CN205528463U - Production line of high -quality composite construction gypsum - Google Patents

Production line of high -quality composite construction gypsum Download PDF

Info

Publication number
CN205528463U
CN205528463U CN201521049382.3U CN201521049382U CN205528463U CN 205528463 U CN205528463 U CN 205528463U CN 201521049382 U CN201521049382 U CN 201521049382U CN 205528463 U CN205528463 U CN 205528463U
Authority
CN
China
Prior art keywords
machine
unit
elevator
drying
gypsum fibrosum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521049382.3U
Other languages
Chinese (zh)
Inventor
解建民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201521049382.3U priority Critical patent/CN205528463U/en
Application granted granted Critical
Publication of CN205528463U publication Critical patent/CN205528463U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model relates to a gypsum production facility field discloses a production line of high -quality composite construction gypsum, include the leading dry unit of major ingredient, major ingredient feed and measurement unit, auxiliary material feed and measurement unit, dry unit, crocus and sorting unit, calcine unit, finished product storage unit, dust removal unit. The dust removal unit includes cyclone, draught fan, water film deduster, the leading dry unit of major ingredient includes leading drying room, dry unit includes desiccator, the 3rd screw conveyer, second lifting machine, the crocus includes with the sorting unit breaks up machine, milling machine, sorter, third lifting machine, calcine the unit including calcining machine, waste heat utilization buffer, pneumatic conveyor, finished product storage unit includes storage silo, bottom of the reservior machine in bulk. The utility model discloses with low costs, environmental protection, the product stability of production is good, and the quality is high.

Description

A kind of production line of high-quality complex building Gypsum Fibrosum
Technical field
This utility model relates to Gypsum Fibrosum production line field, particularly relates to the life of a kind of high-quality complex building Gypsum Fibrosum Produce line.
Background technology
Power plant is qualified discharge sulfur dioxide, substantially uses wet desulphurization, but two water desulfurated plasters become again New trade waste affects environment, and the whole nation has tens million of tons/year to increase to pile up, large-scale thermal power collection The desulfurization the most in a wet process without exception of particularly five big electricity power groups of group produces a large amount of two water desulfurated plasters every year, Its medium and small part provide Thistle board manufacturer as produce Thistle board raw material (about 30 yuan/ Ton);Little part provides manufacture of cement producer to make cement retarder (about 25 yuan/ton) in the ratio interpolation of 3%, The products such as remaining production minimal amount of plaster mould box, anti-static movable floor, gypsum putty, crystal whisker of gypsum (but Because its production cost is compared with high and range is little, Gypsum Fibrosum utilization is the least), then can only pile up without what project utilized, The remote power plant of the transportation range that is located in an outlying district the most all piles up (the most seriously by Gypsum Fibrosum and flyash Dual disposal is piled up, and causes these two kinds of secondary resources forever can not effectively comprehensively utilize), it is dirty that Kingsoft is become Dye source (polluting adjacent periphery environment second, more seriously rain drop erosion sulfur oxide is to subsurface wastewater infiltration system, Serious polluted underground water resource).
Country pays much attention to protection environment;Protecting ecology, encourages exploitation secondary resource;Utilize industrial waste; Require technological innovation;Energy-saving and emission-reduction, reduce energy resource consumption;Architectural industrialization is the most imperative.Chongqing municipal administration Ye Yiyu mansion, mansion is done [2014] No. 176 files and is forwarded about the suggestion accelerating to advance building industry modernization, clearly Propose by standardized designs, factorial praluction, prefabricated construction, integration finishing, information system management, Improve construction quality, advance green construction, it is achieved energy-conservation.
Therefore, the problem that the existing mode of production exists:
1, fire coal is utilized to make heat source way: coal-fired serious environment pollution, national environmental protection department prohibites. And owing to high temperature directly acts on the powder that particle diameter is thinner, this part Gypsum Fibrosum just becomes anhydrous gypsum, stone Cream is big without watr-proportion, and plaster of Paris quality is inevitable bad.
2, natural gas is utilized to make heat source way: natural gas drying cost is the highest, and equally exists due to high temperature Directly acting on the powder that particle diameter is thinner, this part Gypsum Fibrosum just becomes anhydrous gypsum, and Gypsum Fibrosum is without watr-proportion Greatly, the inevitable bad problem of plaster of Paris quality.
3, power plant's residual steam is utilized to make heat source way: steam, as being dried, is calcined thermal source, is one i.e. warp Ji, the heat exchange mode of environmental protection again, but the structure of steam dryer must be hollow axle, hollow blade, hollow Urceolus, determine drying machine can not overload operation, Gypsum Fibrosum humidity bigger than normal will overload operation, cause and stop (after overhauling to stop production two days after cooling, maintainer enters dryer inner will stick to hollow axle and sky to machine The perching knife pointwise of desulfurated plaster on lobus cardiacus sheet is removed.After adhering to Gypsum Fibrosum removing, must again proofread drying machine " static balance " and " dynamic balancing " of rotor, the safety of guarantee drying machine is properly functioning), and Gypsum Fibrosum is wet Spend bigger than normal being difficult to avoid, owing to desulfurated plaster is the accessory substance of thermal power plant's generating, often outside desulfurated plaster Portion's free water discharges higher than GB and design load, easily causes the accident that over loading is shut down.
4, extremely strong due to Gypsum Fibrosum adhesion, in the production process of dried gypsum, Gypsum Fibrosum sticks to above rotary shaft And above blade, increase drying machine load (in design load scope);Reduce dry heat transfer effect, Directly result in energy consumption to increase;Production capacity reduces, and adheres to be gradually increased, and has a strong impact on the normal fortune of drying machine OK.
5, the quality of plaster of Paris, in addition to the content of chemical composition, the percentage composition of its half aqueous phase and Gypsum Fibrosum Granularity the normal consistency of product, comprcssive strength, rupture strength are had vital impact, existing In all dry technologies, owing to the granularity of Gypsum Fibrosum is carse, medium and small state, and Gypsum Fibrosum is dried Time and temperature are all identical, necessarily cause thin anhydrous of product cut size;What particle diameter was thick surpasses half water result, The ratio of half water condition the most necessarily reduces.
