Drilling bit of rotary-digging drilling rig for big erratic boulder earth-boring pouring pile hole Download PDF

Info

Publication number
CN205713996U
CN205713996U CN201620580697.9U CN201620580697U CN205713996U CN 205713996 U CN205713996 U CN 205713996U CN 201620580697 U CN201620580697 U CN 201620580697U CN 205713996 U CN205713996 U CN 205713996U
Authority
CN
China
Prior art keywords
bucket
upper strata
lower floor
earth
erratic boulder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620580697.9U
Other languages
Chinese (zh)
Inventor
靳利安
房师涛
王成
李宗奇
任跃勤
祝全兵
张剑
聂华
鲍明星
胡海明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Railway Construction Co Ltd
Chengdu Hydropower Construction Engineering Co Ltd of Sinohydro Bureau 7 Co Ltd
Original Assignee
PowerChina Railway Construction Co Ltd
Chengdu Hydropower Construction Engineering Co Ltd of Sinohydro Bureau 7 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Railway Construction Co Ltd, Chengdu Hydropower Construction Engineering Co Ltd of Sinohydro Bureau 7 Co Ltd filed Critical PowerChina Railway Construction Co Ltd
Priority to CN201620580697.9U priority Critical patent/CN205713996U/en
Application granted granted Critical
Publication of CN205713996U publication Critical patent/CN205713996U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

For the drilling bit of rotary-digging drilling rig of big erratic boulder earth-boring pouring pile hole, to be effectively improved hole quality and the pore-forming efficiency of big erratic boulder earth-boring bored concrete pile.Including cylinder and being arranged at the bottom of the bucket bottom it.Include having at the bottom of the upper strata bucket in double fanning strip face at the bottom of described bucket, the lower floor bucket end, upper strata bucket back welding is connected on the lower end of cylinder, and lower floor's bucket centre at the bottom of the end, upper strata bucket is rotatably connected, and is provided with, on the lower floor bucket end, the center riser downwardly extended.The inner side of two scallops being located along the same line at the bottom of the bucket of described upper strata is fixedly installed the baffle plate downwardly extended, and (fixing the setting in a row in the inner side of two scallops being located along the same line downwardly extends pick at the lower floor bucket end.At the bottom of the bucket of described upper strata, the arc length of opening is not less than 40cm at lower floor the bucket end.

Description

Drilling bit of rotary-digging drilling rig for big erratic boulder earth-boring pouring pile hole
Technical field
This utility model relates to engineering driller, digs particularly to a kind of rotation for big erratic boulder earth-boring pouring pile hole Drill bit of drilling machine.
Background technology
Erratic boulder typically refers to the underground particle diameter ratchel more than 200mm, generally composes and exists in sand-pebble layer.Erratic boulder stratum Hole between granule is big, do not have cohesive strength, arrange irregular, not of uniform size;And the big particle diameter erratic boulder containing high intensity is difficult With broken, permeability is big, is often accompanied by the subsoil water enriched, brings great difficulty to bored pile construction.
In bored pile construction, rotary drilling rig have speed of fulfiling hole fast, without extrusion effect, little without earthquake, noise and Without advantages such as mud circulations, it is widely applied.To general cohesive soil, banket, the ground such as muck soil, sand and land pebble Layer, rotary drilling rig passes through conveniently, and pore-forming is effective.
Rotation is dug bit drill and opened body drill bit is all the drill bit being most widely used in rotary drilling rig construction, it is adaptable to sand ovum Stone stratum.Employing opens body drill bit when creeping into, and boring mud easily causes a large amount of boring mud during carrying slag after filling drilling bucket and drops, merit of holing Imitate the very end.
Existing rotation dig bit drill due in big erratic boulder stratum erratic boulder arrange random, not of uniform size, cause section Uneven, bucket tooth discontinuity when pore-forming creeps into, vibrations are big, and counteracting force the most easily occurs that broken teeth, perpendicularity should not be controlled System, big drift cobble fish for the situations such as difficulty.
Therefore, it is irrigated pile driving construction on rich water erratic boulder stratum, also there is no ideal erratic boulder treating method.In order to subtract Bucket tooth discontinuity when few traditional rotary drilling rig pore-forming creeps into, counteracting force the most easily occurs that broken teeth, perpendicularity should not be controlled System, big drift cobble fish for the situations such as difficulty, are badly in need of redesigning drilling bit of rotary-digging drilling rig, thus solve this technical barrier.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of for big erratic boulder earth-boring pouring pile hole Drilling bit of rotary-digging drilling rig, to be effectively improved hole quality and the pore-forming efficiency of big erratic boulder earth-boring bored concrete pile.
The technical scheme that the above-mentioned technical problem of this utility model solution is taked is as follows:
Drilling bit of rotary-digging drilling rig for big erratic boulder earth-boring pouring pile hole of the present utility model, including cylinder and setting At the bottom of bucket bottom it, it is characterized in that: include having at the bottom of the upper strata bucket in double fanning strip face at the bottom of described bucket, lower floor struggles against at the end, struggles against in upper strata Back welding is connected on the lower end of cylinder, and lower floor's bucket centre at the bottom of the end, upper strata bucket is rotatably connected, and arranges on the lower floor bucket end There is the center riser downwardly extended;The inner side of two scallops being located along the same line at the bottom of the bucket of described upper strata is fixedly installed downwards The baffle plate extended, (fixing the setting in a row in the inner side of two scallops being located along the same line downwardly extends pick at the lower floor bucket end; At the bottom of the bucket of described upper strata, the arc length of opening is not less than 40cm at lower floor the bucket end.
The beneficial effects of the utility model are, for big erratic boulder stratum, and the situation that especially erratic boulder particle diameter > 30cm is more, Optimize bucket bottom structure and opening size, can quickly drill through the erratic boulder of > 30cm when churning driven enters, successfully solve drill bit Pick abrasion is big, construction cost high, rate of penetration slow-motion and cause the situation of collapse hole.
Accompanying drawing explanation
This specification includes following three width accompanying drawings:
Fig. 1 is this utility model front view for the drilling bit of rotary-digging drilling rig of big erratic boulder earth-boring pouring pile hole;
Fig. 2 is that this utility model (bores for the upward view of the drilling bit of rotary-digging drilling rig of big erratic boulder earth-boring pouring pile hole Head closure state);
Fig. 3 this utility model is for the upward view (drill bit of the drilling bit of rotary-digging drilling rig of big erratic boulder earth-boring pouring pile hole Open state).
Component name shown in figure and corresponding labelling: at the bottom of cylinder 10, upper strata bucket 11, lower floor the bucket end 12, center riser 13, pick 14, baffle plate 15, arc length K.
Detailed description of the invention
Below in conjunction with accompanying drawing illustrated embodiment, this utility model is further described.
With reference to Fig. 1, Fig. 2 and Fig. 3, the rotary drilling rig for big erratic boulder earth-boring pouring pile hole of the present utility model Upward view, including cylinder 10 be arranged at the bottom of the bucket bottom it.Include having at the bottom of the upper strata bucket in double fanning strip face 11 at the bottom of described bucket, The lower floor bucket end 12, at the bottom of the bucket of upper strata, 11 are welded on the lower end of cylinder 10, and at the bottom of lower floor the bucket end 12, upper strata bucket, the centre of 11 can be revolved Turn and connect, and be provided with, on the lower floor bucket end 12, the center riser 13 downwardly extended.At the bottom of the bucket of described upper strata, 11 are positioned at same straight line On the inner side of two scallops be fixedly installed the baffle plate 15 downwardly extended, two fans that lower floor is located along the same line at the bucket end 12 Fixing the setting in a row in the inner side on shape limit downwardly extends pick 14.Arc length K of opening at the bottom of the bucket of described upper strata 11, at lower floor the bucket end 12 Not less than 40cm.
When churning driven enters downwards, cylinder 10 rotates forward, and under center riser 13 acts on, the lower floor bucket end 12 is relative to upper strata The bucket end 11, rotates to an angle, by arrange baffle plate 15 limit at the bottom of the bucket of upper strata 11, the size of two openings at the lower floor bucket end 12, with Shi Liyong pick 14, will float cobble and soil loads in drill bit cylinder 10.When cylinder 10 reversely rotates, act at center riser 13 Under, lower floor reversely rotates certain angle relative at the bottom of the bucket of upper strata 11 in the bucket end 12, is closed by opening, by rig lifting device with flexible Cylinder 10 is proposed to unload outside hole soil by formula drilling rod.
This utility model, for big erratic boulder stratum, the situation that especially erratic boulder particle diameter > 30cm is more, optimizes bucket bear building-up Structure and opening size, can quickly drill through the erratic boulder of > 30cm when churning driven enters, and successfully solves drill bit pick and weares and teares greatly, executes Work cost is high, rate of penetration slow-motion and cause the situation of collapse hole.
The above principle more of the present utility model that simply explain through diagrams, is not intended to be confined to this utility model Shown in and described concrete structure and the scope of application in, therefore every corresponding amendment being likely utilized and equivalent, all Belong to the apllied the scope of the claims of this utility model.

