CN205479715U - Pipeline supports protection architecture - Google Patents
Pipeline supports protection architecture Download PDFInfo
- Publication number
- CN205479715U CN205479715U CN201620042499.7U CN201620042499U CN205479715U CN 205479715 U CN205479715 U CN 205479715U CN 201620042499 U CN201620042499 U CN 201620042499U CN 205479715 U CN205479715 U CN 205479715U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- girders
- protection structure
- positive stop
- bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a pipeline supports protection architecture for pipeline to spaning the foundation ditch both sides supports the protection, two girders including stretching over the foundation ditch are equipped with the bracket that is used for supporting the pipeline between two girders, the pipeline extends along the length direction of girder, and line arrangment is in the pipeline. The utility model discloses an among the pipeline supports protection architecture, two girders including stretching over the foundation ditch are equipped with the bracket between two girders, are equipped with the pipeline that is used for protecting the pipeline on the bracket, and the pipeline extends along the length direction of girder, and line arrangment is in the pipeline, so adopt the utility model discloses a pipeline supports protection architecture not only can support the pipeline that spanes the foundation ditch both sides, still through supporting the pipe protection pipeline on the bracket to when solving the current deep foundation pit construction who exists, the pipeline makes the pipeline because of warping the too big technical problem who causes destruction because unsettled span is big, additionally, the utility model discloses a pipeline supports protection architecture's simple structure, easily preparation and firm reliable.
Description
Technical field
This utility model relates to building engineering field, especially, relates to a kind of pipeline support protection structure.
Background technology
Along with the propelling of urbanization, in Municipal construction process, deep foundation pit construction is increasingly common.And city deep basal pit
In work progress, often running into the underground utilities of complexity, some important pipelines are across excavation of foundation pit face especially, after excavation of foundation pit,
The unsettled span of pipeline is big, if taking no action to protect, pipeline will be made to damage because deformation is excessive.
Utility model content
This utility model provides a kind of pipeline support protection structure, pipeline during to solve existing deep foundation pit construction due to unsettled across
The technical problem that degree is big and makes pipeline damage because deformation is excessive.
The technical solution adopted in the utility model is as follows:
A kind of pipeline support protection structure, for carrying out supporting and protecting to the pipeline across foundation ditch both sides, including across the two of foundation ditch
Root girder, is provided with the bracket for supporting pipeline between two girders, pipeline extends along the length direction of girder, and pipeline is arranged in
In pipeline.
Further, bracket includes many joists, and many joists are spaced layout, the two of each joist successively along the length direction of girder
End is connected with two girders respectively.
Further, two girders are symmetrical arranged, and the two ends of each joist are respectively perpendicular two girders, and the two ends of each joist are respectively
Pass the girder being correspondingly arranged.
Further, pipeline support protection structure also includes for restriction conduit locating part of transverse shifting between two girders.
Further, locating part includes at least first positive stop strip, and one end of the first positive stop strip is fixed with bracket, its other end
Fix with bracket around later from the outer wall of pipeline;Or locating part includes at least two second positive stop strips, at least two second spacing
Bar is divided into the both sides of pipeline, and the outer wall of pipeline is fixed and rested against to each second positive stop strip with bracket.
Further, the quantity of the first positive stop strip is many, and many first positive stop strips are spaced along the length direction of pipeline and arrange.
Further, the second positive stop strip is arranged in pairs the both sides in pipeline, and the second positive stop strip being arranged in pairs is along the length side of pipeline
Carry out spacing to extending resting against the outer wall of pipeline.
Further, the second positive stop strip is arranged in pairs the both sides in pipeline, and the second positive stop strip being arranged in pairs is crossed longitudinally to rest against
The outer wall of pipeline carries out spacing.
Further, it is interior to support two groups of pillar groups of two girders respectively that pipeline support protection structure also includes being arranged at foundation ditch,
Two girders are supported in two groups of pillar groups respectively.
Further, each pillar group includes two pillars being arranged side by side, and the top of two pillars is provided with the pole of both connections,
Girder is supported on pole.
This utility model has the advantages that
In pipeline support of the present utility model protection structure, including two girders across foundation ditch, between two girders, it is provided with bracket,
Bracket is provided with the pipeline for protecting pipeline, and pipeline extends along the length direction of girder, and pipeline is arranged in pipeline, so adopting
Protect structure with pipeline support of the present utility model, not only the pipeline across foundation ditch both sides can be supported, also by being supported on
Pipe protection pipeline on bracket, thus when solving the deep foundation pit construction of existing existence, pipeline makes pipeline owing to unsettled span is big
The technical problem damaged because deformation is excessive;It addition, the simple in construction of pipeline support of the present utility model protection structure, easily
In making and solid and reliable.
In addition to objects, features and advantages described above, this utility model also has other objects, features and advantages.
Below with reference to figure, this utility model is described in further detail.
Accompanying drawing explanation
The accompanying drawing of the part constituting the application is used for providing and being further appreciated by of the present utility model, of the present utility model schematically
Embodiment and explanation thereof are used for explaining this utility model, are not intended that improper restriction of the present utility model.In the accompanying drawings:
Fig. 1 is the pipeline support protection structure main TV structure schematic diagram of this utility model preferred embodiment;And
Fig. 2 is the left view structural representation of the pipeline support protection structure in Fig. 1.
Marginal data
10, girder;20, bracket;21, joist;30, pipeline;40, locating part;41, the second positive stop strip;60, pillar
Group;61, pillar;70, pole.
Detailed description of the invention
Below in conjunction with accompanying drawing, embodiment of the present utility model is described in detail, but this utility model can be limited by claim
Multitude of different ways that is fixed and that cover is implemented.
As it is shown in figure 1, preferred embodiment of the present utility model provides a kind of pipeline support protection structure, for across foundation ditch
The pipeline of both sides carries out supporting and protecting, including two girders 10 across foundation ditch, is provided with for supporting pipeline between two girders 10
The bracket 20 of 30, pipeline 30 extends along the length direction of girder 10, and pipeline is arranged in pipeline 30.Pipe of the present utility model
Line supports in protection structure, including two girders 10 across foundation ditch, is provided with bracket 20, on bracket 20 between two girders 10
Being provided with the pipeline 30 for protecting pipeline, pipeline 30 extends along the length direction of girder 10, and pipeline is arranged in pipeline 30, therefore
And use pipeline support of the present utility model to protect structure, not only the pipeline across foundation ditch both sides can be supported, also by propping up
Hold the pipeline 30 on bracket 20 and protect pipeline, thus when solving the deep foundation pit construction of existing existence, pipeline is due to unsettled span
Make greatly the technical problem that pipeline damages because deformation is excessive;It addition, the knot of pipeline support of the present utility model protection structure
Structure is simple, be prone to making and solid and reliable.
Alternatively, as in figure 2 it is shown, bracket 20 includes many joists 21, many joists 21 along girder 10 length direction successively
Interval is arranged, the two ends of each joist 21 are connected with two girders 10 respectively.In this utility model specific embodiment, many torr
Beam 21 is evenly arranged successively along the length direction of girder 10.
Preferably, as it is shown in figure 1, two girders 10 are symmetrical arranged, the two ends of each joist 21 are respectively perpendicular two girders 10,
And the two ends of each joist 21 pass the girder 10 being correspondingly arranged respectively.In this utility model specific embodiment, girder 10 is by shellfish
Thunder sheet splicing composition, according to the span of pipeline to be supported, selects the beret truss of suitable types to carry out assembly, to reach girder 10
Len req.Joist 21 is made up of I-steel, and the length of each joist 21 is according to the diameter of pipeline 30 and the master of pipeline 30 both sides
The spacing of beam 10 is determined, and during construction, the two ends of joist 21 are welded and fixed with girder 10 respectively, for the load by supporting
It is delivered on girder 10.
In this utility model, as depicted in figs. 1 and 2, pipeline support protection structure also includes for restriction conduit 30 two masters
The locating part 40 of transverse shifting between beam 10.
Alternatively, first embodiment (not shown) of the present utility model, locating part 40 includes at least first positive stop strip, the
One end of one positive stop strip is fixed with bracket 20, and its other end is fixed with bracket 20 around later from the outer wall of pipeline 30.Preferably,
The quantity of the first positive stop strip is many, and many first positive stop strips are spaced layout successively along the length direction of pipeline 30.
Alternatively, the second embodiment of the present utility model, unlike first embodiment, locating part 40 includes at least two
Two positive stop strips 41, at least two second positive stop strips 41 are divided into the both sides of pipeline 30, and each second positive stop strip 41 and bracket 20
Fix and rest against the outer wall of pipeline 30.
Preferably, in the first specific embodiment of the second embodiment of the present utility model, as depicted in figs. 1 and 2, second is spacing
Bar 41 is arranged in pairs in the both sides of pipeline 30, and the second positive stop strip 41 being arranged in pairs extends to prop up along the length direction of pipeline 30
The outer wall in tube road 30 carries out spacing.During actual fabrication, the second positive stop strip 41 is made up of small-sized I-steel, and joint length is about
50cm, draws materials and is convenient and easy to make.
Preferably, in the second specific embodiment of the second embodiment of the present utility model, as depicted in figs. 1 and 2, second is spacing
Bar 41 is arranged in pairs in the both sides of pipeline 30, and the second positive stop strip 41 being arranged in pairs is crossed longitudinally to rest against the outer wall of pipeline 30
Carry out spacing.During actual fabrication, the second positive stop strip 41 is made up of small-sized channel-section steel, draws materials and is convenient and easy to make.
