CN206261261U - It is a kind of with single pressure chamber structure without pump hot-water warming mattress - Google Patents

It is a kind of with single pressure chamber structure without pump hot-water warming mattress Download PDF

Info

Publication number
CN206261261U
CN206261261U CN201621131345.1U CN201621131345U CN206261261U CN 206261261 U CN206261261 U CN 206261261U CN 201621131345 U CN201621131345 U CN 201621131345U CN 206261261 U CN206261261 U CN 206261261U
Authority
CN
China
Prior art keywords
water
pressure chamber
balancing gate
gate pit
chamber structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621131345.1U
Other languages
Chinese (zh)
Inventor
王冰石
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ninghai Meilin New Electrical Appliance Factory
Original Assignee
Ninghai Meilin New Electrical Appliance Factory
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ninghai Meilin New Electrical Appliance Factory filed Critical Ninghai Meilin New Electrical Appliance Factory
Priority to CN201621131345.1U priority Critical patent/CN206261261U/en
Application granted granted Critical
Publication of CN206261261U publication Critical patent/CN206261261U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mattresses And Other Support Structures For Chairs And Beds (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The utility model discloses it is a kind of with single pressure chamber structure without pump hot-water warming mattress, mattress body including being internally provided with hot water pipe, one end of hot water pipe is connected with the outlet pipe of water supply installation, its other end is connected through return pipe with the water supply installation, water supply installation includes water tank and a balancing gate pit being arranged at below the water tank, filler is provided with water tank, the movable valve plate opened along water inlet direction is provided between water tank and balancing gate pit;Balancing gate pit is connected by hydraulic pipeline with outlet pipe, hydraulic pipeline includes the outside heat exchange segment for being arranged with the bringing-up section of electric heating tube and being made up of heat exchanger, electric heating tube is electrically connected with electric control mainboard, heat exchange segment is arranged in the water tank, septation cover is provided with outside heat exchange segment, is provided with the top of balancing gate pit into water air bleeding valve.The utility model has the advantage of:Simple structure, using comfortable, it uses and conveys water without pump configuration, and noiselessness, heat utilization ratio is high.

Description

It is a kind of with single pressure chamber structure without pump hot-water warming mattress
Technical field
The utility model is related to hot-water warming mattress manufacturing technology field, especially it is a kind of with single pressure chamber structure without pump water Warm mattress.
Background technology
In the winter of cold weather, south is more to be warmed oneself using Electric heating bed mattress, but because Electric heating bed mattress is by paving Heating wire in mattress produces heat, and it has certain potential safety hazard, on being made because of Electric heating bed mattress improper use The report of paired human injury is also often seen.At present, in the market occurs in that the substitute products of Electric heating bed mattress, i.e. hot-water warming mattress; Hot-water warming mattress is welcomed by the people with its good security and comfortableness.
Existing hot-water warming mattress is delivered to mattress after heat-exchanger pump heats the water in water tank, and the water in mattress flows back again Into water tank, so as to realize the recycling of water.But the work of heat-exchanger pump can produce sound, the sound is aobvious at quiet night Sleep quality particularly evident and that user can be influenceed is obtained, and, with the increase of pump working time, noise can be increasingly Ring.In addition, a kind of existing on the market with single pressure chamber structure without pump hot-water warming mattress because water velocity is slow, into mattress High-temperature water when slowly flowing to end, temperature can decline a lot, cause the various pieces of mattress to there is the temperature difference, and evening, people lay in Face may feel that obvious temperature difference, so as to cause the decline of comfort.At present, the pressure for being used on some products The movable valve plate for filling in water intake mechanism is just set to heating tube, and heating tube bubble produced when heating can produce punching to movable valve plate Hit, and influence the service life of movable valve plate, therefore its structure needs further to be improved.
The content of the invention
Technical problem to be solved in the utility model is directed to the present situation of prior art, there is provided simple structure, using easypro It is suitable, noiselessness, a kind of high of heat utilization ratio is with single pressure chamber structure without pump hot-water warming mattress.
The utility model solve the technical scheme that is used of above-mentioned technical problem for:
It is a kind of with single pressure chamber structure without pump hot-water warming mattress, including be internally provided with the mattress body of hot water pipe, warm up One end of water pipe is connected with the outlet pipe of water supply installation, and its other end is connected through return pipe with the water supply installation, supplies water Device includes water tank and a balancing gate pit being arranged at below the water tank, and filler, water tank and pressure are provided with water tank The movable valve plate opened along water inlet direction is provided between room;Balancing gate pit is connected by hydraulic pipeline with outlet pipe, water delivery Pipeline includes the outside heat exchange segment for being arranged with the bringing-up section of electric heating tube and being made up of heat exchanger, electric heating tube with it is automatically controlled Mainboard electrical connection processed, heat exchange segment is arranged in the water tank, and septation cover is provided with outside heat exchange segment, and the top of balancing gate pit is set Have into water air bleeding valve.
The technical measures of optimization also include:
The valve block installation portion in the balancing gate pit is stretched into the bottom connection one of above-mentioned water tank, and one end of movable valve plate is fixed In on the outer wall of the valve block installation portion.
Inlet opening is provided with above-mentioned valve block installation portion, movable valve plate is covered in the outside of the inlet opening, moving valve The upper end of piece is mutually fixed by fixture with the valve block installation portion.
Above-mentioned inlet opening is opened in the side away from electric heating tube on the valve block installation portion.
Muffler is provided with above-mentioned balancing gate pit, muffler is arranged at the underface of the water inlet air bleeding valve.
Above-mentioned bringing-up section is obliquely installed in nearly pressure chambers end higher than remote pressure chambers end.
Above-mentioned heat exchanger is u-shaped heat exchanger tube.
Above-mentioned hot water pipe is set in the mattress body in continuous S-shaped.
Above-mentioned electric heating tube is PTC electric heating tubes.
Above-mentioned water tank upper is provided with tank lid, and filler is arranged in the tank lid.
The utility model it is a kind of with single pressure chamber structure without pump hot-water warming mattress, its water supply installation is by below water tank One balancing gate pit is set, and balancing gate pit is that the intrinsic hot water pipe of mattress conveys water by hydraulic pipeline, is added by the electricity of bringing-up section Heat pipes heat water, water is heated while producing bubble, bubble enters the pressure that balancing gate pit increases in balancing gate pit, so as to be water Conveying provides kinetic energy, and water occurs heat exchange, so reduces being delivered to by heat exchange segment in course of conveying with the water in water tank The temperature of hot water pipe reclaimed water, it is to avoid the water overheat entered in mattress, while Water in Water Tanks temperature is improved, so as to effectively improve heating The efficiency of heating surface of section, improves heat utilization ratio.
In addition, setting septation cover in water tank, water tank is separated into two parts with septation cover, heat exchange segment is arranged at separation In lid, by after heat exchange, water temperature in water tank in septation cover can than septation cover outside water temperature it is high 5-10 DEG C, and in septation cover Water is directly entered balancing gate pit in course of conveying, and the water outside septation cover is then needed by entering back into balancing gate pit after heat exchange segment, such as This design can not only effectively improve the temperature into pressure indoor water, moreover it is possible to by reducing the water outside heat exchange segment, to the greatest extent may be used Energy ground improves the water temperature of bringing-up section inducer, so as to improve the efficiency of heating surface, improves flow.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the sectional structure chart of water supply installation in Fig. 1;
Fig. 3 is A portions enlarged drawing in Fig. 2;
Fig. 4 is the mounting structure schematic diagram of movable valve plate in Fig. 2.
Specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing embodiment.
It is as shown in Figures 1 to 4 structural representation of the present utility model,
Reference therein is:Mattress body 1, hot water pipe 11, water supply installation 2, outlet pipe 21, return pipe 22, water tank 3rd, filler 31, valve block installation portion 32, inlet opening 32a, tank lid 33, balancing gate pit 4, water inlet air bleeding valve 4a, hydraulic pipeline, heating Section 51, electric heating tube 51a, heat exchange segment 52, septation cover 52a, electric control mainboard 6, muffler 7, movable valve plate 8, fixture 8a; The direction of arrow in figure represents water (flow) direction.
As shown in Figures 1 to 4,
It is a kind of with single pressure chamber structure without pump hot-water warming mattress, including be internally provided with the mattress body 1 of hot water pipe 11, One end of hot water pipe 11 is connected with the outlet pipe 21 of water supply installation 2, and its other end is through return pipe 22 and the phase of the water supply installation 2 Connection, water supply installation 2 includes water tank 3 and a balancing gate pit 4 for being arranged at the lower section of the water tank 3, is provided with water tank 3 and added water Mouth 31, is provided with the movable valve plate 8 opened along water inlet direction between water tank 3 and balancing gate pit 4;Balancing gate pit 4 passes through hydraulic pipeline It is connected with outlet pipe 21, hydraulic pipeline includes that outside is arranged with the bringing-up section 51 of electric heating tube 51a and by heat exchanger Into heat exchange segment 52, electric heating tube 51a electrically connected with electric control mainboard 6, and heat exchange segment 52 is arranged in the water tank 3, heat Septation cover 52a is provided with outside exchange section 52, the top of balancing gate pit 4 is provided with into water air bleeding valve 4a.
In embodiment, the valve block installation portion 32 in the balancing gate pit 4 is stretched into the bottom connection one of water tank 3, movable valve plate 8 One end is fixed on the outer wall of the valve block installation portion 32.
In embodiment, inlet opening 32a is provided with valve block installation portion 32, movable valve plate 8 is covered in the inlet opening 32a's Outside, the upper end of movable valve plate 8 is mutually fixed by fixture 8a with the valve block installation portion 32.
In embodiment, inlet opening 32a is opened in the side away from electric heating tube 51a on the valve block installation portion 32.So Set, it is to avoid influence of the bubble that bringing-up section 51 is produced when heating to the normal work of movable valve plate 8, can also improve movable valve plate 8 service life.
Be provided with muffler 7 in embodiment, in balancing gate pit 4, muffler 7 be arranged at the water inlet air bleeding valve 4a just under Side;Setting muffler 7 can further reduce sound when equipment is run.
In embodiment, bringing-up section 51 is obliquely installed in nearly pressure chambers end higher than remote pressure chambers end.
In embodiment, heat exchanger is u-shaped heat exchanger tube.Using the heat exchanger tube of U-shaped structure, structure can be made more Step up to gather, make the volume of water supply installation 2 smaller.
In embodiment, hot water pipe 11 is set in the mattress body 1 in continuous S-shaped.In warming up that continuous S-shaped is set Water pipe 11, is not only able to increase distribution length of the hot water pipe 11 in mattress body 1, and make hot water pipe 11 in mattress body 1 Inside more uniformly spread, can so effectively improve hot-water heating effect.
In embodiment, electric heating tube 51a is PTC electric heating tubes.
In embodiment, the top of water tank 3 is provided with tank lid 33, and filler 31 is arranged in the tank lid 33.
Operation principle:
This hot-water warming mattress is used without pump configuration, and water is added in water tank 3 (when adding water first by the filler 31 on water tank 3 Can fill it up with), the flow direction of water is followed successively by:Water in water tank 3 is first flowed into septation cover 52a, then by the water inlet of valve block installation portion 32 Hole 32a enters balancing gate pit 4, and the water in balancing gate pit 4 flows after the bringing-up section 51 of hydraulic pipeline, heat exchange segment 52 from outlet pipe 21 again Enter the hot water pipe 11 in mattress body 1, be finally back in water tank 3 from return pipe 22.
During work, the bringing-up section 51 on hydraulic pipeline is entered by the electric heating tube 51a that outside is nested with to the water that inside flows through Row heating, in heating process, water temperature produces bubble while rising, and these bubbles enter the pressure of increase balancing gate pit 4 in balancing gate pit 4 Power, accelerates the conveying of water, and being obliquely installed bringing-up section 51 can make bubble more smoothly enter balancing gate pit 4 here;The internal pressure of balancing gate pit 4 Power provides power for the course of conveying of whole water.
The movable valve plate 8 opened along water inlet direction is set between water tank 3 and balancing gate pit 4, and movable valve plate 8 is with fixing end Axle is opened.The open theory of movable valve plate 8:When work produces air pressure, air pressure to drain into water from water inlet air bleeding valve 4a in bringing-up section 51 Case 3, when pressure hour in the pressure ratio water tank 3 in balancing gate pit 4, movable valve plate 8 is opened;After movable valve plate 8 is with opening, water is from water Enter balancing gate pit 4 in case 3, with the continuous entrance of water, pressure constantly increases in balancing gate pit 4, when pressure is more than water in balancing gate pit 4 During pressure in case 3, movable valve plate 8 is closed.
As water is delivered to heat exchange segment 52, there is heat in the hot water in heat exchanger with the water in heat exchanger outer water tank 3 Exchange, one can reduce the water temperature of the water for being delivered to hot water pipe 11, it is to avoid the excessive temperature differentials of hot-water warming mattress, and two can improve Water temperature in water tank 3, to improve the water temperature into the water of bringing-up section 51, so as to improve the efficiency of heating surface, improves flow and (enters bringing-up section Water is heated to time of design temperature after the water temperature of 51 water is improved, in bringing-up section 51 just reduces).In addition, this hot-water warming mattress Septation cover 52a is set in water tank 3, water tank 3 is separated into two parts with septation cover 52a, reduce the space of heat exchange zone, heat Exchange section 52 is arranged in septation cover 52a, and the water in septation cover 52a is directly entered balancing gate pit 4 in course of conveying, and septation cover Water outside 52a is then needed by entering back into balancing gate pit 4 after heat exchange segment 52.After tested, by after heat exchange, separating in water tank 3 Lid 52a in water temperature can than septation cover 52a outside water temperature it is high 5-10 DEG C so that preferably reach raising the inflow temperature of bringing-up section 51 Purpose.
Electric heating tube 51a is controlled by electric control mainboard 6, when the water in bringing-up section 51 is heated to 75 DEG C, stops heating, plus After water after heat flows through heat exchange segment 52, water temperature can be reduced to 55 DEG C or so, and the water inlet that can well meet hot water pipe 11 will Ask (not more than 60 DEG C of the inflow temperature of hot water pipe 11);The flow of this hot-water warming mattress up to 110ml/min, compared with existing market On product flow it is big by 35%.Big flow greatly shortens the time that water flows through whole hot water pipe 11, so as to avoid mattress each The generation of the obvious temperature difference in part.
Most preferred embodiment of the present utility model has been illustrated, the various change or remodeling made by those of ordinary skill in the art All without departing from scope of the present utility model.

Claims (10)

1. it is a kind of with single pressure chamber structure without pump hot-water warming mattress, including the mattress body for being internally provided with hot water pipe (11) (1), one end of described hot water pipe (11) is connected with the outlet pipe (21) of water supply installation (2), and its other end is through return pipe (22) it is connected with the water supply installation (2), it is characterized in that:Described water supply installation (2) includes water tank (3) and a setting Balancing gate pit (4) below the water tank (3), is provided with filler (31) on described water tank (3), described water tank (3) and The movable valve plate (8) opened along water inlet direction is provided between balancing gate pit (4);Described balancing gate pit (4) is by hydraulic pipeline Be connected with outlet pipe (21), described hydraulic pipeline including outside be arranged with electric heating tube (51a) bringing-up section (51) and The heat exchange segment (52) being made up of heat exchanger, described electric heating tube (51a) is electrically connected with electric control mainboard (6), described Heat exchange segment (52) is arranged in the water tank (3), and septation cover (52a) is provided with outside described heat exchange segment (52), described It is provided with the top of balancing gate pit (4) into water air bleeding valve (4a).
2. it is according to claim 1 it is a kind of with single pressure chamber structure without pump hot-water warming mattress, it is characterized in that:Described water Valve block installation portion (32) in the balancing gate pit (4) is stretched into the bottom connection one of case (3), one end of described movable valve plate (8) It is fixed on the outer wall of the valve block installation portion (32).
3. it is according to claim 2 it is a kind of with single pressure chamber structure without pump hot-water warming mattress, it is characterized in that:Described valve Inlet opening (32a) is provided with piece installation portion (32), described movable valve plate (8) is covered in the outside of the inlet opening (32a), The upper end of described movable valve plate (8) is mutually fixed by fixture (8a) with the valve block installation portion (32).
4. it is according to claim 3 it is a kind of with single pressure chamber structure without pump hot-water warming mattress, it is characterized in that:Described enters Water hole (32a) is opened in the side away from electric heating tube (51a) on the valve block installation portion (32).
5. it is according to claim 4 it is a kind of with single pressure chamber structure without pump hot-water warming mattress, it is characterized in that:Described pressure Muffler (7) is provided with power room (4), described muffler (7) is arranged at the underface of water inlet air bleeding valve (4a).
6. it is according to claim 5 it is a kind of with single pressure chamber structure without pump hot-water warming mattress, it is characterized in that:Described adds Hot arc (51) is obliquely installed in nearly pressure chambers end higher than remote pressure chambers end.
7. it is according to claim 6 it is a kind of with single pressure chamber structure without pump hot-water warming mattress, it is characterized in that:Described heat Exchanger is u-shaped heat exchanger tube.
8. it is according to claim 7 it is a kind of with single pressure chamber structure without pump hot-water warming mattress, it is characterized in that:Described is warm Water pipe (11) is set in the mattress body (1) in continuous S-shaped.
9. it is according to claim 8 it is a kind of with single pressure chamber structure without pump hot-water warming mattress, it is characterized in that:Described electricity Heating tube (51a) is PTC electric heating tubes.
10. it is according to claim 9 it is a kind of with single pressure chamber structure without pump hot-water warming mattress, it is characterized in that:Described Water tank (3) top is provided with tank lid (33), and described filler (31) is arranged in the tank lid (33).
CN201621131345.1U 2016-10-17 2016-10-17 It is a kind of with single pressure chamber structure without pump hot-water warming mattress Expired - Fee Related CN206261261U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621131345.1U CN206261261U (en) 2016-10-17 2016-10-17 It is a kind of with single pressure chamber structure without pump hot-water warming mattress

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621131345.1U CN206261261U (en) 2016-10-17 2016-10-17 It is a kind of with single pressure chamber structure without pump hot-water warming mattress

Publications (1)

Publication Number Publication Date
CN206261261U true CN206261261U (en) 2017-06-20

Family

ID=59038127

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621131345.1U Expired - Fee Related CN206261261U (en) 2016-10-17 2016-10-17 It is a kind of with single pressure chamber structure without pump hot-water warming mattress

Country Status (1)

Country Link
CN (1) CN206261261U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106263802A (en) * 2016-10-17 2017-01-04 宁海县梅林镇新建电器厂 A kind of hot-water warming mattress without pump with single pressure chamber structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106263802A (en) * 2016-10-17 2017-01-04 宁海县梅林镇新建电器厂 A kind of hot-water warming mattress without pump with single pressure chamber structure

Similar Documents

Publication Publication Date Title
CN204084586U (en) Movable forced convertion radiator
CN106263802B (en) It is a kind of have single pressure chamber structure without pump hot-water warming mattress
CN206261261U (en) It is a kind of with single pressure chamber structure without pump hot-water warming mattress
CN202012980U (en) Electric wall mounting furnace bi-functional in warming and bathing
CN203637638U (en) Heat preservation tank for field dining car
CN203113485U (en) Toilet bowl with warming device
CN205939664U (en) Energy -conserving effectual water heater
CN204404507U (en) Vertical double-liner speed heating electric water heater
CN204026974U (en) A kind of navel-storage type electric water-heater
CN206073217U (en) A kind of multi-functional complementary heating plant
CN206261262U (en) It is a kind of with double pressure chamber structures without pump hot-water warming mattress
CN206269107U (en) A kind of water floor heating energy-saving steam boiler
CN205561223U (en) Novel fixed point constant -temperature water heater with duplicate protection
CN205332566U (en) High -efficient solar water heating system of safe type
CN205372708U (en) Bathroom hot -water heating formula electric fan heater
CN104061618A (en) Solar energy hot water storage bed box
CN209147483U (en) A kind of solar water heater heat storage water tank
CN103557545B (en) Associating heat-exchanger
CN208222818U (en) A kind of water heater
CN201396940Y (en) Bathing and heating dual-purpose gas volume type water heater
CN206648283U (en) A kind of new forced exhaust gas water heater
CN206724500U (en) A kind of non-bearing type water tank for water heater
CN106263801B (en) It is a kind of have double pressure chamber structures without pump hot-water warming mattress
CN2826234Y (en) Improved solar hot-water supply device
CN205747026U (en) Commercial electromagnet cooking stove

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170620