CN204825610U - No expansion joint rigid frame bridge - Google Patents
No expansion joint rigid frame bridge Download PDFInfo
- Publication number
- CN204825610U CN204825610U CN201520536078.5U CN201520536078U CN204825610U CN 204825610 U CN204825610 U CN 204825610U CN 201520536078 U CN201520536078 U CN 201520536078U CN 204825610 U CN204825610 U CN 204825610U
- Authority
- CN
- China
- Prior art keywords
- abutment
- girder
- bridge
- expansion joint
- rigid frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000007596 consolidation process Methods 0.000 claims description 7
- 230000007704 transition Effects 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 10
- 238000012423 maintenance Methods 0.000 abstract description 5
- 239000002689 soil Substances 0.000 abstract description 3
- 238000011065 in-situ storage Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a no expansion joint rigid frame bridge, including girder and abutment. The girder adopts the precast beam, and the girder hoist and mount are placed on the abutment abutment body, the section of watering after the abutment abutment body sets up, and the section of watering behind the abutment body is pour to the girder hoist and mount back of taking one's place, realizes that girder and abutment concrete, flexible base is adopted on the abutment basis, and the bridge floor linear deformation is through the solution that influences each other of the abutment flexible base and the soil body. The utility model discloses mainly there is following advantage: reduce bridge engineering and build the cost. Save the expense of expansion joint and abutment support, subtracted short construction cycle, show saving abutment concrete and pile foundation quantity. Maintenance, upkeep charges hang down. It uses to have saved the maintenance and the replacement cost of expansion joint and abutment support. The bridge does not have the expansion joint, and it is smooth -going comfortable to drive a vehicle.
Description
Technical field
The utility model relates to a kind of jointless rigid frame bridge.
Background technology
Shrinkage joint is one of current bridge construction and the difficult problem in safeguarding.In an atmosphere, environment for use is relatively more severe for the flexible dimension long term exposure of bridge, is be subject to the position of destroying and being comparatively difficult to repair in bridge construction most.China has built part jointless bridge now, but the defect that ubiquity is certain: be still provided with bearing between girder and abutment, need by bearing, girder to be fixedly connected with abutment, bridge domestic demand in application life repeatedly replacing time, the design of jointless brings inconvenience to bearing replacement on the contrary.
In summary, mainly there is following shortcoming in existing jointless rigid frame bridge:
1. need by bearing, girder to be fixedly connected with abutment, bridge domestic demand in application life repeatedly replacing time;
2. abutment foundation is rigid foundation, cannot realize the compatible deformation of abutment foundation and the soil body.
Utility model content
For solving prior art above shortcomings, the utility model provides a kind of jointless rigid frame bridge.
For achieving the above object, the utility model adopts following technical scheme:
Comprise abutment, and by lifting the girder be positioned on abutment abutment body; Described abutment comprises abutment abutment body and abutment foundation, described abutment abutment body the junction with described girder be provided with in order to described girder consolidation after the section of watering, described abutment foundation adopts flexible foundation; Arrange deformation joint at transition slab at bridge head and road joining place, bridge floor longitudinal strain is solved by described abutment flexible foundation and described deformation joint.
Described precast beam adopts precast hollow slab.
Described precast beam adopts prefabricated small box girder.
Described precast beam adopts Precast T-Beam.
The beneficial effects of the utility model are:
Girder adopts precast beam, after precast beam hoisted in position, to build after abutment before the section of watering, is the relation of freely-supported, arranges TR thin rubber pad between the two as temporary support between girder and abutment; Building after abutment after the section of watering, is the relation of consolidation between girder and abutment.It is the process of consolidation after first freely-supported between girder and abutment.
Abutment adopts flexible foundation, allows abutment foundation self to have certain distortion, can interact with the soil body of surrounding, and then solve the longitudinal strain problem of bridge floor.
Bridge, without the need to arranging traditional shrinkage joint, also without the need to arranging bearing, reduces bridge engineering construction costs.Save the expense of shrinkage joint and abutment bearing, shorten construction period; Remarkable saving abutment concrete and pile foundation quantity.
Form of structure is simple, and maintenance, maintenance costs are low.Save maintenance and the replacement cost of shrinkage joint and abutment bearing.
Bridge jointless, drives a vehicle smooth-going comfortable.
Accompanying drawing explanation
Fig. 1; Bridge type elevation;
Wherein: 1. girder, 2. abutment abutment body, 3. abutment foundation, the 4. section of watering after abutment, 5. bridge floor in-situ layer, 6. transition slab at bridge head, 7. deformation joint, 8. TR thin rubber pad.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Girder 1 adopts precast beam (as precast hollow slab, prefabricated small box girder, Precast T-Beam etc.), and girder 1 lifting is placed on abutment abutment body 2, is provided with TR thin rubber pad 8 as temporary support between girder 1 and abutment abutment body 2.Construct after hoisted in position the section of watering 4 after bridge floor in-situ layer 5 and abutment, realizing girder 1 and abutment consolidation, is the process of consolidation after first freely-supported between girder and abutment.Abutment foundation 3 adopts flexible foundation, and transition slab at bridge head 6 and road joining place arrange deformation joint 7, and bridge floor longitudinal strain is by abutment flexible foundation 3 and arrange deformation joint 7 and solve.
Detailed construction operation is as follows:
(1) excavation of foundation pit, construction pile foundation, cushion cap and abutment body;
(2) pit backfill, general backfill is highly no more than 2 meters;
(3) main cable and girder is in place, construction hinge seam or wet seam;
(4) section of watering after bridge floor in-situ layer and abutment of constructing realizes consolidation;
(5) back filling behind abutment compacting, cast-in-place attachment strap, construction Deformation seam and bridge deck, complete bridge construction.
By reference to the accompanying drawings detailed description of the invention of the present utility model is described although above-mentioned; but the restriction not to the utility model protection domain; one of ordinary skill in the art should be understood that; on the basis of the technical solution of the utility model, those skilled in the art do not need to pay various amendment or distortion that creative work can make still within protection domain of the present utility model.
Claims (4)
1. a jointless rigid frame bridge, is characterized in that: comprise abutment, and by lifting the girder be positioned on abutment abutment body, described girder adopts precast beam; Described abutment comprises abutment abutment body and abutment foundation, described abutment abutment body the junction with described girder be provided with in order to described girder consolidation after the section of watering, described abutment foundation adopts flexible foundation; Arrange deformation joint at transition slab at bridge head and road joining place, bridge floor longitudinal strain is solved by described abutment flexible foundation and described deformation joint.
2. a kind of jointless rigid frame bridge according to claim 1, is characterized in that: described precast beam adopts precast hollow slab.
3. a kind of jointless rigid frame bridge according to claim 1, is characterized in that: described precast beam adopts prefabricated small box girder.
4. a kind of jointless rigid frame bridge according to claim 1, is characterized in that: described precast beam adopts Precast T-Beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520536078.5U CN204825610U (en) | 2015-07-22 | 2015-07-22 | No expansion joint rigid frame bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520536078.5U CN204825610U (en) | 2015-07-22 | 2015-07-22 | No expansion joint rigid frame bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204825610U true CN204825610U (en) | 2015-12-02 |
Family
ID=54683226
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520536078.5U Expired - Fee Related CN204825610U (en) | 2015-07-22 | 2015-07-22 | No expansion joint rigid frame bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204825610U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108547209A (en) * | 2018-05-02 | 2018-09-18 | 福建工程学院 | A kind of single hole precast hollow slab jointless bridge and its construction method |
CN109930474A (en) * | 2019-04-04 | 2019-06-25 | 中交第三航务工程勘察设计院有限公司 | A kind of connected structure for pile foundation type trestle and barrel type basis |
CN110195406A (en) * | 2019-05-06 | 2019-09-03 | 唐峰 | A kind of seamless bridge abutment structure |
CN110578290A (en) * | 2019-08-14 | 2019-12-17 | 山东高速工程检测有限公司 | Abutment back backfilling structure of bridgehead and construction method thereof |
CN110847008A (en) * | 2019-12-12 | 2020-02-28 | 福州大学 | Structure of abutment rigid frame bridge with rigid enlarged foundation and construction method thereof |
CN110983983A (en) * | 2019-12-20 | 2020-04-10 | 同济大学建筑设计研究院(集团)有限公司 | Construction method of fixed end beam and fixed end beam structure |
-
2015
- 2015-07-22 CN CN201520536078.5U patent/CN204825610U/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108547209A (en) * | 2018-05-02 | 2018-09-18 | 福建工程学院 | A kind of single hole precast hollow slab jointless bridge and its construction method |
CN108547209B (en) * | 2018-05-02 | 2023-11-21 | 福建工程学院 | Single-hole prefabricated hollow slab bridge without expansion joint and construction method thereof |
CN109930474A (en) * | 2019-04-04 | 2019-06-25 | 中交第三航务工程勘察设计院有限公司 | A kind of connected structure for pile foundation type trestle and barrel type basis |
CN110195406A (en) * | 2019-05-06 | 2019-09-03 | 唐峰 | A kind of seamless bridge abutment structure |
CN110578290A (en) * | 2019-08-14 | 2019-12-17 | 山东高速工程检测有限公司 | Abutment back backfilling structure of bridgehead and construction method thereof |
CN110578290B (en) * | 2019-08-14 | 2024-04-05 | 山东高速工程检测有限公司 | Bridge abutment back backfill structure and construction method thereof |
CN110847008A (en) * | 2019-12-12 | 2020-02-28 | 福州大学 | Structure of abutment rigid frame bridge with rigid enlarged foundation and construction method thereof |
CN110847008B (en) * | 2019-12-12 | 2024-05-31 | 福州大学 | Bridge abutment rigid frame bridge structure with rigid expansion foundation and construction method thereof |
CN110983983A (en) * | 2019-12-20 | 2020-04-10 | 同济大学建筑设计研究院(集团)有限公司 | Construction method of fixed end beam and fixed end beam structure |
CN110983983B (en) * | 2019-12-20 | 2021-11-16 | 同济大学建筑设计研究院(集团)有限公司 | Construction method of fixed end beam and fixed end beam structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204825610U (en) | No expansion joint rigid frame bridge | |
CN206256614U (en) | A kind of prefabricated assembled concrete wallboard for fabricated construction | |
CN203834739U (en) | End steel board connection, positioning and assembly type shear wall structure | |
CN104947709A (en) | Pre-assembled single-compartment municipal tunnel and construction method thereof | |
CN203080430U (en) | Assembly and cast-in-place combined type reinforced concrete pipe type culvert | |
CN203188113U (en) | Segmental precasting assembly structure in large bent cap | |
CN202673588U (en) | Device for connecting concrete tower drum with steel tower drum | |
CN210066671U (en) | Novel rectangular gallery structure | |
CN103966956B (en) | A kind of hood type concrete filled steel tube reinforces single-column Bridge Pier Construction device and construction method | |
CN104499494A (en) | Double-wall corrugated steel cofferdam | |
CN109881661A (en) | Assembled underground continuous wall transverse connection structure | |
CN103669422B (en) | Waterproof construction method of pile head of anchor rod static pressure pile | |
CN202866084U (en) | Concrete composite floor slab with truss provided with floor support | |
CN201674171U (en) | Combined cable trough | |
CN210395437U (en) | Utility tunnel and prefabricated pipe thereof with self-repairing function | |
CN202081434U (en) | Prefabricated pipe shaft | |
CN205369299U (en) | Pin -connected panel precast reinforced concrete piping lane | |
CN211141349U (en) | Track panel well gantry crane foundation fixing structure | |
CN204343166U (en) | A kind of combined type gravity anchorage | |
CN206189456U (en) | Three cabin piping lanes | |
CN207091859U (en) | The precast assembly pavement structure integrated with pipe gallery | |
CN202371158U (en) | Pre-stressed oil pipe sealing gasket for road and railway bridges | |
CN204510861U (en) | Whole building mobile route ground anti-settling structure | |
CN205046569U (en) | Annular wind -powered electricity generation foundation structure based on shaping of two ripple steel cylinder | |
CN201169781Y (en) | Cap digging pit structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151202 |
|
CF01 | Termination of patent right due to non-payment of annual fee |