[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN204248277U - Bogie frame welding tooling - Google Patents

Bogie frame welding tooling Download PDF

Info

Publication number
CN204248277U
CN204248277U CN201420492012.6U CN201420492012U CN204248277U CN 204248277 U CN204248277 U CN 204248277U CN 201420492012 U CN201420492012 U CN 201420492012U CN 204248277 U CN204248277 U CN 204248277U
Authority
CN
China
Prior art keywords
curb girder
crossbeam
keeper
support member
out against
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420492012.6U
Other languages
Chinese (zh)
Inventor
杨红伟
倪宝成
董洪达
宋玉奇
郭豪
刘海兵
杨宝林
刘家家
李方
尤君
胡苏磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Nanjing Puzhen Co Ltd
Original Assignee
CSR Nanjing Puzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSR Nanjing Puzhen Co Ltd filed Critical CSR Nanjing Puzhen Co Ltd
Priority to CN201420492012.6U priority Critical patent/CN204248277U/en
Application granted granted Critical
Publication of CN204248277U publication Critical patent/CN204248277U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The bogie frame welding tooling that the utility model relates to comprises rectangular base plate, base plate be provided with respectively along baseplate width direction extend the first support member, the second support member, crossbeam keeper, crossbeam compressing member, crossbeam holds out against part, curb girder keeper, curb girder compressing member, the first curb girder holds out against part, the second curb girder holds out against part, curb girder locating piece; First support member, crossbeam keeper, crossbeam compressing member, crossbeam hold out against part and form " U " cross-beam of character form located space; First support member, the second support member, curb girder keeper, curb girder compressing member, the first curb girder hold out against part, the second curb girder holds out against part, curb girder locating piece forms curb girder located space.The utility model can be used for welding curb girder, can be used for welding beam again, can avoid losing time, enhance productivity.

Description

Bogie frame welding tooling
Technical field
The utility model relates to a kind of bogie frame welding tooling, is particularly useful for curb girder and the crossbeam of welding bogie framework. 
Background technology
According to the applicant understood, bogie frame curb girder, crossbeam need frock to rigidly fix when manipulator welds, to prevent welding deformation and to be convenient to regulate welding position.Frame design has the long weld seam of curb girder, crossbeam, and existing curb girder, crossbeam manipulator welding tooling are split, when same manipulator welding curb girder, crossbeam, needs to change frock frequently, affects production efficiency. 
Utility model content
Technical problem to be solved in the utility model is: overcome prior art Problems existing, provides a kind of bogie frame welding tooling, can be used for welding curb girder, can be used for welding beam again, can avoid losing time, enhance productivity. 
The technical scheme in the invention for solving the technical problem is as follows:
Bogie frame welding tooling, comprise rectangular base plate, base plate be provided with respectively along baseplate width direction extend the first support member, the second support member, crossbeam keeper, crossbeam compressing member, crossbeam holds out against part, curb girder keeper, curb girder compressing member, the first curb girder holds out against part, the second curb girder holds out against part, curb girder locating piece;
First support member, crossbeam keeper, crossbeam compressing member, crossbeam hold out against part and form " U " cross-beam of character form located space: the first support member is positioned at the below in the middle part of " U " cross-beam of character form, crossbeam keeper is positioned at the two ends of " U " cross-beam of character form and touches with the position location of " U " cross-beam of character form, be formed in the space that base plate thickness direction clamps " U " cross-beam of character form between crossbeam compressing member and base plate, crossbeam holds out against between part and crossbeam keeper and is formed in the space that floor length direction clamps " U " cross-beam of character form;
First support member, second support member, curb girder keeper, curb girder compressing member, first curb girder holds out against part, second curb girder holds out against part, curb girder locating piece forms curb girder located space: the first support member, second support member is positioned at the below of curb girder, curb girder keeper is positioned at the two ends of curb girder, curb girder locating piece is positioned at curb girder side and touches with curb girder position location, the space that base plate thickness direction clamps curb girder is formed between curb girder compressing member and base plate, first curb girder holds out against between part and curb girder keeper and is formed in the space that floor length direction clamps curb girder, second curb girder holds out against part to be had in the space of baseplate width direction clamping curb girder. 
When this structure is used for welding beam, crossbeam is put into frock with counter; During for welding curb girder, curb girder is put into frock with formal dress. 
The perfect further technical scheme of the utility model is as follows:
Preferably, the first support member, the second support member, crossbeam keeper, curb girder keeper are symmetrically distributed in the both sides of baseplate width direction center line. 
More preferably, crossbeam compressing member is located at the top of crossbeam keeper, and crossbeam holds out against the side that part is located at crossbeam keeper. 
More preferably, curb girder compressing member is located at the top of curb girder keeper, first curb girder holds out against the side that part is located at curb girder keeper, and the second curb girder holds out against the top that part is located at the first support member, and curb girder locating piece is located at the first support member top and is positioned at the side that the second curb girder holds out against part. 
More preferably, the first support member is cuboid parts, and the second curb girder holds out against part and comprises the second tight lifting pin and withstanding tight block that are positioned at the first two ends, support member top, is formed in the space of baseplate width direction clamping curb girder between the second tight lifting pin and withstanding tight block; Curb girder locating piece is positioned at the side of withstanding tight block and is connected with withstanding tight block. 
More preferably, the second support member is cuboid parts, and the second two ends, support member top are provided with the caging bolt being positioned at curb girder both sides. 
More preferably, crossbeam keeper comprises the first pedestal and crossbeam backstay, and the first pedestal and base plate are connected, and is connected bottom crossbeam backstay with the first pedestal; Crossbeam compressing member comprises the crossbeam compact heap being located at crossbeam backstay top circumference; Crossbeam holds out against part and comprises the crossbeam tight lifting pin being positioned at the first pedestal side. 
More preferably, curb girder keeper comprises the second pedestal and curb girder backstay that are connected with base plate respectively; Curb girder compressing member comprises the curb girder compact heap being located at curb girder backstay top circumference; First curb girder holds out against part and comprises the curb girder tight lifting pin being positioned at the second pedestal side. 
More preferably, the first support member, crossbeam keeper, curb girder keeper have two respectively, and the second support member has four. 
More preferably, base plate is also provided with frock hoisting ring. 
The utility model can be used for welding curb girder, can be used for welding beam again, can avoid losing time, enhance productivity. 
Accompanying drawing explanation
Fig. 1, Fig. 2 are front view and the top view of the utility model embodiment frock. 
Fig. 3, Fig. 4 are front view and the top view that Fig. 1 embodiment fixes curb girder. 
Fig. 5, Fig. 6 are front view and the top view of Fig. 1 embodiment fixed cross beam. 
Detailed description of the invention
With reference to the accompanying drawings and the utility model is described in further detail in conjunction with the embodiments.But the utility model is not limited to given example. 
Embodiment
As shown in Figure 1 and Figure 2, the bogie frame welding tooling of the present embodiment comprises rectangular base plate 1, and base plate 1 is provided with that the first support member 2, second support member 3, crossbeam keeper 4, crossbeam compressing member 5, the crossbeam that extend along base plate 1 width respectively hold out against part 6, curb girder keeper 7, curb girder compressing member 8, first curb girder hold out against part 9, second curb girder and hold out against part 10, curb girder locating piece 11;
First support member 2, crossbeam keeper 4, crossbeam compressing member 5, crossbeam hold out against part 6 and form " U " cross-beam of character form located space: the first support member 2 is positioned at the below in the middle part of " U " cross-beam of character form 12, crossbeam keeper 4 is positioned at the two ends of " U " cross-beam of character form and touches with the position location of " U " cross-beam of character form, be formed in the space that base plate 1 thickness direction clamps " U " cross-beam of character form between crossbeam compressing member 5 and base plate 1, crossbeam holds out against between part 6 and crossbeam keeper 4 and is formed in the space that base plate 1 length direction clamps " U " cross-beam of character form;
First support member 2, second support member 3, curb girder keeper 7, curb girder compressing member 8, first curb girder holds out against part 9, second curb girder holds out against part 10, curb girder locating piece 11 forms curb girder located space: the first support member 2, second support member 3 is positioned at the below of curb girder 13, curb girder keeper 7 is positioned at the two ends of curb girder, curb girder locating piece 11 is positioned at curb girder side and touches with curb girder position location, the space that base plate 1 thickness direction clamps curb girder is formed between curb girder compressing member 8 and base plate 1, first curb girder holds out against between part 9 and curb girder keeper 7 and is formed in the space that base plate 1 length direction clamps curb girder, second curb girder holds out against part 10 to be had in the space of base plate 1 width clamping curb girder. 
First support member 2, second support member 3, crossbeam keeper 4, curb girder keeper 7 are symmetrically distributed in the both sides of base plate 1 width center line. 
Specifically, crossbeam compressing member 5 is located at the top of crossbeam keeper 4, and crossbeam holds out against the side that part 6 is located at crossbeam keeper 4.Curb girder compressing member 8 is located at the top of curb girder keeper 7, first curb girder holds out against the side that part 9 is located at curb girder keeper 7, second curb girder holds out against the top that part 10 is located at the first support member 2, and curb girder locating piece 11 is located at the first support member 2 top and is positioned at the side that the second curb girder holds out against part 10. 
First support member 2 is cuboid parts, and the second curb girder holds out against part 10 and comprises the second tight lifting pin and withstanding tight block that are positioned at the first two ends, support member 2 top, is formed in the space of base plate 1 width clamping curb girder between the second tight lifting pin and withstanding tight block; Curb girder locating piece 11 is positioned at the side of withstanding tight block and is connected with withstanding tight block. 
Second support member 3 is cuboid parts, and the second two ends, support member 3 top are provided with the caging bolt being positioned at curb girder both sides. 
Crossbeam keeper 4 comprises the first pedestal and crossbeam backstay, and the first pedestal and base plate 1 are connected, and is connected bottom crossbeam backstay with the first pedestal; Crossbeam compressing member 5 comprises the crossbeam compact heap being located at crossbeam backstay top circumference; Crossbeam holds out against part 6 and comprises the crossbeam tight lifting pin being positioned at the first pedestal side. 
Curb girder keeper 7 comprises the second pedestal and curb girder backstay that are connected with base plate 1 respectively; Curb girder compressing member 8 comprises the curb girder compact heap being located at curb girder backstay top circumference; First curb girder holds out against part 9 and comprises the curb girder tight lifting pin being positioned at the second pedestal side. 
In the present embodiment, the first support member 2, crossbeam keeper 4, curb girder keeper 7 have two respectively, and the second support member 3 has four.Base plate 1 is also provided with frock hoisting ring 14. 
When the present embodiment frock is for welding curb girder 13, curb girder is put into frock with formal dress, as shown in Figure 3, Figure 4; During for welding beam 12, crossbeam is put into frock with counter, as shown in Figure 5, Figure 6.The present embodiment can be used for welding curb girder, can be used for welding beam again, can avoid losing time, enhance productivity. 
In addition to the implementation, the utility model can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of the utility model requirement. 

Claims (10)

1. bogie frame welding tooling, comprise rectangular base plate, it is characterized in that, described base plate be provided with respectively along baseplate width direction extend the first support member, the second support member, crossbeam keeper, crossbeam compressing member, crossbeam holds out against part, curb girder keeper, curb girder compressing member, the first curb girder holds out against part, the second curb girder holds out against part, curb girder locating piece;
Described first support member, crossbeam keeper, crossbeam compressing member, crossbeam hold out against part and form " U " cross-beam of character form located space: described first support member is positioned at the below in the middle part of " U " cross-beam of character form, described crossbeam keeper is positioned at the two ends of " U " cross-beam of character form and touches with the position location of " U " cross-beam of character form, be formed in the space that base plate thickness direction clamps " U " cross-beam of character form between described crossbeam compressing member and base plate, described crossbeam holds out against between part and crossbeam keeper and is formed in the space that floor length direction clamps " U " cross-beam of character form;
Described first support member, second support member, curb girder keeper, curb girder compressing member, first curb girder holds out against part, second curb girder holds out against part, curb girder locating piece forms curb girder located space: described first support member, second support member is positioned at the below of curb girder, described curb girder keeper is positioned at the two ends of curb girder, described curb girder locating piece is positioned at curb girder side and touches with curb girder position location, the space that base plate thickness direction clamps curb girder is formed between described curb girder compressing member and base plate, described first curb girder holds out against between part and curb girder keeper and is formed in the space that floor length direction clamps curb girder, described second curb girder holds out against part to be had in the space of baseplate width direction clamping curb girder.
2. bogie frame welding tooling according to claim 1, is characterized in that, described first support member, the second support member, crossbeam keeper, curb girder keeper are symmetrically distributed in the both sides of baseplate width direction center line.
3. bogie frame welding tooling according to claim 2, is characterized in that, described crossbeam compressing member is located at the top of crossbeam keeper, and described crossbeam holds out against the side that part is located at crossbeam keeper.
4. bogie frame welding tooling according to claim 3, it is characterized in that, described curb girder compressing member is located at the top of curb girder keeper, described first curb girder holds out against the side that part is located at curb girder keeper, described second curb girder holds out against the top that part is located at the first support member, and described curb girder locating piece is located at the first support member top and is positioned at the side that the second curb girder holds out against part.
5. bogie frame welding tooling according to claim 4, it is characterized in that, described first support member is cuboid parts, described second curb girder holds out against part and comprises the second tight lifting pin and withstanding tight block that are positioned at the first two ends, support member top, is formed in the space of baseplate width direction clamping curb girder between described second tight lifting pin and withstanding tight block; Described curb girder locating piece is positioned at the side of withstanding tight block and is connected with withstanding tight block.
6. bogie frame welding tooling according to claim 5, described second support member is cuboid parts, and described second two ends, support member top are provided with the caging bolt being positioned at curb girder both sides.
7. bogie frame welding tooling according to claim 6, described crossbeam keeper comprises the first pedestal and crossbeam backstay, and described first pedestal and base plate are connected, and is connected bottom described crossbeam backstay with the first pedestal; Described crossbeam compressing member comprises the crossbeam compact heap being located at crossbeam backstay top circumference; Described crossbeam holds out against part and comprises the crossbeam tight lifting pin being positioned at the first pedestal side.
8. bogie frame welding tooling according to claim 7, described curb girder keeper comprises the second pedestal and curb girder backstay that are connected with base plate respectively; Described curb girder compressing member comprises the curb girder compact heap being located at curb girder backstay top circumference; Described first curb girder holds out against part and comprises the curb girder tight lifting pin being positioned at the second pedestal side.
9. bogie frame welding tooling according to claim 2, described first support member, crossbeam keeper, curb girder keeper have two respectively, and described second support member has four.
10. bogie frame welding tooling according to claim 2, described base plate is also provided with frock hoisting ring.
CN201420492012.6U 2014-08-27 2014-08-27 Bogie frame welding tooling Expired - Lifetime CN204248277U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420492012.6U CN204248277U (en) 2014-08-27 2014-08-27 Bogie frame welding tooling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420492012.6U CN204248277U (en) 2014-08-27 2014-08-27 Bogie frame welding tooling

Publications (1)

Publication Number Publication Date
CN204248277U true CN204248277U (en) 2015-04-08

Family

ID=52952628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420492012.6U Expired - Lifetime CN204248277U (en) 2014-08-27 2014-08-27 Bogie frame welding tooling

Country Status (1)

Country Link
CN (1) CN204248277U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105773494A (en) * 2016-05-03 2016-07-20 中车青岛四方机车车辆股份有限公司 Clamping system
CN108817797A (en) * 2018-06-28 2018-11-16 中车长春轨道客车股份有限公司 Group for the welding of curb girder formal dress is to positioning tool
CN109382649A (en) * 2017-08-04 2019-02-26 中车大同电力机车有限公司 Guide tracked threaded flex connects framework pairing device
CN110919239A (en) * 2019-12-05 2020-03-27 中车长春轨道客车股份有限公司 Automatic assembly quality that falls of bogie

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105773494A (en) * 2016-05-03 2016-07-20 中车青岛四方机车车辆股份有限公司 Clamping system
CN105773494B (en) * 2016-05-03 2018-02-02 中车青岛四方机车车辆股份有限公司 One kind clamps system
CN109382649A (en) * 2017-08-04 2019-02-26 中车大同电力机车有限公司 Guide tracked threaded flex connects framework pairing device
CN108817797A (en) * 2018-06-28 2018-11-16 中车长春轨道客车股份有限公司 Group for the welding of curb girder formal dress is to positioning tool
CN108817797B (en) * 2018-06-28 2020-05-22 中车长春轨道客车股份有限公司 Assembly positioning tool for side beam normal welding
CN110919239A (en) * 2019-12-05 2020-03-27 中车长春轨道客车股份有限公司 Automatic assembly quality that falls of bogie
CN110919239B (en) * 2019-12-05 2021-06-22 中车长春轨道客车股份有限公司 Automatic assembly quality that falls of bogie

Similar Documents

Publication Publication Date Title
CN204248277U (en) Bogie frame welding tooling
CN203992924U (en) Lift movable joint welding tooling
CN205166260U (en) Integral welding tool equipment of rear axle camber beam
CN203738291U (en) Vertical excavator balance-weight overlap welding tool
CN204108584U (en) Undersetting special tooling
CN205169146U (en) Transport tray
CN204470884U (en) For the tailor-welding tool of the body beam with central dividing plate
CN103831567B (en) Stand-type counter weight of excavator joint welding frock
CN104759773A (en) Tyre crane portal frame welding method
CN104759775A (en) Tyre crane portal frame welding method
CN205415007U (en) A anchor clamps for sharp processing of cell -phone center
CN208329151U (en) A kind of assemble welding formula steel construction
CN203855305U (en) Jacking lifting appliance
CN209006938U (en) A kind of automobile panel welding tooling
CN204040272U (en) The hermetically-sealed construction of a kind of steel bar truss floor support plate and beam junction
CN205129226U (en) A frock that it is right that is used for JW4G framework to organize fast
CN204603638U (en) Boats and ships I-steel general part forming frock
CN204123009U (en) A kind of goods shelf welding deflection machine
CN204346173U (en) A kind of welding stock column cap
CN105587111A (en) Temporary support framework structure
CN201893221U (en) Hog frame for corrugated oil tank base
CN205008780U (en) Mobile Workbench convenient to welding of coil pipe elbow
CN204212432U (en) A kind of jib and there is its engineering machinery
CN213771052U (en) Special lifting appliance for frame cross beam of heavy truck
CN204122949U (en) A kind of track of submerged arc welding machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 210031 Nanjing province high tech Industrial Development Zone, Taishan Park, North Pearl Road, No. 68

Patentee after: CRRC NANJING PUZHEN Co.,Ltd.

Address before: 210031 Nanjing province high tech Industrial Development Zone, Taishan Park, North Pearl Road, No. 68

Patentee before: CSR NANJING PUZHEN Co.,Ltd.

CX01 Expiry of patent term

Granted publication date: 20150408

CX01 Expiry of patent term