CN206036397U - Building pipe strutting arrangement - Google Patents

Building pipe strutting arrangement Download PDF

Info

Publication number
CN206036397U
CN206036397U CN201620971496.1U CN201620971496U CN206036397U CN 206036397 U CN206036397 U CN 206036397U CN 201620971496 U CN201620971496 U CN 201620971496U CN 206036397 U CN206036397 U CN 206036397U
Authority
CN
China
Prior art keywords
plate
swash plate
bolt
gripper shoe
right deviation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620971496.1U
Other languages
Chinese (zh)
Inventor
张政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Land Construction Co ltd
Original Assignee
Huaian Huadu Architectural Design Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaian Huadu Architectural Design Ltd filed Critical Huaian Huadu Architectural Design Ltd
Priority to CN201620971496.1U priority Critical patent/CN206036397U/en
Application granted granted Critical
Publication of CN206036397U publication Critical patent/CN206036397U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model belongs to the technical field of the construction, concretely relates to building pipe strutting arrangement, which comprises supporting legs, backup pad and apron, the apron is including the roof, left -leaning swash plate and right deviation swash plate, the roof, first bolt is all worn to be equipped with by the intermediate position of left -leaning swash plate and right deviation swash plate, first bolt is equipped with the spring in the inboard cover of apron, outside cover is equipped with first nut, the stiff end and the interior wall connection of apron of spring, the free end is connected with spacing pad, the right deviation swash plate is connected with the upper junction plate, the medial surface of backup pad is the arc surface, and be equipped with the slipmat, the backup pad is connected with down the connecting plate, the through -hole has been seted up with the position that the connecting plate is corresponding down to the upper junction plate, the through -hole endotheca is equipped with the second bolt, the second bolt is in the upside of upper junction plate, the downside cover of connecting plate is equipped with the second nut down. Its purpose is: the problem of current building pipe strutting arrangement structural design defect exist the pipeline model that can fix single, just can not finely tune according to the external diameter size of different pipelines is solved.

Description

A kind of building pipe support meanss
Technical field
This utility model belongs to technical field of building construction, and in particular to a kind of building pipe support meanss.
Background technology
Tube support arrangement in building field it is any have pipe laying where can all use, also referred to as pipeline Seat, pipe portion etc..Existing tube support arrangement includes supporting leg, and the anchor ear on supporting leg, it would be desirable to the pipeline set of support Be located in anchor ear, and fixation is clamped with anchor ear.Although the tube support arrangement simple structure of this structure, its installation Motility it is poor, can support fixation pipeline model it is single, fixation can only be supported to the pipeline of particular size, it is impossible to It is finely adjusted according to the external diameter size of different pipelines.
Utility model content
The purpose of this utility model is:A kind of building pipe support meanss are aimed to provide, for solving existing building pipeline Support device structure design defect has that the pipeline model that can fix is single, and can not be entered according to the external diameter size of different pipelines The problem of row fine setting.
For realizing above-mentioned technical purpose, the technical solution adopted in the utility model is as follows:
A kind of building pipe support meanss, including supporting leg, are provided with gripper shoe on the supporting leg, the gripper shoe is hinged with Cover plate, the cover plate include top board, left-leaning swash plate and the Right deviation swash plate symmetrical with left-leaning swash plate, the left-leaning swash plate lower end with The left end of fagging is hinged, and the left end of the top board be connected with the top of left-leaning swash plate, the top of right-hand member and Right deviation swash plate connects, institute The centre position for stating top board, left-leaning swash plate and Right deviation swash plate is equipped with the first bolt, and first bolt is in the inner side of cover plate Spring is arranged with, first bolt is arranged with the first nut on the outside of cover plate, and one end of the spring is solid with cover plate inwall Fixed connection, other end connection limited location pad, the lower end of the Right deviation swash plate is connected with upper junction plate, the medial surface of the gripper shoe For arc surface and be provided with rough slipmat, the right-hand member of the gripper shoe is connected with lower connecting plate, the upper junction plate and The corresponding position of lower connecting plate offers through hole, is arranged with the second bolt in the through hole, and second bolt is in upper junction plate Upside, be arranged with the second nut on the downside of lower connecting plate.
Using the utility model of above-mentioned technical proposal, the tube support arrangement is placed on into the position that pipeline needs to support, Cover plate is rotated counterclockwise, pipeline is placed on the supporting plate, cover plate is then rotated clockwise, by the second bolt and the second nut Upper junction plate and lower connecting plate are connected, the first bolt is finally adjusted, is made spring realize the holding of pipeline in compressive state, and The first bolt is fixed with the first nut, thus, the support for just completing pipeline is fixed.By three first bolts Fixation is clamped to pipeline with gripper shoe, spring strengthens the clamping force to pipeline, make the fixation of pipeline more firm, pass through Adjust the first bolt and can support the different size of pipeline of fixation, the motility which is installed is stronger.The setting of slipmat is strengthened The frictional force that pipeline is contacted with gripper shoe, it is to avoid pipe slides.
Further limit, the left-leaning swash plate, top board, Right deviation swash plate and upper junction plate are integrally formed, and such structure sets Meter, compact conformation.
Further limit, the left-leaning swash plate is 120 ° with the angle that top board is constituted, and the Right deviation swash plate is constituted with top board Angle be 120 °, such structure design, Stability Analysis of Structures are stronger to the clamping force of pipeline.
Further limit, the gripper shoe is integrally formed with lower connecting plate, such structure design, compact conformation.
Further limit, the top of the supporting leg with support plate weld, such structure design makes supporting leg and gripper shoe Connection is more firm.
Description of the drawings
This utility model can be further illustrated by the nonlimiting examples that accompanying drawing is given;
Fig. 1 is a kind of structural representation of building pipe support meanss embodiment of this utility model;
Main element symbol description is as follows:
Supporting leg 1, gripper shoe 2, cover plate 3, top board 31, left-leaning swash plate 32, Right deviation swash plate 33, the first bolt 4, spring 5, first Nut 6, spacing pad 7, upper junction plate 81, lower connecting plate 82, slipmat 9, the second bolt 10, the second nut 11, pipeline 12.
Specific embodiment
In order that those skilled in the art may be better understood this utility model, it is right with reference to the accompanying drawings and examples Technical solutions of the utility model are further illustrated.
As shown in figure 1, a kind of building pipe fittable slackening device of the present utility model, including supporting leg 1, installs on supporting leg 1 There is gripper shoe 2, gripper shoe 2 is hinged with cover plate 3, and cover plate 3 includes top board 31, left-leaning swash plate 32 and the right side symmetrical with left-leaning swash plate 32 Hang plate 33,32 lower end of left-leaning swash plate are hinged with the left end of gripper shoe 2, and the left end of top board 31 is connected with the top of left-leaning swash plate 32 Connect, the top connection of right-hand member and Right deviation swash plate 33, the centre position of top board 31, left-leaning swash plate 32 and Right deviation swash plate 33 is equipped with First bolt 4, the first bolt 4 are arranged with spring 5 in the inner side of cover plate 3, and the first bolt 4 is arranged with first in the outside of cover plate 3 Nut 6, one end of spring 5 is fixedly connected with 3 inwall of cover plate, the other end is connected limited location pad 7, the lower end connection of Right deviation swash plate 33 Have a upper junction plate 81, gripper shoe 2 medial surface is arc surface and is provided with rough slipmat 9, the right-hand member of gripper shoe 2 connects Lower connecting plate 82 is connected to, upper junction plate 81 and 82 corresponding position of lower connecting plate offer through hole, be arranged with the second spiral shell in through hole Bolt 10, the second bolt 10 are arranged with the second nut 11 in the downside of the upside of upper junction plate 81, lower connecting plate 82.
It is preferred that left-leaning swash plate 32, top board 31, Right deviation swash plate 33 and upper junction plate 81 are integrally formed, such structure design, Compact conformation.In fact, specifically can also consider as the case may be.
It is preferred that left-leaning swash plate 32 is 120 ° with the angle that top board 31 is constituted, the angle that Right deviation swash plate 33 is constituted with top board 31 is 120 °, such structure design, Stability Analysis of Structures are stronger to the clamping force of pipeline 12.In fact, can also examine as the case may be The angle of angle, Right deviation swash plate 33 and the composition of top board 31 that the left-leaning swash plate 32 of worry is constituted with top board 31.
It is preferred that gripper shoe 2 is integrally formed with lower connecting plate 82, and such structure design, compact conformation.In fact, can also It is concrete as the case may be to consider.
It is preferred that the top of supporting leg 1 is welded with gripper shoe 2, such structure design makes the connection of supporting leg 1 and gripper shoe 2 more Plus firmly.In fact, the connected mode of supporting leg 1 and gripper shoe 2 can also be considered as the case may be.
In this example, the tube support arrangement is placed on into the position that pipeline 12 needs to support, cover plate 3 is rotated counterclockwise, Pipeline 12 is placed in gripper shoe 2, cover plate 3 is then rotated clockwise, by the second bolt 10 and the second nut 11 by upper company Fishplate bar 81 and lower connecting plate 82 connect, and finally adjust the first bolt 4, make spring 5 realize the holding of pipeline 12 in compressive state, And fixed with 6 pairs of the first bolts 4 of the first nut, thus, the support for just completing pipeline 12 is fixed.By three One bolt 4 and gripper shoe 2 are clamped fixation to pipeline 12, and spring 5 strengthens the clamping force to pipeline 12, makes consolidating for pipeline 12 Fixed more firmly to support the different size of pipeline 12 of fixation by adjusting the first bolt 4, the motility which is installed is stronger. The setting of slipmat 9 strengthens the frictional force that pipeline 12 is contacted with gripper shoe 2, it is to avoid pipeline 12 slides.
Above a kind of building pipe fittable slackening device that this utility model is provided is described in detail.It is embodied as The explanation of example is only intended to help and understands method of the present utility model and its core concept.It should be pointed out that for the art Those of ordinary skill for, on the premise of without departing from this utility model principle, this utility model can also be carried out some Improve and modify, these improve and modification is also fallen in this utility model scope of the claims.

Claims (5)

1. a kind of building pipe support meanss, including supporting leg (1), it is characterised in that:Gripper shoe is installed on supporting leg (1) (2), gripper shoe (2) are hinged with cover plate (3), and described cover plate (3) include top board (31), left-leaning swash plate (32) and and left bank The symmetrical Right deviation swash plate (33) of plate (32), left-leaning swash plate (32) lower end are hinged with the left end of gripper shoe (2), the top board (31) left end be connected with the top of left-leaning swash plate (32), the top of right-hand member and Right deviation swash plate (33) connects, top board (31), The centre position of left-leaning swash plate (32) and Right deviation swash plate (33) is equipped with the first bolt (4), and the first bolt (4) are in cover plate (3) spring (5) is arranged with the inside of, and the first bolt (4) are arranged with the first nut (6), the bullet on the outside of cover plate (3) One end of spring (5) is fixedly connected with cover plate (3) inwall, the other end is connected limited location pad (7), the lower end of Right deviation swash plate (33) Upper junction plate (81) is connected with, the medial surface of gripper shoe (2) is arc surface and is provided with rough slipmat (9), institute The right-hand member for stating gripper shoe (2) is connected with lower connecting plate (82), upper junction plate (81) and the corresponding position of lower connecting plate (82) Offer through hole, in the through hole, be arranged with the second bolt (10), the second bolt (10) in upper junction plate (81) upside, The second nut (11) is arranged with the downside of lower connecting plate (82).
2. a kind of building pipe support meanss according to claim 1, it is characterised in that:Left-leaning swash plate (32), top Plate (31), Right deviation swash plate (33) and upper junction plate (81) are integrally formed.
3. a kind of building pipe support meanss according to claim 2, it is characterised in that:Left-leaning swash plate (32) and top The angle that plate (31) is constituted is 120 °, and Right deviation swash plate (33) are 120 ° with the angle that top board (31) is constituted.
4. a kind of building pipe support meanss according to claim 3, it is characterised in that:Gripper shoe (2) and lower company Fishplate bar (82) is integrally formed.
5. a kind of building pipe support meanss according to claim 4, it is characterised in that:The top of supporting leg (1) with Gripper shoe (2) is welded.
CN201620971496.1U 2016-08-26 2016-08-26 Building pipe strutting arrangement Expired - Fee Related CN206036397U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620971496.1U CN206036397U (en) 2016-08-26 2016-08-26 Building pipe strutting arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620971496.1U CN206036397U (en) 2016-08-26 2016-08-26 Building pipe strutting arrangement

Publications (1)

Publication Number Publication Date
CN206036397U true CN206036397U (en) 2017-03-22

Family

ID=58303003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620971496.1U Expired - Fee Related CN206036397U (en) 2016-08-26 2016-08-26 Building pipe strutting arrangement

Country Status (1)

Country Link
CN (1) CN206036397U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106764084A (en) * 2017-04-01 2017-05-31 莱芜钢铁集团有限公司 A kind of pipeline jig
CN108002012A (en) * 2017-12-20 2018-05-08 武汉赛伯瑞德科技有限公司 A kind of slide type lock material device
CN108386653A (en) * 2018-02-02 2018-08-10 四川行之智汇知识产权运营有限公司 Pressing device when being safeguarded for petroleum pipeline
CN110425343A (en) * 2019-07-01 2019-11-08 东莞市建安集团有限公司 A kind of electromechanical pipeline mounting structure and its construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106764084A (en) * 2017-04-01 2017-05-31 莱芜钢铁集团有限公司 A kind of pipeline jig
CN106764084B (en) * 2017-04-01 2019-07-30 莱芜钢铁集团有限公司 A kind of pipeline jig
CN108002012A (en) * 2017-12-20 2018-05-08 武汉赛伯瑞德科技有限公司 A kind of slide type lock material device
CN108386653A (en) * 2018-02-02 2018-08-10 四川行之智汇知识产权运营有限公司 Pressing device when being safeguarded for petroleum pipeline
CN110425343A (en) * 2019-07-01 2019-11-08 东莞市建安集团有限公司 A kind of electromechanical pipeline mounting structure and its construction method

Similar Documents

Publication Publication Date Title
CN206036397U (en) Building pipe strutting arrangement
CN205331596U (en) Adjustable petroleum pipeline support frame
CN106193118A (en) Open trench tunnel agent structure tall and big side wall one side formwork erection and construction technology thereof
CN202521063U (en) Pipeline fixing component
CN204282174U (en) Concrete square road surface steel form splicing seams position fixing apparatus
CN103644379A (en) Pipe fitting base
CN208311664U (en) A kind of gate antidetonation suspension and support
CN207935554U (en) One kind being used for subway transportation antidetonation suspension and support
CN203694495U (en) Special connection mechanism for trampoline
CN209671754U (en) A kind of adjustable type pipeline elevator
CN104291189B (en) A kind of elevator car frame tie rod screw device
CN208442395U (en) A kind of antidetonation water pipe list hangs Bidirectional supporting
CN203867265U (en) Special hold hoop for connecting terminal pole electric pole and jacking rod
CN104264972A (en) Wall connecting component
CN206175405U (en) Fixing device
CN202796023U (en) Electronic drum support
CN204152186U (en) Wall-connecting piece
CN208735063U (en) A kind of fixed device of water pipeline
CN108071744A (en) A kind of good utility pipes suspension and support of stability
CN203797162U (en) Small-gap adjustable pipeline support device
CN208871160U (en) A kind of anti-vibration petroleum pipeline supporter
CN202769052U (en) Pipeline movable cradle
CN208397439U (en) A kind of highway bridge tube support arrangement
CN204029356U (en) Health eggplant drum support
CN221348205U (en) Building construction drainage pipeline clamp

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180425

Address after: 330001 102 storefronts of Qingyun pearl 16, three shop West Road, Qingyun District, Nanchang, Jiangxi, China, 16

Patentee after: Construction Land Construction Co.,Ltd.

Address before: 330200 Nanchang, Nanchang County, Jiangxi province Tangnan town Tangkou village, No. 128

Patentee before: Min Quanjian

Effective date of registration: 20180425

Address after: 330200 Nanchang, Nanchang County, Jiangxi province Tangnan town Tangkou village, No. 128

Patentee after: Min Quanjian

Address before: 223021 library building, 83 Beijing North Road, Qinghe District, Huaian, Jiangsu

Patentee before: HUAI'AN HUADU CONSTRUCTION PROGRAM DESIGN CO.,LTD.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170322

Termination date: 20210826

CF01 Termination of patent right due to non-payment of annual fee