CN206178965U - A information -based management system for power communication - Google Patents
A information -based management system for power communication Download PDFInfo
- Publication number
- CN206178965U CN206178965U CN201621016256.2U CN201621016256U CN206178965U CN 206178965 U CN206178965 U CN 206178965U CN 201621016256 U CN201621016256 U CN 201621016256U CN 206178965 U CN206178965 U CN 206178965U
- Authority
- CN
- China
- Prior art keywords
- engineering
- data
- terminal
- service server
- cabinet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The utility model relates to an information -based management system for power communication, include: business server for a storage and transfer of data is provided, the engineering department terminal is linked with business server for after the engineering is completed, through the data of business server to this engineering of the fortune dimension transmit of portion, fortune dimension portion terminal is connected with business server for accept the data of engineering, and confirm received data when errorless, by the data of business server to meter warp this engineering of transmit the staff of engineering department, meter warp portion terminal is connected with business server for receive the data of engineering, and confirm through a staff at the meter and accomplish the transfer of the data of this engineering after errorless. Compared with the prior art, the utility model has the advantages of convenient to use, reduction staff work load.
Description
Technical field
This utility model is related to field of power communication, more particularly, to a kind of information-based operational control for power communication
System.
Background technology
Enterprise Resources Plan is ERP (Enterprise Resource Planning), public by U.S. Gartner Group
Take charge of and propose in nineteen ninety.Enterprise Resources Plan is the follow-on manufacturing industry systems of MRP II (enterprise's manufacturing resources planning) and resource
Planning software.In addition to the functions such as the existing manufacturing resource plannings of MRP II, manufacture, finance, sale, buying, also quality pipe
Reason, laboratory room managing, BPM, product data management, stock, distribution and transportation management, human resource management and calmly
Phase reporting system.At present, it is extended in the implication representated by China ERP, for all kinds of softwares of enterprise, completely by
Include the category of ERP.It has jumped out traditional forms of enterprises border, goes to optimize the resource of enterprise from supply chain scope, is based on network Jing
The generation information system in Ji epoch.It is mainly used in improving business events flow path to improve the core competitiveness of enterprise.
ERP is a kind of supply chain proposed by american computer technical advice and assessment group Gartner Group Inc
Management thought.Enterprise Resources Plan refers to that foundation, on Information Technology Foundation, with systematized management thought, is business decision
Layer and employee provide the management platform that decision-making runs means.ERP system supports the mixing manufacturing environment such as discrete type, Diversification Type, should
The operating divisions such as retail business, service trade, banking, telecommunications industry, government bodies and school is extend to from manufacturing industry with scope, led to
Cross amalgamation database technology, graphic user interface, forth generation query language, client server architecture, computer aided development work
Tool, transplantable open systemss etc. have carried out effective integrated to ERM.
As ERP system can significantly improve work efficiency, therefore which is widely used in all trades and professions, but electric at present
Still in manual transmission and statistics, workload is huge for the circulation of the engineering of power communications industry completion information after completion.
The content of the invention
The purpose of this utility model is exactly to provide a kind of for electric power to overcome the defect of above-mentioned prior art presence
The information-based business management system of communication.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of information-based business management system for power communication, including:
Service server, for providing the storage and transfer of data;
Engineering department's terminal, is linked with service server, for after completion of works, by service server to O&M portion end
End sends the data of the engineering;
O&M portion terminal, is connected with service server, for receiving the data of engineering, and in engineering department staff
Confirm that received data, without mistaking, sends the data of the engineering from service server to meter Jing portions terminal;
Meter Jing portions terminal, is connected with service server, for receiving the data of engineering, and in meter Jing portion staff
After confirmation is errorless, the transfer of the data of the engineering is completed.
Engineering department's terminal, O&M portion terminal and meter Jing portions terminal are PC.
The service server includes cabinet, the mainboard in cabinet, for the SATA interface on mainboard is extended to
First attachment means of cabinet front end, and for the USB interface on mainboard to be extended to the second attachment means of cabinet rear end,
First attachment means and the second attachment means are connected with mainboard.
The service server also includes the front jam plate for covering cabinet front end and the rear lock for covering cabinet rear end
Plate, the front jam plate are provided with the first lock, and cabinet front end is provided with the first lock fit device coordinated with the first lock,
The rear lock plate is provided with the second lock, and cabinet rear end is provided with the second lock fit device coordinated with the second lock,
After the front jam plate is fixed on cabinet front end and locks, cover cabinet front end and then prevent hard disk stolen,
After the rear lock plate is fixed on cabinet rear end and locks, cover cabinet rear end and then prevent external USB equipment from inserting
Enter.
The cabinet bottom is provided with four legs.
After completion of works, completion information transfer sheet is set up by engineering department staff, engineering department's terminal is based on should
Completion information transfer sheet, extracts the engineering data data, and is uploaded to service server, from service server to O&M portion terminal
Send.
After O&M portion terminal receives the data of engineering, the corresponding completion information circulation of the engineering is generated detailed
It is single, and checked by O&M portion staff, the data of engineering is returned to into engineering department's terminal if mistake is found, if confirming
Data is errorless, then detailed to the data and completion information circulation that meter Jing portions terminal sends the engineering from service server
It is single.
After O&M portion staff checks that the data of engineering is returned to engineering department's terminal by discovery mistake, institute's book industry
Business server generates corresponding daily record.
Compared with prior art, this utility model has advantages below:
1) the interdepartmental data interactions such as engineering, meter Jing, O&M are enhanced, function and the data statisticss point of system are enhanced
Analysis, improves ease for use, automatization's circulation of the electronic document that the file transfer in completion of works is adopted, and reduces artificial
Workload.
2) presence of the first attachment means causes to dismount hard disk without the need for case of starting shooting again, improves the ease for use of server.
3) money jam plate and rear lock plate can be with effective protection servers, and rear lock plate can avoid the insertion of USB device from polluting clothes
Business device copy walks data.
Description of the drawings
Fig. 1 is structural representation of the present utility model;
Wherein:1st, service server, 2, engineering department's terminal, 3, O&M portion terminal, 4, meter Jing portions terminal.
Specific embodiment
This utility model is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with this utility model
Implemented premised on technical scheme, given detailed embodiment and specific operating process, but guarantor of the present utility model
Shield scope is not limited to following embodiments.
A kind of information-based business management system for power communication, including:
Service server 1, for providing the storage and transfer of data;
Engineering department's terminal 2, is linked with service server 1, for after completion of works, by service server 1 to O&M
Portion's terminal 3 sends the data of the engineering;
O&M portion terminal 3, is connected with service server 1, for receiving the data of engineering, and in engineering department work people
Member confirms that received data, without mistaking, sends the data number of the engineering from service server 1 to meter Jing portions terminal 4
According to;
Meter Jing portions terminal 4, is connected with service server 1, for receiving the data of engineering, and in meter Jing portions work people
After member's confirmation is errorless, the transfer of the data of the engineering is completed.
Engineering department's terminal 2, O&M portion terminal 3 and meter Jing portions terminal 4 are PC.
Service server 1 includes cabinet, the mainboard in cabinet, for the SATA interface on mainboard is extended to cabinet
First attachment means of front end, and for the USB interface on mainboard to extend to the second attachment means of cabinet rear end, first
Attachment means and the second attachment means are connected with mainboard.
Service server 1 also includes the front jam plate for covering cabinet front end and the rear lock plate for covering cabinet rear end,
Front jam plate is provided with the first lock, and cabinet front end is provided with the first lock fit device coordinated with the first lock, rear lock plate
The second lock is provided with, cabinet rear end is provided with the second lock fit device coordinated with the second lock,
After front jam plate is fixed on cabinet front end and locks, cover cabinet front end and then prevent hard disk stolen,
After rear lock plate is fixed on cabinet rear end and locks, cover cabinet rear end and then prevent external USB equipment from inserting.
Cabinet bottom is provided with four legs.
After completion of works, completion information transfer sheet is set up by engineering department staff, engineering department's terminal 2 is based on the completion
Data transfer sheet, extracts the engineering data data, and is uploaded to service server 1, from service server 1 to O&M portion terminal 3
Send.
After O&M portion terminal 3 receives the data of engineering, the corresponding completion information circulation detail form of the engineering is generated, and
Checked by O&M portion staff, the data of engineering is returned to into engineering department's terminal 2 if mistake is found, if confirming data
It is errorless, then the data and completion information circulation detail form of the engineering is sent from service server 1 to meter Jing portions terminal 4.
After O&M portion staff checks that the data of engineering is returned to engineering department's terminal 2 by discovery mistake, institute's book
Service server 1 generates corresponding daily record.
Additionally, according to the analysis of demand of collecting money to engineering, increasing to contract value in the checkout process of the contract of undertaking
Clearing, careful valency flow process, that is, doing【Credit note】The settlement amounts (receipts scheduled fun) of front necessary typing correspondence contract value or
The careful valency amount of money (the final amount of money of contract), could be after examination & verification approval【Credit note】The corresponding collection amount of middle typing.
Increase related clearing, careful valency information simultaneously and be backfilled to automatically engineering project billboard function.
In extension system【Engineering project billboard】Function, it is original plan billboard on the basis of increase contract clearing,
Relevant informations such as careful valency, and associating with financial system, increase corresponding engineering bill and account receivable and it is actual to account, urge that money etc. is related to be believed
Breath.
Report form statistics analytic function in increase system to project data, important is【Storage project operation is analyzed
Table】, the table by correspondence the fiscal period engineering storage remaining sum on the basis of data source, count it is all kinds of (point:A- wind up the case do not carry down,
B- be completed do not wind up the case, C- be not completed accept engineering) engineering data on stock (wherein works category contrasting data is by planning management portion
There is provided), can collect and be counted with detail formats respectively.
Other concrete statistical demands according to planning management portion to data, there is provided related【The monthly detail list of construction clearing】
【The monthly detail list of contract signing】【Construction clearing monthly summaries】【Contract signing monthly summaries】Deng statistical forms.
In order to realize finance to the upper reality that the player whose turn comes next is receivable, deal with of correlation engineering correspondence to account, Payment Amount data and right
Aging analysis of accounts answered etc. requires, needs the functional processing module that corresponding engineering is receivable, deal with is added in financial system, wherein leading
Want function include:The receivable single process (credit note in corresponding engineering system) of engineering, engineering deals with single process (corresponding engineering
Payment application list in system), receivable single pair of should generate charge slip (according to actual to account amount balance), deal with single pair of and should generate pair
The process of money list (being settled accounts according to actual payment amount), related document automatically generate the process of correspondence general ledger voucher, receivable data
The detailed statistical function that collects for collecting detailed statistical function, dealing with data, the correspondence correlation function such as aging analysis of accounts.
Simultaneously increase it is related it is receivable, deal with and actual be backfilled to automatically engineering project billboard work(to information such as account, payments
Energy.
Finance are receivable to the existing Dan Zhonghan that transfers accounts for convenience, deal with the Bill Management of information, increase project document
Class switch function, i.e. finance can according to practical situation, by system it is already present transfer accounts it is single (containing it is receivable, the information such as deal with)
Be converted to it is corresponding it is receivable, deal with single (and improving the information such as relative clients and unit), then can be carried out it is corresponding it is receivable,
The reality dealt with simplifies process of the finance to old data to account, payment process.
Claims (5)
1. a kind of information-based business management system for power communication, it is characterised in that include:
Service server, for providing the storage and transfer of data;
Engineering department's terminal, is linked with service server, for, after completion of works, being sent out to O&M portion terminal by service server
Give the data of the engineering;
O&M portion terminal, is connected with service server, for receiving the data of engineering, and is confirmed in engineering department staff
Received data to meter Jing portion terminal sends the data of the engineering from service server without mistaking;
Meter Jing portions terminal, is connected with service server, for receiving the data of engineering, and is confirmed in meter Jing portion staff
After errorless, the transfer of the data of the engineering is completed.
2. a kind of information-based business management system for power communication according to claim 1, it is characterised in that described
Engineering department's terminal, O&M portion terminal and meter Jing portions terminal are PC.
3. a kind of information-based business management system for power communication according to claim 1, it is characterised in that described
Service server include cabinet, the mainboard in cabinet, for the SATA interface on mainboard is extended to cabinet front end
One attachment means, and for the USB interface on mainboard to be extended to the second attachment means of cabinet rear end, first connection
Device and the second attachment means are connected with mainboard.
4. a kind of information-based business management system for power communication according to claim 3, it is characterised in that described
Service server also includes the front jam plate for covering cabinet front end and the rear lock plate for covering cabinet rear end, the front jam plate
The first lock is provided with, cabinet front end is provided with the first lock fit device coordinated with the first lock, on the rear lock plate
The second lock is provided with, cabinet rear end is provided with the second lock fit device coordinated with the second lock.
5. a kind of information-based business management system for power communication according to claim 3, it is characterised in that described
Cabinet bottom is provided with four legs.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621016256.2U CN206178965U (en) | 2016-08-30 | 2016-08-30 | A information -based management system for power communication |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621016256.2U CN206178965U (en) | 2016-08-30 | 2016-08-30 | A information -based management system for power communication |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206178965U true CN206178965U (en) | 2017-05-17 |
Family
ID=58675321
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621016256.2U Expired - Fee Related CN206178965U (en) | 2016-08-30 | 2016-08-30 | A information -based management system for power communication |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206178965U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112016893A (en) * | 2020-08-27 | 2020-12-01 | 西安热工研究院有限公司 | Account-arriving claim system and method based on project management system |
-
2016
- 2016-08-30 CN CN201621016256.2U patent/CN206178965U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112016893A (en) * | 2020-08-27 | 2020-12-01 | 西安热工研究院有限公司 | Account-arriving claim system and method based on project management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109615511A (en) | A kind of supply chain banking software system and method | |
CN108734457B (en) | Refund method under unified cashing system | |
CN101251913A (en) | Administrative system and method of self-help apply for reimbursement | |
CN102800018A (en) | Credit management system and credit processing method thereof | |
CN102096886A (en) | Credit levying business system | |
CN103903081A (en) | Method and system for generating taxi receipt with the use of tax document data in ERP system | |
CN109461071A (en) | Agricultural credit financing assurance business management system | |
CN110335010A (en) | Administrative institution's economic activity internal control system | |
CN110263040A (en) | A kind of accounting class account register system | |
CN114254846A (en) | Engineering project information management system | |
CN106339933A (en) | Accounting document generating method and accounting document generating system | |
CN108876584A (en) | A kind of personnel's revenue control and Individual Income Tax accounting system, method and electronic equipment | |
CN106056418A (en) | Invoice submission method, device and system | |
CN107808334A (en) | A kind of method that accounting voucher is automatically generated from business paper | |
CN109858715A (en) | Artificial intelligence is rendered an account internal control system | |
Murdihardjo et al. | Implementing INTACS Dynamics Enterprise Resources Planning System for Financial Statements | |
CN108985540A (en) | A kind of network-based intellectual property service platform | |
CN206178965U (en) | A information -based management system for power communication | |
JP2003036346A (en) | Method for evaluating operational risk and its system | |
CN110288321A (en) | Commercial multiple utility program total management system and method | |
CN106156958A (en) | A kind of information-based business management system for power communication | |
CN108921682A (en) | A kind of processing method of value-added tax, device and system | |
KR20090063805A (en) | Method and system for managing illegal finance deal information and unitedly carrying out verification and report preparation and registration for suspicion deal | |
WO2004017240A1 (en) | Accounting data management system, management method, and management program | |
CN111325618B (en) | Accounting service processing method, accounting service processing device, accounting service processing equipment and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170517 Termination date: 20210830 |