CN206091259U - Adjustable steel configuration operation hanging flower basket - Google Patents
Adjustable steel configuration operation hanging flower basket Download PDFInfo
- Publication number
- CN206091259U CN206091259U CN201621101231.2U CN201621101231U CN206091259U CN 206091259 U CN206091259 U CN 206091259U CN 201621101231 U CN201621101231 U CN 201621101231U CN 206091259 U CN206091259 U CN 206091259U
- Authority
- CN
- China
- Prior art keywords
- supporting steel
- steel plate
- bolt hole
- plate
- hanging basket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model relates to an adjustable steel configuration operation hanging flower basket, including operation hanging flower basket main part, operation hanging flower basket main part includes the side lever of hanging flower basket and vertical setting, and one side of hanging flower basket is located to the side lever, be equipped with a first supporting steel plate on the top of side lever, be equipped with a second supporting steel plate in the place ahead of first supporting steel plate, be equipped with two rows of parallel arrangement's first bolt hole and second bolt hole on first supporting steel plate, be equipped with two rows of parallel arrangement's third bolt hole and fourth bolt hole on the second supporting steel plate, first bolt hole and third bolt hole looks parallel and level, second bolt hole and fourth bolt hole looks parallel and level, first supporting steel plate and second supporting steel plate pass through the bolt and link to each other, at the vertical baffle that is equipped with of the left end of second supporting steel plate. The utility model discloses can adjust the length of couple, make a string basket be connected with the elevating system of different models, the risk has been avoidd to the expense of having saved.
Description
Technical field
This utility model is related to a kind of high-altitude constructing device, and more particularly to a kind of adjustable steel construction operates hanging basket.
Background technology
During engineering construction, there is substantial amounts of high-altitude safety check operation, existing frequently-used method will be applied with hanging basket
Workman person and instrument take to needs the height constructed to be constructed, so carry out operation not only save time, saving of labor, and be work
Cheng Fang saves substantial amounts of expense, also makes the safety of workmen obtain effective guarantee.But the existing mechanical hanging basket for using,
Its complex structure, generally uses hook and whole hanging basket is hung on the girder of elevating mechanism, it is impossible to entered according to the width of girder steel
Row is adjusted.Which results in when the width of girder steel is less, hanging basket farther out, makes workmen's operation inconvenience and exists apart from girder steel
Larger danger;When the width of girder steel is larger, then hanging basket cannot be used, the hanging basket for needing welding bigger.This is made to hanging basket
With causing inconvenience, and cause certain waste.
The content of the invention
The technical problems to be solved in the utility model is to provide a kind of adjustable steel construction behaviour of adjustable hook length
Make hanging basket.
In order to solve above-mentioned technical problem, the technical solution adopted in the utility model is:
A kind of adjustable steel construction operates hanging basket, including operation basket body, described operation basket body to include hanging
Basket and the side lever being vertically arranged, side lever is located at the side of hanging basket;One first supporting steel is provided with the upper horizontal of described side lever
Plate, is provided with one second supporting steel plate in the front horizontal of the first supporting steel plate;It is provided with the first described supporting steel plate up and down
The first bolt hole and the second bolt hole that two rows be arranged in parallel, are provided with the second described supporting steel plate that two rows are parallel to be set
The 3rd bolt hole put and the 4th bolt hole;The first described bolt hole and the 3rd bolt hole flush, the second described bolt
Tetra- bolt hole flushes of Kong Yu;First supporting steel plate and the second supporting steel plate are connected by bolt;In the second supporting steel plate
Left end is vertically provided with a baffle plate.
Above-described adjustable steel construction operates hanging basket, the second described bolt hole and the 4th bolt hole to be strip
Shape through hole;The length direction of the second described bolt hole is identical with the length direction of the first supporting steel plate, the 4th described bolt
The length direction in hole is identical with the length direction of the second supporting steel plate.
Preferably, the front side horizontal in the first described supporting steel plate is provided with one and sets along the length direction of the first supporting steel plate
The first level plate put, the length of first level plate are identical with the length of the first supporting steel plate;In the second described supporting steel plate
Rear side level be provided with one along the second supporting steel plate length direction and the second horizontal plate of setting is engaged with first level plate,
The length of the second horizontal plate is identical with the length of the second supporting steel plate, and the second described horizontal plate is under first level plate
Side.
Preferably, the length direction along first level plate on the downside of described first level plate is provided with some first
Limited block;Length direction along the second horizontal plate on the upper side of the second described horizontal plate is provided with some and the first limited block
It is engaged the second limited block that clamping is connected.
Preferably, the first described limited block and the second limited block are in dentation.
This utility model adopts said structure, with advantages below:
The length linked up with can be adjusted, enable Hanging Basket to be connected with the elevating mechanism of different model, save
Expense, has evaded risk.
Description of the drawings
Below in conjunction with the accompanying drawings this utility model is further described.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the front view of embodiment 1 in Fig. 1;
Fig. 3 is the close-up schematic view in A portions in Fig. 2;
Fig. 4 is B-B direction cross section structure diagram in Fig. 3;
Fig. 5 is the front view of embodiment 2;
Fig. 6 is the close-up schematic view in C portions in Fig. 5;
Fig. 7 is D-D in Fig. 6 to cross section structure diagram;
Fig. 8 is the close-up schematic view in E portions in Fig. 7;
Fig. 9 be in Fig. 8 F-F to cross section structure diagram.
In figure, 1, operation basket body, 2, side lever, the 3, first supporting steel plate, the 4, second supporting steel plate, the 5, first bolt
Hole, the 6, second bolt hole, the 7, the 3rd bolt hole, the 8, the 4th bolt hole, 9, bolt, 10, baffle plate, 11, first level plate, 12,
Two horizontal plates, the 13, first limited block, the 14, second limited block.
Specific embodiment
Clearly to illustrate the technical characterstic of this programme, below by specific embodiment, and its accompanying drawing is combined, to this reality
It is described in detail with new.
Embodiment 1:
As shown in Fig. 1-Fig. 4, the adjustable steel construction operation hanging basket includes operating basket body 1, described operation
Basket body 1 includes hanging basket and the side lever 2 being vertically arranged, and side lever 2 is located at the side of hanging basket;In the top water of described side lever 2
It is flat to be provided with one first supporting steel plate 3, one second supporting steel plate 4 is provided with the front horizontal of the first supporting steel plate 3;Described
One supporting steel plate 3 is provided with the first bolt hole 5 and the second bolt hole 6 being set in two parallel rows up and down, in the second described support
Steel plate 4 is provided with the 3rd bolt hole 7 and the 4th bolt hole 8 being set in two parallel rows up and down;The first described bolt hole 5 and the 3rd
7 flush of bolt hole, the second described bolt hole 6 and 8 flush of the 4th bolt hole;First supporting steel plate 3 and the second supporting steel
Plate 4 is connected by bolt 9;A baffle plate 10 is provided with vertically in the left end of the second supporting steel plate 4.
Above-described adjustable steel construction operation hanging basket, the second described bolt hole 6 and the 4th bolt hole 8 are
Strip through hole;The length direction of the second described bolt hole 6 is identical with the length direction of the first supporting steel plate 3, and described
The length direction of four bolts hole 8 is identical with the length direction of the second supporting steel plate 4.
The use process of the present embodiment is as follows:
When the installation of hanging basket is carried out, the size of hook needed for first determining, further according to the size for needing to use to second
The position of support steel plate 4 is adjusted, it is determined that after good position, with first bolt of the bolt 9 on the first supporting steel plate 3
The 3rd bolt hole 7 on hole 5 and the second supporting steel plate 4, then the second bolt with a bolt 9 on the first supporting steel plate 3
Bolt 9 is fixed by the 4th bolt hole 8 on hole 6 and the second supporting steel plate 4 with nut, be this completes to linking up with length
Preliminary regulation;Hanging basket is positioned over to be needed behind position to be mounted, further according to the size of installation site, using the second bolt hole 6
It is the characteristic of strip through hole with the 4th bolt hole 8, its length is finely adjusted, after regulating, nut is tightened, is completed hanging basket
The installation of the length adjustment and hanging basket of hook.
Embodiment 2:
As shown in Fig. 5-Fig. 9, the adjustable steel construction operation hanging basket includes operating basket body 1, described operation
Basket body 1 includes hanging basket and the side lever 2 being vertically arranged, and side lever 2 is located at the side of hanging basket;In the top water of described side lever 2
It is flat to be provided with one first supporting steel plate 3, one second supporting steel plate 4 is provided with the dead ahead level of the first supporting steel plate 3;Described
First supporting steel plate 3 is provided with the first bolt hole 5 and the second bolt hole 6 being set in two parallel rows up and down, at described second
Support steel plate 4 is provided with the 3rd bolt hole 7 and the 4th bolt hole 8 being set in two parallel rows up and down;The first described bolt hole 5 and
Three bolts hole, 7 flush, the second described bolt hole 6 and 8 flush of the 4th bolt hole;First supporting steel plate 3 and second is supported
Steel plate 4 is connected by bolt 9;A baffle plate 10 is provided with vertically in the left end of the second supporting steel plate 4.
It is long that above-described adjustable steel construction operates hanging basket, the second described bolt hole 6 and the 4th bolt hole 8
Strip through-hole;The length direction of the second described bolt hole 6 is identical with the length direction of the first supporting steel plate 3, and the described the 4th
The length direction of bolt hole 8 is identical with the length direction of the second supporting steel plate 4.
Preferably, the front side horizontal in the first described supporting steel plate 3 be provided with one along the first supporting steel plate 3 length direction
The first level plate 11 of setting, the length of first level plate 11 are identical with the length of the first supporting steel plate 3;At described second
The rear side level of support steel plate 4 be provided with one along the second supporting steel plate 4 length direction and be engaged setting with first level plate 11
Second horizontal plate 12, the length of the second horizontal plate 12 are identical with the length of the second supporting steel plate 4, and the second described horizontal plate 12 sets
In the lower section of first level plate 11.
Preferably, the length direction along first level plate 11 on the downside of described first level plate 11 is provided with some
First limited block 13;Length direction along the second horizontal plate 12 on the upper side of the second described horizontal plate 12 be provided with it is some with
First limited block 13 is engaged the second limited block 14 that clamping is connected.
Preferably, the first described limited block 13 and the second limited block 14 are in dentation.
The use process of the present embodiment is as follows:
When the installation of hanging basket is carried out, the size of hook needed for first determining, further according to the size for needing to use to second
The position of support steel plate 4 is adjusted, it is determined that after good position, with first bolt of the bolt 9 on the first supporting steel plate 3
The 3rd bolt hole 7 on hole 5 and the second supporting steel plate 4, then the second bolt with a bolt 9 on the first supporting steel plate 3
Bolt 9 is fixed by the 4th bolt hole 8 on hole 6 and the second supporting steel plate 4 with nut, be this completes to linking up with length
Preliminary regulation;Hanging basket is positioned over to be needed behind position to be mounted, further according to the size of installation site, using the second bolt hole 6
It is the characteristic of strip through hole with the 4th bolt hole 8, its length is finely adjusted;After regulating, make on the first supporting steel plate 3
The first level plate 11 of setting is abutted with the second horizontal plate 12 arranged on the second supporting steel plate 4, is made located at first level plate 11
First limited block 13 of the dentation of lower section and 14 clamping of the second limited block of the dentation above the second horizontal plate 12, thus
The movement and deformation of the first supporting steel plate 3 and the second supporting steel plate 4 in horizontal and vertical both direction can further be prevented;Twist
Tight nut, completes the installation of the length adjustment and hanging basket of hanging basket hook.
The above, only this utility model preferably specific embodiment, but protection domain of the present utility model is not
Be confined to this, any those familiar with the art in the technical scope that this utility model is disclosed, according to this practicality
New technical scheme and its inventive concept equivalent or change in addition, should all cover protection domain of the present utility model it
It is interior.This utility model does not describe part in detail, is the known technology of those skilled in the art of the present technique.
Claims (5)
1. a kind of adjustable steel construction operates hanging basket, including operation basket body, described operation basket body to include hanging basket
With the side lever being vertically arranged, side lever is located at the side of hanging basket, it is characterised in that be provided with one the in the upper horizontal of described side lever
One supporting steel plate, is provided with one second supporting steel plate in the front horizontal of the first supporting steel plate;On the first described supporting steel plate
The first bolt hole and the second bolt hole being set in two parallel rows up and down is provided with, and upper and lower two is provided with the second described supporting steel plate
The 3rd bolt hole and the 4th bolt hole that row be arranged in parallel;The first described bolt hole and the 3rd bolt hole flush, it is described
Second bolt hole and the 4th bolt hole flush;First supporting steel plate and the second supporting steel plate are connected by bolt;At second
The left end of support steel plate is vertically provided with a baffle plate.
2. adjustable steel construction according to claim 1 operates hanging basket, it is characterised in that the second described bolt hole and
4th bolt hole is strip through hole;The length direction of the second described bolt hole and the length direction phase of the first supporting steel plate
Together, the length direction of the 4th described bolt hole is identical with the length direction of the second supporting steel plate.
3. the adjustable steel construction according to any one in claim 1 or 2 operates hanging basket, it is characterised in that in institute
The front side horizontal of the first supporting steel plate stated be provided with one along the first supporting steel plate length direction arrange first level plate, first
The length of horizontal plate is identical with the length of the first supporting steel plate;One is provided with along in the rear side level of the second described supporting steel plate
The length direction of two supporting steel plates and the second horizontal plate of setting is engaged with first level plate, the length of the second horizontal plate and the
The length of two supporting steel plates is identical, and the second described horizontal plate is located at the lower section of first level plate.
4. adjustable steel construction according to claim 3 operates hanging basket, it is characterised in that in described first level plate
Downside on be provided with some first limited blocks along the length direction of first level plate;In the upper side of the second described horizontal plate
On be provided with and some the second limited block that clamping is connected be engaged with the first limited block along the length direction of the second horizontal plate.
5. adjustable steel construction according to claim 4 operates hanging basket, it is characterised in that the first described limited block and
Second limited block is in dentation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621101231.2U CN206091259U (en) | 2016-09-30 | 2016-09-30 | Adjustable steel configuration operation hanging flower basket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621101231.2U CN206091259U (en) | 2016-09-30 | 2016-09-30 | Adjustable steel configuration operation hanging flower basket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206091259U true CN206091259U (en) | 2017-04-12 |
Family
ID=58482421
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621101231.2U Expired - Fee Related CN206091259U (en) | 2016-09-30 | 2016-09-30 | Adjustable steel configuration operation hanging flower basket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206091259U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107127486A (en) * | 2017-05-12 | 2017-09-05 | 五冶集团上海有限公司 | Weld job bogey |
CN108729355A (en) * | 2018-06-01 | 2018-11-02 | 江北建设有限公司 | Platform is fitted up on a kind of bridge-collision-avoidance column for municipal science of bridge building |
CN108775016A (en) * | 2018-07-11 | 2018-11-09 | 安徽三建工程有限公司 | A kind of concrete support moves horizontally adjustable Hanging Basket |
CN111005545A (en) * | 2019-12-31 | 2020-04-14 | 上海市机械施工集团有限公司 | Construction device and method for steel structure |
CN111764626A (en) * | 2020-06-05 | 2020-10-13 | 中船澄西船舶修造有限公司 | Cantilever type scaffold |
-
2016
- 2016-09-30 CN CN201621101231.2U patent/CN206091259U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107127486A (en) * | 2017-05-12 | 2017-09-05 | 五冶集团上海有限公司 | Weld job bogey |
CN108729355A (en) * | 2018-06-01 | 2018-11-02 | 江北建设有限公司 | Platform is fitted up on a kind of bridge-collision-avoidance column for municipal science of bridge building |
CN108775016A (en) * | 2018-07-11 | 2018-11-09 | 安徽三建工程有限公司 | A kind of concrete support moves horizontally adjustable Hanging Basket |
CN108775016B (en) * | 2018-07-11 | 2024-02-23 | 安徽建工三建集团有限公司 | Concrete support horizontal movement adjustable hanging basket |
CN111005545A (en) * | 2019-12-31 | 2020-04-14 | 上海市机械施工集团有限公司 | Construction device and method for steel structure |
CN111764626A (en) * | 2020-06-05 | 2020-10-13 | 中船澄西船舶修造有限公司 | Cantilever type scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206091259U (en) | Adjustable steel configuration operation hanging flower basket | |
CN201496669U (en) | Pipeline supporting and hanging frame | |
CN212534174U (en) | Raft foundation steel bar supporting tool | |
CN203923914U (en) | Solely stub bent cap support | |
CN103362069B (en) | Steel and concrete combined box girder concrete wing plate formwork and construction method | |
CN206667042U (en) | Bridge expanssion joint installation and adjustment instrument | |
CN205781433U (en) | Central air-conditioning novel pipeline suspension and support device | |
CN205171782U (en) | Frame curtain system between stone material edge list | |
CN204647554U (en) | Steel structure concrete pump line supporting frame | |
CN214498388U (en) | Assembled overhanging formwork support bent | |
CN208039797U (en) | A kind of construction hanging basket suspension device suitable for steel-frame beam | |
CN201367730Y (en) | A die plate supporting device convenient for dismounting die plates | |
CN208934394U (en) | One kind can turnover type hydraulic climbing formwork wall-attaching equipment | |
CN205061244U (en) | Extension formula elevator guide rail support | |
CN209839352U (en) | Horizontal mounting bracket for heavy pipeline of steel structure building | |
CN208310204U (en) | Base for supporting and arranging elevator shaft coupling beam template | |
CN204144756U (en) | A kind of power transformation overhaul platform of many mounting meanss | |
CN207109843U (en) | A kind of goaf transmission line foundation bracing means | |
CN105648918A (en) | Deviation device and construction method thereof | |
CN201335397Y (en) | Vertical enclosure framework of furnace top | |
CN205064389U (en) | Air cooling fan crane span structure installation base | |
CN211007264U (en) | Adjustable ceiling conversion layer steel frame connecting piece | |
CN203684709U (en) | Adjusting device for assembly inclination angle of truss of steel structure | |
CN204754225U (en) | Can have enough to meet need a support | |
CN208868124U (en) | A kind of lower mounting bracket based on electric steering column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170412 |