CN204240391U - Superheat steam drying powder process type coal generating system - Google Patents
Superheat steam drying powder process type coal generating system Download PDFInfo
- Publication number
- CN204240391U CN204240391U CN201420677577.1U CN201420677577U CN204240391U CN 204240391 U CN204240391 U CN 204240391U CN 201420677577 U CN201420677577 U CN 201420677577U CN 204240391 U CN204240391 U CN 204240391U
- Authority
- CN
- China
- Prior art keywords
- steam
- exhaust steam
- coal
- air
- powder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E20/00—Combustion technologies with mitigation potential
- Y02E20/34—Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery
Landscapes
- Drying Of Solid Materials (AREA)
Abstract
The utility model provides a kind of superheat steam drying powder process type coal generating system, for carrying out burning rear drive electrical power generators to raw coal, comprise: boiler controller system, comprise: powder process subsystem, boiler host subsystem, air-supply powder feeding subsystem and exhaust steam Water Sproading subsystem, and Steam Turbine, wherein, powder process subsystem comprises: vapour powder generates drying device, the drier generating apparatus of vapour powder separator and generation drier, exhaust steam Water Sproading subsystem comprises: utilize the low-temperature condensate of Steam Turbine and environment cold wind to carry out the exhaust steam apparatus for recovering of condensation recovery to a part for exhaust steam, environment cold wind is obtained warm air by the heat preheating of exhaust steam in exhaust steam apparatus for recovering, air preheater carries out heating to a part for warm air and obtains hot blast, exhaust steam extraction heater utilizes and adds the hot exhaust steam of thermosetting from the condensation heat drawn gas of steam turbine to exhaust steam, exhaust steam flue gas heater utilizes and adds thermosetting superheated steam from the flue gas of burner hearth to hot exhaust steam.
Description
Technical field
The utility model relates to a kind of coal fired power generation field, is specifically related to boiler air-supply, superheat steam drying powder process, moisture in coal recovery technology and utilizes the superheat steam drying powder process type coal generating system of the heat that draws gas of steam turbine.
Background technology
China is the country of the few oily deficency of a rich coal, and coal is in core leading position in China's energy supply always, future quite over a long time in, the energy resource structure based on coal can be sustained in China.Because coal fired power plant has the extensive feature concentrating use coal, be conducive to accomplishing efficient, clean utilization coal, thus coal is mainly used in generating at home and abroad.At present in China, coal total output 55% for coal-fired thermal power generation, and in power supply architecture, thermal power generation is the main generation mode of China, and the supply of electric power of China about 80% comes from fired power generating unit.Current China newly builds a power station still based on coal fired power plant, and the ratio of electric coal in coal total output increases fast.But coal fired power generation also discharges a large amount of pollutants while production electric power, comprises SO
2, flue dust, NO
xand CO
2deng; And the generating net efficiency of China's coal fired power plant is compared with developed country and is still had larger gap.Thus, further improve efficiency of energy utilization thus not only reduced energy resource consumption but also the discharge of decreasing pollution thing, becoming the important task urgent again that China's power industry and even whole national economy realize sustainable development.
In recent years, along with power coal price goes up and the decline gradually of high-quality coal reserves ratio in coal gross reserves fast, the outstanding problem utilizing high water content brown coal combustion power generation to become power industry to show great attention to.In worldwide, brown coal account for 40% of world's coal gross reserves, China's brown coal reserves 2,900 hundred million tons, account for 16% of domestic coal gross reserves.Brown coal are coals that degree of coalification is minimum, have that moisture is high, volatile matter is high, calorific value is low, a feature such as the easy spontaneous combustion of easy-weathering in atmosphere, so be difficult to storage, and also unsuitable long-distance transportation.3/4 of China's brown coal are distributed in the Inner Mongol and the Northeast, and these brown coal total moistures, 25 ~ 40%, belong to old brown coal; All the other brown coal are mainly distributed in Yunnan Province, and these brown coal total moistures, 40 ~ 60%, containing wood fibre, belong to young brown coal; And the external moisture as state's brown coal such as Australia, Germany, Serbia, Indonesia is higher, can up to 70%.
The main path that current brown coal utilize is by electric power stations near coal-mines combustion power generation, brown coal and bituminous coal fired boiler many employings unit pulverized-coal system, is generally using stove cigarette and hot blast mixture or hot blast as pulverized coal preparation system drier; Meager coal and anthracite many employings bin storage type pulverizing system are generally using hot blast as pulverized coal preparation system drier.But compared with conventional bituminous coal fired boiler, these boiler using brown coal thermals efficiency are low, the large price of volume is high, greenhouse gas emissions are also larger.And, for high water content brown coal, unit pulverized-coal system is adopted to make in boiler First air containing the inert media such as a large amount of stove cigarette and water vapour, in addition fire box temperature is low again, high water content brown coal is made to there is outstanding combustion instability problem, cause boiler to be difficult to run safely and reliably, this seriously constrains effective utilization of domestic and international high water content brown coal.Meanwhile, because brown coal reactivity is high, brown coal coal dust is inflammable and explosive, and the burning of brown coal pulverized coal preparation system and explosion issues are also outstanding problems always perplexing lignite-fired unit safe and reliable operation for a long time.
In addition, the coal prognostic reserves being positioned at Xinjiang of China In The Eastern Junggar Basin " accurate eastern coalfield " reach 3,900 hundred million tons, are the maximum self-contained coalfields of China.Accurate eastern coal is except caloric value comparatively brown coal height, and other coal characteristic is similar to brown coal, also has moisture high (22 ~ 32%), volatile matter is high, ash fusion point is low, abrasiveness is low and the feature of easy spontaneous combustion.The large-sized station boiler that the exploitation of eastern coal aimed at by current pin in the industry all adopts unit pulverized-coal system, therefore for ensureing smooth combustion in pulverized coal preparation system drying capacity and stove, boiler all have employed very high hot blast temperature and primary air ratio.The result caused thus is the exhaust gas temperature general higher (exhaust gas temperature is generally more than 140 DEG C) of these accurate eastern coal burning boilers, cause accordingly boiler thermal output and unit generation efficiency all lower; And too high primary air ratio makes low NO in stove
xorganizing of burning is comparatively difficult, i.e. NO in furnace outlet flue gas
xcontent is comparatively large, which increases pressure and the cost of the follow-up denitrating flue gas of boiler.
Further, in the boiler of burning high-moisture coal, burnt by combustible in coal in a large number and liberated heat is consumed in moisture in coal and is evaporated to water vapour, because these moisture are finally discharge boiler with Properties of Steam, quite a few causing the actual heat release of fuel is wasted.Thus, it is huge that existing high-moisture coal-burning boiler often shows as Coal-fired capacity, and the pollutant emission of unit generated energy is also obviously higher.If with the high calorific power characterizing the actual thermal discharge of fuel for benchmark boiler thermal output, the thermal efficiency of high-moisture coal-burning boiler is significantly lower than general low moisture coal-burning boiler.
In recent years, thermal power industry extensive concern improves power plants generating electricity efficiency further by the deep exploitation of boiler exhaust gas waste heat, typical mode arranges low-pressure coal saver in boiler exhaust gas flue, smoke discharging residual heat is utilized to heat the unit condensate water of low temperature, thus reduce the low-pressure heater amount of drawing gas, reach the object improving power plant efficiency.Obviously, utilizing the low feature of unit condensing water temperature to carry out waste heat recovery is that power plant improves generating efficiency thus obtains one of effective way of energy-saving and emission-reduction benefit, but because the coefficient of heat transfer of flue gas is low, in addition the heat transfer temperature difference between flue gas and condensate water is less, make by the low-pressure coal saver of flue gas condensate water bulky, investment payback time is longer, and arranges comparatively difficulty in power plant.
On the other hand, China's brown coal major production areas (Eastern Inner Mongolia) and accurate eastern coal producing region (Xinjiang region) are extreme dehydration area.Because fired power generating unit needs to consume large water gaging, water resources shortage has become these areas and has carried out power supply construction of base thus the primary restraining factors developing brown coal and accurate eastern coal resource.But as everyone knows, pulverized coal preparation system is also simultaneously a drying system, for ensureing that breeze airflow enters smooth combustion after stove, require that raw coal is dried to the very low coal dust moisture of moisture content by pulverized coal preparation system.Fuel coal of power station boiler amount is huge, therefore a large amount of moisture in coal is evaporated to water vapour in pulverized coal preparation system enters burner hearth with coal dust, one of constituent becoming boiler smoke.In addition, thermal power plant is water for industrial use rich and influential family, and China's brown coal producing region (such as Eastern Inner Mongolia) belongs to areas of serious mostly, and water resources shortage becomes the important restriction factor affecting near coal-mine power supply construction of base.Thus, if moisture in coal can be reclaimed, to China's brown coal and accurate eastern coal utilization, there is very important ecological protection meaning.But due to dry flue gas (mainly N a large amount of in stove
2, CO
2and excess dry air) dilution, the water capacity of boiler exhaust gas and aqueous dew point temperature are very low, and this makes by cooling boiler exhaust gas thus moisture in recovered flue gas becomes very difficult.For the in-service 600MW unit of certain combustion total moisture 40% brown coal, its boiler exhaust gas amount is 2800t/h, although containing 270t/h moisture in smoke evacuation, smoke evacuation water dew point only has 53 DEG C (water vapour volume shares 15%).Visible, because dry flue gas amount is huge and water dew point is low, reclaim moisture in smoke evacuation and need huge flue gas cooling heat exchanger and the enough low a large amount of cooling mediums of temperature, this makes to reclaim moisture and water recovery latent heat is very difficult from smoke evacuation, does not have so far by cooling power station boiler exhaust gas thus realizing the engineer applied of flue gas Water Sproading and heat recovery.
Utility model content
The utility model carries out to solve the problem, and object is to provide one to have outstanding Water Sproading benefit and energy-saving benefit, and can also ensure pulverized coal preparation system safe operation and the higher superheat steam drying powder process type coal generating system of efficiency of fire coal.
The utility model provides a kind of superheat steam drying powder process type coal generating system, for burning to drive electrical power generators to raw coal, it is characterized in that, comprise: boiler controller system, heat energy is produced for carrying out burning to raw coal, and utilize heat energy that feedwater heating is obtained high-temperature high-pressure steam, comprise: powder process subsystem, boiler host subsystem, air-supply powder feeding subsystem and exhaust steam Water Sproading subsystem, and Steam Turbine, utilize high-temperature high-pressure steam to do work thus drive electrical power generators, comprise the feed pipe for carrying feedwater, for carrying the steam pipeline of high-temperature high-pressure steam, and steam turbine, wherein, powder process subsystem comprises: for grinding raw coal and carrying out drying thus the vapour powder generation drying device of formation vapour powder mixture by drier to raw coal, vapour powder mixture is separated to the vapour powder separator obtaining coal dust and exhaust steam, and generate the drier generating apparatus of drier, boiler host subsystem is used for feedwater to be heated as high-temperature high-pressure steam, comprise: burner hearth, the stove inner flue be connected with furnace outlet, be positioned at the coal burner of burner hearth entry position, air-supply powder feeding subsystem comprises: be connected for the machine supplying powder of pulverized coal conveying with vapour powder separator, the air and powder mixer be connected with machine supplying powder, the First air mixing chamber be connected with air and powder mixer, be positioned at the air preheater of stove inner flue afterbody, and for providing the pressure fan of cold wind, exhaust steam Water Sproading subsystem comprises: be connected with Steam Turbine and be connected with the pressure fan low-temperature condensate that utilizes Steam Turbine and cold wind carry out the exhaust steam apparatus for recovering of condensation recovery to a part for exhaust steam, vapour powder separator comprises: vapour powder mixture is separated to the coal collector obtaining coal dust and exhaust steam, drier generating apparatus comprises: the exhaust steam pipeline be connected with coal collector for carrying exhaust steam, be communicated with on exhaust steam pipeline for carrying the exhaust steam circulating line of another part of exhaust steam, be connected with exhaust steam circulating line and the exhaust steam extraction heater forming hot weary gas is preheated to the exhaust steam in exhaust steam circulating line, be connected for hot exhaust steam being heated further thus forming the exhaust steam flue gas heater of the superheated steam as drier with exhaust steam extraction heater, and drier is delivered to the superheat steam pipeline carrying out in vapour powder generation drying device circulating, exhaust steam extraction heater utilizes the condensation heat drawn gas of steam turbine to add the hot exhaust steam of thermosetting to exhaust steam, exhaust steam flue gas heater utilizes the flue gas of burner hearth to add thermosetting superheated steam to hot exhaust steam, machine supplying powder is used for pulverized coal conveying to air and powder mixer, air and powder mixer is mixed to get wind powder mixture to from the First air of air-supply powder feeding subsystem and coal dust, exhaust steam in exhaust steam apparatus for recovering is become condensate water by the cold wind condensation that the low-temperature condensate of Steam Turbine and pressure fan provide, cold wind is obtained warm air by the heat preheating of exhaust steam in exhaust steam apparatus for recovering, air preheater carries out heating to a part for warm air and obtains hot blast, a part for hot blast enters in air and powder mixer as First air with another part of warm air after First air mixing chamber mixes, another part of hot blast directly enters in coal burner as Secondary Air, coal burner burns to the coal dust in wind powder mixture, coal dust and First air, Secondary Air burns and generates flue gas in burner hearth.
In the superheat steam drying powder process type coal generating system that the utility model provides, such feature can be had, also comprise: gas cleaning subsystem, export with the afterbody of stove inner flue and be connected, comprise: the deduster connected successively, air-introduced machine, desulfurizer, chimney.
In the superheat steam drying powder process type coal generating system that the utility model provides, such feature can also be had: wherein, exhaust steam apparatus for recovering comprises: be communicated with the exhaust steam output channel on exhaust steam pipeline, be connected with exhaust steam output channel the condenser utilizing low-temperature condensate and cold wind exhaust steam to be condensed into condensate water, store the water collector reclaiming condensate water, and to be connected with exhaust steam output channel and exhaust steam directly to be introduced the exhaust steam bypass duct of desulfurizer, condenser comprises the cold water inlet be connected with Steam Turbine, and the cold water outlet pipe to be connected with Steam Turbine, low-temperature condensate flows in condenser through cold water inlet and carries out condensation to exhaust steam, flow back in Steam Turbine through subcooled water outlet pipe after low-temperature condensate is heated by exhaust steam.
In the superheat steam drying powder process type coal generating system that the utility model provides, such feature can also be had: wherein, exhaust steam Water Sproading subsystem also comprises: the residual air conveying device of the residual gas exported for carrying condenser, and residual air conveying device comprises: be connected with the outlet of condenser for the residual air pipeline that delivered into by residual gas in First air mixing chamber and be connected with residual air pipeline and residual gas directly introduced the residual air bypass duct of desulfurizer.
In the superheat steam drying powder process type coal generating system that the utility model provides, can also have such feature: wherein, vapour powder generates drying device and also comprises: grind raw coal and form the coal pulverizer of vapour powder mixture with dry and be connected with the outlet of coal pulverizer for being separated the meal in vapour powder mixture and meal being sent back to the mill separator in coal pulverizer.
In the superheat steam drying powder process type coal generating system that the utility model provides, such feature can also be had: wherein, vapour powder generates drying device and also comprises: outlet is connected for carrying out the predrying pipe of pre-dried raw coal and steam pipeline to raw coal with the entrance of coal pulverizer, the import of the predrying pipe of raw coal is communicated on superheat steam pipeline by steam pipeline, and superheated steam carries out predrying as predry drying prescription to the raw coal in the predrying pipe of raw coal.
In the superheat steam drying powder process type coal generating system that the utility model provides, can also have such feature: wherein, exhaust steam extraction heater comprises: be connected with Steam Turbine for carry draw gas extraction line, for carrying the hydrophobic drain water piping returning Steam Turbine drawing gas and formed after exhaust steam heater condensation heat.
In the superheat steam drying powder process type coal generating system that the utility model provides, such feature can also be had: wherein, powder process subsystem also comprises: be connected for carrying the appendix of gas and being located on appendix for controlling to open and close the control valve of appendix with exhaust steam circulating line, appendix is controlled to exhaust steam circulating line conveying gas by control valve, as drier after gas is heated, after Preset Time, control valve controls appendix stopping to exhaust steam circulating line conveying gas.
In the superheat steam drying powder process type coal generating system that the utility model provides, such feature can also be had: wherein, gas be in air or industrial inerting gas any one.
The effect of utility model and effect
In superheat steam drying powder process type coal generating system of the present utility model, because powder process subsystem take superheated steam as drier and the ventilation medium of powder process subsystem, and the superheated steam moisture generated by vapour powder in the raw coal in drying device evaporate the circulation exhaust steam warp that formed with the condensation heat of extracted steam from turbine to add thermosetting, superheat steam temperature and flow meet the requirement of powder process subsystem drying capacity and coal pulverizer ventilation respectively, except except the circulation exhaust steam of powder process subsystem Inner eycle work, another part exhaust steam constantly produced in the evaporation of powder process subsystem because of former moisture in coal carries out Water Sproading by exhaust steam Water Sproading subsystem.
The utility model take superheated steam as the drier of powder process subsystem, whole powder process subsystem is run under complete inerting atmosphere, ensure that the safe and reliable operation of the high-volatile coal such as brown coal and accurate eastern coal powder process, solve pulverized coal preparation system burning and the explosion issues of long-standing problem brown coal and accurate eastern coal unit safety reliability service.And the inside achieving inertia powder process drier produces and recycling, extra steam, nitrogen production system is not needed in pulverizing process, also do not need to consume other medium such as flue gas, hot blast, make pulverizing process both safe and reliable, flow process is succinctly efficient again.And be pulverized coal preparation system drier with superheated steam, improve the pulverized coal particle particle size uniformity poor bursting caused in a large number by coal grain in the dry and hot-air drying process of stove cigarette in the past, thus contribute to improving coal powder performance, improve Combustion Efficiency of Coal Powder.
The cold wind carried by pressure fan cools exhaust steam as cooling medium in exhaust steam apparatus for recovering, cold wind is preheated formation warm air, warm air finally enters in boiler burns, a large amount of latent heats of condensation of exhaust steam are effectively utilized by boiler, significantly can improve boiler thermal output thus, the boiler thermal output that coal-fired power station boiler is calculated based on coal-fired low heat valve becomes possibility more than 100%.When being not enough to fully reclaim exhaust steam residual heat by means of only boiler air-supply cooling under the prerequisite ensureing best warm air temperature, the utility model cools exhaust steam as cooling medium further by from the low-temperature condensate in Steam Turbine in exhaust steam apparatus for recovering, low-temperature condensate returns Steam Turbine after being heated to uniform temperature thus reduces the low-pressure heater amount of drawing gas, make the latent heat of condensation of exhaust steam effectively be utilized by Steam Turbine therrmodynamic system thus, thus improve power plants generating electricity efficiency further.By the air-cooled Combination application with water-cooled two kinds of waste heat recovery modes, fully can ensure exhaust steam Water Sproading effect, and distributed by the air-cooled heat optimization with water-cooled, the generating efficiency of electricity generation system can be made to reach the highest, and adjustment during electricity generation system variable load operation can be made more flexible.In addition, compared with the existing low-pressure coal saver by flue gas, in the utility model, the volume of water-cooled condenser and cost of investment all can significantly reduce.
Superheated steam in the utility model utilizes extracted steam from turbine and boiler smoke heating exhaust steam to obtain, namely the thermal source in exhaust steam extraction heater comes from the condensation heat that Steam Turbine is drawn gas, the condensation heat drawn gas is made effectively to be used in the drying capacity of coal pulverizing system, also namely make the condensation used heat of steam in Steam Turbine effectively be utilized by steam generator system, significantly decrease the cold source energy of steam turbine thermodynamic cycle.Exhaust steam forms hot exhaust steam after the preheating of exhaust steam extraction heater, hot exhaust steam is more further by the sufficiently high superheated steam of flue gas formation temperature of burner hearth, make the drying capacity of powder process subsystem be able to effective guarantee, significantly improve the adaptive capacity that generating set changes coal-fired moisture.
The utility model completely with powder process subsystem internal produce water vapour for drier and defeated powder medium, make the waste heat recovery of the powder process exhaust steam being almost either pure steam and Water Sproading become very easy.By the waste heat recovery of powder process exhaust steam, can further improve the efficiency of energy utilization of boiler and coal-fired energy consumption system; And exhaust steam apparatus for recovering, realizing the recovery and reuse of the great lot of water resources that waste heat recovery realizes simultaneously, has immeasurable environment protection significance to rich coal water-deficient area especially.
The utility model carries out the separation of vapour powder by coal collector to vapour powder mixture and obtains low moisture coal dust, and coal quantity is significantly improved.This coal dust after drying and upgrading is sent into boiler by uniform temperature air and is burnt, and will there will be no the low combustion instability of in-furnace temperature, low NO
xthe problems such as burning tissues burning difficulty.Meanwhile, adopt pulverized coal carried by hot air that inert gas content in First air is significantly reduced, breeze airflow ignition heat reduces thus, and in First air, oxygen concentration improves.Coefficient result is the combustion stability and the efficiency of combustion that had both improve breeze airflow, also makes the low NOx combustion of breeze airflow organize convenient, thus realizes clean and effective smooth combustion.And, this coal dust after drying and upgrading sends into boiler combustion by the First air in powder feeding subsystem of blowing with uniform temperature, and the moisture from the raw coal that powder process subsystem evaporates no longer enters boiler with powder feeding medium, boiler exhaust gas amount is reduced in a large number, corresponding exhaust gas temperature also can reduce, finally make boiler exhaust gas heat loss significantly reduce, boiler thermal output significantly improves.
Therefore, the superheat steam drying powder process type coal generating system that the utility model can provide has outstanding Water Sproading benefit and energy-saving benefit.
Accompanying drawing explanation
Fig. 1 is the structured flowchart of superheat steam drying powder process type coal generating system in the utility model embodiment;
Fig. 2 is the structured flowchart of boiler controller system in the utility model embodiment;
Fig. 3 is the structural representation of superheat steam drying powder process type coal generating system in the utility model embodiment;
Fig. 4 is the flow chart of superheat steam drying powder process type coal generating system in the utility model embodiment;
Fig. 5 is the block diagram of powder feeding subsystem of blowing in the utility model embodiment; And
Fig. 6 is the block diagram of powder process subsystem in the utility model embodiment.
Detailed description of the invention
The technological means realized to make the utility model, creation characteristic, reach object and effect is easy to understand, following examples relate to superheat steam drying powder process type coal generating system to the utility model in conjunction with the accompanying drawings and embodiments and are described in detail.
Fig. 1 is the structured flowchart of superheat steam drying powder process type coal generating system in the utility model embodiment.
As shown in Figure 1, superheat steam drying powder process type coal generating system 100 comprises: boiler controller system 501, Steam Turbine 502 and generating set 503.
Raw coal enters Steam Turbine 502 to the water vapour that water adds thermosetting HTHP do work at the burn heat that produces of boiler controller system 501, and then drive electrical generators group 503 generates electricity.
Fig. 2 is the structured flowchart of superheat steam drying powder process type coal generating system in the utility model embodiment.
As shown in Figure 2, boiler controller system 501, comprising: powder process subsystem 401, boiler host subsystem 402, air-supply powder feeding subsystem 403, exhaust steam Water Sproading subsystem 404 and gas cleaning subsystem 405.
First air and Secondary Air is formed respectively after air-supply powder feeding subsystem 403 and exhaust steam Water Sproading subsystem 404 pairs of cold wind 2 process, wherein, the coal dust that First air and powder process subsystem 401 pairs of raw coal 1 grind formation mixes in rear feeding boiler host subsystem 402 by a certain percentage, the Secondary Air of air-supply powder feeding subsystem 403 then directly enters in boiler host subsystem 402 and participates in burning, in powder process subsystem 401, isolated a part of exhaust steam is transported to exhaust steam Water Sproading subsystem 404 and carries out Water Sproading, exhaust steam is recovered after being condensed into condensate water by the low-temperature condensate in Steam Turbine 502 and the cold wind of air-supply powder feeding subsystem 403 and recycles, and heat (namely in exhaust steam, water recovery heat release) preheating is carried out to cold wind 2, heat in water vapour is fully utilized.Another part exhaust steam is heated as superheated steam by the high-temperature flue gas of boiler host subsystem 402, enters in powder process subsystem 401 afterwards as drier.The flue gas of boiler host subsystem 402 finally enter gas cleaning subsystem 405 be cleaned after discharged to air.
Fig. 3 is the structural representation of superheat steam drying powder process type coal generating system in the utility model embodiment.
As shown in Figure 3, Steam Turbine 502 utilizes the heat energy produced in boiler controller system 501 that feedwater heating is obtained high-temperature high-pressure steam thus drives generator unit 503 to generate electricity.Steam Turbine 502 comprises feed pipe 61, steam pipeline 62, steam turbine 60 and heat regenerative system of drawing gas (not shown in FIG.).Generating set 503 comprises generator 70.Generator 70 is connected with steam turbine 60, and generator 70 generates electricity under the driving of steam turbine 60.
Powder process subsystem 401 comprises: vapour powder generates drying device, drier generating apparatus, vapour powder separator.Vapour powder generation drying device is used for grinding raw coal 1 and the drier utilizing drier generating apparatus to generate carries out drying to raw coal 1 thus forms vapour powder mixture, primary mixture is separated after entering vapour powder separator obtains coal dust and exhaust steam, gained coal dust can be stored or directly be sent into burning in boiler host subsystem 402, the major part of gained exhaust steam is as the drier of powder process subsystem 401 and ventilation medium in the work of powder process subsystem 401 Inner eycle, and another part exhaust steam is recycled after being condensed into condensate water by exhaust steam Water Sproading subsystem 404.
Vapour powder generates drying device and comprises: run coal bin 5, feeder 6, coal pulverizer 7, mill separator 8.Vapour powder separator comprises: powder process pipeline 9, coal collector 10, Pulverized Coal Bin 11.Drier generating apparatus comprises: exhaust steam pipeline 30, exhaust steam blower fan 31, exhaust steam circulating line 32, exhaust steam extraction heater 33a, exhaust steam flue gas heater 33b, extraction line 63, drain water piping 64, hot exhaust steam pipeline 34a, superheat steam pipeline 34b, booster fan 35, appendix 52, control valve 51.Superheated steam is formed after two-step heating being carried out to exhaust steam by exhaust steam extraction heater 33a and exhaust steam flue gas heater 33b, wherein, thermal source in exhaust steam extraction heater 33a comes from the condensation heat of the low-pressure pumping steam in Steam Turbine 502 in steam turbine 60, utilize the heating exhaust steam of drawing gas of steam turbine 60 to obtain hot exhaust steam, this hot exhaust steam is added the superheated steam of thermosetting as drier by boiler host subsystem 402 again.
Boiler host subsystem 402 obtains high-temperature high-pressure steam for carrying out heating to feedwater, comprising: boiler main frame 24, coal burner 23.The stove inner flue (not shown in FIG.) that boiler main frame 24 comprises burner hearth (not shown in FIG.) and is connected with burner hearth outlet flue.Burner hearth is used for making coal dust and the heat release of air Thorough combustion and produces flue gas, the heat of the water wall absorption flue gas of burner hearth circumference thus make flue gas temperature of hearth outlet within suitable scope, is furnished with carbonated drink heating surface, air preheater in the flue that furnace outlet is later.
Air-supply powder feeding subsystem 403 comprises: machine supplying powder 12, pressure fan 14, warm air pipeline 55, air preheater 15, Secondary Air hot air duct 16, First air hot air duct 17, warm air bypass duct 18, First air mixing chamber 19, First air booster fan 20, First air pipeline 21, powder feeding pipes 22, air and powder mixer 13.Form warm air after condenser 37 pairs of cold wind 2 carry out preheating, then air preheater 15 pairs of warm airs heat further and obtain hot blast.
Exhaust steam Water Sproading subsystem 404 comprises: exhaust steam apparatus for recovering and residual air conveying device.Exhaust steam apparatus for recovering comprises: exhaust steam output channel 36, condenser 37, cold water inlet 65, cold water outlet pipe 66, exhaust steam bypass duct 41, water collector 40.Residual air conveying device comprises: air ejector 38, residual air pipeline 39 and residual air bypass duct 42.
Gas cleaning subsystem 405 comprises: deduster 25, smoke discharging pipe 26, air-introduced machine 27, desulfurizer 28 and chimney 29.
The annexation of superheat steam drying powder process type coal generating system 501 entirety:
Run coal bin 5, feeder 6, coal pulverizer 7, powder process pipeline 9 and coal collector 10 connect in turn, mill separator 8 is located at the top of coal pulverizer 7 and is connected with coal pulverizer 7, the venthole of coal collector 10 is connected with one end of exhaust steam pipeline 30, the coal outlet of coal collector 10 is connected with the import of Pulverized Coal Bin 11, the outlet of Pulverized Coal Bin 11 is connected with machine supplying powder 12, machine supplying powder 12 is connected with the powder inlet of air and powder mixer 13, the outlet of air and powder mixer 13 is connected with one end of powder feeding pipes 22, and the other end of powder feeding pipes 22 is connected with coal burner 23.Stove inner flue is connected with the outlet of burner hearth, and air preheater 15 is positioned at the afterbody of stove inner flue.
Condenser 37 has two refrigerant inlet and two refrigerant exits accordingly, a refrigerant inlet of condenser 37 is connected with one end of cold water inlet 65, the other end of cold water inlet 65 is connected with Steam Turbine 502, with this refrigerant inlet accordingly a refrigerant exit be connected with Steam Turbine 502 by cold water outlet pipe 66.The low-temperature condensate of Steam Turbine 502 is entered in condenser 37 by cold water inlet 65 and carries out condensation to exhaust steam, then flows back to Steam Turbine 502 by cold water outlet pipe 66.Pressure fan 14 outlet is connected with another refrigerant inlet of condenser 37, with this refrigerant inlet accordingly another refrigerant exit be connected with one end of warm air pipeline 55, the other end of warm air pipeline 55 is connected with the air side import of air preheater 15 and is connected with one end of warm air bypass duct 18, and the air side outlet of air preheater 15 is connected with the air inlet of coal burner 23 with First air mixing chamber 19 with First air hot air duct 17 respectively by Secondary Air hot air duct 16.The other end of warm air bypass duct 18 is connected with the air inlet of First air mixing chamber 19, and First air mixing chamber 19 is connected with First air booster fan 20, and First air booster fan 20 is connected with air and powder mixer 13 by First air pipeline 21.
The entrance of exhaust steam pipeline 30 is connected with the gas vent of coal collector 10.Exhaust steam blower fan 31 is located on exhaust steam pipeline 30, for extracting the exhaust steam in coal collector 10.The arrival end of exhaust steam circulating line 32 is connected with the outlet of exhaust steam pipeline 30, the port of export of exhaust steam circulating line 32 is connected with the air inlet of exhaust steam extraction heater 33a, the gas outlet of exhaust steam extraction heater 33a is connected by hot exhaust steam pipe 34a with the air inlet of exhaust steam flue gas heater 33b, the gas outlet of exhaust steam flue gas heater 33b is connected with one end of superheat steam pipeline 34b, the other end of superheat steam pipeline 34 is connected with the entrance of booster fan 35, and the outlet of booster fan 35 is connected with coal pulverizer 7.Appendix 52 is connected with exhaust steam circulating line 32, and control valve 51 is located on appendix 52 and opens and closes appendix 52 for controlling.
The entrance of exhaust steam output channel 36 is communicated with on exhaust steam pipeline 30, the outlet of exhaust steam output channel 36 is connected with the import of condenser 37, exhaust steam bypass duct 41 is in parallel with condenser 37, water collector 40 is connected with condenser 37, for storing the condensate water reclaimed by condenser 37, the residual air outlet of condenser 37 is connected with the import of air ejector 38, the outlet of air ejector 38 connects one end of residual air pipeline 39 and one end of residual air bypass duct 42 respectively, the other end of residual air bypass duct 42 connects desulfurizer 28, the other end of residual air pipeline 39 connects First air mixing chamber 19.Remaining incondensable gas (hereinafter referred to as residual gas) after condenser 37 recycle-water steam, this residual gas enters First air mixing chamber 19 through residual air pipeline 39 and enters in burner hearth as First air, make fuel gas abundant after-flame in burner hearth that may contain in residual gas, in addition, residual gas also can enter in desulfurizer 28 through residual air bypass duct 42.This residual gas is other the incoagulable gas mixed in water vapour, and such as seepage enters the fuel gas that the air of exhaust steam apparatus for recovering and raw coal 1 volatilize in pulverizing process.
Outlet, deduster 25, the air-introduced machine 27 of stove inner flue, sequentially pass through smoke discharging pipe 26 between desulfurizer 28 with chimney 29 and be connected.
One end of the feed pipe 61 of Steam Turbine 502 is connected with the feedwater outlet of Steam Turbine 502, the other end is connected with boiler host subsystem 402, one end of steam pipeline 62 is connected with boiler host subsystem 402, the other end is connected with the steam inlet of Steam Turbine 502, Steam Turbine 502 is connected by the import of extraction line 63 with exhaust steam extraction heater 33a, and Steam Turbine 502 is connected by the outlet of drain water piping 64 with exhaust steam extraction heater 33a, that extracts out from steam turbine 60 is drawn gas to be entered exhaust steam extraction heater 33a by extraction line 63 and heats exhaust steam, drawing gas afterwards, formation is hydrophobic flows back into Steam Turbine 502 by drain water piping 64.
Fig. 4 is the flow chart of superheat steam drying powder process type coal generating system in the utility model embodiment.
As shown in Figure 4, the operation principle of superheat steam drying powder process type coal generating system 501:
The flow process (S1-S4) of coal: raw coal 1 delivers into coal pulverizer 7 by run coal bin 5 through feeder 6, raw coal 1 is ground into coal dust in coal pulverizer 7, export from coal pulverizer 7 after being entered the desiccant dryness of coal pulverizer 7 simultaneously, the mixture of exhaust steam and coal dust that coal pulverizer 7 exports is, vapour powder mixture when mill separator 8, meal is separated and reenters in coal pulverizer 7 and again grinds.Vapour powder mixture through mill separator 8 enters coal collector 10 by powder process pipeline 9, exhaust steam in vapour powder mixture and coal dust are isolated by coal collector 10, coal dust is stored by Pulverized Coal Bin 11, coal dust in Pulverized Coal Bin 11 sends into air and powder mixer 13 by machine supplying powder 12, mix with the First air from First air mixing chamber 19 in air and powder mixer 13, be then sent to coal burner 23 by powder feeding pipes 22 and enter in burner hearth the also heated feed water that burns together with Secondary Air.
Fig. 5 is the block diagram of powder feeding subsystem of blowing in the utility model embodiment.
The flow process (S4) of air: as shown in Fig. 3, Fig. 4, Fig. 5, cold wind 2 i.e. boiler air-supply sends into condenser 37 as cooling medium for the exhaust steam in condensation condenser 37 by pressure fan 14, cold wind 2 is formed warm air by after the heat preheating of exhaust steam simultaneously, and part warm air is entered in air preheater 15 by warm air pipeline 55 and added thermosetting hot blast further by flue gas.The hot blast major part of air preheater 15 air side outlet is directly drawn toward coal burner 23 through Secondary Air hot air duct 16 as Secondary Air.The warm air that another small part hot blast and warm air bypass duct 18 are carried carries out being mixed to form First air in First air mixing chamber 19, the warm air that warm air bypass duct 18 is carried can regulate the temperature of First air, coal dust through being entered air and powder mixer 13 by after the supercharging of First air booster fan through First air pipeline 21, and then is sent in burner hearth and is burnt by First air.
Flue gas flow (S5): coal dust and air generate flue gas in the burner hearth combustion of boiler 19, flue gas in burner hearth is discharged from stove inner flue, at stove inner flue afterbody, air preheater 15 and exhaust steam flue gas heater 33b are heated, the flue gas of discharging enters air-introduced machine 27 by smoke discharging pipe 26 after deduster 25 purifies, enter in desulfurizer 28 afterwards, through the flue gas 3 of desulfurizing and purifying by chimney 29 discharged to atmospheric environment.
Fig. 6 is the block diagram of powder process subsystem in the utility model embodiment.
As shown in Figure 6, water vapour flow process (S6-1, S6-2): be made up of the moisture evaporation of the water vapour in powder process subsystem 401 by raw coal 1.Export at coal pulverizer 7 and be called exhaust steam between the air inlet of exhaust steam extraction heater 33a, between exhaust steam flue gas heater 33b gas outlet and coal pulverizer 7 entrance, be called superheated steam.Exhaust steam is separated in coal collector 10 with coal dust, isolated exhaust steam is extracted out by exhaust steam blower fan 31 and is divided into two parts, part exhaust steam sends into exhaust steam extraction heater 33a by exhaust steam circulating line 32 and exhaust steam flue gas heater 33b carries out adding thermosetting superheated steam, this superheated steam sends into coal pulverizer 7 as drier through superheat steam pipeline 34b, drying is carried out to the raw coal 1 entering coal pulverizer 7, the vapour powder mixture that coal pulverizer 7 exports isolates coal dust by coal collector 10 and exhaust steam forms, the moisture that exhaust steam is now evaporated by superheated steam and the raw coal 1 as drier forms, the part of exhaust steam of discharging from coal collector 10 venthole to enter exhaust steam extraction heater 33a and exhaust steam flue gas heater 33b and as drier at powder process subsystem 401 Inner eycle, a part of exhaust steam is sent into condenser 37 through exhaust steam output channel 36 and is reclaimed in addition.Exhaust steam is cooled by refrigerant 80 in condenser 37, thus obtains a large amount of condensate water, and condensate water combines in water collector 40.
The flow process (S5) of feedwater: water forms high-temperature high-pressure steam after feed pipe 61 is heated by boiler host subsystem 402, high-temperature high-pressure steam is sent in Steam Turbine 502 through steam pipeline 62 and is done work, and Steam Turbine 502 drive electrical generators 70 works.Draw gas from the heat regenerative system extraction section of drawing gas Steam Turbine 502, this draws gas and to heat the exhaust steam in exhaust steam extraction heater 33a, produces hot exhaust steam.In addition, the low-temperature condensate in Steam Turbine 502 is used for cooling the exhaust steam in condenser 37, then flows back in Steam Turbine 502.
The residual gas that exhaust steam apparatus for recovering is discharged after reclaiming water vapour is delivered in First air mixing chamber 19 or in desulfurizer 28 respectively through residual air conveying device.When this residual gas contains fuel gas, close the valve on residual air bypass duct 42, this residual gas is all entered in burner hearth through residual air pipeline 39 and burns; When this residual gas is not containing fuel gas, opens the valve on residual air bypass duct 42, this residual gas is discharged after gas cleaning subsystem 405.
In the present embodiment, first, control steam appendix 52 by control valve 51 and carry gas 50 to exhaust steam circulating line 32, as drier, drying is carried out to the raw coal 1 entered in coal pulverizer 7 and coal dust after gas 50 is heated, then, after Preset Time, control valve 51 controls steam appendix 52 and stops carrying gas 50 to exhaust steam circulating line 32, and the valve opened on exhaust steam circulating line 32 sets up exhaust steam recirculation simultaneously.After running a period of time, the gas 50 inputted by steam appendix 52 is progressively discharged by exhaust steam output channel 36, and make drier convergence be either pure steam and do not contain other assorted gas, so achieving either pure steam is that drier carries out drying to coal dust.
The effect of embodiment and effect
In the superheat steam drying powder process type coal generating system of the present embodiment, powder process subsystem take superheated steam as powder process subsystem drier and coal pulverizer ventilation medium, superheated steam is exported by coal pulverizer and carries out pre-warmed exhaust steam extraction heater to draw gas in Steam Turbine for heat medium and the exhaust steam flue gas heater that heats further through flue gas again adds thermosetting because moisture in coal evaporate the circulation exhaust steam warp formed, superheat steam temperature and flow meet the requirement of powder process subsystem drying capacity and coal pulverizer ventilation respectively, except except the circulation exhaust steam of powder process subsystem Inner eycle work, the another part produced because moisture in coal constantly evaporates in powder process subsystem exports exhaust steam, condensation recovery is carried out as cooling medium using the low-temperature condensate in Steam Turbine together with cold wind by exhaust steam Water Sproading subsystem, the heat of heat in exhaust steam simultaneously for preheating cold wind and in exhaust steam is used in Steam Turbine simultaneously.
And, superheated steam in the utility model utilizes extracted steam from turbine and boiler smoke heating exhaust steam to obtain, namely the thermal source in exhaust steam extraction heater comes from the condensation heat that Steam Turbine is drawn gas, the condensation heat drawn gas is made effectively to be used in the drying capacity of coal pulverizing system, also namely make the condensation used heat of steam in Steam Turbine effectively be utilized by steam generator system, significantly decrease the cold source energy of steam turbine thermodynamic cycle.Exhaust steam forms hot exhaust steam after the preheating of exhaust steam extraction heater, hot exhaust steam is more further by the sufficiently high superheated steam of flue gas formation temperature of burner hearth, make the drying capacity of powder process subsystem be able to effective guarantee, significantly improve the adaptive capacity that generating set changes coal-fired moisture.
In datonation-inhibition inert gas flue gas, nitrogen and water vapour that industry is conventional, water vapour has best datonation-inhibition function.The present embodiment take superheated steam as the drier of powder process subsystem, whole powder process subsystem is run under complete inerting atmosphere, ensure that the safe and reliable operation of the high-volatile coal such as brown coal and accurate eastern coal powder process, solve pulverized coal preparation system burning and the explosion issues of long-standing problem brown coal and accurate eastern coal unit safety reliability service.And the inside achieving inertia powder process drier produces and recycling, extra steam, nitrogen production system is not needed in pulverizing process, also do not need to consume other medium such as flue gas, hot blast, make pulverizing process both safe and reliable, flow process is succinctly efficient again.And be pulverized coal preparation system drier with superheated steam, improve the pulverized coal particle particle size uniformity poor bursting caused in a large number by coal grain in the dry and hot-air drying process of stove cigarette in the past, thus contribute to improving coal powder performance, improve Combustion Efficiency of Coal Powder.
The present embodiment completely with powder process subsystem internal produce water vapour for drier and defeated powder medium, make the waste heat of the powder process exhaust steam being almost either pure steam and Water Sproading become very easy.By the waste heat recovery of powder process exhaust steam, can further improve the efficiency of energy utilization of boiler and coal-fired energy consumption system; And exhaust steam apparatus for recovering, realizing the recovery and reuse of the great lot of water resources that waste heat recovery realizes simultaneously, has immeasurable environment protection significance to rich coal water-deficient area especially.
The cold wind carried by boiler fan cools exhaust steam as cooling medium in exhaust steam apparatus for recovering, cold wind is preheated formation warm air, warm air finally enters in boiler burns, a large amount of latent heats of condensation of exhaust steam are effectively utilized by boiler, significantly can improve boiler thermal output thus, the boiler thermal output that coal-fired power station boiler is calculated based on coal-fired low heat valve becomes possibility more than 100%.Because the condensation heat amount of exhaust steam is larger, and the best warm air temperature that electricity generation system can be made most effective needs to raise to consider with exhaust gas temperature to determine, when being thus not enough to fully reclaim exhaust steam residual heat by means of only boiler air-supply cooling under the prerequisite ensureing best warm air temperature, the utility model cools exhaust steam as cooling medium further by from the low-temperature condensate in Steam Turbine in exhaust steam apparatus for recovering, low-temperature condensate returns Steam Turbine after being heated to uniform temperature thus reduces the low-pressure heater amount of drawing gas, the latent heat of condensation of exhaust steam is made effectively to be utilized by Steam Turbine therrmodynamic system thus, thus improve power plants generating electricity efficiency further.By the air-cooled Combination application with water-cooled two kinds of waste heat recovery modes, fully can ensure exhaust steam Water Sproading effect, and distributed by the air-cooled heat optimization with water-cooled, the generating efficiency of electricity generation system can be made to reach the highest, and adjustment during electricity generation system variable load operation can be made more flexible.In addition, compared with the existing low-pressure coal saver by flue gas, in the utility model, the volume of water-cooled condenser and cost of investment all can significantly reduce.
The present embodiment carries out the separation of vapour powder by coal collector to vapour powder mixture and obtains low moisture coal dust, and coal quantity is significantly improved.This coal dust after drying and upgrading is sent into boiler by uniform temperature air and is burnt, and will there will be no the low combustion instability of in-furnace temperature, low NO
xthe problems such as burning tissues burning difficulty.Meanwhile, adopt pulverized coal carried by hot air that inert gas content in First air is significantly reduced, breeze airflow ignition heat reduces thus, and in First air, oxygen concentration improves.Coefficient result is the combustion stability and the efficiency of combustion that had both improve breeze airflow, also makes the low NOx combustion of breeze airflow organize convenient, thus realizes clean and effective smooth combustion.And, this coal dust after drying and upgrading sends into boiler combustion by the First air in powder feeding subsystem of blowing with uniform temperature, and the moisture from the raw coal that powder process subsystem evaporates no longer enters boiler with powder feeding medium, boiler exhaust gas amount is reduced in a large number, corresponding exhaust gas temperature also can reduce, finally make boiler exhaust gas heat loss significantly reduce, boiler thermal output significantly improves.
In the present embodiment, burn because the fuel gas that may contain in water vapour is sent back in boiler by residual air conveying device, thus fully ensure that the efficiency of combustion of raw coal in steam generator system.
To sum up, embodiment can provide a kind of green high-efficient coal-burning boiler unit, solve the problem of high-moisture coal-fired boiler combustion instability, overcome the inefficient shortcoming of traditional high-moisture coal-fired boiler hot, while significantly improving boiler thermal output, make powder process subsystem run under inerting atmosphere thus improve the safety in operation of high volatile coal powder process subsystem, more outstanding is, waste heat and the Water Sproading very easily Project Realization of moisture in coal is made using superheated steam as drier, also improve coal generating system efficiency further by the recycling of steam condensation latent heat simultaneously, thus the utility model superheat steam drying powder process type coal generating system has energy-saving benefit and the environment protection significance of highly significant.
Superheat steam drying powder process type coal generating system involved by certain the utility model is not merely defined in structure in the above-described embodiments.Above content is only the basic explanation under the utility model design, and according to any equivalent transformation that the technical solution of the utility model is done, all should belong to protection domain of the present utility model.
Above-mentioned embodiment is preferred case of the present utility model, is not used for limiting protection domain of the present utility model.
The gas of appendix conveying can be air, also directly can to carry in the inerting gases such as water vapour, nitrogen, flue gas any one.
When raw coal moisture is higher, the predrying pipe of raw coal can also be set between coal pulverizer and feeder, the import of the predrying pipe of raw coal is communicated on superheat steam pipeline by steam pipeline, part superheated steam is transported in the predrying pipe of raw coal and directly contacts with raw coal by steam pipeline, thus carry out predrying to raw coal, achieve raw coal dry safely by superheated steam.
Predry drying prescription in the predrying pipe of raw coal can be not only the part superheated steam carried by steam pipeline, also can be that the entrance point of the direct pipe predrying with raw coal of superheat steam pipeline is connected, superheated steam through raw coal predrying pipe raw coal is carried out predrying after enter coal pulverizer further drying carried out to vapour powder mixture.
Claims (9)
1. a superheat steam drying powder process type coal generating system, for burning to drive electrical power generators to raw coal, is characterized in that, comprising:
Boiler controller system, produces heat energy for carrying out burning to described raw coal, and utilizes described heat energy that feedwater heating is obtained high-temperature high-pressure steam, comprise: powder process subsystem, boiler host subsystem, air-supply powder feeding subsystem and exhaust steam Water Sproading subsystem; And
Steam Turbine, utilizing described high-temperature high-pressure steam do work thus drive described electrical power generators, comprising for carrying the feed pipe of described feedwater, for carrying steam pipeline and the steam turbine of described high-temperature high-pressure steam,
Wherein, described powder process subsystem comprises: for grinding described raw coal and carrying out drying by drier to described raw coal thus the vapour powder forming vapour powder mixture generates drying device, is separated the vapour powder separator obtaining coal dust and exhaust steam and the drier generating apparatus generating described drier to described vapour powder mixture
Described boiler host subsystem is used for described feedwater to be heated as described high-temperature high-pressure steam, comprises: burner hearth, the stove inner flue be connected with described furnace outlet, be positioned at the coal burner of described burner hearth entry position,
Described air-supply powder feeding subsystem comprises: be connected with described vapour powder separator for the machine supplying powder of pulverized coal conveying, the air and powder mixer be connected with described machine supplying powder, the First air mixing chamber be connected with described air and powder mixer, be positioned at described stove inner flue afterbody air preheater and for providing the pressure fan of cold wind
Described exhaust steam Water Sproading subsystem comprises: being connected with described Steam Turbine and being connected with described pressure fan utilizes the low-temperature condensate of described Steam Turbine and described cold wind to carry out the exhaust steam apparatus for recovering of condensation recovery to a part for described exhaust steam,
Described vapour powder separator comprises: be separated to described vapour powder mixture the coal collector obtaining described coal dust and described exhaust steam,
Described drier generating apparatus comprises: the exhaust steam pipeline be connected with described coal collector for carrying described exhaust steam, be communicated with on described exhaust steam pipeline for carrying the exhaust steam circulating line of another part of described exhaust steam, be connected with described exhaust steam circulating line and the exhaust steam extraction heater forming hot weary gas is preheated to the described exhaust steam in described exhaust steam circulating line, be connected for described hot exhaust steam being heated further thus forming the exhaust steam flue gas heater of the superheated steam as drier with described exhaust steam extraction heater, and described drier is delivered to the superheat steam pipeline carrying out in described vapour powder generation drying device circulating,
Described exhaust steam extraction heater utilizes the condensation heat drawn gas of described steam turbine to add hot exhaust steam described in thermosetting to described exhaust steam,
Described exhaust steam flue gas heater utilizes the flue gas of described burner hearth to add superheated steam described in thermosetting to described hot exhaust steam,
Described machine supplying powder for carrying described coal dust to described air and powder mixer,
Described air and powder mixer is mixed to get wind powder mixture to from the First air of described air-supply powder feeding subsystem and described coal dust,
Exhaust steam in described exhaust steam apparatus for recovering is become condensate water by the described cold wind condensation that the described low-temperature condensate of described Steam Turbine and described pressure fan provide, and described cold wind is obtained warm air by the heat preheating of described exhaust steam in described exhaust steam apparatus for recovering,
Described air preheater carries out heating to a part for described warm air and obtains hot blast, a part for described hot blast enters in described air and powder mixer as described First air with another part of described warm air after described First air mixing chamber mixes, another part of described hot blast directly enters in described coal burner as Secondary Air
Described coal burner burns to the described coal dust in described wind powder mixture,
Described coal dust and described First air, described Secondary Air burn and generate described flue gas in described burner hearth.
2. superheat steam drying powder process type coal generating system according to claim 1, is characterized in that, also comprise:
Gas cleaning subsystem, exports with the afterbody of described stove inner flue and is connected, comprise: the deduster connected successively, air-introduced machine, desulfurizer, chimney.
3. superheat steam drying powder process type coal generating system according to claim 2, is characterized in that:
Wherein, described exhaust steam apparatus for recovering comprises: be communicated with the exhaust steam output channel on described exhaust steam pipeline, be connected with described exhaust steam output channel utilize described low-temperature condensate and described cold wind described exhaust steam is condensed into condensate water condenser, store the water collector that reclaims described condensate water and be connected with described exhaust steam output channel and described exhaust steam is directly introduced the exhaust steam bypass duct of described desulfurizer
Described condenser comprises the cold water inlet be connected with described Steam Turbine and the cold water outlet pipe be connected with described Steam Turbine,
Described low-temperature condensate flows in described condenser through described cold water inlet and carries out condensation to described exhaust steam, and described low-temperature condensate is flow back in described Steam Turbine through described cold water outlet pipe by after described exhaust steam heating.
4. superheat steam drying powder process type coal generating system according to claim 3, is characterized in that:
Wherein, described exhaust steam Water Sproading subsystem also comprises: the residual air conveying device of the residual gas exported for carrying described condenser,
Described residual air conveying device comprises: be connected with the outlet of described condenser for the residual air pipeline that described residual gas delivered in described First air mixing chamber and be connected with described residual air pipeline and described residual gas is directly introduced described desulfurizer residual air bypass duct.
5. superheat steam drying powder process type coal generating system according to claim 1, is characterized in that:
Wherein, described vapour powder generation drying device also comprises: grind described raw coal and form the coal pulverizer of described vapour powder mixture with dry and be connected with the outlet of described coal pulverizer for being separated the meal in described vapour powder mixture and sending described meal back to mill separator in described coal pulverizer.
6. superheat steam drying powder process type coal generating system according to claim 5, is characterized in that:
Wherein, described vapour powder generates drying device and also comprises: outlet is connected for carrying out the predrying pipe of pre-dried raw coal and steam pipeline to described raw coal with the entrance of described coal pulverizer,
The import of the predrying pipe of described raw coal is communicated on described superheat steam pipeline by described steam pipeline,
Described superheated steam carries out predrying as predry drying prescription to the described raw coal in the predrying pipe of described raw coal.
7. superheat steam drying powder process type coal generating system according to claim 1, is characterized in that:
Wherein, described exhaust steam extraction heater comprises: be connected with described Steam Turbine for draw gas described in carrying extraction line, for the hydrophobic drain water piping returning described Steam Turbine formed after described exhaust steam heater condensation heat that draws gas described in carrying.
8. superheat steam drying powder process type coal generating system as claimed in any of claims 1 to 7, is characterized in that:
Wherein, described powder process subsystem also comprises: be connected for carrying the appendix of gas and being located at for controlling to open and close the control valve of described appendix on described appendix with described exhaust steam circulating line,
Control described appendix by described control valve and carry described gas to described exhaust steam circulating line, as described drier after described gas is heated, after Preset Time, described control valve controls the stopping of described appendix and carries described gas to described exhaust steam circulating line.
9. superheat steam drying powder process type coal generating system according to claim 8, is characterized in that:
Wherein, described gas be in air or industrial inerting gas any one.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420677577.1U CN204240391U (en) | 2014-11-13 | 2014-11-13 | Superheat steam drying powder process type coal generating system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420677577.1U CN204240391U (en) | 2014-11-13 | 2014-11-13 | Superheat steam drying powder process type coal generating system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204240391U true CN204240391U (en) | 2015-04-01 |
Family
ID=52769880
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420677577.1U Withdrawn - After Issue CN204240391U (en) | 2014-11-13 | 2014-11-13 | Superheat steam drying powder process type coal generating system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204240391U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104373950A (en) * | 2014-11-13 | 2015-02-25 | 上海理工大学 | Superheated steam drying powder making type coal-fired power generation system |
CN112503497A (en) * | 2020-11-10 | 2021-03-16 | 中国电力工程顾问集团东北电力设计院有限公司 | Combined cycle thermodynamic system based on coupling of light gas turbine and biomass direct-fired grate boiler |
-
2014
- 2014-11-13 CN CN201420677577.1U patent/CN204240391U/en not_active Withdrawn - After Issue
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104373950A (en) * | 2014-11-13 | 2015-02-25 | 上海理工大学 | Superheated steam drying powder making type coal-fired power generation system |
CN104373950B (en) * | 2014-11-13 | 2016-09-14 | 上海理工大学 | Superheat steam drying powder process type coal generating system |
CN112503497A (en) * | 2020-11-10 | 2021-03-16 | 中国电力工程顾问集团东北电力设计院有限公司 | Combined cycle thermodynamic system based on coupling of light gas turbine and biomass direct-fired grate boiler |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204240348U (en) | Superheat steam drying powder process type coal-burning boiler unit and electricity generation system | |
CN204240347U (en) | Superheat steam drying powder process type coal generating system | |
CN104359107B (en) | Superheat steam drying powder process type coal-burning boiler unit | |
CN204240391U (en) | Superheat steam drying powder process type coal generating system | |
CN104132362A (en) | Open powder making steam warm air type boiler unit and power generation system thereof | |
CN104329667A (en) | Superheated steam drying power-making coal-fired power generation system | |
CN204240384U (en) | Superheat steam drying powder process type coal generating system | |
CN104132359A (en) | Open powder making steam warm air type boiler unit and power generation system thereof | |
CN204240386U (en) | Superheat steam drying powder process type coal generating system | |
CN104329666B (en) | Superheat steam drying powder process type coal generating system | |
CN204240382U (en) | Superheat steam drying powder process type coal generating system | |
CN104132361A (en) | Open powder making steam warm air type boiler unit and power generation system thereof | |
CN204240385U (en) | Superheat steam drying powder process type coal generating system | |
CN204240390U (en) | Superheat steam drying powder process type coal generating system | |
CN204240389U (en) | Superheat steam drying powder process type coal generating system | |
CN204114984U (en) | With the stove cigarette dry enclosed powder process coal-burning boiler unit that weary air water reclaims | |
CN204739580U (en) | Superheated steam drying powder process type coal fired boiler unit and power generation system | |
CN104373948B (en) | Superheat steam drying powder process type coal generating system | |
CN204240383U (en) | Superheat steam drying powder process type coal generating system | |
CN104315509B (en) | Superheat steam drying powder process type coal-burning boiler unit | |
CN204240388U (en) | Superheat steam drying powder process type coal generating system | |
CN204240387U (en) | Superheat steam drying pulverized coal preparation system, coal-burning boiler unit and electricity generation system | |
CN104373950B (en) | Superheat steam drying powder process type coal generating system | |
CN104132360A (en) | Open powder making steam warm air type boiler unit and power generation system thereof | |
CN104373951B (en) | Superheat steam drying powder process type coal generating system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20150401 Effective date of abandoning: 20160914 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |