CN205857520U
CN205857520U CN201620444888.2U CN201620444888U CN205857520U CN 205857520 U CN205857520 U CN 205857520U CN 201620444888 U CN201620444888 U CN 201620444888U CN 205857520 U CN205857520 U CN 205857520U
Authority
CN
China
Prior art keywords
sheet material
edges
boards
fixed mount
work shape
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620444888.2U
Other languages
Chinese (zh)
Inventor
张�杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Baoguang New Mstar Technology Ltd
Original Assignee
Jiangsu Baoguang New Mstar Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Baoguang New Mstar Technology Ltd filed Critical Jiangsu Baoguang New Mstar Technology Ltd
Priority to CN201620444888.2U priority Critical patent/CN205857520U/en
Application granted granted Critical
Publication of CN205857520U publication Critical patent/CN205857520U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

This utility model is about a kind of plank connecting structure and sheet material, belongs to building material field.Described plank connecting structure includes: the first sheet material of at least 2 pieces of adjacent hollow structures and the second sheet material, the fixture corresponding with described first sheet material and described second sheet material, and the pedestal corresponding with described fixture;The first edges of boards connected with described second sheet material in described first sheet material are formed with row tank;The upper edge of the second edges of boards connected with described first sheet material in described second sheet material is formed with the shielding part being covered in described row sink top;Described fixture is by described first sheet material and described second board material splice, and described fixture is fixed with the stationary plane of described pedestal and is connected.

