CN1512012A - 一种塑料土工组合式挡土墙 - Google Patents
一种塑料土工组合式挡土墙 Download PDFInfo
- Publication number
- CN1512012A CN1512012A CNA021592918A CN02159291A CN1512012A CN 1512012 A CN1512012 A CN 1512012A CN A021592918 A CNA021592918 A CN A021592918A CN 02159291 A CN02159291 A CN 02159291A CN 1512012 A CN1512012 A CN 1512012A
- Authority
- CN
- China
- Prior art keywords
- wall
- cob
- shelves
- dividing plate
- wall element
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Revetment (AREA)
Abstract
本发明公开了一种塑料土工组合式挡土墙,由墙体单元组合而成,每个墙体单元由塑料内墙板、外墙板,及隔板构成,在内外墙板之间横向间隔设置隔板,单元墙体的两端设置与相邻墙体单元横向和纵向相连的连接件,其中与地面相连的墙体单元下部设置坚固件,单元墙体组合成不同的墙体结构,在墙体的中空部分可用沙土、碎石等填充夯实,形成稳固的墙体结构。本发明具有按需设置墙体高度,尤其可制作成高度、宽度较大的墙体,墙表面为平面,由于墙面板可具有一定的柔性,墙体可为直面也可制成带有一定曲面的弧形墙体,本发明的挡土墙单元可以组合成所需的长度和形状,具有整体性强等特点,制作简单,而且用料省,成本低,尤其在软质地基中,不会导致地面下限,作为陡坡防护墙更具优势。
Description
技术领域:本发明属于土工合成材料技术领域,具体涉及一种塑料土工组合式档土墙。
背景技术:在岩土工程中,修筑永久性挡土墙,一般选用石材、砖块等刚性材料堆砌而成。修筑临时性挡土墙,如军事工程用的临时掩体、抗洪时加固的江岸的子堤,一般采用麻袋填入沙土,码放而成的墙体,由于此方法在填土和码放过程中,不能使用机具来增快筑墙速度,同时码放后的每个麻袋间没有连接,墙体的整体性差。
目前土工合成材料广泛应用在岩土工程中,在挡土墙工程中经常使用土工格栅及复合拉筋带配合刚性墙面材料形成可靠的加筋土结构挡土墙。近年来三维立体土工合成材料土工格室在岩土工程中广泛使用,并在工程中显示出优良特性,如名称为“增强格网材料”公开号为CN1092356A的专利,是一种用以约束混凝土和土工材料的格网材料结构,它有多个塑料带子,该多个带子的面相互并排地在粘接区上粘接在一起,这些粘接区从一个带子到另一个带子交错布置,将带子沿带子垂直面展开形成多个立体网格,带子上有孔,增强件穿入该孔中;又如名称为“复合织物型开孔塑料土工格室”公开号为CN2305431的专利。此实用新型是在组成格室的有孔塑料表面复合有一层可透水的合成织物,再将该片材面对面地两两交错焊接,在拉伸时可形成蜂窝状网格结构,因此使用土工格室作为支挡结构材料的探索成为必然。在建筑临时建筑使用土工格室,其优点为:建筑速度快,结构可靠。并在实际研究发现,土工格室作为掩体的墙体材料是可行的,当将一层层的土工格室展开后,填入沙土并在层间进行必要的连接后,可形成一整体性较强的墙体。
向展开的土工格室内填土时可适当的借助于施工机具,因此速度快于麻袋筑墙的方式。但在实际使用时发现使用土工格室修筑临时性挡土墙存在如下的问题:
(1)充物为沙子时,上层间必须向内错一定距离码放,否则填
入上层的沙子易从层间的接缝中溜出,由于层间的错落码
放,必然形成下大上小的墙体。由于此墙体形状将影响掩
体防护板的安装,同时较上下一致的墙体土方量大。
(2)土工格室层间的高度有限,一般高度为0.2~0.4米,同时
也存在层间的连接问题。
(3)展开后俯视断面为波浪形,此形状也不利于在作为军事掩
体使用时进一步安装其他防护材料。
在使用土工格室建造长久式挡土墙的实验工程时也发现类似的问题。其表现为:
(1)由于工格室层间的高度有限,同时为防止填入上层土工
格室内的填充物从层间的接缝中溜出,因此必需错落码
放,这样只能修筑较缓的陡坡工程。
(2)由于错落码放同时又要保障一定的坡度给施工带来了困
难。
(3)由于要保障一定的坡度,错落宽度极为有限,在雨季时,
上层土工格室的填方容易随雨水从层间流出。
在现有技术中,塑料墙有各种结构,如专利公告号:CN2405984,公告日为2000年11月15日的一种塑料组合砖墙,包括底盘、空心砖及上盖,底盘上具有凸框,凸框间设有嵌合槽,空心砖上侧面设有凸框,凸框间形成嵌合槽,其侧壁嵌合于底盘的嵌合槽,该上盖下方为开口状,其侧壁嵌合于空心砖的嵌合槽。又如申请号为:86201788,发明名称为组装式防风固沙塑料墙,该组装式防风固沙塑料墙上设置有对称的平衡孔、防埋孔、螺丝固定孔以及加强筋。塑料墙分别由墙体、墙底座及“兀形”固定槽连接组装而成。此塑料墙虽具有防风固沙作用,但不能用于陡坡加固,一般塑料墙存在成型复杂,造价高,应用面窄等不足。
发明内容:本发明提供一种塑料土工组合式档土墙,由墙体单元组合而成,每个墙体单元由塑料内墙板、外墙板,及隔板构成,在内外墙板之间横向间隔设置隔板,单元墙体的两端设置与相临墙体单元横向和纵向相连的连接件,其中与地面相连的墙体单元下部设置坚固件,单元墙体连接成不同的墙体结构。
在内外墙板之间横向间隔设置的隔板,可与内外墙板固定连接,固定连接时隔板的端头设置增大焊接面的连接片;隔板也可活动连接,活动连接时,在内外墙板之间设置插槽,将隔板插入插槽内,或设置成铰链连接,将隔板的端头设置铰链与内外墙板内侧的铰链对应连接,用长栓固定,总之墙板之间的隔板连接形式可为多种形式的活动连接,不限于此两种方法。
墙体单元一般制作成长1~40米,宽0.1~2米,高为0.3~3米的单元墙体,优选长为2米~5米,宽为0.2~0.6米,高为0.5~2米,用于制作的墙体的塑料板材一般选用聚乙烯或聚丙烯材料,优选为加入抗氧剂、光稳定剂或阻燃剂等改性剂塑料材料。
塑料土工组合式挡土墙可由多种方法加工而成,现介绍的方法为其中两种加工成型方法。
A、单元墙体内的隔板活动连接时的成型方法:
1.用挤出机挤出所需的墙体单元的墙面板长、宽,厚所要求
的塑料片材。
2.将隔板端头的连接件分别平铺在焊接平台的槽内。
3.上面铺设挤出成型的墙面板。
4.用超声焊接将墙面板与连接件焊接在一起。
5.挤出成型隔板长、宽、厚所要求的塑料片材。
6.在隔板上焊接连接件。
7.将墙面板上连接件与隔板上连接件对应连接,插入连接销
连接。
B、单元墙体内的隔板固定连接时的成型方法:
1.先挤出成型墙面板长、宽、厚所要求的塑料片材。
2.按距离铺设隔板,再铺设墙面板。
3.用超声焊接将墙面板塑料片材与隔板焊接在一起。
塑料土工组合式挡土墙优点为:本发明具有按需设置墙体高度,尤其可做作高度和宽度较大的墙体,墙表面为平面,由于墙面板可具有一定的柔性,墙体可为直面也可制成带有一定曲面的弧形墙体,具有整体性强等特点。解决了现有土工格室的不能达到一定高度的问题,同时简化产品的结构,并可将土工合成挡土墙单元组合成所需的长度和不同的形状,尤其在软质地基中,用比重大的石材筑墙,会导致地面下限,而本发明由于采用质轻的塑料墙体内夹沙土结构,克服了这种不足,而且用料省,成型简单,在陡坡防护中使用更具优势。
附图说明:
图1为塑料土工组合式档土墙墙体单元结构示意图
图2为墙体单元的隔板端头铰链结构示意图
图3为墙体单元的墙面板铰链结构示意图
图4为隔板与墙面板铰链连接时结构示意图
图5为隔板与墙面板插槽连接示意图
图6为塑料土工组合式档土墙插槽式连接墙体单元结构示意图
图7为一种形式的组合塑料档土墙用于掩体结构示意图
图8为一种形式的塑料组合式档土墙用于陡坡防护施工示意图
图9为一种形式的塑料组合式档土墙示意图
图10为隔板与墙面板直接焊接连接结构示意图
具体实施方式:
下面参照附图对本发明作具体说明,但本发明并不限于此。
如图1所示,将加入阻燃剂,抗氧剂和光稳定剂的高密度聚乙烯树脂,经挤出机挤出成型为长为10米,厚为0.02米,高为1.2米的内墙面板2及外墙面板1,及高为1.2米、宽为1米、厚为0.02米的隔板3,隔板宽度即为墙体单元的宽度,将隔板间隔0.8米焊接在内外墙面板之间,如图5所示,也可如图2、图3、图4所示,用铰链连接,隔板两端设置铰链7,与墙面板内侧对应的铰链8相连接,用长栓插入铰链孔内即可,或如图5、图6所示用插槽方式连接,墙面板内侧面与隔板连接部位设置插槽14,隔板端头形状与插槽相匹配,将隔板插入插槽即可连接起来,向墙体内中空部分根据情况加土、沙、水泥或碎石10,夯实即形成稳固的墙体结构,墙体单元9通过横向连接件6和纵向连接件4连接成所需墙体的长度和形状,可组成如图7、图8、图9等多种形状的墙体结构。
墙体单元围成封闭的军事掩体时,按图7所示连接,将墙体单元9通过纵向连接件4,将墙体单元连接成需要的长,再通过墙体单元9横向连接件将墙体单元纵向连接,这样通过纵横连接围成封闭结构,还可在墙体顶部可加顶盖板13,在内外墙面设置两排连接外饰或外防护件的挂孔5,可通过挂孔5与防护板12连接,墙体与地通过用长栓插如墙体底部的紧固孔15与地面固定连接,最后将沙、土、碎石或水泥添入其中夯实,形成稳固结构。
土工合成挡墙的施工方法:
平面施工的方法
A.在地面挖一与档土墙底面相同面积的浅槽。
B.挡土墙横向墙体单元和纵向墙体单元通过连接件连接起
来。
C.可在掩体前方挂装饰或防护单元。
D.向土工合成挡墙内填土、沙等填充物,注意应边填添边夯
实。
当本发明的档土墙用于陡坡防护时,如图8所示,将下层的档土墙与地面固定后,用沙土添实中空部分,将上层的档土墙的外墙面板底面的连接件与下层上部的内墙面板的连接件相连,连接件可用铰链或插槽形式连接,这样层层码放,形成陡坡防护墙体,在墙体的内侧面还可与土工格室11配合使用,形成更加稳固的防护结构。
陡坡档土墙的具体施工方法
A.在地面挖一与档土墙底面相同面积的浅槽。
B.将墙体单元相互用连接起来,放入浅槽内。
C.向挡土墙内填土,注意应边填土边夯实。
D.挡土墙下部与加筋材料(一般选用土工格室)连接,加筋
材料向内侧延伸。
E.向挡土墙后面有加筋材料的部位填土,并压实。
F.当加筋土填至挡土墙后中上部,再将加筋材料与其有效连
接,填土后并压实。
G.当加筋土填至土工合成挡墙后上部约至顶部时,将第一组
土工合成挡墙的上部内墙面板与第二组挡土墙的外墙面板
下部连接。
H.然后重复C-G步骤,将档土墙层层相错叠加,形成陡
坡档土墙防护结构。
Claims (7)
1、一种塑料土工组合式档土墙,其特征在于:由墙体单元组合而成,每个墙体单元由塑料内墙板、外墙板,及隔板构成,在内外墙板之间横向间隔设置隔板,单元墙体的两端设置与相临墙体单元横向和纵向相连的连接件,其中与地面相连的墙体单元下部设置坚固件,单元墙体连接成不同的墙体结构。
2、根据权利要求1所述的档土墙,其特征在于墙体单元的长1~40米,宽0.1~2米,高为0.3~3米的单元墙体单元。
3、根据权利要求2所述的档土墙,其特征在于墙体单元为加入抗氧剂、光稳定剂或阻燃剂的聚乙烯或聚丙烯材料制成。
4、根据权利要求1所述的档土墙,其特征在于所述墙体单元的隔板直接焊接在内外墙板之间。
5、根据权利要求1所述的档土墙,其特征在于所述墙体单元的隔板用铰链或插槽与内外墙板活动连接。
6、根据权利要求1所述的档土墙,其特征在于档土墙的墙侧面设置挂孔,与地连接的墙体底面设有紧固孔,单元墙体两端的端面和侧面设有铰链或插槽型连接件。
7、根据权利要求1所述的档土墙,其特征在于档土墙内添置土、沙、水泥或碎石等材料。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02159291 CN1209535C (zh) | 2002-12-30 | 2002-12-30 | 一种塑料土工组合式档土墙 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02159291 CN1209535C (zh) | 2002-12-30 | 2002-12-30 | 一种塑料土工组合式档土墙 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1512012A true CN1512012A (zh) | 2004-07-14 |
CN1209535C CN1209535C (zh) | 2005-07-06 |
Family
ID=34237415
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 02159291 Expired - Fee Related CN1209535C (zh) | 2002-12-30 | 2002-12-30 | 一种塑料土工组合式档土墙 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1209535C (zh) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101313112B (zh) * | 2005-11-24 | 2010-07-14 | 赫思科巴斯申有限公司 | 土石筐 |
CN102071696A (zh) * | 2010-12-30 | 2011-05-25 | 长安大学 | 陡坡防护的柔性格框及其施工方法 |
CN102767147A (zh) * | 2012-08-15 | 2012-11-07 | 新乡克瑞重型机械科技股份有限公司 | 公路交通安全防护墙体及其骨架 |
CN102776964A (zh) * | 2012-08-15 | 2012-11-14 | 新乡克瑞重型机械科技股份有限公司 | 能重复使用的防爆墙体及其骨架 |
CN103074858A (zh) * | 2013-02-05 | 2013-05-01 | 新乡克瑞重型机械科技股份有限公司 | 公路安全防撞墙体及其骨架 |
CN103352457A (zh) * | 2013-07-20 | 2013-10-16 | 陈炯辉 | 软基加固方法 |
CN103628583A (zh) * | 2013-11-12 | 2014-03-12 | 中国人民解放军空军工程大学 | 一种组装式移动防爆墙 |
CN103912117A (zh) * | 2014-04-04 | 2014-07-09 | 华浚塑料建材有限公司 | 一种pvc建筑墙体主体模块 |
CN106193753A (zh) * | 2016-08-31 | 2016-12-07 | 中国人民解放军军事交通学院 | 一种快速架设的防爆装置及方法 |
CN106223698A (zh) * | 2016-08-31 | 2016-12-14 | 中国人民解放军军事交通学院 | 一种快速架设可循环使用的防爆装置及方法 |
CN106223235A (zh) * | 2016-08-31 | 2016-12-14 | 中国人民解放军军事交通学院 | 一种快速架设的防撞装置及方法 |
CN109252541A (zh) * | 2018-09-21 | 2019-01-22 | 中铁磁浮交通投资建设有限公司 | 一种组合装配式支挡构造 |
CN110565630A (zh) * | 2019-09-24 | 2019-12-13 | 上海市水利工程集团有限公司 | 用于河道永久护岸结构的高强度生态组合板桩 |
CN113356266A (zh) * | 2021-05-12 | 2021-09-07 | 中亿丰建设集团股份有限公司 | 一种地下工程挡土墙快速搭建结构 |
-
2002
- 2002-12-30 CN CN 02159291 patent/CN1209535C/zh not_active Expired - Fee Related
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101313112B (zh) * | 2005-11-24 | 2010-07-14 | 赫思科巴斯申有限公司 | 土石筐 |
CN102071696A (zh) * | 2010-12-30 | 2011-05-25 | 长安大学 | 陡坡防护的柔性格框及其施工方法 |
CN102767147A (zh) * | 2012-08-15 | 2012-11-07 | 新乡克瑞重型机械科技股份有限公司 | 公路交通安全防护墙体及其骨架 |
CN102776964A (zh) * | 2012-08-15 | 2012-11-14 | 新乡克瑞重型机械科技股份有限公司 | 能重复使用的防爆墙体及其骨架 |
CN103074858A (zh) * | 2013-02-05 | 2013-05-01 | 新乡克瑞重型机械科技股份有限公司 | 公路安全防撞墙体及其骨架 |
CN103352457A (zh) * | 2013-07-20 | 2013-10-16 | 陈炯辉 | 软基加固方法 |
CN103628583B (zh) * | 2013-11-12 | 2016-04-20 | 中国人民解放军空军工程大学 | 一种组装式移动防爆墙 |
CN103628583A (zh) * | 2013-11-12 | 2014-03-12 | 中国人民解放军空军工程大学 | 一种组装式移动防爆墙 |
CN103912117A (zh) * | 2014-04-04 | 2014-07-09 | 华浚塑料建材有限公司 | 一种pvc建筑墙体主体模块 |
CN106193753A (zh) * | 2016-08-31 | 2016-12-07 | 中国人民解放军军事交通学院 | 一种快速架设的防爆装置及方法 |
CN106223698A (zh) * | 2016-08-31 | 2016-12-14 | 中国人民解放军军事交通学院 | 一种快速架设可循环使用的防爆装置及方法 |
CN106223235A (zh) * | 2016-08-31 | 2016-12-14 | 中国人民解放军军事交通学院 | 一种快速架设的防撞装置及方法 |
CN109252541A (zh) * | 2018-09-21 | 2019-01-22 | 中铁磁浮交通投资建设有限公司 | 一种组合装配式支挡构造 |
CN109252541B (zh) * | 2018-09-21 | 2024-03-15 | 中铁磁浮交通投资建设有限公司 | 一种组合装配式支挡构造 |
CN110565630A (zh) * | 2019-09-24 | 2019-12-13 | 上海市水利工程集团有限公司 | 用于河道永久护岸结构的高强度生态组合板桩 |
CN113356266A (zh) * | 2021-05-12 | 2021-09-07 | 中亿丰建设集团股份有限公司 | 一种地下工程挡土墙快速搭建结构 |
Also Published As
Publication number | Publication date |
---|---|
CN1209535C (zh) | 2005-07-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1209535C (zh) | 一种塑料土工组合式档土墙 | |
US6565289B2 (en) | Self-connecting, reinforced retaining wall and masonry units therefor | |
US6896449B1 (en) | Retaining wall system | |
CN1360656A (zh) | 组合式挡土墙系统 | |
JP4782648B2 (ja) | 擁壁 | |
CN106368238B (zh) | 一种具有生态恢复功能的蜂窝土工格室挡土墙及其构筑方法 | |
AU2009323978B2 (en) | Reinforced ground structure, and siding elements for constructing same | |
WO2005028772A1 (fr) | Bloc pour mur de construction et mur construit a l'aide de ces blocs | |
KR100350625B1 (ko) | 모래포대를 이용한 분리식 보강토 옹벽 | |
CN203855974U (zh) | 三维排水柔性土工格室生态袋边坡 | |
CN110241779A (zh) | 一种生态砌块挡墙及其施工方法 | |
CN211036596U (zh) | 整体增强钢塑土工格栅 | |
CN101029490A (zh) | 一种岩/土体边坡的防护与治理方法 | |
CN1587546A (zh) | 透水留土墙体及其用途 | |
CN110629732A (zh) | 一种预制组合式河道护岸及其施工布置方法 | |
CN114016544B (zh) | 多级加筋土挡墙结构及施工方法 | |
CN217651845U (zh) | 一种装配式面板钢塑加筋土挡墙结构 | |
CN216379565U (zh) | 一种用于公路路堑渗水边坡的防护体 | |
CN100395415C (zh) | 一种建造挡土墙的方法及该方法所用挡土块 | |
CN210421133U (zh) | 桩板式挡墙绿化排水体系 | |
KR101841433B1 (ko) | 폐플라스틱 및 폐무기분말을 이용한 친환경 고강도 중력식 보강토 옹벽 블럭 | |
KR200448481Y1 (ko) | 식재 가능한 절토사면 옹벽 구조 | |
KR100404077B1 (ko) | 폐타이어를 이용한 옹벽 시공방법 | |
CN110792103A (zh) | 支护桩与管道墙体合二为一的地下管道及施工方法 | |
CN1293265C (zh) | 挡土块 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20050706 Termination date: 20100201 |