6, the particle diameter at Gypsum Fibrosum processes in technique, grinds, owing to the humidity of Gypsum Fibrosum is the highest before drying machine (outside attached water is more than 6%), grinds efficiency the lowest;If the plaster of Paris formed is ground, Substantial amounts of half aqueous phase Gypsum Fibrosum can be heated and become without aqueous phase Gypsum Fibrosum, not reach the high quality results of Gypsum Fibrosum equally.
Utility model content
In order to solve above-mentioned technical problem, this utility model provides the life of a kind of high-quality complex building Gypsum Fibrosum Producing line, this utility model uses brand-new production line, makes full use of energy recovery, low cost, beneficially ring Protecting, and in the product produced, the content of half water desulfurated plaster is high, good stability, quality is high.
Concrete technical scheme of the present utility model is: the production line of a kind of high-quality complex building Gypsum Fibrosum, including The preposition drying unit of major ingredient, major ingredient feed and metering units, adjuvant feed and metering units, drying unit, Pulverizing and separation unit, calcining unit, finished product storage element, dust removing units.
Cyclone dust extractor that described dust removing units includes being sequentially connected with, air-introduced machine, water dust scrubber.
The setting of dust removing units can carry out waste gas eliminating to equipment, is carried out by powder subsidiary in waste gas simultaneously Recycle.It, with heat, can be recycled by the waste gas that removing dust system is discharged.But, two water The chemical composition of desulfurated plaster is more complicated, and chloride ion therein, sulfur trioxide belong to harmful chemicals in atmosphere Material, in the middle of calcining is carried out, when temperature reaches more than 150 DEG C, above harmful chemical can be steamed by water Vapour separates with Gypsum Fibrosum powder (calcium sulfate is main body), and after entering cyclone separator, isolated steam (contains Chlorine, sulfur harmful substance) dust mixture enter preposition drying room and reduce after dust, before emptying through with The water dust scrubber of spray empties after processing, and the membranous wall current of water dust scrubber and spray water slurry, water purification is disposed Rear discharge.Therefore, in dust removing units, be provided with water dust scrubber, it is possible to go chloride ion in removing exhaust gas and The harmful chemicals such as sulfur trioxide.
The preposition drying unit of described major ingredient includes preposition drying room, is provided with the first spiral in described preposition drying room Conveyer.Preposition drying room relevant position is located at by described water dust scrubber.
The preposition drying unit of major ingredient, by gypsum raw material through the pre-dried of preposition drying room, is production line The first step that many echelons are energy-conservation.Preposition drying room carries out pre-dried to gypsum raw material, to desulfurated plaster Outside attached water is dried, and makes the moisture content of desulfurated plaster less than 10%.
Belt conveyor that described major ingredient feed and metering units include being sequentially connected with, feed hopper, the first metering Belt conveyer scale and the first elevator;Described belt conveyor and the first conveying worm connect.
Major ingredient feed and metering units, gypsum raw material successively passes through the first conveying worm, belt conveyor, It is sent to feed hopper.Measuring belt scale uses high-precision measuring, controls the on-demand entrance of major ingredient, so using VFC and computer management, then send to drying machine entrance 1 through the first elevator.
Described adjuvant feed and metering units include the second conveying worm and the second measuring belt being sequentially connected with Scale.
Adjuvant includes flyash etc., sends to drying machine by the second conveying worm and the second measuring belt scale Entrance 2.
Drying machine that described drying unit includes being sequentially connected with, the 3rd conveying worm, the second elevator;Institute State drying machine and be provided with waste gas outlet, described waste gas outlet and the connection of the first electric adjustable air-valve, described first electricity Dynamic adjusting valve is connected with cyclone dust extractor;Described first elevator, the second measuring belt scale respectively with drying machine Entrance connect.
Preposition dry powder enters into drying machine, owing to the addition of flyash, and this production line drying unit energy Enough attached waters removing major ingredient completely, can strengthen the self-purification function of the rotary shaft of drying equipment, blade, substantially The Gypsum Fibrosum that there is not rotary shaft and blade adheres to, solve Gypsum Fibrosum major ingredient humidity higher time stealth to drying machine Safety problem, does not haves drying machine over loading and shuts down.After drying, by the 3rd conveying worm, second Powder is delivered to next unit by elevator.
Beater that described pulverizing and separation unit include being sequentially connected with, flour mill, separator, the 3rd lifting Machine;Described second elevator is connected with beater.
Powder enters flour mill, grinds gypsum powder, makes Gypsum Fibrosum powder thinner, and separator is to powder Sort, choose (greatly) in the powder of 320 mesh and return flour mill.Qualified powder send through the 3rd elevator To next unit.
Described calcining unit includes calcining machine, UTILIZATION OF VESIDUAL HEAT IN buffer unit, Pneumatic conveyer;Described waste heat Buffer unit is utilized to include waste heat surge bunker and the first roots blower being connected with described waste heat surge bunker;Described Pneumatic conveyer includes second sieve that high-performance batcher, accelerating chamber are connected with described high-performance batcher Thatch blower fan;Described calcining machine, waste heat surge bunker, high-performance batcher, accelerating chamber are sequentially connected with;Described forge Burning machine is provided with waste gas outlet, and this waste gas outlet and the second electric adjustable air-valve connect, described second electric adjustable wind Valve is connected with cyclone dust extractor.
For to calcining machine provide fluidisation wind-force, air through the first roots blower, electric adjustable air-valve control, remaining After the heating of hot surge bunker, enter calcining machine from bottom, make powder be issued to critical flow velocity in the driving of hot wind, Obtain fully calcined under non-touching suspended state, remove 1.5 water of crystallization, become semi-hydrated gypsum. Semi-hydrated gypsum product is delivered to waste heat surge bunker, exports from bottom, by high-performance batcher, accelerating chamber etc. Semi-hydrated gypsum is delivered to storage bin by Pneumatic conveyer, and the second roots blower provides air for Pneumatic conveyer Power.Calcining machine unit is provided with pressure transducer and four temperature sensors, after computer sampling carries out it Temperature controls, and is to ensure that the key of semi-hydrated gypsum quality.
Described finished product storage element includes storage bin, bottom bulk machine, roof scrubber and Weight type charge level instrument. The bottom of described storage bin be provided with bottom bulk machine, the top of described storage bin be provided with roof scrubber and weight Hammer level-sensing device, described roof scrubber, bottom bulk machine are connected with compressed air conveying system respectively.
Storage bin is the interim storage of semi-hydrated gypsum product, is exported semi-hydrated gypsum by bottom bulk machine at the bottom of storehouse Finished product, packaging or tank car transport.
As preferably, described calcining machine is provided with powder import, returning charge outlet, discharge valve;Described powder enters Mouthful is connected with the 3rd elevator, described discharge valve and the connection of waste heat surge bunker, described returning charge export successively with return Material valve, returning charge conveyer, the 4th elevator connect, and described 4th elevator is connected with drying machine.To calcining Returning charge taked by part dry powder in machine, again pass by dry, pulverizing, sort, the flow process such as calcining, improve dry Drying quality, saves the energy.
As preferably, described cyclone dust extractor is also connected with air locking valve with counter weight, and described air locking valve with counter weight is again with dry The returning charge import of dry machine is connected.
As preferably, in described separator, it is provided with qualified powder outlet and defective powder outlet, described qualified Powder outlet is connected with described 3rd elevator, described defective powder outlet and the charging aperture of described flour mill Connect.Defective powder is reclaimed pulverizing again, fully makes rational use of resources, cost-effective.
As preferably, the production line of described high-quality complex building Gypsum Fibrosum also includes steam transmission system and steam Processing unit and hydrophobic treatment device, described steam transmission system includes the steam source pipe being sequentially connected with and divides Cylinder, described sub-cylinder is connected with calcining machine and steam processing unit and hydrophobic treatment device respectively, described steaming Vapour processing unit and hydrophobic treatment device are connected with calcining machine and drying machine respectively, and drying machine is additionally provided with steam Floss hole, described steam outlet is connected with preposition drying room by pipeline.Utilize the afterheat steam of drying machine Preposition drying room is heated, takes full advantage of the energy.
As preferably, described compressed air conveying system is also connected with described returning charge valve.
As preferably, it is characterised in that described compressed air conveying system includes the air compression being sequentially connected with Machine, air accumulator, cooling driers.High-performance batcher and returning charge valve are passed through compressed air, beneficially discharging.
Being compared with the prior art, the beneficial effects of the utility model are: this utility model uses brand-new production Line, makes full use of energy recovery, and low cost, beneficially environmental protection, and product half aqueous phase content produced are high, Good stability, quality is high.
