation, make student grasp wind, stream, Influence to the influenceing of Ship Controling, product prestowage to ship's navigation of the influence to ship's navigation of the depth of water, substrate, anchor, cable, ship are grasped Research in terms of the influence motor-driven to ship of vertical performance, expansion ship berthing and the optimal formation of formation shipping, for maritime affairs again Crash analysis is now carried out with judging.
Training method based on virtual environment is compared with marine hands-on, and cost is low, can save substantial amounts of human and material resources And financial resources.
The details of embodiment, and in the case of without departing substantially from spirit or essential attributes of the present utility model, can be with it His concrete form realizes the utility model.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, And be nonrestrictive, scope of the present utility model is limited by appended claims rather than described above, it is intended that will The all changes fallen in the implication and scope of the equivalency of claim are included in the utility model.Right should not be wanted Any reference asked is considered as the claim involved by limitation.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that for clarity, those skilled in the art should Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It may be appreciated other embodiment.

Claims (10)

1. the projection bracket for the naval training simulator being easily installed, it is characterised in that:The naval training simulator includes mould Intend being provided with hull (10), simulation hull (10) copy cabin room (11), lead tune cabin (12), crew department (13) with And cabin (14) are projected, the projection cabin (14) is arranged on the front end of crew department (13), the top of the crew department (13) Portion, which is provided with supporting plate (20), the supporting plate (20), is provided with elevating lever (30), and the lower end of the elevating lever (30) is rotated Formula is provided with supporting plate (40), and the plane of rotation level of the supporting plate (40), the lower end of the elevating lever (30) is provided with first Governor motion, the rod end that the first governor motion driving arm plate (40) is located at elevating lever (30) is rotated, the supporting plate (40) rotary type is gone back on and is provided with fixed plate (50), the rotary shaft cord horizontal of the fixed plate (50) and with supporting plate (40) Rotary shaft cored wire is vertical, and the second governor motion, the second governor motion driving fixed plate (50) are provided with the supporting plate (40) Rotated on supporting plate (40), the fixed plate (50) is in be provided with fixation at frid shape, the notch position of fixed plate (50) The opening (61) that projector equipment (70) is passed through, the both sides of the fixed case (60) are provided with case (60), the fixed case (60) Tank wall is extended with support bar (62), and the support bar (62) is plugged on fixed plate (50) both sides cell wall and offers interface (51) Interior, the trough floor of the bottom and fixed plate (50) of the fixed case (60) is neighbouring.
2. the projection bracket of the naval training simulator according to claim 1 being easily installed, it is characterised in that:It is described solid Opening (61) side for determining case (60) is provided with extension edge (63), and a side box wall of the fixed case (60) away from opening (61) is set Light through hole (64) is equipped with, the projection lens that light through hole (64) is used for projector equipment (70) passes through.
3. the projection bracket of the naval training simulator according to claim 2 being easily installed, it is characterised in that:It is described to insert Interface (51) is large semi-circular.
4. the projection bracket of the naval training simulator according to claim 3 being easily installed, it is characterised in that:The branch The lower end junction of frame plate (40) and elevating lever (30), which is provided with installing pipe (41), the installing pipe (41), is provided with bearing (80), the lower end of the elevating lever (30) is arranged in the through hole of the inner ring of bearing (80), is provided with the installing pipe (41) Fixed lid (31), the fixed lid (31) is fixed on the shaft of elevating lever (30), the upper surface of the inner ring of the bearing (80) It is provided with mounting hole (81), the fixed lid (31) and is provided with installation bolt (32) and mounting hole (81) fixation.
5. the projection bracket of the naval training simulator according to claim 4 being easily installed, it is characterised in that:The branch Frame plate (40) generally channel-section steel frid shape, the fixed plate (50) is arranged in the notch of supporting plate (40), the fixed plate (50) both sides cell wall is above-mentioned extension rod and rotary type is arranged on the both sides cell wall of fixed plate (50).
6. the projection bracket of the naval training simulator according to claim 5 being easily installed, it is characterised in that:It is described Second governor motion includes the second motor (42) being arranged on supporting plate (40), the side cell wall of the fixed plate (50) Extension rod end be provided with driven pulley (52), the output shaft of second motor (42) is provided with driving wheel (421), second Driving wheel (421) the driving driven pulley (52) of motor (42) is rotated.
7. the projection bracket of the naval training simulator according to claim 6 being easily installed, it is characterised in that:Described One governor motion includes the first motor (33) for being arranged on elevating lever (30) lower end, and the upper face of the supporting plate (40) is set Annular rack (43) is equipped with, the output shaft of first motor (33) is provided with drive gear (331) and annular rack (43) engage.
8. the projection bracket of the naval training simulator being easily installed according to claim 1 to 7 any one, its feature It is:The 150 ° of rings curtain (141) set in the projection cabin (14), the projection bracket is arranged on 150 ° of rings curtain (141) circle central axis position.
9. the projection bracket of the naval training simulator according to claim 8 being easily installed, it is characterised in that:It is described to drive Sailing cabin (13) includes the observation window in face of ring curtain (141), and the observation window includes flat surface and positioned at the flat surface The polylith sightingpiston that both sides are drawn in.
10. the projection bracket of the naval training simulator according to claim 9 being easily installed, it is characterised in that:It is described Bridge system is provided with crew department (13), the bridge system includes auto navigator (131), positioned at described automatic The dynamic Control of pilot (131) left and right sides is with called station (132) and signal console (133), positioned at the dynamic Control With the what comes into a driver's console (134) on the outside of called station (132) and the pathfinder on the outside of the signal console (133) Console (135).
CN201621480051.XU 2016-12-30 2016-12-30 The projection bracket for the naval training simulator being easily installed Expired - Fee Related CN206573847U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621480051.XU CN206573847U (en) 2016-12-30 2016-12-30 The projection bracket for the naval training simulator being easily installed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621480051.XU CN206573847U (en) 2016-12-30 2016-12-30 The projection bracket for the naval training simulator being easily installed

Publications (1)

Publication Number Publication Date
CN206573847U true CN206573847U (en) 2017-10-20

Family

ID=60061751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621480051.XU Expired - Fee Related CN206573847U (en) 2016-12-30 2016-12-30 The projection bracket for the naval training simulator being easily installed

Country Status (1)

Country Link
CN (1) CN206573847U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109668017A (en) * 2019-03-01 2019-04-23 葛成燕 A kind of projector installation mounting bracket
CN110878885A (en) * 2019-11-08 2020-03-13 安徽影动文化科技有限公司 Can realize quick assembly disassembly and lifting control's projection setting installing support

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109668017A (en) * 2019-03-01 2019-04-23 葛成燕 A kind of projector installation mounting bracket
CN110878885A (en) * 2019-11-08 2020-03-13 安徽影动文化科技有限公司 Can realize quick assembly disassembly and lifting control's projection setting installing support
CN110878885B (en) * 2019-11-08 2021-10-15 深圳市云杰科技文化有限公司 Can realize quick assembly disassembly and lifting control's projection equipment installing support

Similar Documents

Publication Publication Date Title
CN100561543C (en) High quality marine simulator and development platform system thereof
WO2016190761A1 (en) Unit for monitoring underwater objects
CN107301802B (en) Manned submersible simulation system
CN206573847U (en) The projection bracket for the naval training simulator being easily installed
CN1968849A (en) Positioning device for a free-flying kite-type wind-attacked element in a wind-powered watercraft
CN1968848A (en) Watercraft comprising a free-flying kite-type wind-attacked element as a wind-powered drive unit
CN110836760B (en) Ship attitude dynamic simulation system for wind tunnel test and working method thereof
CN208021694U (en) A kind of underwater duct braiding machine people
CN206171736U (en) Flexible semi -submerged formula unmanned ship
CN206920930U (en) A kind of intelligent navigation and positioning waters oxygenate apparatus
CN107512380A (en) A kind of all-around propeller, ship and floating platform
CN206411410U (en) Projection bracket for naval training simulator
CN113335476A (en) Active control device for ship damage stability model test
CN206379033U (en) For ship naval training simulator
EP1740453B1 (en) Watercraft comprising a free-flying maneuverable wind-attacked element as a drive unit
CN112810781A (en) Novel streamline underwater robot
CN208855818U (en) A kind of long continuation of the journey seawater sampling wave energy solar energy binary unmanned boat of self-righting
CN206379034U (en) Ship naval training simulation system
CN210793516U (en) Ship top system for unmanned pleasure boat
CN107153365B (en) Ship berthing-dependence control simulation system
JPH0471587A (en) Sailing on water and sailing vessel model suitable for display
CN206394836U (en) A kind of active moving heavy object stabilizer
CN208828078U (en) A kind of ship drives platform
CN117095588A (en) Marine ocean three-dimensional environment simulation control system and control equipment thereof
CN104612423A (en) Immersed-tube transverse mooring winch control system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171020

Termination date: 20181230