CN205662832U - Under hold formula beiLei beam steel suspension bridge - Google Patents

Under hold formula beiLei beam steel suspension bridge Download PDF

Info

Publication number
CN205662832U
CN205662832U CN201620509336.5U CN201620509336U CN205662832U CN 205662832 U CN205662832 U CN 205662832U CN 201620509336 U CN201620509336 U CN 201620509336U CN 205662832 U CN205662832 U CN 205662832U
Authority
CN
China
Prior art keywords
crossbeam
distribution
bailey beam
bridge
supporting construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620509336.5U
Other languages
Chinese (zh)
Inventor
李建军
罗建丰
赵永达
邵枫
张建秋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Fifth Engineering Co Ltd
Original Assignee
CCCC First Highway Fifth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Fifth Engineering Co Ltd filed Critical CCCC First Highway Fifth Engineering Co Ltd
Priority to CN201620509336.5U priority Critical patent/CN205662832U/en
Application granted granted Critical
Publication of CN205662832U publication Critical patent/CN205662832U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides an under hold formula beiLei beam steel suspension bridge, includes left lower part bearing structure, right lower part bearing structure, left beiLei beam, right beiLei beam and bridge floor. Left side lower part bearing structure and right lower part bearing structure symmetry are fixed in the right bank and left bank, left side lower part bearing structure and right lower part bearing structure are all including enlarging the basis and being fixed in the abutment that enlarges basic centre of surface, the horizontal orientation in left lower part bearing structure and right lower part bearing structure's surface respectively fixed mounting have left dun ding distribution crossbeam and right dunding distribution crossbeam, left side beiLei beam sets up in the bridge floor left side, and its both ends are fixed with left dun ding distribution crossbeam and right dunding distribution crossbeam respectively, the right side beiLei beam set up in the bridge floor right side, and its both ends are fixed with left dun ding distribution crossbeam and right dunding distribution crossbeam respectively, region between left beiLei beam and right beiLei beam, equidistant fixed mounting a plurality of transverse distribution roof beam, on the transverse distribution roof beam, equidistant fixed mounting a plurality of vertically distributes the roof beam, on vertically distribute the roof beam, lay the bridge floor. The utility model discloses can regard as interim sidewalk in the construction in the river course of shoal, have simple structure, strong adaptability, interchangeability is good, demolishs characteristics such as convenient.

Description

Base-supporting Bailey beam steel suspension bridge
Technical field
This utility model belongs to bridge construction technical field, is specifically related to a kind of base-supporting Bailey beam steel suspension bridge.
Background technology
Steel suspension bridge is bridge foundation, is the transport channel of the materials such as the reinforcing bar of superstructure, concrete, template;Be rig, The plant equipment such as crane, Construction traffic is marched into the arena or transition passage;It is the passages that pass through of personnel.At present, answering in constructing on the water With more and more extensive.
But, existing steel suspension bridge still has the erection problems such as speed is slow, intensity is little and support force is limited, is not suitable for It is applied in Longspan Bridge construction.
Utility model content
The defect existed for prior art, this utility model provides a kind of base-supporting Bailey beam steel suspension bridge, can efficient solution Certainly the problems referred to above.
The technical solution adopted in the utility model is as follows:
This utility model provides a kind of base-supporting Bailey beam steel suspension bridge, supports including lower left quarter supporting construction (1), right lower quadrant Structure (2), left Bailey beam (3), right Bailey beam (4) and bridge floor (5);
Wherein, described lower left quarter supporting construction (1) and described right lower quadrant supporting construction (2) are symmetrically fixed on two sides;Described Lower left quarter supporting construction (1) and described right lower quadrant supporting construction (2) all include Extended chemotherapy (1.1) and are fixed on described expansion The abutment (1.2) of basis (1.1) centre of surface;
Surface horizontal direction described lower left quarter supporting construction (1) and described right lower quadrant supporting construction (2) is fixed respectively Left pier top distribution crossbeam (6) and right pier top distribution crossbeam (7) are installed;Described left Bailey beam (3) is arranged on the left of bridge floor, and they are two years old End is fixed with described left pier top distribution crossbeam (6) and described right pier top distribution crossbeam (7) respectively;Described right Bailey beam (4) is arranged On the right side of bridge floor, its two ends are fixed with described left pier top distribution crossbeam (6) and described right pier top distribution crossbeam (7) respectively;Institute State the region between left Bailey beam (3) and described right Bailey beam (4), equidistantly fixedly mount several transverse distribution beams (8);? Above described transverse distribution beam (8), equidistantly several longitudinal distribution beam (9) of fixed installation;Described longitudinal distribution beam (9) Above, lay described bridge floor (5).
Preferably, described Extended chemotherapy (1.1) lateral length 9m, longitudinal length 3m, high 3m;Described abutment (1.2) is horizontal Length 8m, longitudinal length 1.2m, high 1.8m.
Preferably, described lower left quarter supporting construction (1) and the outside of described right lower quadrant supporting construction (2) use gabion to prevent Protect.
Preferably, described left pier top distribution crossbeam (6) and described right pier top distribution crossbeam (7) use Two bors d's oeuveres I25 I-steel.
Preferably, described transverse distribution beam (8) uses 2I25a crossbeam, and crossbeam is positioned at Bailey bracket montant and the joint of Bailey beam Point position, spacing 150cm;Described longitudinal distribution beam (9) uses 2I12.6 longeron, spacing 40cm.
Preferably, described bridge floor (5) uses 10mm thickness checkered steel plate.
The base-supporting Bailey beam steel suspension bridge that this utility model provides has the advantage that
The base-supporting Bailey beam steel suspension bridge that this utility model provides, as interim sidewalk, tool in construction in river course, shoal Having simple in construction, strong adaptability, interchangeability is good, and dismounting is convenient, sets up speed fast, and load-carrying is big, low cost, and the intensity of structure is with just Spend high distinguishing feature, the related request of Longspan Bridge capital construction can be met, can be widely used among construction.
Accompanying drawing explanation
Longitudinal sectional schematic diagram of the base-supporting Bailey beam steel suspension bridge that Fig. 1 provides for this utility model;
Fig. 2 is the partial enlarged drawing of Fig. 1;
The horizontal sectional schematic diagram of the base-supporting Bailey beam steel suspension bridge that Fig. 3 provides for this utility model.
Detailed description of the invention
In order to make this utility model be solved the technical problem that, technical scheme and beneficial effect clearer, below In conjunction with drawings and Examples, this utility model is further elaborated.Should be appreciated that described herein being embodied as Example, only in order to explain this utility model, is not used to limit this utility model.
In conjunction with Fig. 1-Fig. 3, this utility model provides a kind of base-supporting Bailey beam steel suspension bridge, including lower left quarter supporting construction 1, Right lower quadrant supporting construction 2, left Bailey beam 3, right Bailey beam 4 and bridge floor 5;
Wherein, lower left quarter supporting construction 1 and right lower quadrant supporting construction 2 are symmetrically fixed on two sides;Lower left quarter supporting construction 1 He Right lower quadrant supporting construction 2 all includes Extended chemotherapy 1.1 and is fixed on the abutment 1.2 of Extended chemotherapy 1.1 centre of surface;Expand base Plinth 1.1 lateral length 9m, longitudinal length 3m, high 3m;Abutment 1.2 lateral length 8m, longitudinal length 1.2m, high 1.8m.Lower left quarter Supporting construction 1 and the outside of right lower quadrant supporting construction 2 use gabion protection.Concrete pillar installed below at Extended chemotherapy Pier, concrete column pier is at the water surface following buried depth 3m, the above 3m of the water surface.
Surface horizontal direction in lower left quarter supporting construction 1 and right lower quadrant supporting construction 2 is installed with left pier top respectively Distribution crossbeam 6 and right pier top distribution crossbeam 7;Left Bailey beam 3 is arranged on the left of bridge floor, and crossbeam is distributed with left pier top respectively in its two ends 6 and right pier top distribution crossbeam 7 fix;Right Bailey beam 4 is arranged on the right side of bridge floor, its two ends respectively with left pier top distribution crossbeam 6 and Right pier top distribution crossbeam 7 is fixed;Region between left Bailey beam 3 and right Bailey beam 4, equidistantly fixedly mounts several horizontal Distribution beam 8;On transverse distribution beam 8, equidistantly several longitudinal distribution beam 9 of fixed installation;Upper in longitudinal distribution beam 9 Face, lays bridge floor 5.
In this utility model, left pier top distribution crossbeam 6 and right pier top distribution crossbeam 7 use Two bors d's oeuveres I25 I-steel.Bailey beam For lower load-bearing force design, Bailey beam uses Bailey bracket assembled, and girder is that the Bailey truss of four row's monolayers is assembled, passes through Two bors d's oeuveres I25 I-steel acts on abutment, it is ensured that Bailey beam lower edge is away from more than water surface 3m.Transverse distribution beam 8 uses 2I25a crossbeam, horizontal Beam is positioned at Bailey bracket montant and node location, spacing 150cm of Bailey beam;Longitudinal distribution beam 9 uses 2I12.6 longeron, spacing 40cm.Bridge floor 5 uses 10mm thickness checkered steel plate, both can guarantee that certain support strength, and had had again anti-skidding effect, prevent pedestrian or Vehicle slips.
Above-mentioned steel suspension bridge construction method: abutment Extended chemotherapy uses mechanical bond hand excavation, C25 concreting;In Between bridge pier use build cofferdam, island method construction;Beret truss uses on-site consolidation, crane to coordinate jack and winch dragging to set up, just Bridge floor girder system is installed after Wei.
Construction technology process: measurement and positioning foundation construction bridge sill installs Bailey beam mounting bridge panel peace Dress railing accessory structure is installed.
Detailed construction process be described below:
1) construction lofting
Surveying party, according to design drawing, is released sideline, abutment position with total powerstation, is made steel suspension bridge axis and measure absolute altitude, Determine cutting depth;Determine the position of steel-pipe pile in water outlet simultaneously.
2) excavation of foundation pit
Abutment is positioned at both sides, river course on the bank, and Extended chemotherapy uses mechanical bond hand excavation, is first entered in two sides by digging machine Row excavates on a large scale, notes excavation slope stability, it is ensured that construction safety in work progress.Machine finish less than position artificial Clear up.
3) abutment construction
Abutment uses C25 concrete Extended chemotherapy, basic long 9m, wide 3m, high 3m.Base center arranges abutment, finite element 1.8m, length 8m, width 1.2m.Concrete is numbered C25 concrete, concrete vibration compacting to be guaranteed in casting process.In abutment work progress Note top embedded bar.Abutment and basis around use gabion to protect.
4) Bailey truss is assembled
Bridge pier uses C25 concrete concrete column pier, and bridge pier is at the water surface following buried depth 3m, and the above 3m of the water surface, before Bridge Pier Construction Filling platform cofferdam, surveying and locating goes out pier location, excavation pit to stable basement rock, installation form, adjusts the vertical degree of template Cannot be greater than 20mm, anhydrous entrance in must assure that template during formwork erection.Before casting concrete, it is necessary to by dry for cleaning at the bottom of substrate Only, then casting concrete is to designed elevation, and vibration compacting in layering (thickness about 30cm), and effect of vibrating is put down with concrete surface Smooth bleeding is advisable.Concrete strength reaches to carry out during the 90% of design strength installation and the welding of pier top I-steel.
5) Bailey truss is assembled
Shellfish thunder girder is assembled in ward, the Bailey beam intending installing is lifted, is placed on after the Bailey beam installed, And in line therewith, Bailey beam front end is lifted through gusset plate by two people with waddy, after lower edge pin-and-hole alignment, inserts pin, Lift Bailey beam rear end the most again, insert and wind up pin and set night bolt.The assembly of shellfish thunder is carried out by group, the most assembled one group of shellfish Thunder (horizontal four rows), often the group long 27m of shellfish thunder, connects with flower stand between beret truss.It is assembled in back court to carry out.For ensureing the firm of beam Spending, all bolt nuts of truss frame for connecting must be tightened, and truss pin must be plugged safety plug behind position.
6) first install across longeron
Owing to Bailey beam weight is little (27m weighs about 9.72t across footpath 4 row's Bailey beam), loop wheel machine has enough lifting capacities, therefore single Set up as one group across 4 row's Bailey beams simultaneously.
6.1) on abutment top and steel-pipe pile crossbeam, carry out surveying and locating, make Bailey bracket accurate location.
6.2) by the assembly one group of shellfish thunder main truss sheet entrucking after good and be transported to after truck crane.
6.3) every 4 of shellfish thunder is divided into one group, and first truck crane or pedrail crane install one group of shellfish thunder, accurate rear first jail in place Admittedly be bundled on crossbeam, then welded limiting device, then another group beret truss is installed, simultaneously with mounted one group of shellfish thunder shellfish thunder Sheet bridging is attached..
7) first install across crossbeam
Crossbeam uses 2I25a I-steel, long 6.5m, net span 4.5m.
Use 25t truck crane to carry out the installation of shaped steel distribution beam, by spacing, crossbeam is installed, and fixes with U-bolt.Horizontal The fulcrum of beam must necessarily be placed in Bailey beam and erects chord member or the position of the fulcrum of rhombus chord member, to meet force request.Lifting put in place after with Bailey beam electric spot welding is connected into entirety, and throat depth meets design requirement.
8) the first bridge face distribution beam is installed
Longeron and crossbeam just can install distribution beam after adjusting linear and position.Longeron uses 2I12.6 I-steel, and Row places vertically on crossbeam, spacing 40cm.Longeron joint is located at 1/4 cross-location as far as possible, and requires to be staggeredly arranged, same section Plane tie must not exceed 25%.Use steel plate Double-face adhesive soldering strong after first being welded by I-steel steel again.
9) floorings and accessory structure
Suspension bridge width 4.5m, floorings use 10mm steel plate, fix with longitudinal beam welding.Bridge surface armor plate selects the deep decorative pattern of high-quality Checkered plates, prevents rainy day pedestrian from slipping or motor vehicles skids.Floorings carry out lighting tube line after installing and other are attached The installation of structure.
10) second install across structure
Second after Bailey beam assembly well, and repetition first is across installation steps, until view picture steel suspension bridge installs.
This steel suspension bridge dead load is mainly the dead loads such as shaped steel bridge deck, Bailey beam, and dead load considers that 1.2 safety coefficients are carried out Load Combination, owing to mobile load has contemplated that 1.2 impact coefficients, the most separately counts according to the 4.1.6 of " highway bridge and culvert design general specification " Combination coefficient.Specify according to " highway bridge and culvert steel construction and Code for design of timber structures ": temporary structure allowable stress can improve 1.3 (combination I: dead load+-I grade of highway carload+variable load), 1.4 (combinations II: dead load+creeper truck+variable load).This steel Suspension bridge shaped steel bending allowable stress takes 1.4 × 145=203MPa, and allowable shearing stress takes 1.4 × 85=119MPa.
The base-supporting Bailey beam steel suspension bridge that this utility model provides, as interim sidewalk, tool in construction in river course, shoal Having simple in construction, strong adaptability, interchangeability is good, and dismounting is convenient, sets up speed fast, and load-carrying is big, low cost, and the intensity of structure is with just Spend high distinguishing feature, the related request of Longspan Bridge capital construction can be met, can be widely used among construction.
The above is only preferred implementation of the present utility model, it is noted that for the common skill of the art For art personnel, on the premise of without departing from this utility model principle, it is also possible to make some improvements and modifications, these improve and Retouching also should regard protection domain of the present utility model.

Claims (6)

1. a base-supporting Bailey beam steel suspension bridge, it is characterised in that include lower left quarter supporting construction (1), right lower quadrant supporting construction (2), left Bailey beam (3), right Bailey beam (4) and bridge floor (5);
Wherein, described lower left quarter supporting construction (1) and described right lower quadrant supporting construction (2) are symmetrically fixed on two sides;Described lower-left Portion's supporting construction (1) and described right lower quadrant supporting construction (2) all include Extended chemotherapy (1.1) and are fixed on described Extended chemotherapy (1.1) abutment (1.2) of centre of surface;
Surface horizontal direction described lower left quarter supporting construction (1) and described right lower quadrant supporting construction (2) fixedly mounts respectively There are left pier top distribution crossbeam (6) and right pier top distribution crossbeam (7);Described left Bailey beam (3) is arranged on the left of bridge floor, and its two ends are divided Do not fix with described left pier top distribution crossbeam (6) and described right pier top distribution crossbeam (7);Described right Bailey beam (4) is arranged at bridge Right side of face, its two ends are fixed with described left pier top distribution crossbeam (6) and described right pier top distribution crossbeam (7) respectively;On a described left side Region between Bailey beam (3) and described right Bailey beam (4), equidistantly fixedly mounts several transverse distribution beams (8);Described Above transverse distribution beam (8), equidistantly several longitudinal distribution beam (9) of fixed installation;Upper described longitudinal distribution beam (9) Face, lays described bridge floor (5).
Base-supporting Bailey beam steel suspension bridge the most according to claim 1, it is characterised in that described Extended chemotherapy (1.1) is horizontal Length 9m, longitudinal length 3m, high 3m;Described abutment (1.2) lateral length 8m, longitudinal length 1.2m, high 1.8m.
Base-supporting Bailey beam steel suspension bridge the most according to claim 1, it is characterised in that described lower left quarter supporting construction (1) Outside with described right lower quadrant supporting construction (2) uses gabion protection.
Base-supporting Bailey beam steel suspension bridge the most according to claim 1, it is characterised in that described left pier top distribution crossbeam (6) Two bors d's oeuveres I25 I-steel is used with described right pier top distribution crossbeam (7).
Base-supporting Bailey beam steel suspension bridge the most according to claim 1, it is characterised in that described transverse distribution beam (8) uses 2I25a crossbeam, crossbeam is positioned at Bailey bracket montant and node location, spacing 150cm of Bailey beam;Described longitudinal distribution beam (9) is adopted Use 2I12.6 longeron, spacing 40cm.
Base-supporting Bailey beam steel suspension bridge the most according to claim 1, it is characterised in that described bridge floor (5) uses 10mm thick Checkered steel plate.
CN201620509336.5U 2016-05-30 2016-05-30 Under hold formula beiLei beam steel suspension bridge Active CN205662832U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620509336.5U CN205662832U (en) 2016-05-30 2016-05-30 Under hold formula beiLei beam steel suspension bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620509336.5U CN205662832U (en) 2016-05-30 2016-05-30 Under hold formula beiLei beam steel suspension bridge

Publications (1)

Publication Number Publication Date
CN205662832U true CN205662832U (en) 2016-10-26

Family

ID=57158660

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620509336.5U Active CN205662832U (en) 2016-05-30 2016-05-30 Under hold formula beiLei beam steel suspension bridge

Country Status (1)

Country Link
CN (1) CN205662832U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107237251A (en) * 2017-07-13 2017-10-10 中国水利水电第十工程局有限公司 A kind of access bridge flat stacking sets up the construction method of interim steel bridge
CN109653076A (en) * 2018-12-24 2019-04-19 四川港航建设工程有限公司 Combined type flood control is passed the flood period lock head shellfish Lei Gangqiao and construction method
CN111287088A (en) * 2020-01-06 2020-06-16 河南省公路工程局集团有限公司 Special steel temporary bridge for protecting crossing pipeline and construction method thereof
CN113957881A (en) * 2021-11-11 2022-01-21 中铁大桥局武汉桥梁特种技术有限公司 Construction method suitable for mountainous area river rock layer bridge foundation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107237251A (en) * 2017-07-13 2017-10-10 中国水利水电第十工程局有限公司 A kind of access bridge flat stacking sets up the construction method of interim steel bridge
CN109653076A (en) * 2018-12-24 2019-04-19 四川港航建设工程有限公司 Combined type flood control is passed the flood period lock head shellfish Lei Gangqiao and construction method
CN111287088A (en) * 2020-01-06 2020-06-16 河南省公路工程局集团有限公司 Special steel temporary bridge for protecting crossing pipeline and construction method thereof
CN113957881A (en) * 2021-11-11 2022-01-21 中铁大桥局武汉桥梁特种技术有限公司 Construction method suitable for mountainous area river rock layer bridge foundation

Similar Documents

Publication Publication Date Title
CN101838968B (en) Double track bridge construction process crossing existing railway operational lines
CN106758841B (en) A kind of whole construction process of the double rope face low-pylon cable-stayed bridges of double tower
CN205662832U (en) Under hold formula beiLei beam steel suspension bridge
CN104878766A (en) Long side slope protection concrete continuous rapid pouring and form-drawing system and construction method
CN107841953B (en) High-altitude oblique crossing Liang Doupo side span cast-in-situ section construction support and construction method
CN106087746A (en) A kind of cast-in-situ box girder falsework construction method and bridge
CN104404887B (en) A kind of long-span steel pipe arch bridge is without support hoisting
CN105735139A (en) Supporting system for construction of cast-in-situ box beam in overpass and construction method of box beam
CN106522112A (en) Cable-stayed bridge side span beam section erecting system and method thereof
CN110863498A (en) Deep foundation pit combined supporting construction method next to subway station
CN109235292A (en) Railroad bridge changes beam process and changes girder system system
CN114164764A (en) Construction method for high-fill bridge bearing platform structure
CN109629576B (en) Suspension protection system for water supply pipe crossing foundation pit and construction method
CN107119569A (en) A kind of construction method of the oblique rock geology construction make-shift bridge of deep water shallow overburden
CN111560837A (en) Lifting type river-crossing bridge structure and using method thereof
CN206635599U (en) A kind of road surface for caving in road, which is speedily carried out rescue work, fixes device
CN106930315B (en) Mobile tower crane foundation structure and construction method
CN209194354U (en) High-altitude long-span binder base-supporting shellfish thunder support construction
CN109594581B (en) River-crossing pipeline structure and installation method thereof
CN106320192A (en) Beam section replacement reinforcement method for large-span concrete continuous beam bridge
CN108708290A (en) The case crane span structure hollow structure and cast-in-situ construction method of minor radius railway curve unit
CN216515083U (en) High bridge cushion cap structure of filling
CN207469303U (en) A kind of removable assembled template peace tears operating system open
CN206753488U (en) A kind of artificial digging pile reaming auxiliary equipment
CN106121238A (en) High-altitude concrete conveying device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant