CN113936833B - Automatic control method and device for permanent change state of nuclear power plant - Google Patents
Automatic control method and device for permanent change state of nuclear power plant Download PDFInfo
- Publication number
- CN113936833B CN113936833B CN202111036460.6A CN202111036460A CN113936833B CN 113936833 B CN113936833 B CN 113936833B CN 202111036460 A CN202111036460 A CN 202111036460A CN 113936833 B CN113936833 B CN 113936833B
- Authority
- CN
- China
- Prior art keywords
- item
- project
- state
- permanently changed
- changed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000008859 change Effects 0.000 title claims abstract description 193
- 238000000034 method Methods 0.000 title claims abstract description 53
- 238000012986 modification Methods 0.000 claims description 77
- 230000004048 modification Effects 0.000 claims description 77
- 238000013461 design Methods 0.000 claims description 22
- 238000013070 change management Methods 0.000 claims description 11
- 239000000463 material Substances 0.000 claims description 10
- 238000004590 computer program Methods 0.000 claims description 9
- 238000010276 construction Methods 0.000 claims description 9
- 238000012790 confirmation Methods 0.000 claims description 8
- 238000007689 inspection Methods 0.000 claims description 8
- 238000004458 analytical method Methods 0.000 claims description 6
- 238000011156 evaluation Methods 0.000 claims description 4
- 238000012545 processing Methods 0.000 description 21
- 238000010586 diagram Methods 0.000 description 16
- 238000004891 communication Methods 0.000 description 10
- 238000007726 management method Methods 0.000 description 9
- 230000006870 function Effects 0.000 description 8
- 238000005516 engineering process Methods 0.000 description 6
- 230000003287 optical effect Effects 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 4
- 230000005236 sound signal Effects 0.000 description 4
- 238000003491 array Methods 0.000 description 3
- 230000001133 acceleration Effects 0.000 description 2
- 230000000712 assembly Effects 0.000 description 2
- 238000000429 assembly Methods 0.000 description 2
- 239000000835 fiber Substances 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000003449 preventive effect Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000001902 propagating effect Effects 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 238000012550 audit Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 229910052802 copper Inorganic materials 0.000 description 1
- 239000010949 copper Substances 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 238000003384 imaging method Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 238000010561 standard procedure Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21D—NUCLEAR POWER PLANT
- G21D3/00—Control of nuclear power plant
- G21D3/001—Computer implemented control
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/10—File systems; File servers
- G06F16/14—Details of searching files based on file metadata
- G06F16/148—File search processing
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/10—File systems; File servers
- G06F16/16—File or folder operations, e.g. details of user interfaces specifically adapted to file systems
- G06F16/164—File meta data generation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Databases & Information Systems (AREA)
- General Physics & Mathematics (AREA)
- Library & Information Science (AREA)
- Human Computer Interaction (AREA)
- Plasma & Fusion (AREA)
- High Energy & Nuclear Physics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The disclosure belongs to the technical field of nuclear power, and particularly relates to an automatic control method and device for a permanent change state of a nuclear power plant. According to the method and the device, the corresponding key information of each current project state of the permanently-changed project can be detected from mass information of the nuclear power station, when the change of the key information accords with the preset condition, the current project state is automatically changed to the next project state of the current project state, automatic tracking and flow propulsion management of the permanently-changed project state are achieved, human errors are effectively avoided, the project state is accurately and timely propelled, the labor and time cost of permanently-changed management projects is greatly reduced, and the management efficiency is improved, so that safe, reliable, efficient and environment-friendly operation of the nuclear power unit is ensured.
Description
Technical Field
The invention belongs to the technical field of nuclear power, and particularly relates to an automatic control method and device for a permanent change state of a nuclear power plant.
Background
A permanent change in a nuclear power plant is a change to the production process systems, equipment/materials and structure entities and functions of the nuclear power plant that would involve modification of documentation and configuration information. The permanent change management is used for providing a standard method for controlling the physical configuration, design and power plant configuration information of the nuclear power plant, ensuring that the physical configuration, design reference and power plant configuration information of the power plant are consistent in the running, maintenance and change processes of the power plant, and ensuring that the physical configuration of the power plant is consistent with the design reference, license reference information, management requirements and permission requirements
In the related art, a IFS (Industrial and Financial Systems) system SAP (Systems Applications and Products in data processing) system and a EAM (Enterprise Asset Management) system are mainly adopted for nuclear power permanent change management. None of the above systems enable automatic management of permanently altered states. The project state change of the permanently changed project needs to be manually verified by a change management engineer whether the current flow project is completed, the state pushing condition is met, and the manual pushing operation is performed. When a change management engineer faces a plurality of change items, it is necessary to perform operations on the plurality of items one by one. The workload and error probability of the change management engineer are increased.
Disclosure of Invention
In order to overcome the problems in the related art, an automatic control method and device for the permanent change state of the nuclear power plant are provided.
According to an aspect of the disclosed embodiments, there is provided a method for automatically controlling a permanent change state of a nuclear power plant, the method comprising:
if it is detected that a responsible engineer associated with a permanently changed item is determined in the case where the item status of the permanently changed item is created, changing the item status of the permanently changed item from created to assigned;
If the project state of the permanently changed project is assigned, if the design scheme of the permanently changed project is detected to be approved and the item replacement proof analysis report of the permanently changed project is approved, changing the project state of the permanently changed project from assigned to designed;
if the project state of the permanently changed project is designed, if the state of the file related to the permanently changed project construction is detected to be in accordance with a first preset condition, changing the project state of the permanently changed project from designed to provided with a start-up condition;
if the project state of the permanently changed project is provided with a start condition, if the work order corresponding to the permanently changed project is detected to start or the permanently changed project does not correspond to the work order, changing the project state of the permanently changed project from the provided start condition to the in-process;
if the project state of the permanently changed project is in progress, if it is detected that the final administration inspection form corresponding to the permanently changed project is approved, changing the project state of the permanently changed project from in progress to approved;
if the project state of the permanently changed project is checked and accepted, if the state of the file which is related to the permanently changed project and needs to be changed is detected to meet a second preset condition, changing the project state of the permanently changed project from checked and accepted to changed;
And if the state of the file associated with the completion of the permanently changed item is detected to be in accordance with a third preset condition under the condition that the item state of the permanently changed item is changed, changing the item state of the permanently changed item from changed to closed.
In one possible implementation manner, the permanently changing the state of the project construction associated file conforms to a first preset condition, including:
the start condition confirms that the state of the sheet is approved; and
a file related to the permanent change project is selected, wherein the file related to the permanent change project comprises any one or more of ARD, ARE, ARB, BOM, a fixed value and a fixed asset; and
when the permanent change item relates to ARD, the state of ARD is any one of checking, countersignature, change checking or cancellation; and
in the case where the permanent change item involves a work order, the state of the work order is created or referenced; and
in the case that the permanent change item relates to an ARE, a BOM, and a fixed value, the state of the change form of the ARE, the change form of the BOM, and the fixed value change form is approved or cancelled.
In one possible implementation manner, the status of the file to be changed associated with the permanent change item meets a second preset condition, including:
in the case that the permanent change item relates to an ARE, a BOM and a fixed value, the states of the change application form of the ARE, the change application form of the BOM and the fixed value ARE closed; and
in the case that the permanent change item relates to an ARD, the state of the ARD large version is push release; and
and receiving that the state of the change management engineer account related to the permanent change project is closed for the modification application form of the ARE, the state of the modification application form of the BOM is closed, the state of the fixed modification application form is closed, and the state of the ARD large edition is confirmation information of push release.
In one possible implementation manner, the status of the file associated with the completion of the permanent change project meets a third preset condition, including:
the safety important modification evaluation report of the permanent change project and the completion package are issued; and
the evaluation of the permanently changed item is qualified; and
the legacy item of the permanently altered item has been closed; and
the status of the work order of the permanently changed project is any one of finished, ended, closed or cancelled; and
In the case that the permanent change project relates to the PMP, the state of the modification application form of the PMP and the modification application form of the fixed asset is closed; and
in the event that the permanent change project involves an ARD, a large version of the ARD has been published; and
in the event that the permanent change item relates to an ARB, the status of the ARB's modification application form is closed and the material code is hooked with the BOM.
In one possible implementation, the method further includes:
judging whether the permanently changed item relates to an ARE, a BOM, a fixed value or an ARD or not when the item status of the permanently changed item is checked;
if the permanent change project is judged to relate to ARE and BOM, the states of the ARE modification application form, the BOM modification application form and the fixed value modification application form ARE modifiable;
if the permanently changed item is judged to relate to the ARD, the large version of the ARD starts the modification and approval pushing flow.
In one possible implementation, the method further includes:
if the project state of the permanent change project is checked and accepted, if the permanent change project is judged to relate to the PMP and the fixed asset, and the state of a modification application form of the PMP and a modification application form of the fixed asset is approved, the state of the modification application form of the PMP and the modification application form of the fixed asset is a modifiable state;
If the item status of the permanently changed item is checked, if it is determined that the permanently changed item relates to an ARB and that the modification relating to the ARB has been completed, it is determined whether the material code is hooked with the BOM.
In one possible implementation, the method further includes:
if the item status of the permanently changed item is changed, prohibiting reference to an ARD if the permanently changed item relates to the ARD;
if the item status of the permanent change item is changed, if the permanent change item is ARE, BOM, ARB and a fixed value, the creation of an ARE modification application form, a BOM modification application form, an ARB modification application form, and a fixed value modification application form is prohibited.
In one possible implementation, the method further includes:
if the item status of the permanent change item is closed, prohibiting a reference to an ARD if the permanent change item relates to the ARD;
if the project state of the permanent change project is closed, if the permanent change project relates to PMP and fixed asset, prohibiting creation of a modification application form of PMP and a modification application form of fixed asset;
And prohibiting the creation of the work order of the permanently changed item under the condition that the item state of the permanently changed item is closed.
According to another aspect of the disclosed embodiments, there is provided a nuclear power plant permanent change state automation control device, the device including:
a first changing module, configured to, if it is detected that a responsible engineer associated with a permanently changed item is determined in a case where the item status of the permanently changed item is created, change the item status of the permanently changed item from created to assigned;
a second change module configured to change, if it is detected that the design of the permanent change item is approved and the item replacement proof analysis report of the permanent change item is approved, the item status of the permanent change item from assigned to designed if the item status of the permanent change item is assigned;
a third changing module, configured to, when it is detected that the state of the file associated with the construction of the permanently changed project meets a first preset condition, change the project state of the permanently changed project from being designed to having a start-up condition;
A fourth changing module, configured to, when the item status of the permanently changed item is that the start-up condition is provided, change the item status of the permanently changed item from that provided with the start-up condition to in-service if it is detected that the work order corresponding to the permanently changed item is started up or that the permanently changed item does not correspond to the work order;
a fifth changing module, configured to, when it is detected that a final administration inspection form corresponding to the permanently changed item is approved, change the item status of the permanently changed item from being in execution to being accepted, if the item status of the permanently changed item is in execution;
a sixth changing module, configured to, when the item status of the permanently changed item is checked, change the item status of the permanently changed item from checked to changed if it is detected that the status of the file to be changed associated with the permanently changed item meets a second preset condition;
a seventh changing module, configured to, when the item status of the permanently changed item is changed, change the item status of the permanently changed item from changed to closed if it is detected that the status of the file associated with the completion of the permanently changed item meets a third preset condition.
According to another aspect of the disclosed embodiments, there is provided a nuclear power plant permanent change state automation control device, the device including:
a processor;
a memory for storing processor-executable instructions;
wherein the processor is configured to perform the above-described method.
According to another aspect of the disclosed embodiments, there is provided a non-transitory computer readable storage medium having stored thereon computer program instructions which, when executed by a processor, implement the above-described method.
The beneficial effects of the present disclosure are: according to the method and the device, the corresponding key information of each current project state of the permanently-changed project can be detected from mass information of the nuclear power station, when the change of the key information accords with the preset condition, the current project state is automatically changed to the next project state of the current project state, automatic tracking and flow propulsion management of the permanently-changed project state are achieved, human errors are effectively avoided, the project state is accurately and timely propelled, the labor and time cost of permanently-changed management projects is greatly reduced, and the management efficiency is improved, so that safe, reliable, efficient and environment-friendly operation of the nuclear power unit is ensured.
Drawings
FIG. 1 is a flow chart illustrating a method of automated control of a permanent change state of a nuclear power plant, according to an exemplary embodiment.
FIG. 2 is a block diagram illustrating a nuclear power plant permanent change state automation control device, according to an example embodiment.
FIG. 3 is a block diagram illustrating a nuclear power plant permanent change state automation control device, according to an example embodiment.
FIG. 4 is a block diagram illustrating a nuclear power plant permanent change state automation control device, according to an example embodiment.
Detailed Description
The invention will be described in further detail with reference to the accompanying drawings and specific examples.
FIG. 1 is a flow chart illustrating a method of automated control of a permanent change state of a nuclear power plant, according to an exemplary embodiment. The method may be executed by a terminal device, for example, the terminal device may be a server, a desktop computer, a notebook computer, or a system cluster formed by any one or more devices of the server, the desktop computer, and the notebook computer, and the embodiment of the disclosure does not limit the type of the terminal device. As shown in fig. 1, the method may include:
In the present disclosure, each permanent change item may include a plurality of interrelated item states, wherein an initial state has been created that may be represented as a permanent change item, indicating that the permanent change item has been created. For example, a business person may generate an application for a permanent change item in the system, which may be automatically associated with a change application number by changing the application's legislation into a permanent change item after the application is approved by the associated auditor. As another example, business personnel may create permanent change items directly in the system.
In the case where the project state of the permanent change project is created, the system may determine whether the responsibility engineer is determined, for example, whether the responsibility engineer is determined to be a field value of a field associated with the responsibility engineer, and after detecting that the field associated with the responsibility engineer has a field value, the system may confirm that the responsibility engineer of the permanent change project is determined. Wherein, the responsibility engineer can be expressed as a person managing and coordinating the permanently changed project, and the fields associated with the responsibility engineer can include the name, the work number, the department and the like of the responsibility engineer.
After confirming that the responsibility engineer for the permanent change project is determined, the system may fully indicate that the permanent change project has been assigned to a particular responsibility engineer, and the system may change the project state of the permanent change project from created to assigned, which may indicate that the permanent change project has been assigned to the corresponding responsibility engineer.
for example, the system may detect whether a design field of a permanent change item has a field value if the item status of the permanent change item is assigned, confirm that the design of the permanent change item is approved if the field value of the design field indicates that the design is approved (e.g., the field value is approved, passed, etc., indicating that the design is approved), and detect a field value corresponding to the design field with a preset frequency if the field value of the design field indicates that the design is not approved until the field value of the design is changed to indicate that the design is approved.
Wherein the designed may be represented as the permanent change project already having a design. The approval of the design of the permanent change item may be sufficient to indicate that the permanent change item already has a satisfactory design.
And 102, when the project state of the permanently changed project is designed, if the state of the file related to the permanently changed project construction is detected to be in accordance with a first preset condition, changing the project state of the permanently changed project from designed to provided with a start-up condition.
As an example of the present embodiment, the status of the file associated with the permanent change project construction meets the first preset condition, including the following situations:
the status of the start condition confirmation ticket is approved, e.g., the system detects that the field value of the start condition confirmation ticket field indicates that the start condition confirmation ticket is approved, where the start condition confirmation ticket may be represented as a file describing whether the permanent change item has a start condition.
The file Related to the permanent change item is selected, and the file Related to the permanent change item includes any one or more of ARD (Affected file), ARE (Affected device, affected & Related Equipment), ARB (Affected device Material, affected & Related Material/Bom), bom (Bill of Material), constant (constant Related to the permanent change item), and fixed asset, wherein a responsibility engineer can select the file Related to the permanent change item according to the permanent change item.
When the permanent change item relates to an ARD, the state of the ARD is any one of checking, countersignature, change checking, and cancellation.
In the case where the permanent change item relates to a work order, the state of the work order is created or referenced.
In the case that the permanent change item relates to an ARE, a BOM, and a fixed value, the state of the change form of the ARE, the change form of the BOM, and the fixed value change form is approved or cancelled.
The provision of the start-up condition indicates that the objective condition associated with the permanently changed item meets the relevant specification and the start-up is possible. The file related to the permanent change project covers various objective conditions required by the start of the permanent change project, and can clearly indicate that the permanent change project can be started.
In this case, the implementation may be expressed as a permanent change item being implemented. When the work order corresponding to the permanently changed item is changed, the work order start can clearly indicate that the permanently changed item is being implemented, and when the permanently changed item does not need the work order, the permanently changed item with the start condition can be automatically converted into the implementation. Therefore, the method and the device have the advantages that two situations of requiring a work order and not requiring the work order in the permanent change project are considered, and the automatic pushing of the permanent change project flow in different situations can be adapted more flexibly and accurately.
the final commissioning inspection sheet is used for describing the commissioned situation of the permanently-changed object, the final commissioning inspection sheet is approved to clearly indicate that the commissioned situation of the permanently-changed object meets the requirement, and the project state of the permanently-changed project can be changed from implementation to acceptance.
as an example of this embodiment, the status of the file to be changed associated with the permanent change item meets the second preset condition, including the following situations:
in the case that the permanent change item relates to an ARE, a BOM, and a fixed value, the state of the change form of the ARE, the change form of the BOM, and the fixed value change form is closed.
In the case where the permanent change item relates to ARD, the state of the ARD large version is push release.
And receiving that the state of the change management engineer account related to the permanent change project is closed for the modification application form of the ARE, the state of the modification application form of the BOM is closed, the state of the fixed modification application form is closed, and the state of the ARD large edition is confirmation information of push release. In this way, the present disclosure ensures the accuracy of project progress through the dual confirmation of the detection of the objective state of the files requiring change associated with the permanently changed project and the audit of the files requiring change associated with the permanently changed project by the change management engineer.
In one possible implementation manner, the system can uniformly push the state of the change application form of the ARE, the state of the change application form of the BOM, the state of the fixed value change application form and the state of the ARD large version to the account number of the change management engineer associated with the permanent change project so as to ensure that the change management project can timely and comprehensively know the state of the file associated with the permanent change project and needing to be changed to make quick and accurate judgment.
And step 106, when the item state of the permanently changed item is changed, if the state of the file associated with the completion of the permanently changed item is detected to be in accordance with a third preset condition, changing the item state of the permanently changed item from changed to closed.
As an example of this embodiment, the status of the file associated with the completion of the permanent change item meets a third preset condition, including the following situations:
the security-important modification of the permanently altered project evaluates the report and the finished package has been released.
And evaluating the permanently changed item as qualified.
The legacy item of the permanently altered item has been closed.
The status of the work order of the permanently changed project is any one of finished, ended, closed or cancelled.
In the case where the permanent change project involves PMP (preventive maintenance outline, preventive Maintenance Program), the status of the modification application form of PMP and the modification application form of fixed asset is closed.
In the event that the permanent change item relates to an ARD, a large version of the ARD has been published.
In the event that the permanent change item relates to an ARB, the status of the ARB's modification application form is closed and the material code is hooked with the BOM.
The state of the file associated with the completion of the permanent change project covers various objective conditions associated with the closing of the permanent change project, and can clearly indicate that the permanent change project can be closed.
In one possible implementation, the method further includes: judging whether the permanently changed item relates to an ARE, a BOM, a fixed value or an ARD or not when the item status of the permanently changed item is checked; if the permanent change project is judged to relate to ARE and BOM, the states of the ARE modification application form, the BOM modification application form and the fixed value modification application form ARE modifiable; if the permanently changed item is judged to relate to the ARD, the large version of the ARD starts the modification and approval pushing flow. In this way, the present disclosure may automatically trigger and open a modification application form for an ARE, a modification application form for a BOM and a modification application form for a fixed value after the project status of a permanently changed project is checked and it is confirmed that the permanently changed project relates to the ARE, the BOM, the fixed value or the ARD, and trigger a large version of the ARD to start a modification and approval pushing procedure.
In one possible implementation, the method further includes: if the project state of the permanent change project is checked and accepted, if the permanent change project is judged to relate to the PMP and the fixed asset, and the state of a modification application form of the PMP and a modification application form of the fixed asset is approved, the state of the modification application form of the PMP and the modification application form of the fixed asset is a modifiable state; if the item status of the permanently changed item is checked, if it is determined that the permanently changed item relates to an ARB and that the modification relating to the ARB has been completed, it is determined whether the material code is hooked with the BOM. In this way, the present disclosure may confirm that the permanent change project relates to the PMP and the fixed asset when the project status of the permanent change project is checked, and trigger the modification of the modification application form of the PMP and the modification application form of the fixed asset to be opened when the status of the modification application form of the PMP and the modification application form of the fixed asset is approved.
In one possible implementation, the method further includes: if the item status of the permanently changed item is changed, prohibiting reference to an ARD if the permanently changed item relates to the ARD; if the item status of the permanent change item is changed, if the permanent change item is ARE, BOM, ARB and a fixed value, the creation of an ARE modification application form, a BOM modification application form, an ARB modification application form, and a fixed value modification application form is prohibited. Therefore, the method and the device can logically lock the changed file under the condition that the related file of the permanently changed project is changed, and prevent the changed file from being edited and modified again, thereby effectively preventing the changed file information from being tampered.
In one possible implementation, the method further includes: if the item status of the permanent change item is closed, prohibiting a reference to an ARD if the permanent change item relates to the ARD; if the project state of the permanent change project is closed, if the permanent change project relates to PMP and fixed asset, prohibiting creation of a modification application form of PMP and a modification application form of fixed asset; and prohibiting the creation of the work order of the permanently changed item under the condition that the item state of the permanently changed item is closed. Thus, the present disclosure can logically lock related files in the event that a permanently altered item has been closed, preventing such file information from being tampered with.
FIG. 2 is a block diagram illustrating a nuclear power plant permanent change state automation control device, according to an example embodiment. As shown in fig. 2, the apparatus may include:
a first changing module, configured to, if it is detected that a responsible engineer associated with a permanently changed item is determined in a case where the item status of the permanently changed item is created, change the item status of the permanently changed item from created to assigned;
A second change module configured to change, if it is detected that the design of the permanent change item is approved and the item replacement proof analysis report of the permanent change item is approved, the item status of the permanent change item from assigned to designed if the item status of the permanent change item is assigned;
a third changing module, configured to, when it is detected that the state of the file associated with the construction of the permanently changed project meets a first preset condition, change the project state of the permanently changed project from being designed to having a start-up condition;
a fourth changing module, configured to, when the item status of the permanently changed item is that the start-up condition is provided, change the item status of the permanently changed item from that provided with the start-up condition to in-service if it is detected that the work order corresponding to the permanently changed item is started up or that the permanently changed item does not correspond to the work order;
a fifth changing module, configured to, when it is detected that a final administration inspection form corresponding to the permanently changed item is approved, change the item status of the permanently changed item from being in execution to being accepted, if the item status of the permanently changed item is in execution;
A sixth changing module, configured to, when the item status of the permanently changed item is checked, change the item status of the permanently changed item from checked to changed if it is detected that the status of the file to be changed associated with the permanently changed item meets a second preset condition;
a seventh changing module, configured to, when the item status of the permanently changed item is changed, change the item status of the permanently changed item from changed to closed if it is detected that the status of the file associated with the completion of the permanently changed item meets a third preset condition.
The description of the above apparatus is already described in detail in the description of the above method, and will not be repeated here.
FIG. 3 is a block diagram illustrating a nuclear power plant permanent change state automation control device, according to an example embodiment. For example, apparatus 800 may be a mobile phone, computer, digital broadcast terminal, messaging device, game console, tablet device, medical device, exercise device, personal digital assistant, or the like.
Referring to fig. 3, apparatus 800 may include one or more of the following components: a processing component 802, a memory 804, a power component 806, a multimedia component 808, an audio component 810, an input/output (I/O) interface 812, a sensor component 814, and a communication component 816.
The processing component 802 generally controls overall operation of the apparatus 800, such as operations associated with display, telephone calls, data communications, camera operations, and recording operations. The processing component 802 may include one or more processors 820 to execute instructions to perform all or part of the steps of the apparatus described above. Further, the processing component 802 can include one or more modules that facilitate interactions between the processing component 802 and other components. For example, the processing component 802 can include a multimedia module to facilitate interaction between the multimedia component 808 and the processing component 802.
The memory 804 is configured to store various types of data to support operations at the apparatus 800. Examples of such data include instructions for any application or device operating on device 800, contact data, phonebook data, messages, pictures, videos, and the like. The memory 804 may be implemented by any type or combination of volatile or nonvolatile memory devices such as Static Random Access Memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, magnetic or optical disk.
The power supply component 806 provides power to the various components of the device 800. The power components 806 may include a power management system, one or more power sources, and other components associated with generating, managing, and distributing power for the device 800.
The multimedia component 808 includes a screen between the device 800 and the user that provides an output interface. In some embodiments, the screen may include a Liquid Crystal Display (LCD) and a Touch Panel (TP). If the screen includes a touch panel, the screen may be implemented as a touch screen to receive input signals from a user. The touch panel includes one or more touch sensors to sense touches, swipes, and gestures on the touch panel. The touch sensor may sense not only the boundary of a touch or sliding action, but also the duration and pressure associated with the touch or sliding operation. In some embodiments, the multimedia component 808 includes a front camera and/or a rear camera. The front camera and/or the rear camera may receive external multimedia data when the apparatus 800 is in an operational mode, such as a photographing mode or a video mode. Each front camera and rear camera may be a fixed optical lens system or have focal length and optical zoom capabilities.
The audio component 810 is configured to output and/or input audio signals. For example, the audio component 810 includes a Microphone (MIC) configured to receive external audio signals when the device 800 is in an operational mode, such as a call mode, a recording mode, and a voice recognition mode. The received audio signals may be further stored in the memory 804 or transmitted via the communication component 816. In some embodiments, audio component 810 further includes a speaker for outputting audio signals.
The I/O interface 812 provides an interface between the processing component 802 and peripheral interface modules, which may be a keyboard, click wheel, buttons, etc. These buttons may include, but are not limited to: homepage button, volume button, start button, and lock button.
The sensor assembly 814 includes one or more sensors for providing status assessment of various aspects of the apparatus 800. For example, the sensor assembly 814 may detect an on/off state of the device 800, a relative positioning of the assemblies, such as a display and keypad of the device 800, the sensor assembly 814 may also detect a change in position of the device 800 or one of the assemblies of the device 800, the presence or absence of user contact with the device 800, an orientation or acceleration/deceleration of the device 800, and a change in temperature of the device 800. The sensor assembly 814 may include a proximity sensor configured to detect the presence of nearby objects without any physical contact. The sensor assembly 814 may also include a light sensor, such as a CMOS or CCD image sensor, for use in imaging applications. In some embodiments, the sensor assembly 814 may also include an acceleration sensor, a gyroscopic sensor, a magnetic sensor, a pressure sensor, or a temperature sensor.
The communication component 816 is configured to facilitate communication between the apparatus 800 and other devices, either in a wired or wireless manner. The device 800 may access a wireless network based on a communication standard, such as WiFi,2G or 3G, or a combination thereof. In one exemplary embodiment, the communication component 816 receives broadcast signals or broadcast related information from an external broadcast management system via a broadcast channel. In one exemplary embodiment, the communication component 816 further includes a Near Field Communication (NFC) module to facilitate short range communications. For example, the NFC module may be implemented based on Radio Frequency Identification (RFID) technology, infrared data association (IrDA) technology, ultra Wideband (UWB) technology, bluetooth (BT) technology, and other technologies.
In an exemplary embodiment, the apparatus 800 may be implemented by one or more Application Specific Integrated Circuits (ASICs), digital Signal Processors (DSPs), digital Signal Processing Devices (DSPDs), programmable Logic Devices (PLDs), field Programmable Gate Arrays (FPGAs), controllers, microcontrollers, microprocessors, or other electronic elements for executing the methods described above.
In an exemplary embodiment, a non-transitory computer readable storage medium is also provided, such as memory 804 including computer program instructions executable by processor 820 of apparatus 800 to perform the above-described methods.
FIG. 4 is a block diagram illustrating a nuclear power plant permanent change state automation control device, according to an example embodiment. For example, the apparatus 1900 may be provided as a server. Referring to fig. 4, the apparatus 1900 includes a processing component 1922 that further includes one or more processors and memory resources represented by memory 1932 for storing instructions, such as application programs, that are executable by the processing component 1922. The application programs stored in memory 1932 may include one or more modules each corresponding to a set of instructions. Further, processing component 1922 is configured to execute instructions to perform the methods described above.
The apparatus 1900 may further include a power component 1926 configured to perform power management of the apparatus 1900, a wired or wireless network interface 1950 configured to connect the apparatus 1900 to a network, and an input/output (I/O) interface 1958. The device 1900 may operate based on an operating system stored in memory 1932, such as Windows Server, mac OS XTM, unixTM, linuxTM, freeBSDTM, or the like.
In an exemplary embodiment, a non-transitory computer readable storage medium is also provided, such as memory 1932, including computer program instructions executable by processing component 1922 of apparatus 1900 to perform the above-described methods.
The present disclosure may be a system, method, and/or computer program product. The computer program product may include a computer readable storage medium having computer readable program instructions embodied thereon for causing a processor to implement aspects of the present disclosure.
The computer readable storage medium may be a tangible device that can hold and store instructions for use by an instruction execution device. The computer readable storage medium may be, for example, but not limited to, an electronic storage device, a magnetic storage device, an optical storage device, an electromagnetic storage device, a semiconductor storage device, or any suitable combination of the foregoing. More specific examples (a non-exhaustive list) of the computer-readable storage medium would include the following: portable computer disks, hard disks, random Access Memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), static Random Access Memory (SRAM), portable compact disk read-only memory (CD-ROM), digital Versatile Disks (DVD), memory sticks, floppy disks, mechanical coding devices, punch cards or in-groove structures such as punch cards or grooves having instructions stored thereon, and any suitable combination of the foregoing. Computer-readable storage media, as used herein, are not to be construed as transitory signals per se, such as radio waves or other freely propagating electromagnetic waves, electromagnetic waves propagating through waveguides or other transmission media (e.g., optical pulses through fiber optic cables), or electrical signals transmitted through wires.
The computer readable program instructions described herein may be downloaded from a computer readable storage medium to a respective computing/processing device or to an external computer or external storage device over a network, such as the internet, a local area network, a wide area network, and/or a wireless network. The network may include copper transmission cables, fiber optic transmissions, wireless transmissions, routers, firewalls, switches, gateway computers and/or edge servers. The network interface card or network interface in each computing/processing device receives computer readable program instructions from the network and forwards the computer readable program instructions for storage in a computer readable storage medium in the respective computing/processing device.
Computer program instructions for performing the operations of the present disclosure can be assembly instructions, instruction Set Architecture (ISA) instructions, machine-related instructions, microcode, firmware instructions, state setting data, or source or object code written in any combination of one or more programming languages, including an object oriented programming language such as Smalltalk, c++ or the like and conventional procedural programming languages, such as the "C" programming language or similar programming languages. The computer readable program instructions may be executed entirely on the user's computer, partly on the user's computer, as a stand-alone software package, partly on the user's computer and partly on a remote computer or entirely on the remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any kind of network, including a Local Area Network (LAN) or a Wide Area Network (WAN), or may be connected to an external computer (for example, through the Internet using an Internet service provider). In some embodiments, aspects of the present disclosure are implemented by personalizing electronic circuitry, such as programmable logic circuitry, field Programmable Gate Arrays (FPGAs), or Programmable Logic Arrays (PLAs), with state information of computer readable program instructions, which can execute the computer readable program instructions.
Various aspects of the present disclosure are described herein with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems) and computer program products according to embodiments of the disclosure. It will be understood that each block of the flowchart illustrations and/or block diagrams, and combinations of blocks in the flowchart illustrations and/or block diagrams, can be implemented by computer-readable program instructions.
These computer readable program instructions may be provided to a processor of a general purpose computer, special purpose computer, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions/acts specified in the flowchart and/or block diagram block or blocks. These computer readable program instructions may also be stored in a computer readable storage medium that can direct a computer, programmable data processing apparatus, and/or other devices to function in a particular manner, such that the computer readable medium having the instructions stored therein includes an article of manufacture including instructions which implement the function/act specified in the flowchart and/or block diagram block or blocks.
The computer readable program instructions may also be loaded onto a computer, other programmable data processing apparatus, or other devices to cause a series of operational steps to be performed on the computer, other programmable apparatus or other devices to produce a computer implemented process such that the instructions which execute on the computer, other programmable apparatus or other devices implement the functions/acts specified in the flowchart and/or block diagram block or blocks.
The flowcharts and block diagrams in the figures illustrate the architecture, functionality, and operation of possible implementations of systems, methods and computer program products according to various embodiments of the present disclosure. In this regard, each block in the flowchart or block diagrams may represent a module, segment, or portion of instructions, which comprises one or more executable instructions for implementing the specified logical function(s). In some alternative implementations, the functions noted in the block may occur out of the order noted in the figures. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved. It will also be noted that each block of the block diagrams and/or flowchart illustration, and combinations of blocks in the block diagrams and/or flowchart illustration, can be implemented by special purpose hardware-based systems which perform the specified functions or acts, or combinations of special purpose hardware and computer instructions.
The foregoing description of the embodiments of the present disclosure has been presented for purposes of illustration and description, and is not intended to be exhaustive or limited to the embodiments disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the various embodiments described. The terminology used herein was chosen in order to best explain the principles of the embodiments, the practical application, or the technical improvement of the technology in the marketplace, or to enable others of ordinary skill in the art to understand the embodiments disclosed herein.
Claims (11)
1. An automated control method for a permanent change state of a nuclear power plant, the method comprising:
if it is detected that a responsible engineer associated with a permanently changed item is determined in the case where the item status of the permanently changed item is created, changing the item status of the permanently changed item from created to assigned;
if the project state of the permanently changed project is assigned, if the design scheme of the permanently changed project is detected to be approved and the item replacement proof analysis report of the permanently changed project is approved, changing the project state of the permanently changed project from assigned to designed;
If the project state of the permanently changed project is designed, if the state of the file related to the permanently changed project construction is detected to be in accordance with a first preset condition, changing the project state of the permanently changed project from designed to provided with a start-up condition;
if the project state of the permanently changed project is provided with a start condition, if the work order corresponding to the permanently changed project is detected to start or the permanently changed project does not correspond to the work order, changing the project state of the permanently changed project from the provided start condition to the in-process;
if the project state of the permanently changed project is in progress, if it is detected that the final administration inspection form corresponding to the permanently changed project is approved, changing the project state of the permanently changed project from in progress to approved;
if the project state of the permanently changed project is checked and accepted, if the state of the file which is related to the permanently changed project and needs to be changed is detected to meet a second preset condition, changing the project state of the permanently changed project from checked and accepted to changed;
and if the state of the file associated with the completion of the permanently changed item is detected to be in accordance with a third preset condition under the condition that the item state of the permanently changed item is changed, changing the item state of the permanently changed item from changed to closed.
2. The method of claim 1, wherein the status of the file associated with the permanent change project construction meets a first preset condition, comprising:
the start condition confirms that the state of the sheet is approved; and
a file related to the permanent change project is selected, wherein the file related to the permanent change project comprises any one or more of ARD, ARE, ARB, BOM, a fixed value and a fixed asset; and
when the permanent change item relates to ARD, the state of ARD is any one of checking, countersignature, change checking or cancellation; and
in the case where the permanent change item involves a work order, the state of the work order is created or referenced; and
in the case that the permanent change item relates to an ARE, a BOM, and a fixed value, the state of the change form of the ARE, the change form of the BOM, and the fixed value change form is approved or cancelled.
3. The method of claim 1, wherein the status of the files associated with the permanent change item that need to be changed meets a second preset condition, comprising:
in the case that the permanent change item relates to an ARE, a BOM and a fixed value, the states of the change application form of the ARE, the change application form of the BOM and the fixed value ARE closed; and
In the case that the permanent change item relates to an ARD, the state of the ARD large version is push release; and
and receiving that the state of the change management engineer account related to the permanent change project is closed for the modification application form of the ARE, the state of the modification application form of the BOM is closed, the state of the fixed modification application form is closed, and the state of the ARD large edition is confirmation information of push release.
4. The method of claim 1, wherein the status of the file associated with the completion of the permanent change project meets a third predetermined condition, comprising:
the safety important modification evaluation report of the permanent change project and the completion package are issued; and
the evaluation of the permanently changed item is qualified; and
the legacy item of the permanently altered item has been closed; and
the status of the work order of the permanently changed project is any one of finished, ended, closed or cancelled; and
in the case that the permanent change project relates to the PMP, the state of the modification application form of the PMP and the modification application form of the fixed asset is closed; and
in the event that the permanent change project involves an ARD, a large version of the ARD has been published; and
In the event that the permanent change item relates to an ARB, the status of the ARB's modification application form is closed and the material code is hooked with the BOM.
5. The method according to claim 1, wherein the method further comprises:
judging whether the permanently changed item relates to an ARE, a BOM, a fixed value or an ARD or not when the item status of the permanently changed item is checked;
if the permanent change project is judged to relate to ARE and BOM, the states of the ARE modification application form, the BOM modification application form and the fixed value modification application form ARE modifiable;
if the permanently changed item is judged to relate to the ARD, the large version of the ARD starts the modification and approval pushing flow.
6. The method according to claim 1, wherein the method further comprises:
if the project state of the permanent change project is checked and accepted, if the permanent change project is judged to relate to the PMP and the fixed asset, and the state of a modification application form of the PMP and a modification application form of the fixed asset is approved, the state of the modification application form of the PMP and the modification application form of the fixed asset is a modifiable state;
if the item status of the permanently changed item is checked, if it is determined that the permanently changed item relates to an ARB and that the modification relating to the ARB has been completed, it is determined whether the material code is hooked with the BOM.
7. The method according to claim 1, wherein the method further comprises:
if the item status of the permanently changed item is changed, prohibiting reference to an ARD if the permanently changed item relates to the ARD;
if the item status of the permanent change item is changed, if the permanent change item is ARE, BOM, ARB and a fixed value, the creation of an ARE modification application form, a BOM modification application form, an ARB modification application form, and a fixed value modification application form is prohibited.
8. The method according to claim 1, wherein the method further comprises:
if the item status of the permanent change item is closed, prohibiting a reference to an ARD if the permanent change item relates to the ARD;
if the project state of the permanent change project is closed, if the permanent change project relates to PMP and fixed asset, prohibiting creation of a modification application form of PMP and a modification application form of fixed asset;
and prohibiting the creation of the work order of the permanently changed item under the condition that the item state of the permanently changed item is closed.
9. An automated control device for permanently changing status of a nuclear power plant, the device comprising:
A first changing module, configured to, if it is detected that a responsible engineer associated with a permanently changed item is determined in a case where the item status of the permanently changed item is created, change the item status of the permanently changed item from created to assigned;
a second change module configured to change, if it is detected that the design of the permanent change item is approved and the item replacement proof analysis report of the permanent change item is approved, the item status of the permanent change item from assigned to designed if the item status of the permanent change item is assigned;
a third changing module, configured to, when it is detected that the state of the file associated with the construction of the permanently changed project meets a first preset condition, change the project state of the permanently changed project from being designed to having a start-up condition;
a fourth changing module, configured to, when the item status of the permanently changed item is that the start-up condition is provided, change the item status of the permanently changed item from that provided with the start-up condition to in-service if it is detected that the work order corresponding to the permanently changed item is started up or that the permanently changed item does not correspond to the work order;
A fifth changing module, configured to, when it is detected that a final administration inspection form corresponding to the permanently changed item is approved, change the item status of the permanently changed item from being in execution to being accepted, if the item status of the permanently changed item is in execution;
a sixth changing module, configured to, when the item status of the permanently changed item is checked, change the item status of the permanently changed item from checked to changed if it is detected that the status of the file to be changed associated with the permanently changed item meets a second preset condition;
a seventh changing module, configured to, when the item status of the permanently changed item is changed, change the item status of the permanently changed item from changed to closed if it is detected that the status of the file associated with the completion of the permanently changed item meets a third preset condition.
10. An automated control device for permanently changing status of a nuclear power plant, the device comprising:
a processor;
a memory for storing processor-executable instructions;
wherein the processor is configured to perform the method of any one of claims 1 to 8.
11. A non-transitory computer readable storage medium having stored thereon computer program instructions, which when executed by a processor, implement the method of any of claims 1 to 8.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111036460.6A CN113936833B (en) | 2021-09-06 | 2021-09-06 | Automatic control method and device for permanent change state of nuclear power plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111036460.6A CN113936833B (en) | 2021-09-06 | 2021-09-06 | Automatic control method and device for permanent change state of nuclear power plant |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113936833A CN113936833A (en) | 2022-01-14 |
CN113936833B true CN113936833B (en) | 2023-06-13 |
Family
ID=79275093
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111036460.6A Active CN113936833B (en) | 2021-09-06 | 2021-09-06 | Automatic control method and device for permanent change state of nuclear power plant |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113936833B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0588707A (en) * | 1991-09-25 | 1993-04-09 | Hitachi Ltd | Plant operation automating device |
JP2005157550A (en) * | 2003-11-21 | 2005-06-16 | Takenaka Komuten Co Ltd | Building evaluating device and its method, and building evaluating program |
CN101655932A (en) * | 2008-08-22 | 2010-02-24 | 环达电脑(上海)有限公司 | Project progress tracking system and method thereof |
CN105160467A (en) * | 2015-08-26 | 2015-12-16 | 长安马自达汽车有限公司 | Engineering change control management system and method therefor |
CN105893050A (en) * | 2016-04-05 | 2016-08-24 | 延锋伟世通电子科技(南京)有限公司 | Method for carrying out overall lifecycle management on software project based on project lifecycle management (PLMS), subversion (SVN) and Jenkins |
CN111339171A (en) * | 2020-02-07 | 2020-06-26 | 拉扎斯网络科技(上海)有限公司 | Data query method, device and equipment |
CN112712300A (en) * | 2021-02-03 | 2021-04-27 | 浙江交工集团股份有限公司 | BIM + GIS construction project management system based on B/S information system |
CN112967025A (en) * | 2020-07-09 | 2021-06-15 | 北京中百信信息技术股份有限公司 | Information engineering supervision project image progress management system |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW200428250A (en) * | 2003-06-06 | 2004-12-16 | Hon Hai Prec Ind Co Ltd | A project control system and method |
US20050240458A1 (en) * | 2004-04-23 | 2005-10-27 | Lucent Technologies, Inc. | Methods and apparatus for transaction and project management |
US7937349B2 (en) * | 2006-11-09 | 2011-05-03 | Pucher Max J | Method for training a system to specifically react on a specific input |
US20190220936A1 (en) * | 2015-08-22 | 2019-07-18 | Salim B. KHALIL | Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods |
US20200327116A1 (en) * | 2017-10-03 | 2020-10-15 | Lyconos, Inc. | Systems and methods for document automation |
-
2021
- 2021-09-06 CN CN202111036460.6A patent/CN113936833B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0588707A (en) * | 1991-09-25 | 1993-04-09 | Hitachi Ltd | Plant operation automating device |
JP2005157550A (en) * | 2003-11-21 | 2005-06-16 | Takenaka Komuten Co Ltd | Building evaluating device and its method, and building evaluating program |
CN101655932A (en) * | 2008-08-22 | 2010-02-24 | 环达电脑(上海)有限公司 | Project progress tracking system and method thereof |
CN105160467A (en) * | 2015-08-26 | 2015-12-16 | 长安马自达汽车有限公司 | Engineering change control management system and method therefor |
CN105893050A (en) * | 2016-04-05 | 2016-08-24 | 延锋伟世通电子科技(南京)有限公司 | Method for carrying out overall lifecycle management on software project based on project lifecycle management (PLMS), subversion (SVN) and Jenkins |
CN111339171A (en) * | 2020-02-07 | 2020-06-26 | 拉扎斯网络科技(上海)有限公司 | Data query method, device and equipment |
CN112967025A (en) * | 2020-07-09 | 2021-06-15 | 北京中百信信息技术股份有限公司 | Information engineering supervision project image progress management system |
CN112712300A (en) * | 2021-02-03 | 2021-04-27 | 浙江交工集团股份有限公司 | BIM + GIS construction project management system based on B/S information system |
Non-Patent Citations (2)
Title |
---|
中国核电厂的技术管理;林传清;中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑(第12期);全文 * |
核电项目技术变更管理系统的设计;王丽君 等;自动化博览;第30卷(第1期);第82-84页 * |
Also Published As
Publication number | Publication date |
---|---|
CN113936833A (en) | 2022-01-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3300407B1 (en) | Method and device for processing verification code | |
CN110941942A (en) | Method, device and system for checking circuit schematic diagram | |
CN112597051B (en) | Method and device for obtaining test result, electronic equipment and storage medium | |
CN112256563A (en) | Android application stability testing method and device, electronic equipment and storage medium | |
CN111724063A (en) | Business data processing method and device, electronic equipment and storage medium | |
CN116069612A (en) | Abnormality positioning method and device and electronic equipment | |
CN113936833B (en) | Automatic control method and device for permanent change state of nuclear power plant | |
CN114254944A (en) | Food quality management system, method and device | |
CN118331653A (en) | Settlement data processing model configuration method and device, electronic equipment and storage medium | |
CN106354595B (en) | Mobile terminal, hardware component state detection method and device | |
CN117974021A (en) | File approval method and device | |
CN114386925B (en) | Nuclear power plant isolation conflict adjustment method and device | |
CN113869295A (en) | Object detection method and device, electronic equipment and storage medium | |
CN109409097B (en) | Information management method, device and computer readable storage medium | |
CN106709285B (en) | Display method and device of application lock interface | |
CN110413525B (en) | Safety testing method and device | |
CN114386752A (en) | Nuclear power plant work order task starting control method and device | |
CN114399884B (en) | Alarm and alarm releasing method and device | |
CN111221593A (en) | Dynamic loading method and device | |
CN111240875B (en) | Network exception handling method, device and storage medium | |
CN113590382B (en) | NFC function processing method, NFC function processing device and storage medium | |
CN118780760A (en) | State report processing method and device | |
CN116308242A (en) | Conference management method and device | |
CN112612516B (en) | Code processing method and device | |
CN117132237A (en) | Nuclear power plant digital front meeting management method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20220114 Assignee: NUCLEAR POWER QINSHAN JOINT VENTURE Co.,Ltd. Assignor: CNNC NUCLEAR POWER OPERATION MANAGEMENT Co.,Ltd. Contract record no.: X2024330000725 Denomination of invention: Automated Control Method and Device for Permanent Change of State in Nuclear Power Plants Granted publication date: 20230613 License type: Common License Record date: 20241010 |
|
EE01 | Entry into force of recordation of patent licensing contract |