Claims (1)

1. for the drilling bit of rotary-digging drilling rig of big erratic boulder earth-boring pouring pile hole, including cylinder (10) be arranged at bottom it The bucket end, it is characterized in that: include having (11) at the bottom of the upper strata bucket in double fanning strip face, lower floor's bucket end (12) at the bottom of described bucket, at the bottom of the bucket of upper strata (11) being welded on the lower end of cylinder (10), at the bottom of lower floor's bucket end (12), upper strata bucket, the centre of (11) is rotatably connected, and It is provided with, in lower floor's bucket end (12), the center riser (13) downwardly extended;(11) at the bottom of the bucket of described upper strata be located along the same line two The inner side of bar scallop is fixedly installed the baffle plate (15) downwardly extended, two sectors that lower floor's bucket end (12) is located along the same line Fixing the setting in a row in the inner side on limit downwardly extends pick (14);Opening between (11), lower floor's bucket end (12) at the bottom of the bucket of described upper strata Arc length (K) is not less than 40cm.
CN201620580697.9U 2016-06-15 2016-06-15 Drilling bit of rotary-digging drilling rig for big erratic boulder earth-boring pouring pile hole Expired - Fee Related CN205713996U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620580697.9U CN205713996U (en) 2016-06-15 2016-06-15 Drilling bit of rotary-digging drilling rig for big erratic boulder earth-boring pouring pile hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620580697.9U CN205713996U (en) 2016-06-15 2016-06-15 Drilling bit of rotary-digging drilling rig for big erratic boulder earth-boring pouring pile hole

Publications (1)

Publication Number Publication Date
CN205713996U true CN205713996U (en) 2016-11-23

Family

ID=57306536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620580697.9U Expired - Fee Related CN205713996U (en) 2016-06-15 2016-06-15 Drilling bit of rotary-digging drilling rig for big erratic boulder earth-boring pouring pile hole

Country Status (1)

Country Link
CN (1) CN205713996U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098657A (en) * 2018-10-24 2018-12-28 云南建投基础工程有限责任公司 A kind of high-voltage water jet device and method of the processing erratic boulder in conjunction with rotary pile-digging machine
CN112281805A (en) * 2020-11-24 2021-01-29 中铁三局集团建筑安装工程有限公司 Deep collapsible loess comprehensive treatment structure and construction method
CN113236131A (en) * 2021-06-28 2021-08-10 湖南省大盛基础工程有限公司 Bottom expanding drill bit
CN115030676A (en) * 2022-08-09 2022-09-09 南通东方雨虹建筑材料有限公司 Rotary excavating device for building construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098657A (en) * 2018-10-24 2018-12-28 云南建投基础工程有限责任公司 A kind of high-voltage water jet device and method of the processing erratic boulder in conjunction with rotary pile-digging machine
CN112281805A (en) * 2020-11-24 2021-01-29 中铁三局集团建筑安装工程有限公司 Deep collapsible loess comprehensive treatment structure and construction method
CN113236131A (en) * 2021-06-28 2021-08-10 湖南省大盛基础工程有限公司 Bottom expanding drill bit
CN115030676A (en) * 2022-08-09 2022-09-09 南通东方雨虹建筑材料有限公司 Rotary excavating device for building construction

Similar Documents

Publication Publication Date Title
CN205713996U (en) Drilling bit of rotary-digging drilling rig for big erratic boulder earth-boring pouring pile hole
CN109653682B (en) Drill bit with adjustable drill diameter and hole digging machine
CN106168024A (en) A drilling construction method is dug in special formation rotation
CN101173517A (en) Pile-pulling construction method
CN106088064A (en) A kind of hard stratum precrushing three axle cement mixing pile drilling tool and construction method thereof
JP2021165468A (en) Construction method of steel pipe pile
CN108086342A (en) The construction method of karst strata pile foundation
CN104805831A (en) Pore-forming method of hard rock foundation pile with large diameter
CN203584319U (en) Desilter for rotary drilling rig
US9469959B2 (en) Full displacement pile tip and method for use
CN203655162U (en) Improved drilling head used for pump suction reverse circulation
CN206800431U (en) A kind of sealing bottom type caisson wall
CN112901074A (en) Rock-socketed drilling pore-forming process of marine large-diameter inclined pile rotary excavator
CN206942652U (en) Stone cylinder is taken to bore
KR101237749B1 (en) Propulsion unit head that is used in shield method
CN201190279Y (en) Construction equipment for spiral digging small-diameter bored pile
CN205894066U (en) Hard stratum is broken triaxial cement stirring stake drilling tool in advance
CN214997452U (en) Large-scale long auger drilling that shakes
KR100478234B1 (en) Pile excution machine using screw hammer
CN218376336U (en) Ultra-long auger drill bit suitable for beach area
KR101337223B1 (en) Apparatus Equipped with Double Casing for Inserting Plastic Drain Board and Process thereof
CN211115837U (en) Horizontal well directional well drilling column anti-clamping device
CN206916750U (en) A kind of foundation pit support device
CN204590042U (en) A kind of deep-sea tunnel boring stake space enclosing structure
JP3938440B2 (en) Pile penetration method and apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161123

CF01 Termination of patent right due to non-payment of annual fee