[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN1380470A - Impervious wall construction and soilslip-resisting and leakage-blocking process - Google Patents

Impervious wall construction and soilslip-resisting and leakage-blocking process Download PDF

Info

Publication number
CN1380470A
CN1380470A CN 01116418 CN01116418A CN1380470A CN 1380470 A CN1380470 A CN 1380470A CN 01116418 CN01116418 CN 01116418 CN 01116418 A CN01116418 A CN 01116418A CN 1380470 A CN1380470 A CN 1380470A
Authority
CN
China
Prior art keywords
leakage
pipe
impervious wall
wall construction
soilslip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 01116418
Other languages
Chinese (zh)
Other versions
CN1173097C (en
Inventor
李振吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI WATER CONSERVANCY ENGINEERING BUREAU
Original Assignee
HEBEI WATER CONSERVANCY ENGINEERING BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI WATER CONSERVANCY ENGINEERING BUREAU filed Critical HEBEI WATER CONSERVANCY ENGINEERING BUREAU
Priority to CNB011164182A priority Critical patent/CN1173097C/en
Publication of CN1380470A publication Critical patent/CN1380470A/en
Application granted granted Critical
Publication of CN1173097C publication Critical patent/CN1173097C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The present invention belongs to foundation stratum technology, in particular it is an avalanche prevention and leakage blocking process for cutoff wall construction. Said process can be closely combined with construction of cutoff wall, its hole interior adopts large-diameter wall-protecting pipe to make wall protection, so that it possesses the advantages of quick construction, high-efficiency, short construction period and low construction cost, etc.

Description

Impervious wall construction and soilslip-resisting and leakage-blocking process
The invention belongs to foundation treatment technology, be specifically related to a kind of impervious wall construction and soilslip-resisting and leakage-blocking process.
At present, at some reservoirs of China more serious seepage phenomenon is arranged, there is certain unsafe factor, especially in flood season, dangerous situation is bigger, therefore these reservoirs suddenly must be built impervious wall, we know that the reservoir dam ground seldom is single soil property, often by clay, sandy loam, husky, gravel, compositions such as cobble, that have even for no sand-pebble, the basement rock shallow-layer also has solution cavity, the crack, therefore can cause mud to run off in a large number, so that its liquid level is difficult to remain on predetermined height, thereby may cause that dam body caves in, the measure of taking when running into serious thief zone in the impervious wall construction process mainly contains two kinds of measures: (one) dwindles the groove segment length in conjunction with impervious wall construction, first making hole construction main aperture and leak stopping before the grooving, bore again to split and pay the hole grooving, reduce the whole groove section risk of caving in, improve concentration of hydraulic mixture in the groove during leak stopping, wash in a pan slurry when creeping into less and add in the hole, to load when clay is met serious spillage various materials etc. and in time mend slurry, though the method is convenient and easy, to the often thoroughly leak stopping of severe leakage layer, very easily cause spillage repeatedly, thus cause collapse the hole or on a large scale dam body cave in.(2) prospecting finds out that serious thief zone implements grouting treatment then before the impervious wall construction, and this kind method is not only invested greatly, and the long in time limit and restriction that is subjected to equipment is to strong seepage floor DeGrain, accident-proneness.
The object of the present invention is to provide a kind of not only quick, efficient, easy to operate but also the serious spillage stratum that runs in the impervious wall construction, strong percolation zone and solution cavity grown the tangible anti-collapse leak stopping new technology of stratum treatment effect.
The object of the present invention is achieved like this: impervious wall construction and soilslip-resisting and leakage-blocking process comprises the following steps:
A, pore-forming utilize the pore-creating of impervious wall construction machinery, and hole depth is to more than the lost-circulation zone, and aperture and impervious wall thickness are equal to;
Impervious wall construction order Drilling main aperture is pressed in b, cloth hole, splits the arrangement in secondary hole;
C, following pipe only are lowered to heavy caliber retaining wall pipe in the impervious wall main aperture, simultaneously that heavy caliber retaining wall pipe is suitable for reading temporary fixed, manage outer slit clay refilling;
Creep in d, the pipe, utilize the drilling tool that matches with heavy caliber retaining wall pipe to continue to creep into to the leakage stratum;
E, hole flushing, after being drilled into the leakage stratum, mud runs off rapidly in the pipe, continues slip casting or water filling in pipe, and boring mud is washed away, and makes leakage passage unimpeded;
F, fill out filling,, select one or more to fill out the filling material, till material feeding no longer according to the leakage degree;
G, whole hole, after filler reaches time of setting, in pipe during slip casting not spillage get final product;
H, tube drawing are extracted heavy caliber retaining wall pipe with the hydraulic pipe drawing machine.
Hole depth apart from the leakage stratum more than 2 meters.Heavy caliber retaining wall pipe is the nodular compound tube, and caliber is 273-800mm.
In filling out the filling step, serious thief zone, strong percolation zone, especially severe leakage stratum are filled out filling and can be taked following measures: (1) is pumping mud or water while back-up sand in managing in pipe, stops when water level rises in waiting to manage; (2) in pipe, fill out one or more prebagged materials; (3) impact in pipe with special drilling tool, prebagged material is stopped up leakage passage to extruding all around, filler impacts once more once more, and 2-3 time repeatedly, until no longer material feeding.
In filling out the filling step, can directly in pipe, fill out packed pea gravel concreten to connecting solution cavity, then in pipe, impact with special drilling tool, 2-3 time repeatedly, no longer till the material feeding.
Serious thief zone, strong percolation zone institute underfill material can be flocculation, quick-setting mortar, and the major ingredient component and the ratio of weight and number of described mortar are:
Water 0.7-0.8 cement 1 sand 1.5-3.0
It is auxilliary more in addition that to join by mass of cement percentage be the flocculant of 2-3% and the accelerating admixture of 1.5-4%.
The perforation solution cavity is filled out the filling material be flocculation, rapid hardening pea gravel concreten, the component of described pea gravel concreten and ratio of weight and number are:
Water 256-267 cement 366 sands 659
Stone 805 flocculants 11 accelerating admixture 8-11
The filling material is filled out on especially severe leakage stratum be flocculation soft aggregate expansive concrete, the component and the ratio of weight and number of described soft aggregate expansive concrete major ingredient are:
Water 0.65 cement 1 sand 1 soya bean 0.5-1.5
The auxilliary more in addition flocculant of by mass of cement 2-3% and the accelerating admixture of 1-3% of joining.
This technology impervious wall construction of combining closely, utilize the impervious wall construction mechanical hole building, speed of fulfiling hole is fast, and hole depth is to missing more than the stratum, spillage in having avoided creeping into, adopt the heavy caliber retaining wall to manage and protect wall in the hole and make when spillage occurring in the drilling process, be difficult for caving in, under the situation of not replenishing mud, can in pipe, take leaking-stopping measure.Simultaneously can choose the different filling materials of filling out according to different leakage degree, and realize quick filler, so this technology have quick construction, efficient, the duration is short, easy to operate, fill out advantages such as the optional scope of filling material is wide, construction cost is low, and it is serious more to have seepage, the tangible more characteristics of its superiority can solve effectively that conventional art can not solve or masty problem.This technology also is adapted to the processing of serious thief zone in the Other Engineering project.
Describe in detail below in conjunction with embodiment.
A kind of impervious wall construction and soilslip-resisting and leakage-blocking process, this technology can be undertaken by the processing step in the technique scheme, wherein the aperture is 800mm, the leakage depth of stratum is 56-58m, hole depth is to missing 2 meters more than the stratum, and heavy caliber retaining wall pipe is the nodular compound tube, and caliber is 550mm, if being serious thief zone or strong percolation zone, lost-circulation zone fills out the optional mortar of stating proportioning that takes off of filling the material, (kg/m of unit 3).Component example 1 example 2 examples 3 examples 4 water 70 70 73 80 cement 100 100 100 100 sands 300 150 200 150 flocculants 22 2.5 3 accelerating admixtures 1.5 134
If lost-circulation zone is for connecting the optional pea gravel concreten of stating proportioning that takes off of the solution cavity, (kg/m of unit 3) component example 1 example 2 water 267 256 cement 366 366 sands 659 659 stones 805 805 flocculants 11 11 accelerating admixtures 11 8
If being the leakage stratum of especially severe, lost-circulation zone can fill out the soft aggregate expansive concrete of irritating following the proportioning, (kg/m of unit 3) component example 1 example 2 examples 3 water 65 65 65 cement 100 100 100 sands 100 100 100 soya beans 50 100 150 flocculants 2 2.5 3 accelerating admixtures 1 1.5 3

Claims (8)

1, impervious wall construction and soilslip-resisting and leakage-blocking process is characterized in that this technology comprises the following steps:
A, pore-forming utilize the pore-creating of impervious wall construction machinery, and hole depth is to more than the lost-circulation zone, and aperture and impervious wall thickness are equal to;
Impervious wall construction order Drilling main aperture is pressed in b, cloth hole, splits the arrangement in secondary hole;
C, following pipe only are lowered to heavy caliber retaining wall pipe in the impervious wall main aperture, simultaneously that heavy caliber retaining wall pipe is suitable for reading temporary fixed, manage outer slit clay refilling;
Creep in d, the pipe, utilize the drilling tool that matches with heavy caliber retaining wall pipe to continue to creep into to the leakage stratum;
E, hole flushing, after being drilled into the leakage stratum, mud runs off rapidly in the pipe, continues slip casting or water filling in pipe, and boring mud is washed away, and makes leakage passage unimpeded;
F, fill out filling,, select one or more to fill out the filling material, till material feeding no longer according to the leakage degree;
G, whole hole, after filler reaches time of setting, in pipe during slip casting not spillage get final product;
H, tube drawing are extracted heavy caliber retaining wall pipe with the hydraulic pipe drawing machine.
2, impervious wall construction and soilslip-resisting and leakage-blocking process according to claim 1, it is characterized in that described hole depth apart from the leakage stratum more than 2 meters.
3, impervious wall construction and soilslip-resisting and leakage-blocking process according to claim 1 is characterized in that described heavy caliber retaining wall pipe is the nodular compound tube, and caliber is 273-800mm.
4, impervious wall construction and soilslip-resisting and leakage-blocking process according to claim 1, it is characterized in that in filling out the filling step, serious thief zone, strong percolation zone, especially severe leakage stratum are filled out filling and can be taked following measures: (1) is pumping mud or water while back-up sand in pipe in pipe, stops when water level rises in waiting to manage; (2) in pipe, fill out one or more prebagged materials; (3) impact in pipe with special drilling tool, prebagged material is stopped up leakage passage to extruding all around, filler impacts once more once more, and 2-3 time repeatedly, until no longer material feeding.
5, impervious wall construction and soilslip-resisting and leakage-blocking process according to claim 1 is characterized in that in filling out the filling step, can directly fill out packed pea gravel concreten to connecting solution cavity in pipe, then in pipe, impact with special drilling tool, and 2-3 time repeatedly, no longer till the material feeding.
6, impervious wall construction and soilslip-resisting and leakage-blocking process according to claim 4 is characterized in that serious thief zone, strong percolation zone institute underfill material can be flocculation, quick-setting mortar, and the major ingredient component and the ratio of weight and number of described mortar are:
Water 0.7-0.8 cement 1 sand 1.5-3.0
It is auxilliary more in addition that to join by mass of cement percentage be the flocculant of 2-3% and the accelerating admixture of 1.5-4%.
7, impervious wall construction and soilslip-resisting and leakage-blocking process according to claim 5 is characterized in that the perforation solution cavity is filled out the filling material is flocculation, rapid hardening pea gravel concreten, and the component of described pea gravel concreten and ratio of weight and number are:
Water 256-267 cement 366 sands 659
Stone 805 flocculants 11 accelerating admixture 8-11
8, impervious wall construction and soilslip-resisting and leakage-blocking process according to claim 4 is characterized in that the filling material is filled out on especially severe leakage stratum is flocculation soft aggregate expansive concrete, and the component and the ratio of weight and number of described soft aggregate expansive concrete major ingredient are:
Water 0.65 cement 1 sand 1 soya bean 0.5-1.5
The auxilliary more in addition flocculant of by mass of cement 2-3% and the accelerating admixture of 1-3% of joining.
CNB011164182A 2001-04-13 2001-04-13 Impervious wall construction and soilslip-resisting and leakage-blocking process Expired - Fee Related CN1173097C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB011164182A CN1173097C (en) 2001-04-13 2001-04-13 Impervious wall construction and soilslip-resisting and leakage-blocking process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB011164182A CN1173097C (en) 2001-04-13 2001-04-13 Impervious wall construction and soilslip-resisting and leakage-blocking process

Publications (2)

Publication Number Publication Date
CN1380470A true CN1380470A (en) 2002-11-20
CN1173097C CN1173097C (en) 2004-10-27

Family

ID=4662475

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB011164182A Expired - Fee Related CN1173097C (en) 2001-04-13 2001-04-13 Impervious wall construction and soilslip-resisting and leakage-blocking process

Country Status (1)

Country Link
CN (1) CN1173097C (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101235632B (en) * 2007-12-28 2010-06-02 中国水电顾问集团中南勘测设计研究院 Grouting leak-stopping technique
CN101649606B (en) * 2009-07-13 2011-07-06 黄泽普 Non-negative-pressure leak-blocking method for forming lake in karst depression
CN102587400A (en) * 2012-03-08 2012-07-18 天津建岩岩土工程有限公司 Leakage-plugging method for water-stopping curtain
CN103061670A (en) * 2013-01-06 2013-04-24 中国建筑第六工程局有限公司 Structure for preventing collapse of boreholes in pebble bed and construction method thereof
CN103074869A (en) * 2013-02-05 2013-05-01 张永忠 Dam leakage stopping method
CN103726487A (en) * 2013-12-27 2014-04-16 中国京冶工程技术有限公司厦门分公司 Leaking stoppage method for waterproof curtain
CN104563084A (en) * 2014-09-11 2015-04-29 张殿凤 Seepage-proofing and water-retaining method
CN105201001A (en) * 2015-10-10 2015-12-30 中国电建集团贵阳勘测设计研究院有限公司 Composite seepage-proofing structure of large karst cave in karst region and construction method thereof
CN106013057A (en) * 2016-06-08 2016-10-12 长江三峡勘测研究院有限公司(武汉) Method for determining deep covering layer lower slope bed rock surface impervious wall drilling
CN106049467A (en) * 2016-08-02 2016-10-26 中铁六局集团有限公司 Method for treating slurry leakage of bored pile through percussion drill under complex geology
CN106812114A (en) * 2017-03-07 2017-06-09 广东水利电力职业技术学院(广东省水利电力技工学校) A kind of erosion control method of dam concrete
CN111809606A (en) * 2020-07-21 2020-10-23 四川童燊防水工程有限公司 Basement exterior wall leaking stoppage grouting and reinforcing construction method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100387781C (en) * 2005-05-31 2008-05-14 王铁元 Antiseepage and water preserving method

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101235632B (en) * 2007-12-28 2010-06-02 中国水电顾问集团中南勘测设计研究院 Grouting leak-stopping technique
CN101649606B (en) * 2009-07-13 2011-07-06 黄泽普 Non-negative-pressure leak-blocking method for forming lake in karst depression
CN102587400B (en) * 2012-03-08 2014-05-07 天津建岩岩土工程有限公司 Leakage-plugging method for water-stopping curtain
CN102587400A (en) * 2012-03-08 2012-07-18 天津建岩岩土工程有限公司 Leakage-plugging method for water-stopping curtain
CN103061670A (en) * 2013-01-06 2013-04-24 中国建筑第六工程局有限公司 Structure for preventing collapse of boreholes in pebble bed and construction method thereof
CN103061670B (en) * 2013-01-06 2015-03-25 中国建筑第六工程局有限公司 Structure for preventing collapse of boreholes in pebble bed and construction method thereof
CN103074869A (en) * 2013-02-05 2013-05-01 张永忠 Dam leakage stopping method
CN103726487A (en) * 2013-12-27 2014-04-16 中国京冶工程技术有限公司厦门分公司 Leaking stoppage method for waterproof curtain
CN104563084A (en) * 2014-09-11 2015-04-29 张殿凤 Seepage-proofing and water-retaining method
CN105201001A (en) * 2015-10-10 2015-12-30 中国电建集团贵阳勘测设计研究院有限公司 Composite seepage-proofing structure of large karst cave in karst region and construction method thereof
CN106013057A (en) * 2016-06-08 2016-10-12 长江三峡勘测研究院有限公司(武汉) Method for determining deep covering layer lower slope bed rock surface impervious wall drilling
CN106013057B (en) * 2016-06-08 2018-03-16 长江三峡勘测研究院有限公司(武汉) A kind of method of steep dip bedrock surface Boreholing for cutoff wall under determination deep covering layer
CN106049467A (en) * 2016-08-02 2016-10-26 中铁六局集团有限公司 Method for treating slurry leakage of bored pile through percussion drill under complex geology
CN106812114A (en) * 2017-03-07 2017-06-09 广东水利电力职业技术学院(广东省水利电力技工学校) A kind of erosion control method of dam concrete
CN111809606A (en) * 2020-07-21 2020-10-23 四川童燊防水工程有限公司 Basement exterior wall leaking stoppage grouting and reinforcing construction method

Also Published As

Publication number Publication date
CN1173097C (en) 2004-10-27

Similar Documents

Publication Publication Date Title
CN101260672B (en) Weak surface rock slope grouting method and anchor tube for grouting
CN1193141C (en) Combined grouting construction process of reinforcing foundation
CN104929114A (en) High pressure jet grouting pile waterproof curtain construction device and method
CN1173097C (en) Impervious wall construction and soilslip-resisting and leakage-blocking process
CN1309909C (en) Follow-up mud jacking rotary digging drilling hole bored concrete pile technology
KR101907141B1 (en) Sealing composition for umbrella arch method and process for preparing the same
CN108086296B (en) Dynamic and static combined grouting foundation reinforcing construction method
CN110965595A (en) Raft foundation building lifting reinforcement structure and method under corrosive geological environment
CN110397056A (en) A kind of deep building pit piping method for blocking
CN102337732A (en) Seawall construction method with top pipes penetrating through block stone
CN108505514B (en) Construction method of mud retaining wall of pile foundation in complex stratum
CN107217987A (en) Colliery flood administers well boring method
CN104711973A (en) Construction method for small-diameter pile composite foundation
EA036706B1 (en) Method of limiting permeability of a matrix to limit liquid and gas inflow
CN105569071A (en) Cement-based material underwater grouting or mud-jack rock block foundation construction method
CN105064335A (en) Ultrahigh pressure rotary jet grouting method suitable for sandy cobble stratum shield end well reinforcement
CN1657711A (en) Rotary spray anchoring pile construction process
CN107587502A (en) A kind of spiral-digging pore pressure pour water soil occlusion curtain pile construction method
CN102174818A (en) Controlled impermeable leaking stoppage grout-extruding water-stopping technology of strong water permeable stratum of quaternary system
CN105672329B (en) The large size prefabricated building enclosure of deep basal pit and construction method
CN106677190A (en) Grouting construction method for underwater pebble bed foundation pit curtain
CN113982033B (en) Method for repairing hydraulic retaining wall with inclination trend by using water in post-construction structure without damage to wall
CN111254939A (en) Foundation pit enclosure strengthening method for soft soil foundation
CN109537612A (en) A kind of porous impact stirring diaphram wall Barrier Technology and its construction method
CN107975027A (en) The construction method that shield launching is reinforced with reaching end soil body

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20041027

Termination date: 20110413