Description

Plank connecting structure and sheet material
Technical field
This utility model relates to building material field, particularly to a kind of plank connecting structure and sheet material.
Background technology
In architectural engineering, various sheet material can be used, such as wooden boards, sheet metal, plastic plate and Novel FRP (Fiber Reinforced Plastics, fibre reinforced plastics) sheet material.
FRP (being commonly called as " fiberglass ") sheet material is usually used in building industrial door, lighting roof, metope, glass sunlight house and prefabricated house Deng.Refer to Fig. 1, it illustrates the schematic diagram of the attachment structure of a kind of common FRP plate material.This plank connecting structure includes: The first adjacent sheet material 11 and the second sheet material 12;One end of first sheet material 11 is formed with inserting groove 13, one end of the second sheet material 12 Be formed with the Plug Division 14 corresponding with inserting groove 13, Plug Division 14 and inserting groove 13 grafting thus by the first sheet material 11 and the second plate Material 12 splices.Additionally, be formed with row tank 15 in the inserting groove 13 of the first sheet material 11, row tank 15 is for by from two boards material The water infiltered at link position is resident, and discharges downwards.Above-mentioned plank connecting structure is applicable to build metope, in the rainy day, one Dividing rainwater can penetrate at the link position of two boards material, due to the existence of row tank, rainwater cannot ooze through space tank smoothly Entering inside body of wall, residing at the water in row tank will flow downward discharge along row tank.
Inventor, during realizing this utility model, finds that such scheme at least has following defects that above-mentioned sheet material Attachment structure is not particularly suited for building house roof, if being used for building house roof, rainwater will be easy to fill up row tank also Penetrate into inside roof through space tank.
Utility model content
In order to solve above-mentioned problems of the prior art, this utility model embodiment provides a kind of sheet material and connects knot Structure and sheet material.Described technical scheme is as follows:
First aspect, it is provided that a kind of plank connecting structure, described plank connecting structure includes: during at least 2 pieces adjacent First sheet material of hollow structure and the second sheet material, the fixture corresponding with described first sheet material and described second sheet material, and with institute State the pedestal that fixture is corresponding;
The first edges of boards connected with described second sheet material in described first sheet material are formed with row tank;
The upper edge of the second edges of boards connected with described first sheet material in described second sheet material is formed and is covered in described row water The shielding part at groove top;
Described fixture is by described first sheet material and described second board material splice, and the consolidating of described fixture and described pedestal Determine the fixing connection in face.
Alternatively, the downward turnup in upper edge of described first edges of boards is formed with described row tank.
Alternatively, described row tank take the shape of the letter U, any one in V-arrangement, rectangle or semicircle.
Alternatively, described fixture includes the first work shape fixed mount and at least one screw;
First end on the upper edge of described first work shape fixed mount is formed with limiting section, and the second end is formed with Plug Division;Described First end on the lower edge of the first work shape fixed mount is formed with the first butting section, and the second end is formed with the second butting section;Described first It is also formed with at least one fixing hole on work shape fixed mount;
Described limiting section is by spacing for the outward flange buckle of described row tank, and the bottom of described first edges of boards is against described first Butting section;Described Plug Division is plugged in the spliced eye that the side of described second edges of boards is formed, the bottom of described second edges of boards Against described second butting section;
The stationary plane of described first work shape fixed mount with described pedestal is fixed by described screw through described fixing hole.
Alternatively, described fixture includes the second work shape fixed mount and at least one screw;
Upper edge and the lower edge of the side of described second work shape fixed mount form the first inserting groove, described second work shape fixed mount Opposite side upper edge and lower along formed the second inserting groove, described second work shape fixed mount is also formed with at least one and fixes Hole;
The lower edge of described first edges of boards is formed with the first Plug Division, and described first Plug Division is plugged in described first inserting groove In;The lower edge of described second edges of boards is formed with the second Plug Division, and described second Plug Division is plugged in described second inserting groove;
The stationary plane of described second work shape fixed mount with described pedestal is fixed by described screw through described fixing hole.
Alternatively, described fixing hole runs through the axis of target work shape fixed mount;Or, described fixing hole runs through described target The lower edge of work shape fixed mount;
Wherein, described target work shape fixed mount is described first work shape fixed mount or described second work shape fixed mount.
Second aspect, it is provided that a kind of sheet material, described sheet material is hollow structure;First edges of boards of described sheet material are formed with row Tank;The upper edge of the second edges of boards of described sheet material is formed with the shielding part corresponding with described row tank.
Alternatively, the downward turnup in upper edge of described first edges of boards is formed with described row tank.
Alternatively, the side of described second edges of boards is formed with at least one spliced eye.
Alternatively, the lower edge of described first edges of boards is formed with the first Plug Division, and the lower edge of described second edges of boards is formed with Two Plug Divisions.
Some beneficial effects of the technical scheme that this utility model embodiment provides may include that
Solve the sheet material related in background technology and connect the problem that cannot be applicable to build house roof;This utility model The plank connecting structure that embodiment provides, is not only applicable to build metope, is also applied for building house roof, and drainage effect is more Good, rainwater can be derived smoothly along row tank.And the plank connecting structure that this utility model embodiment provides, surfacing, formed Board joint structure.
It should be appreciated that it is only exemplary that above general description and details hereinafter describe, can not be limited this Utility model.
Accompanying drawing explanation
In order to be illustrated more clearly that embodiment of the present utility model, in describing embodiment below, required use is attached Figure is briefly described, it should be apparent that, the accompanying drawing in describing below is only embodiments more of the present utility model, for this From the point of view of the those of ordinary skill of field, on the premise of not paying creative work, it is also possible to obtain other according to these accompanying drawings Accompanying drawing.
Fig. 1 is the schematic diagram of the attachment structure of a kind of existing FRP plate material;
Fig. 2 A is the schematic diagram of the plank connecting structure that one embodiment of this utility model provides;
Fig. 2 B is the schematic diagram of the plank connecting structure that another embodiment of this utility model provides;
Fig. 2 C corresponds to the overall diagram of the plank connecting structure shown in Fig. 2 A;
Fig. 2 D corresponds to the top view of the plank connecting structure shown in Fig. 2 C;
Fig. 2 E shows the schematic diagram of other several plank connecting structures being formed with row tank;
Fig. 3 A is the schematic diagram of the sheet material that one embodiment of this utility model provides;
Fig. 3 B is the schematic diagram of the sheet material that another embodiment of this utility model provides.
By above-mentioned accompanying drawing, it has been shown that the embodiment that this utility model is clear and definite, hereinafter will be described in more detail.These Accompanying drawing and word describe the scope being not intended to be limited this utility model design by any mode, but by with reference to specific Embodiment is that those skilled in the art illustrate concept of the present utility model.
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with accompanying drawing to this practicality Novel be described in further detail, it is clear that described embodiment be only this utility model some embodiments rather than Whole embodiments.Based on the embodiment in this utility model, those of ordinary skill in the art are not making creative work The all other embodiments obtained under premise, broadly fall into the scope of this utility model protection.
Refer to Fig. 2 A, it illustrates the schematic diagram of the plank connecting structure that one embodiment of this utility model provides.Should Plank connecting structure includes: the first sheet material 220 and the second sheet material 240 of at least 2 pieces of adjacent hollow structures, with the first sheet material 220 and second fixture 260 of sheet material 240 correspondence, and the pedestal (not shown) corresponding with fixture 260.
First sheet material 220 and the second sheet material 240 are hollow structure.Sheet material (that is, the first sheet material 220 and the second sheet material 240) top board and base plate are at least included.Hollow structure is formed, as shown in Figure 2 A between top board and base plate.Alternatively, sheet material is (i.e., First sheet material 220 and the second sheet material 240) also include middle plate.Within middle plate is positioned at above-mentioned hollow structure, as shown in Figure 2 B.At this In embodiment, the structure of centering plate is not construed as limiting, and such as middle plate can be strip stud, it is also possible to be shape wave plate, or poly-ammonia Ester cystosepiment, etc..
Additionally, in the present embodiment, the material of sheet material is not construed as limiting.Such as, the material of sheet material can be wood, gold Genus, alloy, plastics and FRP etc..Under normal circumstances, the plank connecting structure that the present embodiment provides, is FRP's for material Sheet material better adaptability.
Pedestal can be hollow structure, it is also possible to be solid construction, and its material can be wood, metal, alloy, mould Material, cement and FRP etc..It addition, pedestal is typically fabricated as square tube type, such as rustless steel square tube, aluminum alloy square tube.
The first edges of boards connected with the second sheet material 240 in first sheet material 220 are formed with row tank 221.In second sheet material 240 The upper edge of the second edges of boards connected with the first sheet material 220 is formed with the shielding part 241 being covered in row tank 221 top.
The row tank 221 water under oozing at the stitching position of the first sheet material 220 and the second sheet material 240 is derived.Example As, under rainwater likely oozes at the stitching position of the first sheet material 220 and the second sheet material 240, the rainwater under oozing can fall into row water In groove 221, derive along row tank 221 to target direction flowing.In a kind of possible embodiment, the first sheet material 220 The downward turnup in upper edge of the first edges of boards is formed with row tank, as shown in Fig. 2 A or Fig. 2 B.Alternatively, row tank take the shape of the letter U, V-arrangement, Any one in rectangle or semicircle.In Fig. 2 A and Fig. 2 B, only it is illustrated as a example by U-shaped row tank.Row water The bottom of groove is smooth, in order to water is derived.
Shielding part 241 can be stretched out by the upper edge of the second edges of boards of the second sheet material 240 and be formed.Alternatively, shielding part The outward flange of 241 bends downwards, so that under water the most gently oozes.
Alternatively, glue, or the first sheet material 220 He it are filled with at the stitching position of the first sheet material 220 and the second sheet material 240 It is provided with soft leather strap, to stop water ooze down to row tank 221 or reduce as much as possible at the stitching position of the second sheet material 240 Ooze the amount of water down to row tank 221.Such as, glue can select engineering silica gel, soft leather strap can select rubber leather strap.
First sheet material 220 and the second sheet material 240 are spliced by fixture 260, and the stationary plane of fixture 260 and pedestal is fixed Connect.
In a kind of possible embodiment, as shown in Figure 2 A, fixture 260 includes the first work shape fixed mount 261 and extremely A few screw 263.First end on the upper edge of the first work shape fixed mount 261 is formed with limiting section 261a, and the second end is formed slotting Meet portion 261b;First end on the lower edge of the first work shape fixed mount 261 is formed with the first butting section 261c, and the second end is formed with second Butting section 261d;It is also formed with at least one fixing hole 264 on first work shape fixed mount 261.Limiting section 261a is by row tank Outward flange buckle is spacing, and the bottom of the first edges of boards is against the first butting section 261c;Plug Division 261b is plugged in the side of the second edges of boards In the spliced eye (not shown) that face is formed, the bottom of the second edges of boards is against the second butting section 261d.Screw 263 is through solid Determine hole 264 to be fixed by the stationary plane of the first work shape fixed mount 261 with pedestal.
For the plank connecting structure shown in Fig. 2 A, first installation procedure can be such that places the first sheet material;And tailing edge First edges of boards of one sheet material place several the first work shape fixed mounts, and the first end buckle of each first work shape fixed mount is expert at water The outward flange of groove;Then on the fixing hole of the first work shape fixed mount, squeeze into screw, by consolidating of the first work shape fixed mount and pedestal Determine face to be fixed;Finally the second sheet material is plugged in the Plug Division of the second end of the first work shape fixed mount.
In alternatively possible embodiment, as shown in Figure 2 B, fixture 260 includes the second work shape fixed mount 262 He At least one screw 263.Upper edge and the lower edge of the side of the second work shape fixed mount 262 form the first inserting groove 262a, the second work Upper edge and the lower edge of the opposite side of shape fixed mount 262 form the second inserting groove 262b, and the second work shape fixed mount 262 is also formed with At least one fixing hole 264.The lower edge of the first edges of boards is formed with the first Plug Division 222, and the first Plug Division 222 is plugged in first and inserts In access slot 262a;The lower edge of the second edges of boards is formed with the second Plug Division 242, and the second Plug Division 242 is plugged in the second inserting groove In 262b.The stationary plane of the second work shape fixed mount 262 with pedestal is fixed by screw 263 through fixing hole 264.
For the plank connecting structure shown in Fig. 2 B, first installation procedure can be such that places the second sheet material;And tailing edge Second edges of boards of two sheet materials place several the second work shape fixed mounts, and the second inserting groove of each second work shape fixed mount is plugged in On second Plug Division of the second sheet material;Then on the fixing hole of the second work shape fixed mount, squeeze into screw, the second work shape is fixed Frame is fixed with the stationary plane of pedestal;Finally the first Plug Division of the first sheet material is plugged in each the second work shape fixed mount In second inserting groove.
The design structure of fixing hole 260 includes the following two kinds: 1, fixing hole 264 runs through the axis of target work shape fixed mount, As shown in Figure 2 A;2, fixing hole 264 runs through the lower edge of target work shape fixed mount, as shown in Figure 2 B.Wherein, target work shape fixed mount It is the first work shape fixed mount 261 or the second work shape fixed mount 262.
Additionally, in actual applications, the quantity of fixture 260 is multiple, and the plurality of fixture 260 is along the first edges of boards and Two edges of boards uniformly or are anisotropically arranged.It addition, in actual applications, can according to the first edges of boards and the length of the second edges of boards, Determine the quantity of required fixture.When the length of the first edges of boards and the second edges of boards is longer, fixture is more, with by the first plate Material 220 and the second sheet material 240 are the most firm.Additionally, each work shape fixed mount (includes the first work shape fixed mount and second Work shape fixed mount) on the quantity of fixing hole 264 can be one, it is also possible to being multiple (such as 2), fixing hole 264 quantity is more Many, by more screw 263, the stationary plane of work shape fixed mount with pedestal is fixed, the most firm.
Refer to Fig. 2 C, it illustrates the overall diagram corresponding to the plank connecting structure shown in Fig. 2 A.As shown in Figure 2 C, One sheet material 220 and the second sheet material 240 are connected by fixture (not shown) is fixing with pedestal 280.In first sheet material 220 with The first edges of boards that second sheet material 240 connects are formed with row tank 221.
Refer to Fig. 2 D, it illustrates the top view corresponding to the plank connecting structure shown in Fig. 2 C.Connect between adjacent sheet metal Connecing closely, and fixture does not exposes, fixture is difficult to be corroded or be difficult to get rusty, and service life is long, and sheet material connecting portion Point smooth surface, attractive in appearance.
Additionally, the edges of boards being positioned at the water outlet side of row tank can be formed with strip effluent trough, strip effluent trough is plugged on above-mentioned The edges of boards of the water outlet side of row tank, the bottom of strip effluent trough offers at least one outlet, can set under each outlet It is equipped with outlet pipe, thus water is down discharged.
In sum, the plank connecting structure that the present embodiment provides, solve the sheet material related in background technology and connect nothing The problem that method is applicable to build house roof;The plank connecting structure that the present embodiment provides, is not only applicable to build metope, also fits For building house roof, drainage effect more preferably, can derive smoothly along row tank by rainwater.Additionally, the sheet material that the present embodiment provides Attachment structure, surfacing, form board joint structure.
Refer to Fig. 2 E, it illustrates the schematic diagram of other several plank connecting structures being formed with row tank. As shown in (a) in Fig. 2 E, left side is the first sheet material and right side is the second sheet material, first connected with the second sheet material in the first sheet material The side of edges of boards is formed with row tank 21.As shown in (b) in Fig. 2 E, left side is the first sheet material and right side is the second sheet material, first The side of the first edges of boards connected with the second sheet material in sheet material is formed with row tank 22.As shown in (c) in Fig. 2 E, left side is first Sheet material and right side are the second sheet material, and the side of the first edges of boards connected with the second sheet material in the first sheet material is formed with row tank 23. As shown in (d) in Fig. 2 E, left side is the first sheet material and right side is the second sheet material, first connected with the second sheet material in the first sheet material The side of edges of boards is formed with row tank 24.
Refer to Fig. 3 A and Fig. 3 B, it illustrates the schematic diagram of the sheet material that one embodiment of this utility model provides.
Sheet material 30 is hollow structure.First edges of boards of sheet material 30 are formed with row tank 31;Second edges of boards of sheet material 30 upper Along being formed with the shielding part 32 corresponding with row tank 31.
Alternatively, the downward turnup in upper edge of the first edges of boards is formed with row tank.
Row tank takes the shape of the letter U, any one in V-arrangement, rectangle or semicircle.
In a kind of possible embodiment, the side of the second edges of boards is formed with at least one spliced eye.
In alternatively possible embodiment, the lower edge of the first edges of boards is formed with the first Plug Division, under the second edges of boards Along being formed with the second Plug Division.
The structure of this sheet material 30 and connected mode have been discussed in detail and have illustrated, the present embodiment is no longer Repeat.
Above-mentioned this utility model embodiment is disclosed exemplary embodiment, it should be noted that wanting without departing substantially from right On the premise of seeking the scope of the present utility model of restriction, may be many modifications and revise.Although it is additionally, of the present utility model Element can describe or requirement with individual form, it is also contemplated that multiple, it is odd number unless explicitly limited.
Above-mentioned this utility model embodiment sequence number, just to describing, does not represent the quality of embodiment.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all in this practicality Within novel spirit and principle, any modification, equivalent substitution and improvement etc. made, should be included in guarantor of the present utility model Within the scope of protecting.

Claims (9)

1. a plank connecting structure, it is characterised in that described plank connecting structure includes: at least 2 pieces of adjacent hollow structures The first sheet material and the second sheet material, the fixture corresponding with described first sheet material and described second sheet material, and fixing with described The pedestal that part is corresponding;
The first edges of boards connected with described second sheet material in described first sheet material are formed with row tank;
The upper edge of the second edges of boards connected with described first sheet material in described second sheet material is formed and is covered in described row tank top The shielding part in portion;
Described fixture is by described first sheet material and described second board material splice, and the stationary plane of described fixture and described pedestal Fixing connection.
Plank connecting structure the most according to claim 1, it is characterised in that the upper edge downward turnup shape of described first edges of boards Become to have described row tank.
Plank connecting structure the most according to claim 2, it is characterised in that described row tank takes the shape of the letter U, V-arrangement, rectangle or Any one in semicircle.
Plank connecting structure the most according to claim 2, it is characterised in that described fixture includes the first work shape fixed mount With at least one screw;
First end on the upper edge of described first work shape fixed mount is formed with limiting section, and the second end is formed with Plug Division;Described first First end on the lower edge of work shape fixed mount is formed with the first butting section, and the second end is formed with the second butting section;Described first work shape At least one fixing hole it is also formed with on fixed mount;
Described limiting section by spacing for the outward flange buckle of described row tank, the bottom of described first edges of boards against described first against Portion;Described Plug Division is plugged in the spliced eye that the side of described second edges of boards is formed, the bottom of described second edges of boards against Described second butting section;
The stationary plane of described first work shape fixed mount with described pedestal is fixed by described screw through described fixing hole.
Plank connecting structure the most according to claim 2, it is characterised in that described fixture includes the second work shape fixed mount With at least one screw;
The upper edge of the side of described second work shape fixed mount and lower along forming the first inserting groove, described second work shape fixed mount another Upper edge and the lower edge of side form the second inserting groove, and described second work shape fixed mount is also formed with at least one fixing hole;
The lower edge of described first edges of boards is formed with the first Plug Division, and described first Plug Division is plugged in described first inserting groove; The lower edge of described second edges of boards is formed with the second Plug Division, and described second Plug Division is plugged in described second inserting groove;
The stationary plane of described second work shape fixed mount with described pedestal is fixed by described screw through described fixing hole.
6. a sheet material, it is characterised in that described sheet material is hollow structure;First edges of boards of described sheet material are formed with row tank; The upper edge of the second edges of boards of described sheet material is formed with the shielding part corresponding with described row tank.
Sheet material the most according to claim 6, it is characterised in that the downward turnup in upper edge of described first edges of boards is formed described Row tank.
Sheet material the most according to claim 7, it is characterised in that the side of described second edges of boards is formed with at least one grafting Hole.
Sheet material the most according to claim 7, it is characterised in that the lower edge of described first edges of boards is formed with the first Plug Division, The lower edge of described second edges of boards is formed with the second Plug Division.
CN201620444888.2U 2016-05-16 2016-05-16 Plank connecting structure and sheet material Expired - Fee Related CN205857520U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620444888.2U CN205857520U (en) 2016-05-16 2016-05-16 Plank connecting structure and sheet material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620444888.2U CN205857520U (en) 2016-05-16 2016-05-16 Plank connecting structure and sheet material

Publications (1)

Publication Number Publication Date
CN205857520U true CN205857520U (en) 2017-01-04

Family

ID=57643418

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620444888.2U Expired - Fee Related CN205857520U (en) 2016-05-16 2016-05-16 Plank connecting structure and sheet material

Country Status (1)

Country Link
CN (1) CN205857520U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914682A (en) * 2017-12-12 2019-06-21 上海三现净化装饰工程有限公司 A kind of wall barrier plate not gluing composite plate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914682A (en) * 2017-12-12 2019-06-21 上海三现净化装饰工程有限公司 A kind of wall barrier plate not gluing composite plate
CN109914682B (en) * 2017-12-12 2023-12-05 上海三现净化装饰工程有限公司 Non-glue-beating composite board for wall partition board

Similar Documents

Publication Publication Date Title
CN205857520U (en) Plank connecting structure and sheet material
US20180132428A1 (en) Building Structure, Building and Greenhouse
CN110284802B (en) Modular frameless door pocket mounting structure
CN106313306A (en) Combined formwork with optical fiber arranged evenly, wiring unit and using method thereof
CN205804758U (en) Steel construction plate
CN208455905U (en) A kind of moulding aluminum profile
CN203145793U (en) Shutter
CN215926576U (en) Spliced sports wood floor structure
CN205399176U (en) Arched bridge structure
CN209293408U (en) A kind of building template
CN217840590U (en) Resin tile of convenient installation
CN108590022B (en) Stainless steel corrugated plate for outdoor building curtain wall
CN209907702U (en) Top surface mantle smallpox binding off mounting structure of assembled fitment
CN209722777U (en) Multiple groups Bailey beam fixed support body system
CN208203733U (en) A kind of profile corner connecting assemldy
CN208748971U (en) A kind of engineering plastic resin watt
CN110258853B (en) Wallboard connecting method, connecting structure and quick-assembly wallboard for aluminum house
CN219528225U (en) Wear-resisting stone plate
CN207994523U (en) A kind of large span aluminum cable tray
CN214531591U (en) Modeling awning and high-through stainless steel stand column
CN211548486U (en) High-strength aluminum-plastic plate capable of being spliced quickly
CN211239175U (en) Bridge with splicing structure
CN215395881U (en) Concrete prefabricated part fixing assembly
CN214755317U (en) Polymer anti-corrosion cable bridge
CN222183986U (en) A kind of aluminum profile for imitating edge grinding stone for exterior wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170104