Accompanying drawing explanation
Fig. 1 is a kind of schematic flow sheet of the present utility model;
Fig. 2 is a kind of flow diagram of the present utility model.
Reference is: preposition drying room the 11, first conveying worm 12, belt conveyor 21, feed hopper 22, first measuring belt scale the 23, first elevator the 24, second conveying worm the 31, second measuring belt scale 32, drying machine the 41, the 3rd conveying worm the 42, second elevator the 43, first electric adjustable air-valve 44, beat Dissipate machine 51, flour mill 52, separator the 53, the 3rd elevator 54, calcining machine 61, waste heat surge bunker 62, First roots blower 63, high-performance batcher 64, accelerating chamber the 65, second roots blower 66, second are electronic Adjusting valve 67, returning charge conveyer the 68, the 4th elevator 69, storage bin 71, bottom bulk machine 72, Cang Ding Cleaner unit 73, Weight type charge level instrument 74, cyclone dust extractor 81, air-introduced machine 82, water dust scrubber 83, weight Hammer air valve 84, steam source pipe 91, sub-cylinder 92, steam processing unit and hydrophobic treatment device 100, Air compressor 111, air accumulator 112, cooling driers 113.
Detailed description of the invention
Below in conjunction with embodiment, the utility model will be further described.
Embodiment 1
As shown in Figure 1 and Figure 2: the production line of a kind of high-quality complex building Gypsum Fibrosum, it is dried including major ingredient is preposition Unit, major ingredient feed and metering units, adjuvant feed and metering units, drying unit, pulverizing and sorting list Unit, calcining unit, finished product storage element, dust removing units.
Cyclone dust extractor 81 that described dust removing units includes being sequentially connected with, air-introduced machine 82, water dust scrubber 83.
The preposition drying unit of described major ingredient includes preposition drying room 11, is provided with the first spiral shell in described preposition drying room Rotation conveyer 12;Preposition drying room relevant position is located at by described water dust scrubber.
Described major ingredient feed and metering units include belt conveyor 21, the feed hopper 22, first being sequentially connected with Measuring belt scale 23 and the first elevator 24;Described belt conveyor and the first conveying worm connect.
Described adjuvant feed and metering units include the second conveying worm 31 and the second metering skin being sequentially connected with Belt scale 32.
Described drying unit includes drying machine the 41, the 3rd conveying worm the 42, second elevator being sequentially connected with 43;Described drying machine is provided with waste gas outlet, described waste gas outlet and the first electric adjustable air-valve 44 and connects, institute State the first electric adjustable air-valve to be connected with cyclone dust extractor;Described first elevator, the second measuring belt scale are respectively It is connected with the entrance of drying machine.Described cyclone dust extractor is also connected with air locking valve with counter weight 84, described weight lock wind Valve is connected with the returning charge import of drying machine again.
Beater 51 that described pulverizing and separation unit include being sequentially connected with, flour mill 52, separator 53, Three elevators 54;Described second elevator is connected with beater.It is provided with powder particles in described separator to be less than The 320 qualified powder outlet of purpose and defective powder outlets, described qualified powder outlet and described 3rd elevator Connecting, described defective powder outlet is connected with the charging aperture of described flour mill.
Described calcining unit includes calcining machine 61, UTILIZATION OF VESIDUAL HEAT IN buffer unit, Pneumatic conveyer;Described remaining Heat utilization buffer unit includes waste heat surge bunker 62 and the first roots blower being connected with described waste heat surge bunker 63;Described Pneumatic conveyer includes high-performance batcher 64, accelerating chamber 65 and described high-performance batcher The second roots blower 66 connected;Described calcining machine, waste heat surge bunker, high-performance batcher, accelerating chamber depend on Secondary connection;Described calcining machine is provided with waste gas outlet, and this waste gas outlet and the second electric adjustable air-valve 67 connect, Described second electric adjustable air-valve is connected with cyclone dust extractor.Described calcining machine is provided with powder import, returning charge goes out Mouth, discharge valve;Described powder import is connected with the 3rd elevator, and described discharge valve and waste heat surge bunker connect, Described returning charge outlet is connected with returning charge valve, returning charge conveyer the 68, the 4th elevator 69 successively, and the described 4th carries The machine of liter is connected with drying machine.
Described finished product storage element includes storage bin 71, the bottom bulk machine 72 of the bottom of described storage bin, institute The top stating storage bin is provided with roof scrubber 73 and Weight type charge level instrument 74, described roof scrubber, bottom of the reservior Bulk machine is connected with compressed air conveying system respectively.Described compressed air conveying system includes being sequentially connected with Air compressor 111, air accumulator 112, cooling driers 113.Described compressed air conveying system also returns with described Material valve connects.
The production line of described high-quality complex building Gypsum Fibrosum also include steam transmission system and steam processing unit and Hydrophobic treatment device 100, described steam transmission system includes steam source pipe 91 and the sub-cylinder being sequentially connected with 92, described sub-cylinder is connected with calcining machine and steam processing unit and hydrophobic treatment device respectively, described steam Processing unit and hydrophobic treatment device are connected with calcining machine and drying machine respectively, and drying machine is additionally provided with steam row Putting mouth, described steam outlet is connected with preposition drying room by pipeline.
In this production line:
(1), there are 175 DEG C at the exhaust temperature carrying out gypsum calcining, this waste heat is input into compact arranged steel pipe Bank of tubes, the Gypsum Fibrosum homogeneous reactor then will being dried is placed on bank of tubes, entrance slowly push away people with scraper plate and go out Material mouth, elevator input drying machine after entering metering, reaches to utilize waste heat that powder carries out preposition being dried, Reducing the purpose of the outside attached water of 3-5%, its effect ensures equipment not overload operation, also saving heat energy.
(2), drying machine one conveying worm of entrance 2 Plane Installation (by total dry amount 15% metering, And adjust by the actual items requirement of product) input composite, this new technology, new technique to drying machine Composite selects to use flyash, and (flyash is the garbage in the power generation process of thermal power plant, belongs to equally In comprehensive utilization category.Flyash is that coal dust is formed during high-temp combustion, there is substantial amounts of glass micro- Pearl, causes flyash to have mobility the best;The low-down excellent in performance of adhesion, and moisture content is extremely low (<1%), former ash particle diameter is less than 325 purposes>70%), for ensureing the good result and the good product of product that produce Matter, reaches loss on ignition less than 8% (the lowest more good) to the quality requirements of flyash;Water demand ratio is less than 105%; Less than 325 mesh sieve margins, < 25% (GB two grades), due to high fluidity and the non-stick of flyash, makes fineness Hollow axle and blade are provided with self-purification function, solve the Gypsum Fibrosum sticking problem of hollow axle and blade, again due to Flyash does not has outside attached water, further reduces the humidity of Gypsum Fibrosum.So, both can guarantee that equipment was good Good heat transfer effect;Reach to improve production capacity;Reduce energy consumption, can ensure that again drying machine safe operation.
(3), due to the self drainage of flyash the best, not only dry but also light, it is necessary to airtight and try hard to recommend with outside plane Dynamic conveying, otherwise, can cause metering inaccurate and fly the consequence that poplar pollutes, after electronic scale measures, by design Ratio enters drying machine.
(4), between the outlet of drying machine and the entrance of calcining machine, install one and match with total dry amount Roll-type (thunder illiteracy) carry the grinding machine (when designing air conveying, increasing the 15% of former value of calculation) of sorting, Thing grain ground fineness equal control at 325 mesh, then calcines through calcining machine, it is achieved temperature is consistent;Calcining Time consistency;Gypsum Fibrosum particle diameter is consistent, just can reach the high percentage of plaster of Paris half aqueous phase, ensure that and build Build the high-quality of Gypsum Fibrosum.
(5) outlet temperature, with computer strictly controlling calcining machine (controls between 175 1 178 DEG C, warp Repeatedly determine after sampling and testing).
Technical essential of the present utility model is as follows:
(1), the problem firstly the need of solution is to stop to enter the outside attached water of Gypsum Fibrosum of drying machine higher than design Value, causes drying machine overload operation, it is ensured that equipment safety, and scheme is to utilize waste heat to carry out preposition to powder It is dried, reduces the outside attached water of 3-5%: admix absolutely dry composite (flyash etc.), reduce further The outside attached water of Gypsum Fibrosum, so, had both guaranteed drying machine safe operation, can reduce again energy consumption and improve production capacity.
(2), solving hollow axle and the Gypsum Fibrosum sticking problem of blade, scheme is to utilize the good stream of composite Dynamic property reduces the adhesion of Gypsum Fibrosum, reaches the self-purification function of hollow axle and blade, so, both can guarantee that equipment was good Good heat transfer effect;Can ensure that again drying machine safe operation.
(3) temperature, is realized consistent;Calcination time is consistent;Gypsum Fibrosum particle diameter is consistent, just can reach plaster of Paris The high percentage of half aqueous phase, ensures that the high-quality of plaster of Paris.
(4), the outlet temperature computer of calcining machine strictly controls.

Claims (7)

1. the production line of a high-quality complex building Gypsum Fibrosum, it is characterised in that: include the preposition drying unit of major ingredient, major ingredient feed and metering units, adjuvant feed and metering units, drying unit, pulverizing and separation unit, calcining unit, finished product storage element, dust removing units;
Cyclone dust extractor (81) that described dust removing units includes being sequentially connected with, air-introduced machine (82), water dust scrubber (83);
The preposition drying unit of described major ingredient includes preposition drying room (11), is provided with the first conveying worm (12) in described preposition drying room;Preposition drying room relevant position is located at by described water dust scrubber;
Described major ingredient feed and metering units include belt conveyor (21), feed hopper (22), the first measuring belt scale (23) and the first elevator (24) being sequentially connected with;Described belt conveyor and the first conveying worm connect;Described first measuring belt scale and the first elevator are connected with the entrance 1 of drying machine;
Described adjuvant feed and metering units include the second conveying worm (31) and the second measuring belt scale (32) being sequentially connected with;Described second conveying worm and the second measuring belt scale are connected with the entrance 2 of drying machine;
Drying machine (41) that described drying unit includes being sequentially connected with, the 3rd conveying worm (42), the second elevator (43);Described drying machine is provided with waste gas outlet, described waste gas outlet and the first electric adjustable air-valve (44) and connects, and described first electric adjustable air-valve is connected with cyclone dust extractor;
Beater (51) that described pulverizing and separation unit include being sequentially connected with, flour mill (52), separator (53), the 3rd elevator (54);Described second elevator is connected with beater;
Described calcining unit includes calcining machine (61), UTILIZATION OF VESIDUAL HEAT IN buffer unit, Pneumatic conveyer;Described UTILIZATION OF VESIDUAL HEAT IN buffer unit includes waste heat surge bunker (62) and the first roots blower (63) being connected with described waste heat surge bunker;Described Pneumatic conveyer includes the second roots blower (66) that high-performance batcher (64), accelerating chamber (65) are connected with described high-performance batcher;Described calcining machine, waste heat surge bunker, high-performance batcher, accelerating chamber are sequentially connected with;Described calcining machine is provided with waste gas outlet, and this waste gas outlet and the second electric adjustable air-valve (67) connect, and described second electric adjustable air-valve is connected with cyclone dust extractor;
Described finished product storage element includes storage bin (71), the bottom bulk machine (72) of the bottom of described storage bin, the top of described storage bin is provided with roof scrubber (73) and Weight type charge level instrument (74), and described roof scrubber, bottom bulk machine are connected with compressed air conveying system respectively.
2. the production line of high-quality complex building Gypsum Fibrosum as claimed in claim 1, it is characterised in that described calcining machine is provided with powder import, returning charge outlet, discharge valve;Described powder import is connected with the 3rd elevator, described discharge valve and waste heat surge bunker connect, described returning charge outlet is connected with returning charge valve, returning charge conveyer (68), the 4th elevator (69) successively, and described 4th elevator is connected with drying machine returning charge import.
3. the production line of high-quality complex building Gypsum Fibrosum as claimed in claim 2, it is characterised in that described cyclone dust extractor is also connected with air locking valve with counter weight (84), described air locking valve with counter weight again with the returning charge import connection of drying machine.
4. the production line of high-quality complex building Gypsum Fibrosum as claimed in claim 1, it is characterized in that, powder particles it is provided with less than the 320 qualified powder outlets of purpose with more than the 320 defective powder outlets of purpose in described separator, described qualified powder outlet is connected with described 3rd elevator, and described defective powder outlet is connected with the charging aperture of described flour mill.
5. the production line of high-quality complex building Gypsum Fibrosum as claimed in claim 1, it is characterized in that, the production line of described high-quality complex building Gypsum Fibrosum also includes steam transmission system and steam processing unit, hydrophobic treatment device (100), described steam transmission system includes steam source pipe (91) and the sub-cylinder (92) being sequentially connected with, described sub-cylinder respectively with calcining machine and steam processing unit, hydrophobic treatment device connects, described steam processing unit, hydrophobic treatment device is connected with calcining machine and drying machine respectively, steam outlet it is additionally provided with on drying machine, described steam outlet is connected with preposition drying room by pipeline.
6. the production line of high-quality complex building Gypsum Fibrosum as claimed in claim 3, it is characterised in that described compressed air conveying system is also connected with described returning charge valve.
7. the production line of the high-quality complex building Gypsum Fibrosum as described in one of claim 1,3 or 6, it is characterized in that, air compressor (111) that described compressed air conveying system includes being sequentially connected with, air accumulator (112), cooling driers (113).
CN201521049382.3U 2015-12-14 2015-12-14 Production line of high -quality composite construction gypsum Expired - Fee Related CN205528463U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521049382.3U CN205528463U (en) 2015-12-14 2015-12-14 Production line of high -quality composite construction gypsum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521049382.3U CN205528463U (en) 2015-12-14 2015-12-14 Production line of high -quality composite construction gypsum

Publications (1)

Publication Number Publication Date
CN205528463U true CN205528463U (en) 2016-08-31

Family

ID=56762666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521049382.3U Expired - Fee Related CN205528463U (en) 2015-12-14 2015-12-14 Production line of high -quality composite construction gypsum

Country Status (1)

Country Link
CN (1) CN205528463U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112919837A (en) * 2021-03-23 2021-06-08 华能国际电力股份有限公司营口电厂 Gypsum powder production system and production process thereof
CN113307520A (en) * 2021-04-28 2021-08-27 浙申环保材料(宁波)有限公司 Preparation device for calcining gypsum powder and processing technology thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112919837A (en) * 2021-03-23 2021-06-08 华能国际电力股份有限公司营口电厂 Gypsum powder production system and production process thereof
CN113307520A (en) * 2021-04-28 2021-08-27 浙申环保材料(宁波)有限公司 Preparation device for calcining gypsum powder and processing technology thereof

Similar Documents

Publication Publication Date Title
CN102358705B (en) Process for producing sintered ceramsite by using solid waste materials, and system thereof
CN102249577B (en) Process method for producing building gypsum powder by utilizing citric acid gypsum
US20220243910A1 (en) System and method for calcining coal gangue
CN101537653B (en) Process for recycled concrete wall body sheets of building rubbish
CN106431035B (en) Device and method for preparing building gypsum from phosphogypsum
CN113019648B (en) High-efficient preparation system of abandonment concrete regeneration sand powder
CN203816740U (en) Modularized sand making equipment
CN204676004U (en) A kind of five-step approach prepares the production line of half water desulfurated plaster
CN103936313A (en) Process for preparing building gypsum powder from phosphogypsum
CN109675906A (en) A kind of wholly-owned source recycling and reusing system of building castoff
CN102173608A (en) Method for preparing cement clinker from high-proportion carbide slag through decomposition outside kiln of five-stage preheater
CN109226185A (en) Paint slag recycling system device and its production technology
CN106278088A (en) A kind of environmental protection is non-burning brick and preparation method thereof
CN107737642A (en) The production line and its technique of a kind of flyash
CN205528463U (en) Production line of high -quality composite construction gypsum
CN104446071A (en) Dry sand making process
CN104003689B (en) A kind of quartzy tailings brick and preparation method thereof
CN209077416U (en) Paint slag recycling system device
CN113135674B (en) Utilize integrated device of abandonment ready-mixed concrete preparation regeneration cement thick liquid powder
CN102910847A (en) Portland cement produced by using building rubbish as admixture and preparation process of portland cement
CN106167361A (en) A kind of alkaline residue building waste haydite and preparation method thereof
RU2606424C1 (en) Production line and method of construction materials automated production
CN113292262A (en) Phosphogypsum calcining system
CN104291719A (en) System for producing building gypsum powder through rapid dehydration, and method thereof
CN202016957U (en) Continuous gypsum powder production system of small gypsum boards for architectural decoration

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160831

Termination date: 20211214

CF01 Termination of patent right due to non-payment of annual fee