[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN206090581U - A cubic metre of earth backfill structure for in narrow and small space - Google Patents

A cubic metre of earth backfill structure for in narrow and small space Download PDF

Info

Publication number
CN206090581U
CN206090581U CN201621006552.4U CN201621006552U CN206090581U CN 206090581 U CN206090581 U CN 206090581U CN 201621006552 U CN201621006552 U CN 201621006552U CN 206090581 U CN206090581 U CN 206090581U
Authority
CN
China
Prior art keywords
filled layer
foundation ditch
slip casting
earth
small space
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621006552.4U
Other languages
Chinese (zh)
Inventor
陆关林
柴成栋
顾海峰
杨志良
何隽
常关仁
任芳
徐步帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU TIANHE CONSTRUCTION GROUP CO Ltd
Original Assignee
HANGZHOU TIANHE CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU TIANHE CONSTRUCTION GROUP CO Ltd filed Critical HANGZHOU TIANHE CONSTRUCTION GROUP CO Ltd
Priority to CN201621006552.4U priority Critical patent/CN206090581U/en
Application granted granted Critical
Publication of CN206090581U publication Critical patent/CN206090581U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model discloses a cubic metre of earth backfill structure for in narrow and small space, it includes the foundation ditch, the cushion cap of setting in the foundation ditch sets up the frame post on the cushion cap and fills the earth filled layer that returns in the foundation ditch, the upper surface that returns earth filled layer is equipped with the bed course, the through -hole has been seted up on the bed course, wear to establish to be used for the slip casting pipe of cement slurry water conservancy diversion in the through -hole, the slip casting pipe is worn to establish to return earth filled layer inside. The beneficial effects of the utility model are that, manage to returning the earth filled layer pouring cement thick liquid through slip casting, cement slurry solidifies the back and returns earth filled layer and condenses into an induration, has improved time earth filled layer's intensity, prevents back subsiding of earth filled layer.

Description

A kind of backfilling of earthwork structure in small space
Technical field
The utility model is related to backfilling of earthwork technical field, and in particular to a kind of backfilling of earthwork in small space is tied Structure.
Background technology
At present, during basement backfilling of earthwork, some backfill regions can be run into, its area is narrow and small, particularly the area Spacing is less between the frame column of domain, and earthmoving machinery cannot be walked between frame column.And backfill the duration tightly, backfilling of earthwork settling amount It is required that less, earthwork uniform settlement amount is required within 10mm, for preventing building settlement above from increasing, damage building.
Utility model content
For problems of the prior art, the utility model provides simple and reasonable one kind is used for narrow and small sky Interior backfilling of earthwork structure.
The technical solution of the utility model is as follows:
A kind of backfilling of earthwork structure in small space, including foundation ditch, the cushion cap being arranged in foundation ditch, are arranged on and hold Frame column on platform and the back fill course being filled in foundation ditch, it is characterised in that the upper surface of the back fill course is provided with bed course, Through hole is offered on the bed course, is worn in the through hole for the Grouting Pipe of cement grout water conservancy diversion, the Grouting Pipe wear to Inside back fill course.
Described a kind of backfilling of earthwork structure in small space, it is characterised in that the Grouting Pipe is uniformly arranged Between frame column.
A kind of described backfilling of earthwork structure in small space, it is characterised in that the Grouting Pipe wear to return Fill stratum 3/5-4/5 depths.
Described a kind of backfilling of earthwork structure in small space, it is characterised in that back fill course is using artificial pressure It is real.
The beneficial effects of the utility model are, by Grouting Pipe to back fill course casting cement slurries, cement grout solidification Condense into an induration with back fill course afterwards, improve the intensity of back fill course, prevent the sedimentation of back fill course.
Description of the drawings
Fig. 1 is the utility model structural representation;
In figure:1st, Grouting Pipe, 2, bed course, 3, cement grout, 4, frame column, 5, foundation ditch, 6, cushion cap.
Specific embodiment
The utility model is further described below in conjunction with Figure of description.
As shown in figure 1, a kind of backfilling of earthwork structure in small space, including Grouting Pipe 1, bed course 2, cement grout 3rd, frame column 4, foundation ditch 5 and cushion cap 6.Cushion cap 6 is arranged in foundation ditch 5, and frame column 4 is arranged on cushion cap 5, is provided with back in foundation ditch 5 Fill stratum, bed course 2 is arranged on the upper of back fill course, and through hole is offered on bed course 2, and Grouting Pipe 1 is interspersed in through hole until stretching into Back fill course 3/5-4/5 depths, Grouting Pipe 1 is used for the water conservancy diversion of cement grout 3 so that cement grout 3 can reach backfill In layer, with the induration that back fill course condenses into high intensity.
Before compaction grouting, grouting test is carried out using three hole slip casting methods, it is determined that every time the parameter of slip casting, i.e. slip casting are maximum Pressure and maximum grouting amount.Slip casting can be carried out according to the numerical value of grouting test during actual slip casting.Slip casting can be at short notice The intensity of ground is improved, shortens the soil body settlement stability time, control terrace differential settlement.And only need to simply press after backfilling of earthwork It is real, without the need for by needing compacting before per layer of backfill during backfill, saving the time.Method slip casing by pressure technology is rammed by right using water Grouting in soil mass is aiding in backfilling of earthwork.Only manual compaction is simply carried out with after the completion of i.e. during backfilling of earthwork, carry out bed course 2 and apply Work.The intensity of bed course 2 reaches and carry out when can go up people cloth hole, punching, insert Grouting Pipe 1 and carry out compaction grouting.Filled out with cement grout 3 Particle voids are filled, the soil body is formed into the induration of an intensity height, stable chemical performance.
Work progress of the present utility model:
Choose representative position at the construction field (site), three positions for choosing bed course 2 are punchinged, cloth hole, the insertion note of Grouting Pipe 1 Slurry.Three pitchs of holes are equal, in equilateral triangle distribution.Cement grout 3 is flowed between three holes and three holes week by the Grouting Pipe 1 in three holes In enclosing region soil layer space, cement grout 3 is combined into induration after solidifying with surrounding soil.Note can be terminated by result of the test Minimum grouting pressure and maximum grouting amount during slurry.Because three Grouting Pipes 1 are in that equilateral triangle is symmetrical, and there is representative in the region Property, therefore the slip casting situation of soil layer below whole bed course 2 will be seen that by the slip casting situation in the Triangle-Profile region.We Minimum grouting pressure and maximum grouting amount are used as formal slip casting standard when will determine termination slip casting by three hole grouting tests.
In the foundation ditch, there is the structures such as frame column 4 and post lower cushion cap 6, it is in small distance between frame column 4, earthmoving machinery without Method passes through.Through simple compacting after backfilling of earthwork, bed course 2 is laid, by the spacing arrangement hole position of regulation, punchinged, cloth hole, inserted Enter Grouting Pipe 1.Then according to result of the test slip casting during three hole grouting tests, all hole grouting pressures and grouting amount are both needed to reach Minimum grouting pressure and maximum grouting amount are required during above-mentioned three holes grouting test.It is empty that cement grout 3 enters underground layer by Grouting Pipe 1 Gap, an induration is formed after solidification by soil layer and cement grout 3.

Claims (3)

1. a kind of backfilling of earthwork structure in small space, including foundation ditch(5), it is arranged on foundation ditch(5)Interior cushion cap(6), It is arranged on cushion cap(6)On frame column(4)And it is filled in foundation ditch(5)Interior back fill course, it is characterised in that the back fill course Upper surface be provided with bed course(2), the bed course(2)On offer through hole, wear for cement grout in the through hole(3)Water conservancy diversion Grouting Pipe(1), the Grouting Pipe(1)Wear to back fill course.
2. a kind of backfilling of earthwork structure in small space according to claim 1, it is characterised in that the slip casting Pipe(1)It is uniformly arranged on frame column(4)Between.
3. a kind of backfilling of earthwork structure in small space according to claim 1, it is characterised in that the slip casting Pipe(1)Wear to back fill course 3/5-4/5 depths.
CN201621006552.4U 2016-08-31 2016-08-31 A cubic metre of earth backfill structure for in narrow and small space Active CN206090581U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621006552.4U CN206090581U (en) 2016-08-31 2016-08-31 A cubic metre of earth backfill structure for in narrow and small space

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621006552.4U CN206090581U (en) 2016-08-31 2016-08-31 A cubic metre of earth backfill structure for in narrow and small space

Publications (1)

Publication Number Publication Date
CN206090581U true CN206090581U (en) 2017-04-12

Family

ID=58478371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621006552.4U Active CN206090581U (en) 2016-08-31 2016-08-31 A cubic metre of earth backfill structure for in narrow and small space

Country Status (1)

Country Link
CN (1) CN206090581U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107816046A (en) * 2017-10-24 2018-03-20 中国建筑第八工程局有限公司 Deep basal pit narrow zone backfills construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107816046A (en) * 2017-10-24 2018-03-20 中国建筑第八工程局有限公司 Deep basal pit narrow zone backfills construction method
CN107816046B (en) * 2017-10-24 2019-09-06 中国建筑第八工程局有限公司 Deep basal pit narrow zone backfills construction method

Similar Documents

Publication Publication Date Title
CN103215960B (en) Grouting method for high polymer vertical support system
CN103233454B (en) Processing method of soaking, vacuum preloading and slurry injecting for sand piles of collapsible loess foundation
CN102561308B (en) Light-well plastic-strip superposition vacuum preloading method for soft soil foundation
CN106703050A (en) Expansive soil road cutting side slope reinforced soil back-pressure seepage-preventive supporting structure and construction method thereof
CN103758113B (en) A kind of grid encloses the anti-liquefied foundation reinforcement means of hoop
CN104131575A (en) Plugging and drainage method for dam foundation on karst highly developed stratum
CN106948340B (en) A kind of construction method of the Manual excavated pile structure of high polymer grouting protection
CN106884433A (en) Control vibrations pile pulling causes the structure of underground structure depression and control depression method
CN105804007B (en) A kind of reinforced earth quaywall structure based on the soft base of beach
CN108005104A (en) A kind of combined type retaining wall structure and its construction method
CN107653889A (en) A kind of shaped steel pressure is poured water the construction method of soil curtain support pile
CN104929142B (en) A kind of combined cofferdam structure and construction construction method thereof
CN107587502A (en) A kind of spiral-digging pore pressure pour water soil occlusion curtain pile construction method
CN206090581U (en) A cubic metre of earth backfill structure for in narrow and small space
CN204000848U (en) A kind of socketed pile for subaqueous construction
CN207659986U (en) A kind of building or structures foundation stabilization underpin pier
CN105297737A (en) Grouting scope-controllable bag type micro bearing pile
CN112081158B (en) Construction method for forming reinforced composite pile foundation by advanced grouting of high-rise building
CN104005416A (en) Method for processing major-diameter hole pile collapsed holes under high and steep slope plain fill back-pressing condition
CN208364097U (en) It is a kind of to block the device for disclosing the drilling of coating artesian water
CN103015430A (en) Long auger pressure filling steel reinforced cement-soil pile foundation pit water-resisting and supporting method
CN207525774U (en) A kind of cantilever retaining wall structure
CN102535457B (en) Method for treating slurry leakage of perforated holes of offshore pile foundation in process of utilizing steel casing to carry out pile foundation construction
CN108221948A (en) A kind of method for processing foundation
CN106337409A (en) Method for treating peat soil foundation through preloading in combination with salt piles

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant