CN205556009U - Tunnel bow member operation car - Google Patents

Tunnel bow member operation car Download PDF

Info

Publication number
CN205556009U
CN205556009U CN201620324034.0U CN201620324034U CN205556009U CN 205556009 U CN205556009 U CN 205556009U CN 201620324034 U CN201620324034 U CN 201620324034U CN 205556009 U CN205556009 U CN 205556009U
Authority
CN
China
Prior art keywords
arm frame
operation van
tunnel arch
arch operation
oil cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620324034.0U
Other languages
Chinese (zh)
Inventor
王祥军
龚俊
高云
宋祖源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Wuxin Tunnel Intelligent Equipment Co Ltd
Original Assignee
Hunan Wuxin Tunnel Intelligent Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Wuxin Tunnel Intelligent Equipment Co Ltd filed Critical Hunan Wuxin Tunnel Intelligent Equipment Co Ltd
Priority to CN201620324034.0U priority Critical patent/CN205556009U/en
Application granted granted Critical
Publication of CN205556009U publication Critical patent/CN205556009U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a tunnel bow member operation car, which comprises a carriage body, be provided with the guide rail on the automobile body, install the slip table in the guide rail, be connected with drive arrangement on the slip table, there are left pendulum rod and right pendulum rod in the left and right sides of slip table movable mounting respectively, between a left side pendulum rod and the slip table and all be provided with the swing hydro -cylinder between right pendulum rod and the slip table, the swing hydro -cylinder is used for controlling the horizontal hunting of left pendulum rod and right pendulum rod, left side pendulum rod top movable mounting has the left arm frame, right side pendulum rod top movable mounting has the right arm frame, all be provided with pitching cylinder between left side pendulum rod and the left arm frame and between right pendulum rod and the right arm frame, pitching cylinder is used for controlling the every single move of left arm frame and right arm frame, the top of left arm frame and the top of right arm frame all are provided with work platform, all be provided with leveling cylinder between left arm frame and the work platform and between right arm frame and the work platform. This tunnel bow member operation car can be convenient removal transition, can increase the working space of equipment again, ensure that the both sides direction can the collaborative work.

Description

A kind of tunnel arch Operation Van
Technical field
The utility model relates to engineering machinery field, more specifically, particularly to a kind of tunnel Bow member Operation Van.
Background technology
Tunnel arch Operation Van is typically arranged branched hydraulic jack, hydraulic pressure by hydraulic pressure or power driven system Arranging job platform on oil cylinder, hydraulic jack drives job platform to lift up and down, standing Job platform carries out a kind of vehicle of work high above the ground.Tunnel arch Operation Van is a kind of present age Relatively advanced engineering mechanical device, operating personnel by tunnel arch Operation Van can go up to the air to Certain altitude, thus realize high-altitude production operation problem easily.Along with the development of modern science and technology, The research and development of tunnel arch Operation Van are developed greatly, and research staff gradually develops scissor-type Tunnel arch Operation Van, folding-jib tunnel arch Operation Van, boom type tunnel arch Operation Van, Crank arm type tunnel arch Operation Van, double-cylinder type tunnel arch Operation Van etc., expand further The scope of application of tunnel arch Operation Van.
Tunnel arch Operation Van generally comprises jib, job platform and driving means, operation horizontal Platform is arranged on jib top, and driving means is connected on jib.During use, jib is fixed on work On journey chassis, so, need to move tunnel arch Operation Van after a region fulfils assignment During transition, very inconvenient.In specific implementation process, especially in some water conservancy and hydropower tunnels In the construction works such as engineering, highway and railway tunnel work, subway engineering and large cross-section tunnel, Would ordinarily be encountered weak surrounding rock, generally require after excavation and top is carried out preliminary bracing, such as frame If steel arch-shelf, grillage, bar-mat reinforcement etc., to reinforce country rock.Conventional tunnel encircles Frame Operation Van typically requires and first reinforces side, completes to move again to other side afterwards and enters Row is reinforced, and arranges working space limited, it is impossible to ensures both sides co-ordination simultaneously, both reduced Construction quality, has also been significantly greatly increased time cost.
In sum, how to provide one both can easily move transition, equipment can be increased again Working space, it is ensured that direction, both sides can become ability with the tunnel arch Operation Van of collaborative work Field technique personnel's problem demanding prompt solution.
Utility model content
The technical problems to be solved in the utility model is for providing a kind of tunnel arch Operation Van, this tunnel Road bow member Operation Van is designed by its structure, both can easily move transition, can increase again equipment Working space, it is ensured that direction, both sides can be with collaborative work.
A kind of tunnel arch Operation Van, including car body, described car body is provided with guide rail, described Being provided with slide unit in guide rail, described slide unit connects has driving means, described driving means to be used for Controlling described slide unit to move in described guide rail, the activity respectively of the left and right sides of described slide unit is installed There are left swing bar and right fork, between described left swing bar and described slide unit and described right fork and institute State and between slide unit, be provided with oscillating oil cylinder, described oscillating oil cylinder be used for controlling described left swing bar with And the swinging of described right fork, it is movably installed with left arm frame above described left swing bar, described Right arm frame it is movably installed with, between described left swing bar and described left arm frame and institute above right fork Stating and be provided with pitching oil cylinder between right fork and described right arm frame, described pitching oil cylinder is used for controlling Make described left arm frame and the pitching of described right arm frame, the top of described left arm frame and the described right side The top of jib is provided with workbench, between described left arm frame and described workbench and Being provided with leveling cyclinder between described right arm frame and described workbench, described leveling cyclinder is used In the level controlling described workbench.
Preferably, it is provided with safety caging device between described guide rail and described slide unit.
Preferably, described vehicle bottom is provided with bracing frame.
Preferably, described car body both sides are provided with article carrying platform.
Preferably, between described left swing bar and described right fork, it is provided with collision prevention device, described Collision prevention device includes the right baffle-plate being arranged on described left swing bar and is arranged on described right fork On right baffle plate.
Preferably, described right baffle-plate is or/and be provided with buffer unit on described right baffle plate.
Preferably, described workbench connecting and has pitch arm and revoliving arm, described pitch arm is used In the pitching of the described workbench of control, described revoliving arm is for controlling returning of described workbench Turn.
Preferably, it is provided with clamping device at described workbench.
Preferably, described clamping device includes expansion link and is connected to grabbing on described expansion link Hand, expansion link pitching oil cylinder, expansion link telescopic oil cylinder, described handgrip is provided with handgrip degree of tightness Oil cylinder.
Preferably, described handgrip is provided with seal.
The beneficial effects of the utility model are: the tunnel arch Operation Van that the utility model provides depends on Move transition on a large scale by what car body can realize entirety, rely on slide unit mobile permissible in guide rail Realize little scope and move transition, the mobile transition of equipment can easily be realized;The utility model carries The tunnel arch Operation Van of confession is designed by structure cleverly, can realize left arm frame left with right arm frame Right direction controls with the adjustment of pitch orientation, can be in level with real-time ensuring workbench simultaneously State, adds the working space of equipment, it is ensured that direction, equipment both sides can be with collaborative work, energy It is effectively improved construction quality, reduces time cost.
Accompanying drawing explanation
In order to be illustrated more clearly that the utility model embodiment or technical scheme of the prior art, The accompanying drawing used required in embodiment or description of the prior art will be briefly described below, It should be evident that the accompanying drawing in describing below is only embodiment of the present utility model, for this From the point of view of the those of ordinary skill of field, on the premise of not paying creative work, it is also possible to according to The accompanying drawing provided obtains other accompanying drawing.
Main apparent direction structure when Fig. 1 is the utility model embodiment 1 tunnel arch Operation Van's gathering Schematic diagram;
Fig. 2 is to overlook direction structure during the utility model embodiment 1 tunnel arch Operation Van's gathering Schematic diagram;
Left view direction structure when Fig. 3 is the utility model embodiment 1 tunnel arch Operation Van's gathering Schematic diagram;
Right apparent direction structure when Fig. 4 is the utility model embodiment 1 tunnel arch Operation Van's gathering Schematic diagram;
Backsight direction structure when Fig. 5 is the utility model embodiment 1 tunnel arch Operation Van's gathering Schematic diagram;
Fig. 6 is that direction structure is overlooked when opening by the utility model embodiment 1 tunnel arch Operation Van Schematic diagram;
Fig. 7 is structural representation at the utility model embodiment 2 collision prevention device;
Fig. 8 is structural representation at the utility model embodiment 3 workbench.
Detailed description of the invention
For the technical scheme making those skilled in the art be more fully understood that in the application, below The accompanying drawing in the embodiment of the present application will be combined, the technical scheme in the embodiment of the present application will be carried out clearly Chu, it is fully described by, it is clear that described embodiment is only some embodiments of the present application, Rather than whole embodiments.
Based on the embodiment in the application, those of ordinary skill in the art are not making creativeness The every other embodiment obtained under work premise, all should belong to the scope of the application protection.
Embodiment 1:
See Fig. 1 to Fig. 6, Fig. 1 to Fig. 6 and provide the utility model one tunnel arch work The specific embodiment of industry car, wherein, Fig. 1 is the utility model embodiment 1 tunnel arch operation Main apparent direction structural representation when car draws in;Fig. 2 is the utility model embodiment 1 tunnel arch Direction structure schematic diagram is overlooked when Operation Van draws in;Fig. 3 is the utility model embodiment 1 tunnel Left view direction structure schematic diagram when bow member Operation Van draws in;Fig. 4 is the utility model embodiment 1 Right apparent direction structural representation when tunnel arch Operation Van draws in;Fig. 5 is that the utility model is implemented Backsight direction structure schematic diagram during example 1 tunnel arch Operation Van's gathering;Fig. 6 is the utility model Direction structure schematic diagram is overlooked when embodiment 1 tunnel arch Operation Van opens.
As shown in Figures 1 to 6, a kind of tunnel arch Operation Van that the utility model provides, bag Including car body 1, car body 1 is used for carrying and the global transfer of equipment of equipment.
Being provided with guide rail 2 on car body 1, be provided with slide unit 3 in guide rail 2, slide unit 3 connects to be had Driving means 4, driving means 4 is used for controlling slide unit 3 and moves in guide rail 2.
For the set-up mode of guide rail 2, generally longitudinally it is arranged on car body 1;For guide rail 2 Quantity, one, two or three etc. can be selected, in order to the carrying of slide unit 3 with Slip is as the criterion.
The embodiment 1 that the utility model provides i.e. has been selected two be parallel to each other and has been longitudinally arranged Guide rail 2.Driving means 4 is used for controlling slide unit 3 and moves in guide rail 2, and the utility model carries The embodiment driving means 4 of confession selects chain drive, by chain-driving slide unit 3 at guide rail 2 Interior movement.
The left and right sides of slide unit 3 is movably installed with left swing bar 5 and right fork 6, left swing bar 5 respectively And it is provided with oscillating oil cylinder 7 between slide unit 3 and between right fork 6 and slide unit 3, swings Oil cylinder 7 is for controlling swinging of left swing bar 5 and right fork 6.For left swing bar 5 with And the amplitude that swings of right fork 6, general control, between-45 degree to+45 degree, prevents Following left arm frame 8 collides with right arm frame 9.
It is movably installed with left arm frame 8 above left swing bar 5, above right fork 6, is movably installed with the right side Jib 9, is all provided with between left swing bar 5 and left arm frame 8 and between right fork 6 and right arm frame 9 Being equipped with pitching oil cylinder 10, pitching oil cylinder 10 is for controlling bowing of left arm frame 8 and right arm frame 9 Face upward.
The top of left arm frame 8 and the top of right arm frame 9 are provided with workbench 11, work Platform 11 is used for carrying operating personnel, between left arm frame 8 and workbench 11 and right arm frame Being provided with leveling cyclinder 12 between 9 and workbench 11, leveling cyclinder 12 is used for controlling work Make the level of platform 11.
The embodiment that the utility model provides directly uses fixed workbench 11, the most again Leveling cyclinder 12 furnishing level is utilized to carry operating personnel, it is no longer necessary to use in prior art Manually hang operation basket, reduce labour intensity, operating efficiency is high, and can improve operator The safety of member.
Generally, the tunnel arch Operation Van dependence car body 1 that the utility model provides can be real The most overall moves transition on a large scale, relies on slide unit 3 movement in guide rail 2 can realize little model Enclose mobile transition, the mobile transition of equipment can easily be realized.
The tunnel arch Operation Van that the utility model provides is designed by structure cleverly, can realize Left arm frame 8 controls with the adjustment of right arm frame 9 left and right directions with pitch orientation, simultaneously can be real-time Ensure that workbench 11 is in level, add the working space of equipment, it is ensured that equipment two Side, to can being effectively improved construction quality with collaborative work, reduces time cost.
In the present embodiment, in order to realize the slide unit 3 positioning stablity in guide rail 2, prevent work Time slide unit slide, be provided with safety caging device between guide rail 2 and described slide unit 3.
In specific implementation process, safety caging device can use limiting plate, it would however also be possible to employ card Button etc..
In the present embodiment, for the most effectively improving the anti-overturning of this tunnel arch Operation Van, Promote the job area of this tunnel arch Operation Van, strengthen the carrying energy of this tunnel arch Operation Van Power, is provided with bracing frame 13 bottom car body 1.
In the present embodiment, transport other relevant corollary equipment and utensil, car bodies 1 liang for convenience Side is provided with article carrying platform 14.
Embodiment 2:
See Fig. 7, Fig. 7 and provide the second of the utility model a kind of tunnel arch Operation Van Specific embodiment, wherein, Fig. 7 is that at the utility model embodiment 2 collision prevention device, structure is shown It is intended to.
As it is shown in fig. 7, be provided with collision prevention device, anti-collision between left swing bar 5 and right fork 6 Collision device includes the right baffle-plate 15 being arranged on left swing bar 5 and is arranged on the right side on right fork 6 Baffle plate 16.
So, left swing bar 5 and right fork 6 are when swinging towards direction in opposite directions, when it swings to one After fixed scope, right baffle-plate 15 can contact with right baffle plate 16, thus prevents left swing bar 5 Contact collision with right fork 6, and then prevents left arm frame 8 from colliding with right arm frame 9, prevents Equipment smashes, it is ensured that operating personnel's construction safety on job platform.
In the present embodiment, for reducing rocking when right baffle-plate 15 contacts with right baffle plate 16, left On baffle plate 15 and right baffle plate 16, buffer unit 17 is installed.
Embodiment 3:
See Fig. 8, Fig. 8 and provide the third of the utility model a kind of tunnel arch Operation Van Specific embodiment, wherein, Fig. 8 is structural representation at the utility model embodiment 3 workbench Figure.
As shown in Figure 8, on workbench 11, connection has pitch arm 18 and revoliving arm 19, pitching Arm 18 is for controlling the pitching of described workbench 11, and revoliving arm 19 is used for controlling described work The revolution of platform 11.
In the present embodiment, for convenience of the isostructural clamping of steel arch-shelf during constructing tunnel, work Clamping device 20 it is provided with at platform 11.
In the present embodiment, for improving clamping effect further, clamping device 20 includes expansion link 201 and the handgrip 202, expansion link pitching oil cylinder 203, flexible that is connected on expansion link 201 Bar telescopic oil cylinder 204, handgrip 202 is provided with handgrip degree of tightness oil cylinder 205.
Expansion link pitching oil cylinder 203 is for controlling the pitching of expansion link 201.
Expansion link telescopic oil cylinder 204 is for controlling the flexible of expansion link 201.
Handgrip degree of tightness oil cylinder 205 is for controlling the degree of tightness of handgrip 202, thus handgrip degree of tightness oil cylinder 205 drive handgrip 202 clamp and get loose.
In the present embodiment, for guaranteeing the safety of clamping process, handgrip 202 is provided with insulation dress Put.
Above a kind of tunnel arch Operation Van provided by the utility model is carried out detailed Jie Continue.Principle of the present utility model and embodiment are explained by specific case used herein Stating, the explanation of above example is only intended to help to understand method of the present utility model and core thereof Thought.It should be pointed out that, for those skilled in the art, without departing from this On the premise of utility model principle, it is also possible to the utility model is carried out some improvement and modification, These improve and modification also falls in the utility model scope of the claims.

Claims (10)

1. a tunnel arch Operation Van, it is characterised in that include car body, described car body sets Being equipped with guide rail, be provided with slide unit in described guide rail, described slide unit connects driving means, institute State driving means and move in described guide rail for controlling described slide unit, the left and right two of described slide unit Side is movably installed with left swing bar and right fork respectively, between described left swing bar and described slide unit and Being provided with oscillating oil cylinder between described right fork and described slide unit, described oscillating oil cylinder is used for controlling Make swinging of described left swing bar and described right fork, movable above described left swing bar install There is left arm frame, above described right fork, be movably installed with right arm frame, described left swing bar and a described left side It is provided with pitching oil cylinder between jib and between described right fork and described right arm frame, described Pitching oil cylinder is used for controlling described left arm frame and the pitching of described right arm frame, described left arm frame The top of top and described right arm frame is provided with workbench, described left arm frame and described work Make to be provided with leveling cyclinder between platform and between described right arm frame and described workbench, Described leveling cyclinder is for controlling the level of described workbench.
Tunnel arch Operation Van the most according to claim 1, it is characterised in that described in lead It is provided with safety caging device between rail and described slide unit.
Tunnel arch Operation Van the most according to claim 1, it is characterised in that described car Bracing frame it is provided with bottom body.
Tunnel arch Operation Van the most according to claim 1, it is characterised in that described car Body both sides are provided with article carrying platform.
Tunnel arch Operation Van the most according to claim 1, it is characterised in that a described left side Being provided with collision prevention device between fork and described right fork, described collision prevention device includes installing Right baffle-plate on described left swing bar and be arranged on the right baffle plate on described right fork.
Tunnel arch Operation Van the most according to claim 5, it is characterised in that a described left side Baffle plate is or/and be provided with buffer unit on described right baffle plate.
Tunnel arch Operation Van the most according to claim 1, it is characterised in that described work Make to connect on platform have pitch arm and revoliving arm, described pitch arm to be used for controlling described workbench Pitching, described revoliving arm is for controlling the revolution of described workbench.
Tunnel arch Operation Van the most according to claim 1, it is characterised in that described work Make to be provided with at platform clamping device.
Tunnel arch Operation Van the most according to claim 8, it is characterised in that described folder Hold mechanism include expansion link and be connected to the handgrip on described expansion link, expansion link pitching oil cylinder, Expansion link telescopic oil cylinder, described handgrip is provided with handgrip degree of tightness oil cylinder.
Tunnel arch Operation Van the most according to claim 9, it is characterised in that described Seal it is provided with on handgrip.
CN201620324034.0U 2016-04-18 2016-04-18 Tunnel bow member operation car Expired - Fee Related CN205556009U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620324034.0U CN205556009U (en) 2016-04-18 2016-04-18 Tunnel bow member operation car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620324034.0U CN205556009U (en) 2016-04-18 2016-04-18 Tunnel bow member operation car

Publications (1)

Publication Number Publication Date
CN205556009U true CN205556009U (en) 2016-09-07

Family

ID=56808435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620324034.0U Expired - Fee Related CN205556009U (en) 2016-04-18 2016-04-18 Tunnel bow member operation car

Country Status (1)

Country Link
CN (1) CN205556009U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105731318A (en) * 2016-04-18 2016-07-06 湖南五新隧道智能装备股份有限公司 Tunnel arch frame work vehicle
CN106368723A (en) * 2016-10-21 2017-02-01 中铁五局集团有限公司 Two-arm one-basket tunnel arch support assembling machine with tire type chassis
CN107215827A (en) * 2017-07-10 2017-09-29 徐州徐工随车起重机有限公司 Tunnel Inspection device
CN107499076A (en) * 2017-07-20 2017-12-22 西南交通大学 A kind of spherical tank external detection workbench
CN109458218A (en) * 2018-09-12 2019-03-12 中国铁建重工集团有限公司 Straight arm type heavy duty Multipurpose tunnel operating platform

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105731318A (en) * 2016-04-18 2016-07-06 湖南五新隧道智能装备股份有限公司 Tunnel arch frame work vehicle
CN106368723A (en) * 2016-10-21 2017-02-01 中铁五局集团有限公司 Two-arm one-basket tunnel arch support assembling machine with tire type chassis
CN107215827A (en) * 2017-07-10 2017-09-29 徐州徐工随车起重机有限公司 Tunnel Inspection device
CN107215827B (en) * 2017-07-10 2023-03-07 徐州徐工随车起重机有限公司 Tunnel inspection operation device
CN107499076A (en) * 2017-07-20 2017-12-22 西南交通大学 A kind of spherical tank external detection workbench
CN107499076B (en) * 2017-07-20 2023-06-16 西南交通大学 Spherical tank external detection working platform
CN109458218A (en) * 2018-09-12 2019-03-12 中国铁建重工集团有限公司 Straight arm type heavy duty Multipurpose tunnel operating platform

Similar Documents

Publication Publication Date Title
CN105731318A (en) Tunnel arch frame work vehicle
CN205556009U (en) Tunnel bow member operation car
CN104747078B (en) A kind of tunnel construction trolley
CN102748039B (en) Multi-functional tunnel operation trolley
CN202690071U (en) Multifunctional tunnel working trolley
CN107060844B (en) Two-arm two-basket steel arch installing machine for tunnel and steel arch construction method
CN102808623A (en) Coal mine underground multipurpose vehicle
CN203034394U (en) Road cone translation mechanism with gear joint
CN102785243B (en) Multi-directional regulating mechanical hand
CN204703761U (en) A kind of tunnel construction trolley
CN202668552U (en) Multidirectional adjusting mechanical hand
CN202866810U (en) Multifunctional car for underground coal mine
CN202989702U (en) Track switch hoisting transportation operation device
CN206691869U (en) A kind of single pile movement system
CN203440751U (en) Self-propelled underbridge construction platform
CN205556008U (en) Clamping device and tunnel bow member operation car
CN107143293A (en) A kind of all-hydraulic coal mine down-hole drilling auxiliary machinery
CN207998409U (en) A kind of high inclination-angle monorail crane
CN207597466U (en) A kind of rescue vehicle
CN109435967A (en) Suspension type container transport system
CN210310099U (en) Multifunctional operation vehicle for underground engineering construction
CN205617376U (en) Novel pile driver
CN202966321U (en) Vehicle-mounted working device
CN103387114B (en) A kind of chute installation device of drag conveyer at front part of coalface
CN209667070U (en) Suspension type container transport system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant