[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN206562621U - City planting ductwork fluting pipe laying structure - Google Patents

City planting ductwork fluting pipe laying structure Download PDF

Info

Publication number
CN206562621U
CN206562621U CN201720249273.9U CN201720249273U CN206562621U CN 206562621 U CN206562621 U CN 206562621U CN 201720249273 U CN201720249273 U CN 201720249273U CN 206562621 U CN206562621 U CN 206562621U
Authority
CN
China
Prior art keywords
foundation trench
foundation
encapsulating
planting ductwork
city planting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720249273.9U
Other languages
Chinese (zh)
Inventor
钱申春
杜海峰
任杰
沈维成
王明礼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Road and Bridge Engineering Co Ltd
Original Assignee
Anhui Road and Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Road and Bridge Engineering Co Ltd filed Critical Anhui Road and Bridge Engineering Co Ltd
Priority to CN201720249273.9U priority Critical patent/CN206562621U/en
Application granted granted Critical
Publication of CN206562621U publication Critical patent/CN206562621U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses city planting ductwork fluting pipe laying structure, including foundation trench, the foundation reinforcing structure and encapsulating structure being provided with foundation trench, foundation reinforcing structure includes the timber of insertion foundation trench bottom, the crowded what block stone for being located at foundation trench bottom and the sand-gravel cushion being located on crowded what block stone, encapsulating structure includes supplying drainage and is connected to two separated concretes encapsulating of supplying drainage upper and lower ends, separated concrete, which is encapsulated, is filled with throwing what block stone in the space between foundation trench wall, two separated concrete encapsulatings are connected by connecting screw rod, damping rubber block is provided between supplying drainage and two separated concrete encapsulatings, not only collect basement process, foundation trench is gone along with sb. to guard him with pipe protection in one, and it is fast to meet speed of application, it is superior in quality.

Description

City planting ductwork fluting pipe laying structure
Technical field
The utility model belongs to municipal works field, and in particular to city planting ductwork fluting pipe laying structure.
Background technology
Because urban drainage pipeline system has been assigned new intension new in the period of, ceased with the water environment that people survive It is related.In municipal works and environmental improvement engineering construction, urban drainage pipeline system is normally occupied the larger output investment ratio of engineering. Therefore how under conditions of specification and other technical requirements is met, according to the concrete condition in city, improve city planting ductwork and install Construction quality, to reduce its construction cost be a very important problem.
The construction method of current city planting ductwork is fairly simple, does not set support, water supply and sewerage pipeline during fluting mostly and does not also carry out Protection well, most simple process by the way of backfill material;And some soft stratums are directed in practice of construction, traditional applies There is more construction quality, potential safety hazard in work method.
In summary, although the city planting ductwork constructing structure that some existing strick precautions are used in engineering, may not apply to All geological conditions.In consideration of it, in order to enrich city planting ductwork constructing structure, preferably solving the installation of soft soil foundation city planting ductwork Problem, needs badly to invent at present and a kind of integrates that basement process, foundation trench are gone along with sb. to guard him, the city planting ductwork of pipe protection is slotted pipe laying knot Structure.
The content of the invention
The purpose of this utility model is to provide city planting ductwork fluting pipe laying structure, not only collect basement process, foundation trench go along with sb. to guard him and Pipe protection meets speed of application soon in one, superior in quality.
For up to above-mentioned purpose, major technique solution of the present utility model is to provide city planting ductwork fluting pipe laying structure, Including the foundation reinforcing structure and encapsulating structure being provided with foundation trench, foundation trench, foundation reinforcing structure includes the wood of insertion foundation trench bottom Stake, the sand-gravel cushion for being located at the crowded what block stone of foundation trench bottom and being located on crowded what block stone, encapsulating structure include supplying drainage and divided It is not connected in two separated concretes encapsulating of supplying drainage upper and lower ends, the space between separated concrete encapsulating and foundation trench wall and fills out There is throwing what block stone.
Described two separated concrete encapsulatings are connected by connecting screw rod,
Damping rubber block is provided between the supplying drainage and two separated concrete encapsulatings.
The utility model beneficial effect:
1st, basement process is carried out using timber, sand-gravel cushion, crowded what block stone, greatly improves foundation bearing capacity, reduce construction Potential safety hazard;
2nd, by protective conduit such as prefabricated separated concrete encapsulating, damping rubber blocks, the service life of pipeline is extended.
Brief description of the drawings
Fig. 1 is the elevation of the utility model city planting ductwork fluting pipe laying structure;
In figure:1. foundation trench, 2. supplying drainages, the encapsulating of 3. separated concretes, 4. throw what block stone, 5. timbers, 6. crowded what block stones, 7. Sand-gravel cushion, 8. connecting screw rods, 9. damping rubber blocks.
Embodiment
The construction ginseng for the treatment of construction scene, foundation trench excavation technology, bracing members construction technology code, timber, sand-gravel cushion etc. Number etc., is not repeated, emphasis illustrates that the utility model is related to the embodiment of structure in present embodiment.
As shown in figure 1, in city planting ductwork fluting pipe laying structure, including foundation trench 1, foundation trench 1 foundation reinforcing structure that is provided with and Encapsulating structure, foundation reinforcing structure includes the timber 5 of insertion foundation trench 1 bottom, is located at the crowded what block stone 6 of the bottom of foundation trench 1 and is located at The sand-gravel cushion 7 squeezed on what block stone 6, encapsulating structure includes supplying drainage 2 and is connected to the two of the upper and lower ends of supplying drainage 2 Throwing what block stone 4 is filled with individual separated concrete encapsulating 3, the space between separated concrete encapsulating 3 and the wall of foundation trench 1.
Described two separated concrete encapsulatings 3 are connected by connecting screw rod 8.
Damping rubber block 9 is provided between the supplying drainage 2 and two separated concrete encapsulatings 3.
The long 6m of stake of the timber 5, stake footpath is not less than the spacing 600mm between 150mm, timber 5, using quincunx cloth Put.
The crowded what block stone 6 is handled by heavy tamping, is squeezed in the gap of what block stone 6 and has been poured into rubble and aggregate chips, after compacting, Squeeze the top of what block stone 6 and be provided with 200mm thickness 1:1 sand-gravel cushion 7 is simultaneously tamped.

Claims (3)

  1. The pipe laying structure 1. city planting ductwork is slotted, including foundation trench (1), it is characterised in that city planting ductwork fluting pipe laying structure also includes The foundation reinforcing structure and encapsulating structure being provided with foundation trench (1), foundation reinforcing structure include the timber of insertion foundation trench (1) bottom (5) sand-gravel cushion (7) for, being located at the crowded what block stone (6) of foundation trench (1) bottom and being located on crowded what block stone (6), encapsulating structure includes Supplying drainage (2) and the two separated concretes encapsulating (3) for being connected to supplying drainage (2) upper and lower ends, separated concrete encapsulating (3) throwing what block stone (4) is filled with the space between foundation trench (1) wall.
  2. The pipe laying structure 2. city planting ductwork according to claim 1 is slotted, it is characterised in that described two separated concrete encapsulatings (3) connected by connecting screw rod (8).
  3. The pipe laying structure 3. city planting ductwork according to claim 1 is slotted, it is characterised in that the supplying drainage (2) and two Damping rubber block (9) is provided between separated concrete encapsulating (3).
CN201720249273.9U 2017-03-14 2017-03-14 City planting ductwork fluting pipe laying structure Active CN206562621U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720249273.9U CN206562621U (en) 2017-03-14 2017-03-14 City planting ductwork fluting pipe laying structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720249273.9U CN206562621U (en) 2017-03-14 2017-03-14 City planting ductwork fluting pipe laying structure

Publications (1)

Publication Number Publication Date
CN206562621U true CN206562621U (en) 2017-10-17

Family

ID=60030674

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720249273.9U Active CN206562621U (en) 2017-03-14 2017-03-14 City planting ductwork fluting pipe laying structure

Country Status (1)

Country Link
CN (1) CN206562621U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108412016A (en) * 2018-03-15 2018-08-17 中建五局土木工程有限公司 Underground tube body assures construction method
WO2020038315A1 (en) * 2018-08-19 2020-02-27 吴卿 Floating-type crushing single tower
WO2020038333A1 (en) * 2018-08-19 2020-02-27 吴卿 Floating return material crushing integrated multi-tower
WO2020038316A1 (en) * 2018-08-19 2020-02-27 吴卿 Comprehensive crushing and floating tower
CN113700935A (en) * 2021-09-09 2021-11-26 安徽省新路建设工程集团有限责任公司 Grooving pipe burying structure for soft soil area and construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108412016A (en) * 2018-03-15 2018-08-17 中建五局土木工程有限公司 Underground tube body assures construction method
WO2020038315A1 (en) * 2018-08-19 2020-02-27 吴卿 Floating-type crushing single tower
WO2020038333A1 (en) * 2018-08-19 2020-02-27 吴卿 Floating return material crushing integrated multi-tower
WO2020038316A1 (en) * 2018-08-19 2020-02-27 吴卿 Comprehensive crushing and floating tower
CN113700935A (en) * 2021-09-09 2021-11-26 安徽省新路建设工程集团有限责任公司 Grooving pipe burying structure for soft soil area and construction method

Similar Documents

Publication Publication Date Title
CN206562621U (en) City planting ductwork fluting pipe laying structure
CN204059124U (en) A kind of sand drain strong rammer grouting behind shaft or drift lining foundation reinforcing structure
CN204059332U (en) A kind of concrete precast pipe pile and piling prepressing Soft Ground device
CN106192665B (en) A kind of sponge urban road rain infiltration system and its construction method
CN103410139B (en) Foundation ditch narrow zone backfill densification process
CN204370473U (en) Precast module type panel Fill Reinforced With Geogrids CHARACTERISTICS OF TAILINGS SAND barricade
CN107419630A (en) A kind of the soft soil foundation high-filled embankment and construction method of effectively control settlement after construction
CN104480963A (en) Construction method of retaining wall by a prefabricated module panel geogrid reinforcement tailing sand
CN203295913U (en) Novel ecological permeable road structure
CN103741670B (en) A kind of method for processing foundation eliminating negative friction
CN206902488U (en) A kind of soft soil foundation high-filled embankment of effectively control settlement after construction
CN203393530U (en) Anti-floating lightweight high-fill embankment structure
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN108532406A (en) Can rapid construction high-bearing capacity pervious surface and laying method
CN203594041U (en) Piled raft structure with good resistance to seepage and buoyancy
CN104947651A (en) Anti-liquefaction method applicable to sand foundation of subway station
CN104358273B (en) A kind of construction method of in-situ deposited prefabricated combined retaining wall structure
CN204174636U (en) In-situ deposited prefabricated combined retaining wall structure
CN103628488A (en) Damming method of tailing subdam
CN103321181A (en) Method for damming by hydraulic-filling full tailings to geomembrane bag woven by using split film yarns
CN106544987B (en) A kind of anti-seepage of channels construction method storing flooded wetland
CN108979711A (en) The tailing-filled dehydration enclosing wall of one kind and its construction method
CN117449423A (en) Construction process for newly-built inspection well under state of maintaining water flowing state of existing pipeline
CN108930253B (en) Ecological flexible slope protection structure for river channel and construction method
CN203096758U (en) Hard concrete smooth foundation pit for installing drainage pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant