CN204492173U - Elevator shaft integral lifting template operation platform - Google Patents
Elevator shaft integral lifting template operation platform Download PDFInfo
- Publication number
- CN204492173U CN204492173U CN201520043759.8U CN201520043759U CN204492173U CN 204492173 U CN204492173 U CN 204492173U CN 201520043759 U CN201520043759 U CN 201520043759U CN 204492173 U CN204492173 U CN 204492173U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- vertical supporting
- operation platform
- pipe
- elevator shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Elevator Door Apparatuses (AREA)
Abstract
The utility model relates to a kind of elevator shaft integral lifting template operation platform, it is characterized in that it comprises substructure and superstructure, connected by four vertical supporting pipes between substructure and superstructure, described substructure comprises two group of first steel pipe (1) of longitudinally arranging, the front end of the first steel pipe (1) is supported on the shear wall on opposite, escalator doorway, the rear end of the first steel pipe (1) is held on the flooring at escalator doorway place, joist is set up above the middle part of two group of first steel pipe (1), joist upwards arranges vertical supporting pipe, joist is set up into operation platform (8), bracing frame is connected with between the top of vertical supporting pipe, bracing frame is set up windrow platform (9).This elevator shaft integral lifting template operation platform has the advantage that can improve safety prevention measure, quality management &control and construction speed.
Description
Technical field
The utility model relates to a kind of elevator shaft integral lifting template operation platform.
Background technology
Along with the high speed development of builing industry, the construction site management method of many innovation practicality and constructure scheme obtain and draw widely and utilize.Esidential building and public building tend to high level day by day to be drawn close, and under this development situation, the construction main quality of executive information systems controls to become another major subjects in construction work with security maintenance.In its building construction process, what the particularity due to the specific position of elevator hoistways and safety thereof, quality control became many building operations troops pays close attention to object.In executive information systems elevator hoistway moulding plate construction operation process, safety prevention measure, quality management &control, construction speed are the three large key elements affecting project entirety.Therefore a kind of elevator shaft integral lifting template operation platform that can improve safety prevention measure, quality management &control and construction speed is sought particularly important.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned deficiency, provides a kind of elevator shaft integral lifting template operation platform that can improve safety prevention measure, quality management &control and construction speed.
The purpose of this utility model is achieved in that
A kind of elevator shaft integral lifting template operation platform, it comprises substructure and superstructure, connected by four vertical supporting pipes between substructure and superstructure, described substructure comprises two group of first steel pipe longitudinally arranged, the front end of the first steel pipe is supported on the shear wall on opposite, escalator doorway, the rear end of the first steel pipe is held on the flooring at escalator doorway place, the back segment of two group of first steel pipe is provided with the second steel pipe of lateral arrangement, two group of first steel pipe at the second steel pipe rear is furnished with the 3rd steel pipe of two lateral arrangement up and down, two ends, left and right and both sides, the escalator doorway body of wall of the 3rd steel pipe hold out against, joist is set up above the middle part of two group of first steel pipe, joist upwards arranges vertical supporting pipe, joist sets up into operation platform, bracing frame is connected with between the top of vertical supporting pipe, bracing frame is set up windrow platform.
Preferred as one, the 4th steel pipe is connected with vertical supporting pipe and adopts fastener to connect, and the vertical supporting pipe above connection fastener is also provided with separately an anti-skid fastener.
Compared with prior art, the beneficial effects of the utility model are:
Using the utility model elevator shaft integral lifting template operation platform without the need to setting up scaffold in elevator shaft inside from the end to top, simplifying the construction technology of operating platform, saving lease equipment consumption, reduce hiring cost; Can directly shelve on the operational platform bottom template when elevator shaft inner side template is installed, not need embedded bar to support and security protection is arranged and met the demands; Be provided with operating platform and windrow platform at construction layer, be convenient to administrative staff model sheetinstallat quality is inspected for acceptance and construction operation time material heap give; Elevator shaft inner side template can with operating platform entirety upwards hoisted in position after removing, time saving and energy saving.Therefore this elevator shaft integral lifting template operation platform has the advantage that can improve safety prevention measure, quality management &control and construction speed.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model elevator shaft integral lifting template operation platform.
Fig. 2 is the schematic diagram of substructure in Fig. 1.
Fig. 3 is the schematic diagram of Fig. 1 structure at the middle and upper levels.
Wherein:
First steel pipe 1
Second steel pipe 2
3rd steel pipe 3
4th steel pipe 4
5th steel pipe 5
6th steel pipe 6
7th steel pipe 7
Operation platform 8
Windrow platform 9.
Detailed description of the invention
See Fig. 1 ~ Fig. 3, a kind of elevator shaft integral lifting template operation platform that the utility model relates to, it comprises substructure and superstructure, connected by four vertical supporting pipes between substructure and superstructure, described substructure comprises two group of first steel pipe 1 longitudinally arranged, first steel pipe 1 is main bearing beam, often organize the first steel pipe 1 and have two, the length of the first steel pipe 1 is 3m, two group of first steel pipe 1 is close to respectively inside escalator doorway and is arranged, the front end of the first steel pipe 1 is supported on the shear wall on opposite, escalator doorway, the rear end of the first steel pipe 1 is held on the flooring at escalator doorway place, 45° angle is cut in the rear and front end of described first steel pipe 1.
The back segment of two group of first steel pipe 1 is provided with the second steel pipe 2 of lateral arrangement, first steel pipe 1 adopts fastener to be connected with the second steel pipe 2, second steel pipe 2 is anti-skidding pin, second steel pipe 2 at the first steel pipe 1 root near elevator shaft door opening inner side, two group of first steel pipe about 1 at the second steel pipe 2 rear is furnished with the 3rd steel pipe 3 of two lateral arrangement, the length of the 3rd steel pipe 3 is 1.8m, two ends, left and right and both sides, the escalator doorway body of wall of the 3rd steel pipe 3 hold out against, as the anti-skidding pin of the outside slippage of restriction main bearing beam, the length that hole side is stretched at second steel pipe 2 two ends is not less than 30cm.
Joist is set up above the middle part of two group of first steel pipe 1, joist comprises the 4th steel pipe 4 of six roots of sensation lateral arrangement, the six roots of sensation the 4th steel pipe 4 is divided into two, front the 4th steel pipe 4, 3rd the 4th steel pipe 4, 4th the 4th steel pipe 4, two, rear the 4th steel pipe 4 four groups, the part that first the 4th steel pipe 4 and the six roots of sensation the 4th steel pipe 4 are positioned at outside two group of first steel pipe 1 is upwards connected with vertical supporting pipe, vertical supporting Guan Wei five steel pipe 5, joist adopt the lumps of wood and wood glue plate set up into operation platform 8, the bracing frame of the groined type of the 6th steel pipe 6 and the 7th steel pipe 7 composition is connected with between the top of vertical supporting pipe, bracing frame is set up windrow platform 9.
Above adopted steel pipe all can use Φ 48*3.5mm steel pipe.
4th steel pipe 4 is connected with vertical supporting pipe and adopts fastener to connect, and the vertical supporting pipe above connection fastener is also provided with separately an anti-skid fastener.
After concreting completes, remove shear wall formwork inside elevator shaft, the integral mold plate after dismounting and the equipment such as steel pipe, screw mandrel are directly shelved on the operational platform, and bundlees firmly with operating platform.Then wire rope is carried out binding with the 5th steel pipe top corner of operating platform to be connected, then adopt 4, tower crane lifting, in place to next floor.
Claims (2)
1. an elevator shaft integral lifting template operation platform, it is characterized in that it comprises substructure and superstructure, connected by four vertical supporting pipes between substructure and superstructure, described substructure comprises two group of first steel pipe (1) of longitudinally arranging, the front end of the first steel pipe (1) is supported on the shear wall on opposite, escalator doorway, the rear end of the first steel pipe (1) is held on the flooring at escalator doorway place, the back segment of two group of first steel pipe (1) is provided with second steel pipe (2) of lateral arrangement, two group of first steel pipe (1) at the second steel pipe (2) rear is furnished with the 3rd steel pipe (3) of two lateral arrangement up and down, two ends, left and right and both sides, the escalator doorway body of wall of the 3rd steel pipe (3) hold out against, joist is set up above the middle part of two group of first steel pipe (1), joist upwards arranges vertical supporting pipe, joist is set up into operation platform (8), bracing frame is connected with between the top of vertical supporting pipe, bracing frame is set up windrow platform (9).
2. a kind of elevator shaft integral lifting template operation platform according to claim 1, it is characterized in that the 4th steel pipe (4) is connected with vertical supporting pipe adopts fastener to connect, and the vertical supporting pipe above connection fastener is also provided with separately an anti-skid fastener.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520043759.8U CN204492173U (en) | 2015-01-22 | 2015-01-22 | Elevator shaft integral lifting template operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520043759.8U CN204492173U (en) | 2015-01-22 | 2015-01-22 | Elevator shaft integral lifting template operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204492173U true CN204492173U (en) | 2015-07-22 |
Family
ID=53571489
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520043759.8U Expired - Fee Related CN204492173U (en) | 2015-01-22 | 2015-01-22 | Elevator shaft integral lifting template operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204492173U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105464364A (en) * | 2015-11-30 | 2016-04-06 | 中建海峡建设发展有限公司 | Electric self-climbing type elevator shaft formwork |
CN106245908A (en) * | 2016-10-18 | 2016-12-21 | 新疆维泰开发建设(集团)股份有限公司 | A kind of quick holder method of elevator well formwork |
-
2015
- 2015-01-22 CN CN201520043759.8U patent/CN204492173U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105464364A (en) * | 2015-11-30 | 2016-04-06 | 中建海峡建设发展有限公司 | Electric self-climbing type elevator shaft formwork |
CN105464364B (en) * | 2015-11-30 | 2017-07-07 | 中建海峡建设发展有限公司 | Driven self-crawling type elevator shaft template |
CN106245908A (en) * | 2016-10-18 | 2016-12-21 | 新疆维泰开发建设(集团)股份有限公司 | A kind of quick holder method of elevator well formwork |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205348725U (en) | Large -span, bearing structure that encorbelments by a wide margin | |
CN202450774U (en) | Shaft template of small-step-pitch self-climbing elevator | |
CN108033367B (en) | Synchronous lifting device and lifting method for steel column and cylinder frame alternately supported steel platform and tower crane | |
CN206408952U (en) | A kind of construction adhesion type lifts discharging platform | |
CN107190964A (en) | A kind of construction method of prefabricated hoistway operation platform | |
CN106245919A (en) | A kind of assembled architecture Automated assembly platform | |
CN201334769Y (en) | Attached type lifting scaffold with double guide rails | |
CN102031862A (en) | Constructing method for high-rise building elevator shaft through elevating type safety protection steel platform | |
CN204492173U (en) | Elevator shaft integral lifting template operation platform | |
CN106567542A (en) | Super high-rise double tower building steel structure corridor assembling method | |
CN206769351U (en) | A kind of regularization hoistway operation platform hoisting frame | |
CN202882376U (en) | Elevator shaft template support platform | |
CN105155832B (en) | A kind of hanging basket equipment and its moving method | |
CN204059906U (en) | Elevator hoistways Integral lifting type steel scaffold | |
CN203394032U (en) | Inside-cylinder climb-type operation frame | |
CN203867198U (en) | Slip equipment for high-rise steel structure transfer layer truss | |
CN203475801U (en) | Telescopic steel platform for elevator shaft | |
CN206395664U (en) | Building hoist overlaps platform | |
CN102767280A (en) | Quick-dismounting system and installation method for top plate | |
CN210013362U (en) | Assembled oblique roofing construction structures | |
CN101215968A (en) | Inclined shaft sliding mode structure and inclined shaft pull-crawling construction process | |
CN203924652U (en) | The operation platform of periphery shear wall between a kind of precast stair | |
CN204126237U (en) | A kind of elevator hoistway construction platform | |
CN203559574U (en) | Elevator shaft formwork supporting movable support | |
CN211257761U (en) | Lifting type elevator shaft operating platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150722 Termination date: 20220122 |
|
CF01 | Termination of patent right due to non-payment of annual fee |