[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN206220357U - One kind splicing rack deformed bar anchorage - Google Patents

One kind splicing rack deformed bar anchorage Download PDF

Info

Publication number
CN206220357U
CN206220357U CN201621080213.0U CN201621080213U CN206220357U CN 206220357 U CN206220357 U CN 206220357U CN 201621080213 U CN201621080213 U CN 201621080213U CN 206220357 U CN206220357 U CN 206220357U
Authority
CN
China
Prior art keywords
lumen therethrough
anchorage
anchor slab
main lumen
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621080213.0U
Other languages
Chinese (zh)
Inventor
陈星岑
刘春�
郭涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KUNSHAN ECO-HOUSE BUILDING TECHNOLOGY Co Ltd
Original Assignee
KUNSHAN ECO-HOUSE BUILDING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KUNSHAN ECO-HOUSE BUILDING TECHNOLOGY Co Ltd filed Critical KUNSHAN ECO-HOUSE BUILDING TECHNOLOGY Co Ltd
Priority to CN201621080213.0U priority Critical patent/CN206220357U/en
Application granted granted Critical
Publication of CN206220357U publication Critical patent/CN206220357U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses one kind splicing rack deformed bar anchorage, it belongs to building anchorage, including anchorage body, the anchorage body is spliced by upper anchor slab and lower anchor slab by bolt, at least one semi-cylindrical upper groove is provided with the lower surface of upper anchor slab, correspondence is provided with the semi-cylindrical low groove of equal number on the upper surface of lower anchor slab, and the main lumen therethrough of accommodating reinforcing bar is formed after the upper groove and low groove splicing.Anchorage body is used Split type structure by the utility model, and design is simple, it is easy to dismount, and is easy to cleaning, rapidly and efficiently;Lumen therethrough is arranged symmetrically, intensity and uniform force, power transmission is reasonable, it is reliable and stable, displacement and deformation can be efficiently controlled, with stronger anchoring property, is applicable not only to splice rack, by prestress application on the reinforcing bar or truss of rack, and can need to apply prestressed project suitable for other.

Description

One kind splicing rack deformed bar anchorage
Technical field
The utility model is related to a kind of prestressed anchor, more particularly to a kind of splicing rack deformed bar anchorage.
Background technology
Under normal circumstances, before concrete structure bears load, stress is applied to it in advance, makes it in external load function When concrete in tension zone in produce compression, be used to offset or reduces the tension that external applied load is produced, structure is normally made Do not produce crack in the case of or split must be than later.
The construction method of prestressed reinforced concrete construction is divided into pre-tensioning system and post stretching.Pre-tensioning system be precast pedestal or its Tension reinforcing steel bar on the anchorage of his fixed position, then casting concrete, when concrete reaches prescribed strength, lays down anchorage, puts Loose reinforcing bar, the elastic recoil of reinforcing bar is prevented by the cohesive force of reinforcing bar and concrete, section concrete is obtained compressive pre-stress.Afterwards The method of opening refers to first casting concrete post-stretching, and duct is left in advance before casting concrete, treats that concrete reaches intensity, in duct Reinforcing bar is penetrated, then stretch-draw anchor, cement mortar is finally injected in duct.
With the rise of space structure, grid structure is more and more active in building trade.Pre-tensioning system and post stretching all can not Meet splicing rack and apply prestressed demand.The requirement of splicing rack prestressing force by prestress application rack reinforcing bar or truss On, existing prestressed anchor can not all meet this requirement, therefore in the urgent need to developing a kind of novel anchorage.
Utility model content
The purpose of this utility model is to provide a kind of splicing rack deformed bar anchorage, is deposited in the prior art with overcoming Cannot by prestress application splicing rack reinforcing bar or truss on technological deficiency.
As above conceive, the technical scheme that the utility model is used is:
One kind splicing rack deformed bar anchorage, including anchorage body, the anchorage body is by upper anchor slab and lower anchor slab It is spliced by bolt, at least one semi-cylindrical upper groove is provided with the lower surface of the upper anchor slab, the lower anchor slab Correspondence is provided with the semi-cylindrical low groove of equal number on upper surface, and accommodating reinforcing bar is formed after the upper groove and low groove splicing Main lumen therethrough.
Alternatively, the quantity of the upper groove is 1, and the quantity of the low groove mutually should be 1, the upper groove and low groove The main lumen therethrough being spliced is located at the center of the anchorage body.
By upper, it is located on the upper anchor slab at above-mentioned main lumen therethrough both sides and is symmetrically arranged with two auxiliary lumen therethroughs.
By upper, the diameter with diameter greater than the auxiliary lumen therethrough of the main lumen therethrough.
By upper, it is provided perpendicular to the master positioned at place between main lumen therethrough and each auxiliary lumen therethrough on the anchorage body and passes through Be stitched together for upper anchor slab and lower anchor slab by the bolt connecting hole by the bolt connecting hole of cavity and auxiliary lumen therethrough, above-mentioned bolt.
Alternatively, the quantity of the upper groove is 3, and the quantity of the low groove mutually should be 3, the upper groove and low groove Three main lumen therethrough uniform intervals being spliced are set.
By upper, positioned at the diameter with diameter greater than the main lumen therethrough positioned at both sides of middle main lumen therethrough.
By upper, a bolt connecting hole is provided between the adjacent main lumen therethrough of each two, above-mentioned bolt is by being somebody's turn to do Be stitched together for upper anchor slab and lower anchor slab by bolt connecting hole.
The utility model proposes splicing rack deformed bar anchorage, anchorage body is used into Split type structure, by upper anchor Plate and lower anchor slab are spliced by bolt, and design is simple, it is easy to dismount, and construction rapidly and efficiently, is easy to cleaning, is applicable not only to Splicing rack, by prestress application on the reinforcing bar or truss of rack, and can need to apply prestressed item suitable for other Mesh.
Brief description of the drawings
Fig. 1 is a kind of front view of structure that the utility model splicing rack deformed bar anchorage is provided;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the A-A profiles of Fig. 1;
Fig. 4 is the front view of another structure that the utility model splicing rack deformed bar anchorage is provided.
In figure:
1st, upper anchor slab;2nd, lower anchor slab;3rd, main lumen therethrough;4th, auxiliary lumen therethrough;5th, bolt connecting hole;
51st, through hole;52nd, screwed hole.
Specific embodiment
Below in conjunction with the accompanying drawings the technical solution of the utility model is further illustrated with implementation method.It is understood that this The described specific embodiment in place is used only for explanation the utility model, rather than to restriction of the present utility model.Further need exist for Illustrate, for the ease of description, the part related to the utility model is illustrate only in accompanying drawing and not all.
Referring to Fig. 1 and Fig. 2, a kind of splicing rack deformed bar anchorage that the utility model embodiment is provided, including anchor Tool body, anchorage body is used Split type structure, is spliced by bolt by upper anchor slab 1 and lower anchor slab 2, under upper anchor slab 1 At least one semi-cylindrical upper groove is provided with surface, and correspondence is provided with the semicircle of equal number on the upper surface of lower anchor slab 2 Cylindricality low groove, after upper anchor slab 1 and lower anchor slab 2 are spliced, upper groove and low groove form the main lumen therethrough 3 of accommodating reinforcing bar.
Split type structure is used by by anchorage body, design is simple, it is easy to dismount, construction rapidly and efficiently, is easy to cleaning, no It is only applicable to splice rack, by prestress application on the reinforcing bar or truss of rack, and can applies pre- suitable for other needs The project of stress.
Specifically, anchorage body is cuboid, a length of 80 to 86 millimeters, a width of 24 to 28 millimeters, a height of 38 to 44 millimeters. Preferably, upper anchor slab 1 and lower anchor slab 2 is highly identical.
Exemplarily, the quantity of upper groove can be preferably 1, then the quantity of low groove mutually should be 1, upper groove and low groove The main lumen therethrough 3 being spliced is located at the center of anchorage body.On upper anchor slab 1, or on lower anchor slab 2, positioned at main insertion Two auxiliary lumen therethroughs 4 are symmetrically arranged with the both sides of chamber 3.
It is arranged symmetrically by by lumen therethrough, intensity and uniform force, power transmission is rationally, reliable and stable, can efficiently control steel The displacement and deformation of muscle, with stronger anchoring property.
Specifically, a diameter of 11 to 15 millimeters of main lumen therethrough 3, a diameter of 8 to 12 millimeters of auxiliary lumen therethrough 4, two auxiliary Lumen therethrough 4 between the end face center of circle of one end at intervals of 62 to 68 millimeters, when two auxiliary lumen therethroughs are located on upper anchor slab, then two The distance of the upper surface of anchor slab 1 is 12 to 16 millimeters on the distance of center circle of individual auxiliary lumen therethrough 4, when two auxiliary lumen therethroughs are located on lower anchor slab When, then the distance of anchor slab lower surface is 12 to 16 millimeters under two distance of center circle of auxiliary lumen therethrough 4.
Preferably, the diameter with diameter greater than the auxiliary lumen therethrough 4 in both sides of middle main lumen therethrough 3.The lumen therethrough of different-diameter can Reinforcing bar for housing different-diameter, this set both ensure that the intensity of anchorage, expands again and uses scope, practical.
Preferably, the master is provided perpendicular to positioned at place between main lumen therethrough 3 and each auxiliary lumen therethrough 4 on anchorage body to pass through The bolt connecting hole 5 of cavity 3 and auxiliary lumen therethrough 4, bolt has been spliced upper anchor slab 1 and lower anchor slab 2 by the bolt connecting hole 5 Come.
Referring to Fig. 3, for the ease of Fast Installation, bolt connecting hole 5 includes the through hole 51 being arranged on anchor slab 1 and sets In screwed hole 52 coaxial with through hole 51 on lower anchor slab 2.Specifically, a diameter of 12 to 16 millimeters of through hole 51, two through holes 51 With between the end face center of circle of one end at intervals of 34 to 38 millimeters.
When using, bolt by manhole 51 enter therewith just to screwed hole 52, bolt and the screw thread of screwed hole 52 connect Connect, connected different from traditional bolt and nut, the constitutional detail number is few, time saving and energy saving, fastening anti-loosing effect is good.
Preferably, the diameter of through hole 51 is equal to the external diameter of screwed hole 52, both facilitates bolt connection, while can prevent anchor again Plate 1 loosens.
Preferably, pad can be increased on bolt, between the upper surface of upper anchor slab 1 and bolt, further up to tight Gu locking effect.
Exemplarily, referring to Fig. 4, the quantity of upper groove can also be preferably 3, then the quantity of low groove mutually should be 3, fovea superior Groove is set with three uniform intervals of main lumen therethrough 3 that low groove is spliced, on a horizontal line.
So set benefit be:Not only intensity and uniform force, power transmission are rationally, reliable and stable, can efficiently control position Move and deform, with stronger anchoring property, and be easy to production and processing, it is easy to clean.
It is preferably located at the diameter with diameter greater than the main lumen therethrough 3 positioned at both sides of the main lumen therethrough 3 of centre.
Specifically, it is provided with a bolt connecting hole perpendicular to main lumen therethrough 3 between the adjacent main lumen therethrough 3 of each two 5, bolt is bolted hole 5 and upper anchor slab 1 and lower anchor slab 2 is stitched together.
Embodiment of above is to elaborate general principle of the present utility model and characteristic, and the utility model does not receive above-mentioned reality The mode of applying is limited, and on the premise of the utility model spirit and scope are not departed from, the utility model also has various change and change, These changes and modifications are both fallen within the range of claimed the utility model.The claimed scope of the utility model is by appended Claims and its equivalent thereof.

Claims (8)

1. it is a kind of to splice rack deformed bar anchorage, it is characterised in that including anchorage body, the anchorage body is by upper anchor slab It is spliced by bolt with lower anchor slab, at least one semi-cylindrical upper groove is provided with the lower surface of the upper anchor slab, it is described Correspondence is provided with the semi-cylindrical low groove of equal number on the upper surface of lower anchor slab, is formed after the upper groove and low groove splicing The main lumen therethrough of accommodating reinforcing bar.
2. splicing rack deformed bar anchorage according to claim 1, it is characterised in that the quantity of the upper groove is 1, the quantity of the low groove mutually should be 1, and the upper groove is located at the anchorage sheet with the main lumen therethrough that low groove is spliced The center of body.
3. it is according to claim 2 to splice rack deformed bar anchorage, it is characterised in that to be located on the upper anchor slab upper State and two auxiliary lumen therethroughs are symmetrically arranged with main lumen therethrough both sides.
4. it is according to claim 3 to splice rack deformed bar anchorage, it is characterised in that the diameter of the main lumen therethrough More than the diameter of the auxiliary lumen therethrough.
5. it is according to claim 4 to splice rack deformed bar anchorage, it is characterised in that to be located on the anchorage body Place is provided perpendicular to the bolt connecting hole of the main lumen therethrough and auxiliary lumen therethrough between main lumen therethrough and each auxiliary lumen therethrough, above-mentioned Be stitched together for upper anchor slab and lower anchor slab by the bolt connecting hole by bolt.
6. splicing rack deformed bar anchorage according to claim 1, it is characterised in that the quantity of the upper groove is 3, the quantity of the low groove mutually should be 3, and three main lumen therethrough uniform intervals that the upper groove is spliced with low groove set Put.
7. it is according to claim 6 to splice rack deformed bar anchorage, it is characterised in that positioned at middle main lumen therethrough The diameter with diameter greater than the main lumen therethrough positioned at both sides.
8. it is according to claim 7 to splice rack deformed bar anchorage, it is characterised in that to be located on the anchorage body A bolt connecting hole perpendicular to the main lumen therethrough is provided between the adjacent main lumen therethrough of each two, above-mentioned bolt passes through Be stitched together for upper anchor slab and lower anchor slab by the bolt connecting hole.
CN201621080213.0U 2016-09-26 2016-09-26 One kind splicing rack deformed bar anchorage Expired - Fee Related CN206220357U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621080213.0U CN206220357U (en) 2016-09-26 2016-09-26 One kind splicing rack deformed bar anchorage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621080213.0U CN206220357U (en) 2016-09-26 2016-09-26 One kind splicing rack deformed bar anchorage

Publications (1)

Publication Number Publication Date
CN206220357U true CN206220357U (en) 2017-06-06

Family

ID=58782218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621080213.0U Expired - Fee Related CN206220357U (en) 2016-09-26 2016-09-26 One kind splicing rack deformed bar anchorage

Country Status (1)

Country Link
CN (1) CN206220357U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284849A (en) * 2016-09-26 2017-01-04 昆山生态屋建筑技术有限公司 A kind of splicing rack deformed bar anchorage

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284849A (en) * 2016-09-26 2017-01-04 昆山生态屋建筑技术有限公司 A kind of splicing rack deformed bar anchorage

Similar Documents

Publication Publication Date Title
CN103195170B (en) Prefabricated reinforced concrete frame structure system
CN204753896U (en) Multilayer assembled concrete panel structure system
CN205369525U (en) Local prestressing force assembled power consumption beam column node
CN104763078A (en) Shock-absorption type frame-shear wall combination structure system and construction method thereof
CN106930436B (en) Reinforced concrete shear wall with built-in prestressed steel diagonal bracing
CN115369910A (en) Assembly type column lower independent foundation of post-tensioned pre-stressed assembled transformer substation and design method thereof
CN206220357U (en) One kind splicing rack deformed bar anchorage
CN206554247U (en) Precast floor slab and prefabricated panel attachment structure and building
CN206070796U (en) A kind of vertical attachment means of prefabricated assembled shear wall slab
CN107524251A (en) Prestress steel strip masonry faced wall
CN208603614U (en) Tower crane anchor for fabricated construction
CN203080799U (en) Coupling beam combining steel plates and high-strength concrete
CN110469047B (en) Function-restorable assembled bidirectional self-locking shear wall and prefabricated wallboard thereof
CN201526006U (en) Prestressed concrete continuous box girder
CN109914846B (en) External reinforcing device for brick masonry infilled wall plane in traditional wood structure
CN208803736U (en) Shear wall punching internal ruggedized construction
CN106284849A (en) A kind of splicing rack deformed bar anchorage
CN203347018U (en) T-shaped-end-head pre-buried rebar
CN207277608U (en) Prestress steel strip masonry faced wall
CN110886185A (en) Box girder with anchoring device and box girder bridge
CN211646901U (en) High-strength composite noise-reducing floor structure
CN208486441U (en) A kind of prefabricated panel and assembled architecture wallboard longitudinal connection structure
CN207812834U (en) A kind of damping combined beam structure
CN109403523B (en) Prefabricated assembled laminated slab suspension type supporting structure and laminated slab construction method
CN209742152U (en) Assembled composite shear wall based on self-resetting combined end column slurry anchor shear wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170606

Termination date: 20180926

CF01 Termination of patent right due to non-payment of annual fee