CN205976725U - A face limit safety barrier for standardizing construction - Google Patents
A face limit safety barrier for standardizing construction Download PDFInfo
- Publication number
- CN205976725U CN205976725U CN201620810742.5U CN201620810742U CN205976725U CN 205976725 U CN205976725 U CN 205976725U CN 201620810742 U CN201620810742 U CN 201620810742U CN 205976725 U CN205976725 U CN 205976725U
- Authority
- CN
- China
- Prior art keywords
- connecting tube
- connecting pipe
- stand
- column
- safety barrier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 230000004888 barrier function Effects 0.000 title claims abstract description 16
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 20
- 239000010959 steel Substances 0.000 claims abstract description 20
- 208000027418 Wounds and injury Diseases 0.000 abstract description 2
- 230000006378 damage Effects 0.000 abstract description 2
- 230000007123 defense Effects 0.000 abstract description 2
- 208000014674 injury Diseases 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 3
- 239000003973 paint Substances 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 239000002994 raw material Substances 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 229910001018 Cast iron Inorganic materials 0.000 description 1
- 210000000481 breast Anatomy 0.000 description 1
- 230000001680 brushing effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000004922 lacquer Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000011002 quantification Methods 0.000 description 1
- 239000002966 varnish Substances 0.000 description 1
Landscapes
- Fencing (AREA)
Abstract
The utility model relates to a face limit safety barrier for standardizing construction, including establishhing in a plurality of stands on ground perpendicularly, the upper end of stand and stand be perpendicular to be provided with first connecting pipe, the middle part and the perpendicular second connecting pipe and the third connecting pipe of being provided with of stand of stand, be provided with sheer pole and last horizontal pole between per two stands respectively, the both ends of sheer pole are connected on the second connecting pipe and third connecting pipe at stand middle part through the PPR connecting pipe respectively, it connects on the first connecting pipe of two stand upper ends through the PPR connecting pipe respectively to go up the both ends of horizontal pole, the lower extreme of stand is provided with the high sole that keeps off. The utility model discloses simple structure, the design is compact, and convenient to use can utilize the building site steel pipe to face frontier defense and protect and set up, and the expense is low effectual, circulated used repeatedly, the cost is lower, and it is easy to dismantle, and steel pipe less prominent when setting up does not hinder currently, and is difficult for leading to the fact personnel to collide the injury.
Description
Technical field
This utility model be related to a kind of face side safety barrier for standardized construction, belong to safety guarantee equipment and technology neck
Domain.
Background technology
Standardization building site construction is by building site management job content materialization, quantification, systematization, site layout project, inspection
Look into content and inspection method etc. and be converted into working standard, realize live " standardization ", layout " scientific ", train " regular practice ",
Life " regularization ".
At the construction field (site), though when the edge of work surface in high-rise working is not gone along with sb. to guard him facility or gone along with sb. to guard him facility, it is high
When degree is less than 800mm, side operation is referred to as faced in this class operation.When carrying out facing side operation, by regulation, should safety protection facility be set,
Facility is mainly guard rail, safety net, safety door etc..
The other depth of job site and passage is on the stake holes of 2m and more than 2m, manhole, groove and the edge such as pipeline, hole
Operation, referred to as hole operation.Horizontal hole short side dimension is more than 25mm, and vertical hole height is more than 750mm, is intended to setting anti-
Guard rail rod.
" four mouthfuls " refer to stairs port, elevator shaft mouth, reserved opening, passway." five face side " refer to the groove that depth is more than 2m,
Hole, the periphery of ditch;The no roofing (scope of operation) of external scaffolding and the periphery of frame structure floor in construction;Well cabinet frame, gantry
Two sides of the passage of frame, external elevator and scaffold and building, upper and lower runway and oblique side line;Breast board, railing are not yet installed
Balcony, the periphery expected platform, choose platform;Building in construction
Traditional hole adopts reinforcement welding guard rail with facing side, or is formed using steel pipe and all kinds of fastener association, no
The requirement of normalized security Civilization Worksite can be met, and traditional handicraft is coarse, stability difference is it is difficult to meet increasingly enhanced safety
Requirement of shelter;The guard rail of particularly reinforcement welding can not have enough to meet the need, high cost;The guard rail set up with steel pipe and steering fastener
Bar, because being affected to meet the requirement that staircase two runs bench central idle width by steering fastener size, makes guard rail
In the outside of bench it is impossible to meet the requirement installing foot guard plate and guard rail.
The hole developed in recent years and face side safety barrier joint and be attached using bigger steel pipe or cast iron pipe, even
Fastened by screw steel pipe is adopted after connecing.The method can meet the requirement of normalized security Civilization Worksite, but joint weight weight, assembling is relatively
Complexity, construction efficiency is low.
Content of the invention
The purpose of this utility model be in order to solve existing face side safety barrier to install constant, construction efficiency low, outside steel pipe
Dew easily causes the problem of potential safety hazard, there is provided a kind of structure is simple, compact to design faces side safety for standardized construction
Guardrail.
This utility model adopts the following technical scheme that:A kind of face side safety barrier for standardized construction, including vertical
It is built in some root posts on ground, the upper end of described column and uprights vertical are provided with the first connecting tube, in described column
Portion and uprights vertical are provided with the second connecting tube and the 3rd connecting tube, are respectively arranged with sheer pole and upper horizontal stroke between every two root posts
Bar, the two ends of described sheer pole are connected in the second connecting tube and the 3rd connecting tube in the middle part of column by PPR connecting tube respectively,
The two ends of described cross tube are connected in the first connecting tube of two root posts upper end by PPR connecting tube respectively, described column
Lower end is provided with high foot guard plate.
Further, the spacing of described column is 2-3m.
Further, described sheer pole is apart from ground 0.5-0.6m.
Further, described cross tube is apart from ground 1.0-1.2m.
Further, described PPR connecting tube is through type or right angle two formula.
Further, the height of described high foot guard plate is 175-185mm.
This utility model structure is simple, compact to design, easy to use, can carry out facing frontier defense shield using building site steel pipe and take
If the poorly efficient fruit of expense is good, reuse capable of circulation, and cost is relatively low, easily, when setting up, steel pipe does not project for dismounting, and without prejudice to is passed through,
And do not easily cause personnel's collision injury.
Brief description
Fig. 1 is structural representation of the present utility model.
Fig. 2 is pillar construction schematic diagram of the present utility model.
Reference:Column 1, the first connecting tube 2, the second connecting tube 3, the 3rd connecting tube 4, sheer pole 5, cross tube 6,
PPR connecting tube 7, high foot guard plate 8, steel plate cushion block 9.
Specific embodiment
Below in conjunction with accompanying drawing, the utility model will be further described.
As Figure 1-Figure 2, a kind of face side safety barrier for standardized construction, if including being vertically built in ground
Dry root post 1, the upper end of column 1 and uprights vertical are provided with the first connecting tube 2, and the middle part of column 1 and uprights vertical are provided with
Second connecting tube 3 and the 3rd connecting tube 4, the spacing of column 1 is 2-3m, is respectively arranged with sheer pole 5 and upper between every two root posts 1
Cross bar 6, sheer pole 5 passes through apart from ground 1.0-1.2m, the two ends of sheer pole 5 respectively apart from ground 0.5-0.6m, cross tube 6
PPR connecting tube 7 is connected in second connecting tube 3 and the 3rd connecting tube 4 at column 1 middle part, and the two ends of cross tube 6 are passed through respectively
PPR connecting tube 7 is connected in the first connecting tube 2 of two root posts 1 upper end, and the lower end of column 1 is provided with high foot guard plate 8, high gear
The height of sole 8 is 175-185mm, and PPR connecting tube 7 is through type or right angle two formula.
Preparation and installation method:
(1)The preparation of material:50 × 150 × 10mm steel plate is some;Φ 10 setscrew is some;If Φ 48*3.0 steel pipe
Dry;Template is some;The through type PPR connecting tube of internal diameter 50(Long 80mm)Some;If the right angle of internal diameter 50 two formula PPR connecting tube
Dry;Red paint is some;Dirty oil paint is some;Raw material band is some;
(2)The preparation of vertical rod:In one piece of 150 × 150 × 10mm steel plate cushion block middle piece 1000~1200mm of full weld
Steel pipe make vertical rod, 150 × 150 × 10mm steel plate cushion block opens 4 φ 12 holes according to drawing;
Make the first connecting tube in steel pipe top full weld 200mm long Φ 48 steel pipe;
It is respectively prepared the second connecting tube in 2 50mm long Φ 48 steel pipes of two ends full weld at steel pipe top 500~600mm
With the second connecting tube;
(3)Vertical rod is fixed with four setscrews on the ground;
(4)Sheer pole on installing 2 meters long in the vertical rod fixing, the connection between cross tube, sheer pole and vertical rod is adopted
With the PPR connecting tube of internal diameter 50 or the right angle two-way PPR connecting tube of internal diameter 50, before connecting PPR pipe joint, completely twine raw material band
To be connected firmly;
(5)Fix vertical rod with 4 Φ 10 setscrews on cross tube, sheer pole another side concrete slab, joint is same
Using PPR pipe joint, the same previous step of way;
(6)Facing the side safety barrier bottom setting high foot guard plate of 180mm, the brushing of 180mm high foot guard plate spacing 150mm is red-black
Alternate paint, at 45 ° with foot guard plate;
(7)Vertical rod and cross tube, sheer pole are spaced and varnish with lacquer.
Claims (7)
1. a kind of for standardized construction face side safety barrier it is characterised in that:Including being vertically built in some of ground
Column(1), described column(1)Upper end and column(1)It is vertically installed with the first connecting tube(2), described column(1)Middle part with
Column(1)It is vertically installed with the second connecting tube(3)With the 3rd connecting tube(4), every two root posts(1)Between be respectively arranged with sheer pole
(5)And cross tube(6), described sheer pole(5)Two ends respectively pass through PPR connecting tube(7)It is connected to column(1)The second of middle part
Connecting tube(3)With the 3rd connecting tube(4)On, described cross tube(6)Two ends respectively pass through PPR connecting tube(7)It is connected to two
Column(1)First connecting tube of upper end(2)On, described column(1)Lower end be provided with high foot guard plate(8).
2. be used for as claimed in claim 1 standardized construction face side safety barrier it is characterised in that:Described column(1)'s
Spacing is 2-3m.
3. be used for as claimed in claim 1 standardized construction face side safety barrier it is characterised in that:Described sheer pole(5)
Apart from ground 0.5-0.6m.
4. be used for as claimed in claim 1 standardized construction face side safety barrier it is characterised in that:Described cross tube(6)
Apart from ground 1.0-1.2m.
5. be used for as claimed in claim 1 standardized construction face side safety barrier it is characterised in that:Described PPR connecting tube
(7)For through type or right angle two formula.
6. be used for as claimed in claim 1 standardized construction face side safety barrier it is characterised in that:Described high foot guard plate
(8)Height be 175-185mm.
7. be used for as claimed in claim 1 standardized construction face side safety barrier it is characterised in that:Described column(1)With
It is provided with steel plate cushion block between ground(9), described column(1)Fixed on the ground by swell fixture.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620810742.5U CN205976725U (en) | 2016-07-28 | 2016-07-28 | A face limit safety barrier for standardizing construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620810742.5U CN205976725U (en) | 2016-07-28 | 2016-07-28 | A face limit safety barrier for standardizing construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205976725U true CN205976725U (en) | 2017-02-22 |
Family
ID=58027032
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620810742.5U Expired - Fee Related CN205976725U (en) | 2016-07-28 | 2016-07-28 | A face limit safety barrier for standardizing construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205976725U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111350366A (en) * | 2020-03-12 | 2020-06-30 | 中建四局第五建筑工程有限公司 | Quick-release type edge-facing protective fence and construction method thereof |
CN112854894A (en) * | 2021-01-14 | 2021-05-28 | 中国十七冶集团有限公司 | High-rise building edge and opening enclosure falling-proof object construction method |
-
2016
- 2016-07-28 CN CN201620810742.5U patent/CN205976725U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111350366A (en) * | 2020-03-12 | 2020-06-30 | 中建四局第五建筑工程有限公司 | Quick-release type edge-facing protective fence and construction method thereof |
CN112854894A (en) * | 2021-01-14 | 2021-05-28 | 中国十七冶集团有限公司 | High-rise building edge and opening enclosure falling-proof object construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211622528U (en) | Basket type outer vertical surface scaffold inclined-pulling type I-steel cantilever beam | |
CN205976725U (en) | A face limit safety barrier for standardizing construction | |
CN213268816U (en) | Assembled shaped steel horizontal protection platform of encorbelmenting | |
CN213626818U (en) | Frame type safety ladder cage | |
CN105822076A (en) | Construction edge safety protection warning fence | |
CN118564040A (en) | Scaffold erection construction method | |
CN205617771U (en) | Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft | |
CN111622483A (en) | Method for erecting reverse-construction type overhanging scaffold | |
CN201826545U (en) | Safety fire protection system device for core tube construction of super high-rise building | |
CN213330165U (en) | Deep foundation pit berm for construction | |
CN211256664U (en) | Guardrail for bridge floor | |
CN217998886U (en) | Narrow space climbing platform | |
CN219118917U (en) | Safe anti-climbing fence platform device of tower crane | |
CN214615635U (en) | Frame type safety ladder stand | |
CN214330012U (en) | Can have enough to meet need instrument formula stair and prevent railing temporarily | |
CN214697029U (en) | Steel construction assembled house floor face limit protector | |
CN110219478A (en) | Assembled protection canopy | |
KR200395096Y1 (en) | Length-adjustable guardrail | |
CN220487281U (en) | Protective railing structure convenient to dismantle | |
CN219808677U (en) | Scaffold for tunnel construction | |
CN207004058U (en) | A kind of assembled steel tubing string welding procedure operating platform | |
CN115288414B (en) | Construction method of hydraulic climbing operation frame of super high-rise core tube special-shaped shaft | |
CN215107394U (en) | Tool type tower crane pedestrian passageway | |
CN221823330U (en) | Scaffold for building engineering | |
CN217398151U (en) | Adjustable passageway platform of construction elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170222 |
|
CF01 | Termination of patent right due to non-payment of annual fee |