CN204281373U - Begin to rehearse tank - Google Patents
Begin to rehearse tank Download PDFInfo
- Publication number
- CN204281373U CN204281373U CN201420742384.XU CN201420742384U CN204281373U CN 204281373 U CN204281373 U CN 204281373U CN 201420742384 U CN201420742384 U CN 201420742384U CN 204281373 U CN204281373 U CN 204281373U
- Authority
- CN
- China
- Prior art keywords
- tank body
- tank
- soil chamber
- rehearse
- internal partition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Float Valves (AREA)
Abstract
The utility model discloses one to begin to rehearse tank, comprise tank body, to be arranged in described tank body and tank body to be divided into mutual disconnected soil chamber and the two-part internal partition of spill cavity, be arranged on the entrance at tank body top, soil chamber side, be arranged on the outlet of soil chamber side plate bottom, be arranged on the overflow port of spill cavity side plate bottom, be arranged in soil chamber and one end is fixedly connected with the other end and outlet flexible pipe with ball float, in described spill cavity, be provided with upflow tube.The flexible hose of a set of quality of rubber materials is set in tank body and feed-water end is connected with ball float, in the uniform perforate in the below of flexible pipe using as fluid inlet, when residual sea water pump runs, the liquid discharged comes from the liquid-covered at place, flexible pipe upper end all the time, and the oil slick this ensures that thering fluid surface can be discharged timely.
Description
Technical field
The utility model relates to marine oil water-treatment technology field, particularly relates to one and to begin to rehearse tank.
Background technology
The tank that begins to rehearse application and marine oil industry, for collecting the sump oil/oily(waste)water of ocean platform because producing when maintenance, rainfall, deck cleaning.The existing tank that begins to rehearse comprises tank body, be arranged on the entrance at tank body top, be arranged on row's mouth of tank body one side bottom, and be arranged on the overflow port at tank body opposite side top, interior weir plate is set in the tank interior of overflow port side simultaneously, described interior weir plate top is connected lower end with tank body roof and tank base leaves passage, the sump oil that sump oil/sewage is lighter under gravity after entrance enters the tank body of the tank that begins to rehearse floats over top layer, sewage is in bottom, when the liquid level in tank body reach a certain height, outside residual sea water pump starts discharges the sewage of bottom.If when the sump oil/discharge of sewage entered in tank is greater than the ability of residual sea water pump, the liquid level in tank body can continue to raise, and now liquid can flow out from overflow port in the space below weir plate.
But there is following shortcoming in the tank that begins to rehearse of this kind of structure:
(1) in order to avoid residual sea water pump cavitation erosion problem and guarantee emptying rate of liquid in tank body, liquid row mouth is located at pot bottom, this causes the sump oil on top layer can only cannot be built up in tank body by discharging in time, and the passage that can be carried through when overflow occurs bottom weir plate enters marine to environment with sewage.
(2) after tank body manufactures, the height of overflow port can not be changed, and when the variable density of sump oil in actual motion, the height of overflow port cannot regulate, left side canful and situation that right side does not still start overflow may be caused, easily cause the damage of equipment.
Utility model content
The purpose of this utility model is the technological deficiency for existing in prior art, and provides one to begin to rehearse tank.
The technical scheme adopted for realizing the purpose of this utility model is:
One begins to rehearse tank, comprise tank body, to be arranged in described tank body and tank body to be divided into mutual disconnected soil chamber and the two-part internal partition of spill cavity, be arranged on the entrance at tank body top, soil chamber side, be arranged on the outlet of soil chamber side plate bottom, be arranged on the overflow port of spill cavity side plate bottom, be arranged in soil chamber and one end is fixedly connected with the other end and outlet flexible pipe with ball float, upflow tube is provided with in described spill cavity, described upflow tube comprises and to be fixedly connected with described internal partition with bottom and the lower pipe of through described internal partition, and lower pipe that can be relatively described vertically moves up and down and keeps the upper pipe of sealing, the sidewall of described upper pipe is provided with water vent.
Described internal partition is staircase structural model, and described lower pipe lower end is arranged on the table top of internal partition.
The below of described flexible pipe and ball float coupling end is provided with the perforate be evenly arranged.
Screw rod regulating mechanism is provided with between described upper pipe and tank body top.
Compared with prior art, the beneficial effects of the utility model are:
The flexible hose of a set of quality of rubber materials is set in tank body and feed-water end is connected with ball float, in the uniform perforate in the below of flexible pipe using as fluid inlet, when residual sea water pump runs, the liquid discharged comes from the liquid-covered at place, flexible pipe upper end all the time, the oil slick this ensures that thering fluid surface can be discharged timely, meanwhile, what adopt internal partition and upflow tube is arranged so that actual overflow height can regulate according to the actual needs, can effectively avoid tank body to overload.
Accompanying drawing explanation
Figure 1 shows that the structural representation of the tank that begins to rehearse of the present utility model;
Figure 2 shows that the A direction view shown in Fig. 1.
Embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
As shown in Figure 1, 2, one of the present utility model begins to rehearse tank, comprise tank body 1, to be arranged in described tank body and tank body to be divided into mutual disconnected soil chamber and the two-part internal partition 2 of spill cavity, be arranged on the entrance 3 at tank body top, soil chamber side, be arranged on the outlet 4 of soil chamber side plate bottom, be arranged on the overflow port 5 of spill cavity side plate bottom, be arranged in soil chamber and one end is fixedly connected with the quality of rubber materials of the other end and outlet flexible pipe 7 with ball float 6, wherein, the below of described flexible pipe and ball float coupling end is provided with the perforate be evenly arranged.Upflow tube is provided with in described spill cavity, described upflow tube comprises and to be fixedly connected with described internal partition with bottom and the lower pipe 8 of through described internal partition, and lower pipe that can be relatively described vertically moves up and down and keeps the upper pipe 9 of sealing, the sidewall of described upper pipe is provided with water vent, water vent can be one, and what also can ring week be arranged on sustained height be multiple.
The flexible hose of a set of quality of rubber materials is set in tank body and feed-water end is connected with ball float, in the uniform perforate in the below of flexible pipe using as fluid inlet, when residual sea water pump runs, the liquid discharged comes from the liquid-covered at place, flexible pipe upper end all the time, the oil slick this ensures that thering fluid surface can be discharged timely, meanwhile, what adopt internal partition and upflow tube is arranged so that actual overflow height can regulate according to the actual needs, can effectively avoid tank body to overload.
Specifically, described internal partition is staircase structural model, on the table top that described lower pipe lower end is arranged on internal partition and through described table top being communicated with soil chamber, certainly, described internal partition also can adopt straight-plate-type to design, one end horizontal connection tube is set in lower pipe lower end, utilizes the through internal partition of horizontal connection tube and be communicated with the same object that can realize the present invention with soil chamber.
Preferably, for realizing water vent height adjustable, screw rod regulating mechanism 10 is provided with between described upper pipe upper end and tank body top, namely, between top tube and down tube, anti-rotation feature is set, as arranged keyway, lead rib or bottom adopts the modes such as square connection, control hand wheel is set at tank body upper surface simultaneously, described control hand wheel is fixedly connected with the screw rod be arranged in tank body, in described upper pipe or upper end the nut mated with described screw rod is set, the object that handwheel regulates upper pipe height can be realized, namely realize the adjustment of actual overflow height.
Further, the division plate 11 only having bottom reserve channel is also provided with in described soil chamber, described entrance is arranged on division plate and the different opposite side of internal partition, namely, the division plate that one has barrier effect is set in soil chamber, arrangement utilizes two-stage law of connected vessels, effectively prevents grease overflow.
The above is only preferred implementation of the present utility model; it should be noted that; for those skilled in the art; under the prerequisite not departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.
Claims (4)
1. the tank that begins to rehearse, it is characterized in that, comprise tank body, to be arranged in described tank body and tank body to be divided into mutual disconnected soil chamber and the two-part internal partition of spill cavity, be arranged on the entrance at tank body top, soil chamber side, be arranged on the outlet of soil chamber side plate bottom, be arranged on the overflow port of spill cavity side plate bottom, be arranged in soil chamber and one end is fixedly connected with the other end and outlet flexible pipe with ball float, upflow tube is provided with in described spill cavity, described upflow tube comprises and to be fixedly connected with described internal partition with bottom and the lower pipe of through described internal partition, and lower pipe that can be relatively described vertically moves up and down and keeps the upper pipe of sealing, the sidewall of described upper pipe is provided with water vent.
2. begin to rehearse tank as claimed in claim 1, it is characterized in that, described internal partition is staircase structural model, and described lower pipe lower end is arranged on the table top of internal partition.
3. begin to rehearse tank as claimed in claim 1, and it is characterized in that, the below of described flexible pipe and ball float coupling end is provided with the perforate be evenly arranged.
4. begin to rehearse tank as claimed in claim 1, it is characterized in that, is provided with screw rod regulating mechanism between described upper pipe and tank body top.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420742384.XU CN204281373U (en) | 2014-12-01 | 2014-12-01 | Begin to rehearse tank |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420742384.XU CN204281373U (en) | 2014-12-01 | 2014-12-01 | Begin to rehearse tank |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204281373U true CN204281373U (en) | 2015-04-22 |
Family
ID=52864556
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420742384.XU Expired - Fee Related CN204281373U (en) | 2014-12-01 | 2014-12-01 | Begin to rehearse tank |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204281373U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104828991A (en) * | 2015-05-07 | 2015-08-12 | 中国海洋石油总公司 | Discharging system for offshore platform |
CN105481056A (en) * | 2015-12-31 | 2016-04-13 | 天津市禾厘油气技术有限公司 | Novel discharge opening tank of offshore oil platform |
CN106927631A (en) * | 2017-03-29 | 2017-07-07 | 安徽德玉环境工程装备有限公司 | A kind of Ship's Repair factory oil conte, sewage treatment device |
-
2014
- 2014-12-01 CN CN201420742384.XU patent/CN204281373U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104828991A (en) * | 2015-05-07 | 2015-08-12 | 中国海洋石油总公司 | Discharging system for offshore platform |
CN105481056A (en) * | 2015-12-31 | 2016-04-13 | 天津市禾厘油气技术有限公司 | Novel discharge opening tank of offshore oil platform |
CN106927631A (en) * | 2017-03-29 | 2017-07-07 | 安徽德玉环境工程装备有限公司 | A kind of Ship's Repair factory oil conte, sewage treatment device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204281373U (en) | Begin to rehearse tank | |
CN205250083U (en) | Simple and easy automatic drinking bowl | |
CN102828869B (en) | Diesel oil box with water discharging device | |
CN110498476A (en) | Catering trade water-oil separating reclaimer | |
CN103910449B (en) | A kind of fracturing outlet liquid treatment unit | |
CN102614684A (en) | Oil-water separation device for leakage drainage system in hydropower station | |
CN205435067U (en) | Portable oil slick is retrieved and oil -water separator | |
CN201978537U (en) | Automatic oil-water separating device | |
CN203269678U (en) | Sewage treatment device | |
CN210874230U (en) | Automatic drainage device for atomization oil purifier | |
CN207276259U (en) | Inclined tube separator | |
CN206793113U (en) | A kind of oil-water separation tank for dangerous waste processing system | |
CN210367318U (en) | Oil-separating sand-settling device for sewage of villages and towns | |
CN104106981B (en) | Anti-overflow flow pattern water dispenser | |
CN210776333U (en) | A liquid level control tank | |
CN203794718U (en) | Fracturing flowback liquid treating device | |
CN110217854B (en) | Oil-water separation device and separation method | |
CN202988789U (en) | Level control device of air-floated oil remover | |
CN107428407A (en) | Systems and methods for purifying water from a body of water | |
CN209602159U (en) | A kind of tube settling degreaser | |
CN104998459A (en) | Water-removing sediment-filtering oil purifier | |
CN219217813U (en) | Sludge treatment device for sludge storage tank | |
CN220953646U (en) | Optimize pump station water yield intelligent regulation device | |
CN202594826U (en) | Oil-water separating device for leakage drainage system of hydropower station | |
CN203678019U (en) | Liquid discharging device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150422 Termination date: 20191201 |
|
CF01 | Termination of patent right due to non-payment of annual fee |