In this utility model, as depicted in figs. 1 and 2, to support respectively in pipeline support protection structure also includes being arranged at foundation ditch
Two groups of pillar groups 60 of two girders 10, two girders 10 are supported in two groups of pillar groups 60 respectively.
Alternatively, as it is shown in figure 1, each pillar group 60 includes two pillars being arranged side by side 61, the top of two pillars 61 sets
Having the pole 70 of both connections, girder 10 is supported on pole 70.In this utility model specific embodiment, pillar 61 uses
H profile steel is made, and is positioned at the span center of girder 10, and the top of every two pillars 61 is connected by pole 70, pole 70
For I-steel, pole 70 supports girder 10 to strengthen the resistance of girder 10.
During pipeline support of the present utility model of constructing protection structure, before excavation of foundation pit, first carry out the construction of pillar 61;Then
Carrying out earth excavation across foundation ditch pipeline position, and carrying out the assembly of girder 10 simultaneously, the length of girder 10 need to be longer than foundation ditch
Distance between basis, both sides;After earth excavation completes, on the basis of using hanging device that girder 10 is set up in foundation ditch both sides,
And be attached with pillar 61;Then start joist 21 and construct across the pipeline of foundation ditch;After pipeline construction completes, just
First positive stop strip or the second positive stop strip 41 can be installed;After conduit wiring suspension has been protected, i.e. can ensure that below pipeline after soil excavation,
Pipeline does not causes because deformation is excessive destroying.
The foregoing is only preferred embodiment of the present utility model, be not limited to this utility model, for this area
For technical staff, this utility model can have various modifications and variations.All within spirit of the present utility model and principle, institute
Any modification, equivalent substitution and improvement etc. made, within should be included in protection domain of the present utility model.
Claims (10)
1. a pipeline support protection structure, it is characterised in that for the pipeline across foundation ditch both sides is carried out supporting and protecting,
Including two girders (10) across foundation ditch, it is provided with for supporting pipeline (30) between described two girders (10)
Bracket (20), described pipeline (30) extends along the length direction of described girder (10), and described pipeline is arranged in described
In pipeline (30).
Pipeline support the most according to claim 1 protection structure, it is characterised in that
Described bracket (20) includes many joists (21), and described many joists (21) are along the length of described girder (10)
Direction is spaced layout successively, and the two ends of each described joist (21) are connected with described two girders (10) respectively.
Pipeline support the most according to claim 2 protection structure, it is characterised in that
Described two girders (10) are symmetrical arranged, and the two ends of each described joist (21) are respectively perpendicular described two girders (10),
And the two ends of each described joist (21) pass the described girder (10) being correspondingly arranged respectively.
Pipeline support the most according to claim 1 protection structure, it is characterised in that
Described pipeline support protection structure also includes for limiting described pipeline (30) between described two girders (10)
The locating part (40) of transverse shifting.
Pipeline support the most according to claim 4 protection structure, it is characterised in that
Described locating part (40) includes at least first positive stop strip, one end of described first positive stop strip and described bracket (20)
Fixing, its other end is fixed with described bracket (20) around later from the outer wall of described pipeline (30);Or
Described locating part (40) includes at least two second positive stop strips (41), at least two described second positive stop strips (41)
It is divided into the both sides of described pipeline (30), and each described second positive stop strip (41) is fixing with described bracket (20) and props up
Outer wall by described pipeline (30).
Pipeline support the most according to claim 5 protection structure, it is characterised in that
The quantity of described first positive stop strip is many, and many described first positive stop strips are along the length direction of described pipeline (30)
Interval is arranged.
Pipeline support the most according to claim 5 protection structure, it is characterised in that
Described second positive stop strip (41) is arranged in pairs in the both sides of described pipeline (30), described second limit being arranged in pairs
Position bar (41) extends along the length direction of described pipeline (30) and carries out spacing resting against the outer wall of described pipeline (30).
Pipeline support the most according to claim 5 protection structure, it is characterised in that
Described second positive stop strip (41) is arranged in pairs in the both sides of described pipeline (30), described second limit being arranged in pairs
Position bar (41) the crossed longitudinally outer wall to rest against described pipeline (30) carries out spacing.
Pipeline support the most according to claim 1 protection structure, it is characterised in that
It is interior to support described two girders (10) respectively that described pipeline support protection structure also includes being arranged at described foundation ditch
Two groups of pillar groups (60), described two girders (10) are supported in pillar group (60) described in two groups respectively.
Pipeline support the most according to claim 9 protection structure, it is characterised in that
Each described pillar group (60) includes two pillars being arranged side by side (61), and the top of two described pillars (61) sets
Having the pole (70) of both connections, described girder (10) is supported on described pole (70).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620042499.7U CN205479715U (en) | 2016-01-18 | 2016-01-18 | Pipeline supports protection architecture |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620042499.7U CN205479715U (en) | 2016-01-18 | 2016-01-18 | Pipeline supports protection architecture |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205479715U true CN205479715U (en) | 2016-08-17 |
Family
ID=56669682
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620042499.7U Expired - Fee Related CN205479715U (en) | 2016-01-18 | 2016-01-18 | Pipeline supports protection architecture |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205479715U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108343782A (en) * | 2017-01-22 | 2018-07-31 | 北京爱地地质勘察基础工程公司 | The steel pipe pile-supported structure of underground utilities |
CN108797760A (en) * | 2018-06-19 | 2018-11-13 | 新疆铁道勘察设计院有限公司 | The construction method of rail yard drainage pipeline temporary support structure |
CN110578833A (en) * | 2019-09-30 | 2019-12-17 | 武汉市市政建设集团有限公司 | Underground rigid pipeline supporting structure and method |
CN112609741A (en) * | 2020-12-07 | 2021-04-06 | 郑州地铁集团有限公司 | In-situ protection structure and method for large-diameter pipeline of open cut station of rail transit |
CN117127628A (en) * | 2023-10-26 | 2023-11-28 | 国网(天津)综合能源服务有限公司 | Cable structure foundation pit supporting device |
-
2016
- 2016-01-18 CN CN201620042499.7U patent/CN205479715U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108343782A (en) * | 2017-01-22 | 2018-07-31 | 北京爱地地质勘察基础工程公司 | The steel pipe pile-supported structure of underground utilities |
CN108797760A (en) * | 2018-06-19 | 2018-11-13 | 新疆铁道勘察设计院有限公司 | The construction method of rail yard drainage pipeline temporary support structure |
CN110578833A (en) * | 2019-09-30 | 2019-12-17 | 武汉市市政建设集团有限公司 | Underground rigid pipeline supporting structure and method |
CN110578833B (en) * | 2019-09-30 | 2024-10-18 | 武汉市市政建设集团有限公司 | Underground rigid pipeline supporting structure and method |
CN112609741A (en) * | 2020-12-07 | 2021-04-06 | 郑州地铁集团有限公司 | In-situ protection structure and method for large-diameter pipeline of open cut station of rail transit |
CN117127628A (en) * | 2023-10-26 | 2023-11-28 | 国网(天津)综合能源服务有限公司 | Cable structure foundation pit supporting device |
CN117127628B (en) * | 2023-10-26 | 2024-03-26 | 国网(天津)综合能源服务有限公司 | Cable structure foundation pit supporting device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205479715U (en) | Pipeline supports protection architecture | |
CN104265306A (en) | Municipal shield tunnel | |
CN207211784U (en) | A kind of positioner of prefabricated components installation reinforcing bar | |
CN202500096U (en) | Rain water box culvert crossing underground pipeline protection device | |
CN206409743U (en) | The steel pipe pile-supported structure of underground utilities | |
CN104295001B (en) | The construction technology of variable cross-section prestressing force cant beam | |
WO2018047926A1 (en) | Hydraulic turbine suspending device | |
CN204113295U (en) | A kind of municipal shield tunnel | |
CN111795212A (en) | Suspension method and suspension structure for pipeline crossing foundation pit | |
CN205781429U (en) | A kind of pipe gallery line holder | |
CN203222817U (en) | Connecting structure of basement stand column | |
CN202299362U (en) | Erecting structure for suspension type scaffold of pipe rack | |
CN203571233U (en) | Large-span X-shaped spatial arch pipeline support | |
CN205778921U (en) | A kind of down-hole filling type steel pipe concrete bracket | |
CN109469338A (en) | A kind of tall and big workshop self-control grid platform and its construction method as electromechanical pipeline | |
KR20140140838A (en) | Structure of power-transmission tower | |
CN206279539U (en) | Assembled equalizer bar foundation pit support system | |
CN106703040B (en) | Assembled equalizer bar foundation pit support system | |
CN205403760U (en) | Foot rest that is used for suspending in midair hammer ball during contact triangle -shaped measures | |
CN213115585U (en) | Stable form bearing structure that building engineering used | |
CN207974506U (en) | A kind of regularization hard protection device for elevator | |
CN111244832B (en) | Moving and modifying method for integrally lifting and protecting pipe-jacking type underground high-voltage cable in situ | |
CN206618774U (en) | Groundwater velocity test device in tunnel surrounding | |
CN207567809U (en) | A kind of city integrated piping lane outlet combined system | |
CN206233246U (en) | For the saw component of box formula equalizer bar foundation ditch support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160817 Termination date: 20210118 |
|
CF01 | Termination of patent right due to non-payment of annual fee |