CN205626786U - Fastening mounting tool that electric power construction used - Google Patents
Fastening mounting tool that electric power construction used Download PDFInfo
- Publication number
- CN205626786U CN205626786U CN201620506428.8U CN201620506428U CN205626786U CN 205626786 U CN205626786 U CN 205626786U CN 201620506428 U CN201620506428 U CN 201620506428U CN 205626786 U CN205626786 U CN 205626786U
- Authority
- CN
- China
- Prior art keywords
- braces
- power construction
- belt
- electric power
- band
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model discloses a fastening mounting tool that electric power construction used, including waistband, two bracess, suspension rope and two leg strap, waistband one end is equipped with first link, and the other end is equipped with first hasp, article two, the braces is connected with the waistband, and two braces rear portions are equipped with suspension rope, article two, it buckles to be equipped with the braces regulation on the braces, suspension rope passes through second link and two shoulder strap connection, article two, leg strap is connected with the waistband through two first connecting bands, and is equipped with leg strap regulation knot on two leg strap. This fastening mounting tool that electric power construction used adopts the structural design of disjunctor formula, has improved electric power construction personnel high altitude construction's factor of safety greatly, use comfortable degree high simultaneously, and intensity is big, convenient to use, wear -resisting, durable, simple and easy light.
Description
Technical field
This utility model relates to power construction apparatus technical field, the fastening of a kind of power construction
Installation tool.
Background technology
The maintenance of power delivery circuit or maintenance are groundworks of power department, at present, and major part transmission of electricity
Circuit takes that electric pole is built on stilts to be laid, and therefore, power worker needs when keeping in repair or safeguard to climb electric pole
To job position, in order to ensure safety, it is typically necessary wear safety belt and prevents from falling.In electric power high-altitude
When operation or maintenance of electrical equipment, operation maintenance, technological transformation construction, arrange without reliable safety precaution
Execute, many potential safety hazards can be there is, or the serious accident such as falling from high altitude, workmen's injures and deaths occurs,
So during work high above the ground, being typically necessary and fasten one's safety belt or safety rope, existing electric power safety band or
Person's safety rope is low to the security protection coefficient of operating personnel, and level of comfort is poor, in order to solve these
Problem, therefore, it is proposed that the fastening installation tool of a kind of power construction.
Utility model content
The purpose of this utility model is to provide the fastening installation tool of a kind of power construction, on solving
State the problem proposed in background technology.
For achieving the above object, this utility model provides following technical scheme: a kind of power construction tight
Guan County's holding tool, including belt, two braces, suspension strop and two legs band, described belt one end is provided with
One link, the other end is provided with the first snap close, and described two braces are connected with belt, and two braces rear portions
Being provided with suspension strop, described two braces are provided with braces adjusting button, described suspension strop by the second link with
Article two, braces connects, and described two legs band connects band by two first and is connected with belt, and two legs band
It is provided with bottom bands of trouser legs adjusting button.
Preferably, the second connection band between described two braces is provided with adjusting button.
Preferably, the middle part of described belt is provided with back pad, described back pad, belt, two braces and
Cortex cushion is sewed on two legs band.
Preferably, the other end of described suspension strop is provided with the second snap close.
Compared with prior art, the beneficial effects of the utility model are: the fastening of this power construction is installed
Instrument, uses the structure design of Contiuum type, substantially increases the safety coefficient of operating personnel, use simultaneously
Level of comfort is high, and intensity is big, easy to use, wear-resisting, durable, simple light.
Accompanying drawing explanation
Fig. 1 is the fastening installation tool structural representation of a kind of power construction of this utility model.
In figure: 1 belt, 11 first links, 12 first snap closes, 2 braces, 21 braces adjusting buttons, 3
Suspension strop, 31 second snap closes, 4 bottom bands of trouser legs, 41 bottom bands of trouser legs adjusting buttons, 5 back pad, 6 second links, 7
One connects band, 8 second connection bands.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, to the technology in this utility model embodiment
Scheme is clearly and completely described, it is clear that described embodiment is only this utility model one
Divide embodiment rather than whole embodiments.Based on the embodiment in this utility model, this area is common
The every other embodiment that technical staff is obtained under not making creative work premise, broadly falls into this
The scope of utility model protection.
Referring to Fig. 1, this utility model provides a kind of technical scheme: the fastening of a kind of power construction is installed
Instrument, including 1, two braces 2 of belt, suspension strop 3 and two legs band 4, described belt 1 one end is provided with
First link 11, the other end is provided with the first snap close 12, and described two braces 2 are connected with belt 1, and two
Bar braces 2 rear portion is provided with suspension strop 3, and described two braces 2 are provided with braces adjusting button 21, described outstanding
Lanyard 3 is connected with two braces 2 by the second link 6, and described two legs band 4 is by two first even
Tape splicing 7 is connected with belt 1, and two legs band 4 is provided with bottom bands of trouser legs adjusting button 41.
This utility model is improved by: the fastening installation tool of this power construction, by two braces 2 it
Between the second connection band 8 be provided with adjusting button such that it is able to the length connecting band between two braces 2
Degree is adjusted, and meets the use of different electric power personnel, is provided with back pad 5 by the middle part of belt 1,
Sewing cortex cushion on described back pad 5,1, two braces 2 of belt and two legs band 4, thus significantly
Improve power construction librarian use level of comfort, be provided with the second snap close 31 by the other end of suspension strop 3,
Suspension strop 3 top can be hung on object, thus improve the use safety coefficient of power construction personnel.
This use is novel in use, and the first link 11 and the first snap close that are provided with by belt 1 two ends are joined
12 close use ties up to waist by belt 1, and two braces 2 tie up to electric power personnel back, are regulated by braces
Button 21 its length of regulation, owing to being provided with the second connection band 8, it is possible to effectively prevent between two braces 2
Electric power personnel when work high above the ground, the problem of the easy landing of braces, two legs band 4 is tied up to electric power simultaneously
Personnel's leg, regulates its length by bottom bands of trouser legs adjusting button 41, then suspension strop 3 be provided with by top
Two snap closes 31 are suspended on suitable object to reach to improve the safety coefficient of operating personnel.
Embodiment the most of the present utility model, for the ordinary skill people of this area
For Yuan, it is possible to understand that can be real to these in the case of without departing from principle of the present utility model and spirit
Executing example to carry out multiple change, revise, replace and modification, scope of the present utility model is by claims
And equivalent limits.
Claims (4)
1. a fastening installation tool for power construction, including belt (1), two braces (2), outstanding
Lanyard (3) and two legs band (4), it is characterised in that: described belt (1) one end is provided with the first link
(11), the other end is provided with the first snap close (12), and described two braces (2) are connected with belt (1),
And two braces (2) rear portions are provided with suspension strop (3), described two braces (2) are provided with braces regulation
Button (21), described suspension strop (3) is connected with two braces (2) by the second link (6), described
Two legs band (4) connects band (7) by two first and is connected with belt (1), and two legs band (4)
It is provided with bottom bands of trouser legs adjusting button (41).
The fastening installation tool of a kind of power construction the most according to claim 1, it is characterised in that:
The second connection band (8) between described two braces (2) is provided with adjusting button.
The fastening installation tool of a kind of power construction the most according to claim 1, it is characterised in that:
The middle part of described belt (1) is provided with back pad (5), described back pad (5), belt (1), two back ofs the body
(4) sewing cortex cushion on band (2) and two legs band.
The fastening installation tool of a kind of power construction the most according to claim 1, it is characterised in that:
The other end of described suspension strop (3) is provided with the second snap close (31).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620506428.8U CN205626786U (en) | 2016-05-30 | 2016-05-30 | Fastening mounting tool that electric power construction used |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620506428.8U CN205626786U (en) | 2016-05-30 | 2016-05-30 | Fastening mounting tool that electric power construction used |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205626786U true CN205626786U (en) | 2016-10-12 |
Family
ID=57050898
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620506428.8U Expired - Fee Related CN205626786U (en) | 2016-05-30 | 2016-05-30 | Fastening mounting tool that electric power construction used |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205626786U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108079462A (en) * | 2017-12-05 | 2018-05-29 | 国网山东省电力公司烟台供电公司 | Electric power overhaul safety device |
CN111202660A (en) * | 2020-01-09 | 2020-05-29 | 广东博智林机器人有限公司 | Walking aid protective device |
CN112473036A (en) * | 2020-11-24 | 2021-03-12 | 泰州巨环起重防护装备有限公司 | Anti-falling safety belt with self-locking hanging buckle |
CN112618988A (en) * | 2020-11-27 | 2021-04-09 | 中国人民解放军63919部队 | Suspension operation safety belt |
-
2016
- 2016-05-30 CN CN201620506428.8U patent/CN205626786U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108079462A (en) * | 2017-12-05 | 2018-05-29 | 国网山东省电力公司烟台供电公司 | Electric power overhaul safety device |
CN111202660A (en) * | 2020-01-09 | 2020-05-29 | 广东博智林机器人有限公司 | Walking aid protective device |
CN112473036A (en) * | 2020-11-24 | 2021-03-12 | 泰州巨环起重防护装备有限公司 | Anti-falling safety belt with self-locking hanging buckle |
CN112618988A (en) * | 2020-11-27 | 2021-04-09 | 中国人民解放军63919部队 | Suspension operation safety belt |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205626786U (en) | Fastening mounting tool that electric power construction used | |
US20090236176A1 (en) | Integrated harness boiler suit | |
CN204106893U (en) | A kind of safety means | |
CN203663278U (en) | Full-body harness for overhead work | |
CN205182024U (en) | Escape device slowly falls in high altitude | |
CN201862168U (en) | Full body type fall-protection safety belt | |
CN207856108U (en) | Safety belt for building construction and supervision | |
CN201227476Y (en) | Safety band | |
CN207967777U (en) | A kind of electric power overhaul construction auxiliary tool | |
CN203123388U (en) | Safety belt for building construction | |
CN211024878U (en) | Safety belt for high-altitude operation | |
CN211050768U (en) | Electrician uses safety belt | |
CN209848171U (en) | Work clothes with safety belt | |
CN210904729U (en) | Climbing wire pole prevents weighing down safety belt | |
CN108096737A (en) | A kind of electric power overhaul safety device | |
CN204840721U (en) | Safety belts | |
CN205924752U (en) | Shaft tower climbing protection device of braces formula transmission of electricity fortune wesy | |
CN211188855U (en) | Iron tower climbing protection device | |
CN206239917U (en) | A kind of power construction protective rope | |
CN205095293U (en) | Electric power construction safety belt | |
CN221266950U (en) | Communication tower overhauls climbing anti-falling device | |
CN206434735U (en) | A kind of Multifunctional safety belt | |
CN204864610U (en) | High multi -purpose safety belt of security | |
CN210331471U (en) | Anti-falling protective tool for aerial work | |
CN219128088U (en) | Flame-retardant safety belt structure easy to wear |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161012 Termination date: 20170530 |
|
CF01 | Termination of patent right due to non-payment of annual fee |