CN113846567B - Method for quickly constructing underwater pile-column type foundation of bridge - Google Patents

Method for quickly constructing underwater pile-column type foundation of bridge Download PDF

Info

Publication number
CN113846567B
CN113846567B CN202111200709.2A CN202111200709A CN113846567B CN 113846567 B CN113846567 B CN 113846567B CN 202111200709 A CN202111200709 A CN 202111200709A CN 113846567 B CN113846567 B CN 113846567B
Authority
CN
China
Prior art keywords
hanging box
cofferdam
drilling platform
box cofferdam
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111200709.2A
Other languages
Chinese (zh)
Other versions
CN113846567A (en
Inventor
曹振杰
黄昌富
张京斌
林伟群
郝伟亮
王事成
苗相生
孙丹丹
邢如祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 15th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd
Original Assignee
China Railway 15th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 15th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd filed Critical China Railway 15th Bureau Group Co Ltd
Priority to CN202111200709.2A priority Critical patent/CN113846567B/en
Publication of CN113846567A publication Critical patent/CN113846567A/en
Application granted granted Critical
Publication of CN113846567B publication Critical patent/CN113846567B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/02Supports for the drilling machine, e.g. derricks or masts specially adapted for underwater drilling

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Paleontology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a method for quickly constructing a pile-type foundation in bridge water, which is characterized in that a longitudinal beam of a hanging box cofferdam used in the method consists of a walkway beam of a drilling platform, and a bottom plate of the hanging box cofferdam consists of a panel of the drilling platform, so that the material reuse is realized; the steel suspension box cofferdam is prefabricated integrally, and the bottom die is bolted in sub-modules, so that the construction and the disassembly after the construction are convenient; the side plates and part of the bottom plate of the cofferdam of the hanging box can be recycled, the side plates and part of the bottom plate can be repeatedly used in the same project, and the cost is saved. In addition, the traditional cofferdam construction occupies a large area, influences the navigation of a water area and causes resistance to the flow of water flow; the novel rapid construction method for the pile-column type foundation in the bridge water has the advantages of small occupied area, convenience in construction, reduction of the influence on navigation to the greatest extent and reduction of cost. The invention has the advantages that: the problems that the drilling platform needs to be dismantled, the construction period is long, the construction cost is high, the cofferdam structure is difficult to recycle and the like in the traditional cofferdam method are solved.

Description

Method for quickly constructing underwater pile-column type foundation of bridge
Technical Field
The invention belongs to the technical field of building construction, and particularly relates to a method for quickly constructing a pile-column type foundation in bridge water.
Background
In the construction of conventional small and medium-span bridges, because the stress is clear, pile pier is generally adopted as a lower structure of the bridge, and in the design of the pile pier of the bridge, a tie beam is arranged between piles (among the piles) in order to improve the stability of a pile body (a column body). When the bridge pile foundation is constructed, a drilling platform is required to carry out auxiliary construction. In the construction of tie beams, particularly in water, larsen steel sheet pile cofferdams or steel suspension box cofferdams are usually adopted. For the underwater pile-column type foundation, a drilling platform is generally adopted for construction of a cast-in-situ bored pile, then the drilling platform is dismantled after cofferdam, and a tie beam and a pier column between piles (between columns) are constructed, so that the construction period is long, the construction cost is high, and the cofferdam structure is difficult to recycle. Therefore, a method for rapidly constructing the pile-column type foundation in the bridge water by using the drilling platform is urgently needed.
Disclosure of Invention
The invention aims to provide a method for quickly constructing a pile-column foundation in the water of a bridge according to the defects of the prior art, the longitudinal beam of the hanging box cofferdam used in the method consists of a walkway beam of a drilling platform, and the bottom plate of the hanging box cofferdam consists of a panel of the drilling platform, so that the material reuse is realized; the steel suspension box cofferdam is prefabricated integrally, and the bottom die is bolted in sub-modules, so that the construction and the disassembly after the construction are convenient; the side plates and part of the bottom plate of the cofferdam of the hanging box can be recycled, the side plates and the part of the bottom plate can be repeatedly used in the same project, and the cost is saved.
The purpose of the invention is realized by the following technical scheme:
a method for quickly constructing a pile-column type foundation in bridge water is characterized by comprising the following steps:
(1) The method comprises the following steps that a reserved hole is formed in the upper end portion of a steel pipe pile, a bracket is welded on the outer wall surface, corresponding to the reserved hole, of the steel pipe pile, a socket distribution beam is inserted into the reserved hole of each two adjacent steel pipe piles, the socket distribution beam and the bracket are screwed and fixed through bolts, a drilling platform longitudinal beam is arranged above the socket distribution beam, a drilling platform panel is arranged on the drilling platform longitudinal beam, and the drilling platform panel, the drilling platform longitudinal beam and the socket distribution beam jointly form a drilling platform;
(2) Arranging a drilling machine above the drilling platform, and constructing a cast-in-situ bored pile downwards through a preset circular hole on a panel of the drilling platform by using the drilling machine;
(3) The drilling platform longitudinal beam is used as a hanging box cofferdam longitudinal beam in an inverted mode, the drilling platform panel is used as a hanging box cofferdam bottom plate in an inverted mode, and a hanging box cofferdam side plate, a hanging box cofferdam ring beam and a hanging box cofferdam supporting beam are assembled on the drilling platform on the inverted hanging box cofferdam bottom plate to form a hanging box cofferdam; meanwhile, installing an extension steel pipe column on the original steel pipe pile, and welding a pile top beam on the top of the extension steel pipe column;
(4) Installing a lowering system on the pile top beam, lifting the hanging box cofferdam, unfastening the bolts between the socket distribution beams and the brackets, drawing the socket distribution beams out of the holes of the steel pipe piles, and reserving space for lowering the hanging box cofferdam;
(5) Lowering the suspension box cofferdam to a proper position by using the lowering system, restoring the socket distribution beam from the hole of the steel pipe pile, fixing the socket distribution beam on the steel pipe pile by using the bolt again, and fixing the suspension box cofferdam on the socket distribution beam by using the hanging strip;
(6) And (4) installing a steel cofferdam water stop device, pumping water in the hanging box cofferdam, erecting a mould and pouring a tie beam.
After the tie beam construction is finished, firstly, the connection between the hanging box cofferdam side plate and the hanging box cofferdam longitudinal beam is unfastened, the hanging box cofferdam side plate is hung away by the lowering system, a diver turns off the deformed steel bar for tongue-and-groove connection of the hanging box cofferdam bottom plate under water to realize the blocking of the hanging box cofferdam bottom plate, and the lowering system is used for hanging away the drilling platform panel to realize the recycling of the hanging box cofferdam material.
The drilling platform panel comprises a panel with holes and a panel without holes, the panel with holes and the panel without holes are connected through tongues and grooves, and the tongues and the grooves are aligned and fixed through finish-rolled deformed steel bars in a counter-pulling mode.
And (4) hoisting the hanging box cofferdam by using a steel strand or finish rolling deformed steel bar.
And (5) fixing the socket distribution beam on the steel pipe pile by using bolts again, specifically: inserting the socket distribution beam into the reserved hole in the steel pipe pile, and then screwing and fixing the socket distribution beam and the bracket by bolts.
The invention has the advantages that:
(1) The traditional cofferdam construction occupies a large area, influences the navigation of a water area and causes resistance to the flow of water flow; the novel rapid construction method for the pile foundation in the bridge water has the advantages of small occupied area, convenience in construction, reduction of influence on navigation to the maximum extent and reduction of cost.
(2) The longitudinal beam of the hanging box cofferdam is composed of the walkway beams of the drilling platform, and the bottom plate of the hanging box cofferdam is composed of the panel of the drilling platform, so that the material reuse is realized.
(3) The steel suspension box cofferdam is integrally prefabricated, the bottom die is bolted in sub-modules, and the cofferdam is convenient to disassemble after construction. The side plates and part of the bottom plate of the cofferdam of the hanging box can be recycled, the side plates and the part of the bottom plate can be repeatedly used in the same project, and the cost is saved.
Drawings
FIG. 1 is a schematic structural view of a drilling platform built before construction of the hanging box cofferdam of the invention;
FIG. 2 is an elevational view of the construction of the spigot and socket distributor beam of the present invention;
FIG. 3 is a side view of the installation of the bell and spigot distributor beam construction of the invention;
FIG. 4 is a plan view of the installation of the spigot and socket distributor beam construction of the present invention;
FIG. 5 is an exploded view of the drill floor panel construction of the present invention;
FIG. 6 is an overall view of a drilling platform panel construction of the present invention;
FIG. 7 is a schematic view of a tongue-and-groove joint of a drilling platform panel according to the present invention;
FIG. 8 is a structural diagram of the steel suspension box cofferdam of the present invention;
FIG. 9 is an elevation view of a steel suspension box cofferdam construction before lowering in the invention;
FIG. 10 is a top view of a steel suspension box cofferdam construction before lowering in accordance with the present invention;
FIG. 11 is an elevation view of a cofferdam construction of the steel suspension box after lowering the cofferdam of the invention;
FIG. 12 is a top view of the cofferdam construction of the steel suspension box after lowering the steel suspension box of the present invention;
fig. 13 is a plan view of the tie beam of the present invention after it has been cast.
Detailed Description
The features of the present invention and other related features are described in further detail below by way of example in conjunction with the following drawings to facilitate understanding by those skilled in the art:
referring to fig. 1-13, the symbols in the drawings are: the device comprises a drilling platform panel 1, a drilling platform longitudinal beam 2, a socket distribution beam 3, a bracket 4, a bolt 5, a non-perforated panel 6, a perforated panel 7, an elongated steel pipe column 8, a pile top cross beam 9, a hanging box cofferdam supporting beam 10, a hanging box cofferdam ring beam 11, a hanging box cofferdam side plate 12, a lowering system 13 and a hanging strip 14.
Example (b): as shown in fig. 1 to 13, the embodiment specifically relates to a method for quickly constructing a pile-column type foundation in water of a bridge, which includes:
(1) Before the construction of the hanging box cofferdam, a drilling platform is built, the drilling platform comprises a drilling platform panel 1, a drilling platform longitudinal beam 2 and a socket distribution beam 3, and the drilling platform is structurally shown in figure 1. Holes are reserved in the steel pipe piles before the socket distribution beams 3 are constructed, brackets 4 are welded to the steel pipe piles, the socket distribution beams 3 are inserted into the holes reserved in the steel pipe piles, and then the socket distribution beams 3 and the brackets 4 are screwed and fixed through bolts 5, as shown in fig. 2-4.
The drilling platform panel 1 comprises a panel 7 with holes and a panel 6 without holes, the panel 7 with holes and the panel 6 without holes are connected by adopting grooves and tongues, and the grooves and tongues are aligned and then fixed by adopting finish-rolled deformed steel bars in a counter-pulling way, as shown in figures 5, 6 and 7;
in addition, the drilling platform panel 1 can be used as a hanging box cofferdam bottom plate in the later period, the drilling platform longitudinal beam 2 is made of I-shaped steel or steel beams in other forms, and the drilling platform longitudinal beam 2 can be used as a longitudinal beam of a hanging box bottom die in the later period, so that the materials can be used reversely.
(2) A drilling machine is arranged on the drilling platform, and a cast-in-situ bored pile is constructed;
(3) The drilling platform longitudinal beam 2 is used as a hanging box cofferdam longitudinal beam in an inverted mode, the drilling platform panel 1 is used as a hanging box cofferdam bottom plate in an inverted mode, and a hanging box cofferdam side plate 12, a hanging box cofferdam ring beam 11 and a hanging box cofferdam supporting beam 10 are well assembled on the inverted hanging box cofferdam bottom plate on the drilling platform to form a hanging box cofferdam; meanwhile, an extension steel pipe column 8 is installed on the original steel pipe pile, a pile top cross beam 9 is welded on the top of the extension steel pipe column 8, and the structural schematic diagram of the construction step is shown in fig. 8;
(4) Installing a lowering system 13 on the pile top cross beam 9, lifting the hanging box cofferdam formed in the step (3) by using a steel strand or finish-rolled deformed steel bar, unfastening the bolts 5 between the socket distribution beams 3 and the brackets 4, drawing out the socket distribution beams 3 from the holes of the steel pipe pile to leave a space for lowering the hanging box cofferdam, wherein the structural schematic diagram of the construction step is shown in fig. 9 and 10;
(5) Lowering the suspension box cofferdam to a proper position by using a lowering system 13, restoring the socket distribution beam 3 from the hole of the steel pipe pile, fixing the socket distribution beam 3 on the steel pipe pile by using a bolt 5 again (specifically, welding a bracket on the steel pipe pile, inserting the socket distribution beam 3 into the reserved hole on the steel pipe pile, then screwing and fixing the socket distribution beam 3 and the bracket 4 by using the bolt 5), and fixing the suspension box cofferdam on the socket distribution beam 3 by using a hanging strip 14; the installed hanging box cofferdam is shown in figures 11 and 12;
(6) Installing a steel cofferdam water stop device, pumping water in the cofferdam of the hanging box, then erecting a mould, and pouring a tie beam as shown in figure 13;
and finally, after the beam tying construction is finished, firstly disconnecting the connection between the hanging box cofferdam side plate 12 and the hanging box cofferdam longitudinal beam (namely the drilling platform longitudinal beam 2), hoisting the hanging box cofferdam side plate 12 away by using the lowering system 13, unscrewing the hanging box cofferdam bottom plate (namely the drilling platform panel 1) by a diver from the water for tongue-and-groove connection, realizing the blocking of the hanging box cofferdam bottom plate, hoisting the drilling platform panel 1 away by using the lowering system 13, and realizing the recycling of the hanging box cofferdam material.

Claims (5)

1. A method for quickly constructing a pile-column type foundation in bridge water is characterized by comprising the following steps:
(1) The method comprises the following steps that a reserved hole is formed in the upper end portion of a steel pipe pile, a bracket is welded on the outer wall surface, corresponding to the reserved hole, of the steel pipe pile, a socket distribution beam is inserted into the reserved hole of two adjacent steel pipe piles and is screwed and fixed with the bracket through a bolt, a drilling platform longitudinal beam is arranged above the socket distribution beam, a drilling platform panel is arranged on the drilling platform longitudinal beam, and the drilling platform panel, the drilling platform longitudinal beam and the socket distribution beam jointly form a drilling platform;
(2) Arranging a drilling machine above the drilling platform, and constructing a cast-in-situ bored pile downwards through a preset circular hole on a panel of the drilling platform by using the drilling machine;
(3) The drilling platform longitudinal beam is used as a hanging box cofferdam longitudinal beam, the drilling platform panel is used as a hanging box cofferdam bottom plate, and a hanging box cofferdam side plate, a hanging box cofferdam ring beam and a hanging box cofferdam supporting beam are well assembled on the inverted hanging box cofferdam bottom plate on the drilling platform to form a hanging box cofferdam; meanwhile, installing an extension steel pipe column on the original steel pipe pile, and welding a pile top beam on the top of the extension steel pipe column;
(4) Installing a lowering system on the pile top cross beam, lifting the hanging box cofferdam, unfastening the bolts between the socket distribution beams and the brackets, drawing out the socket distribution beams from the holes of the steel pipe piles, and reserving space for lowering the hanging box cofferdam;
(5) Lowering the suspension box cofferdam in place by using the lowering system, restoring the socket distribution beam from the hole of the steel pipe pile, fixing the socket distribution beam on the steel pipe pile by using the bolt again, and fixing the suspension box cofferdam on the socket distribution beam by using the hanging strip;
(6) And (4) installing a steel cofferdam water stop device, pumping water in the hanging box cofferdam, then erecting a mould, and pouring a tie beam.
2. The method for rapidly constructing the underwater pile column type foundation of the bridge as claimed in claim 1, wherein after the construction of the tie beam is completed, the connection between the hanging box cofferdam side plate and the hanging box cofferdam longitudinal beam is firstly released, the hanging box cofferdam side plate is hung away by the lowering system, a screw steel used for tongue-and-groove connection of the hanging box cofferdam bottom plate is unscrewed from the water by a diver to realize the blocking of the hanging box cofferdam bottom plate, and the drilling platform panel is hung away by the lowering system to realize the recycling of the hanging box cofferdam material.
3. The method for quickly constructing the pile-type foundation in the water of the bridge according to claim 1, wherein the panels of the drilling platform comprise panels with holes and panels without holes, the panels with the holes and the panels without the holes are connected by adopting grooves and tongues, and the grooves and the tongues are aligned and then are fixed by adopting finish-rolled deformed steel bars in a counter-pulling way.
4. The method for quickly constructing the pile-column type foundation in the water of the bridge according to claim 1, wherein in the step (4), the hanging box cofferdam is hoisted by using a steel strand or finish-rolled deformed steel bar.
5. The method for rapidly constructing the pile-column type foundation in the water of the bridge according to claim 1, wherein in the step (5), the socket distribution beam is fixed on the steel pipe pile by using bolts again, and specifically comprises the following steps: inserting the socket distribution beam into the reserved hole in the steel pipe pile, and then screwing and fixing the socket distribution beam and the bracket by bolts.
CN202111200709.2A 2021-10-15 2021-10-15 Method for quickly constructing underwater pile-column type foundation of bridge Active CN113846567B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111200709.2A CN113846567B (en) 2021-10-15 2021-10-15 Method for quickly constructing underwater pile-column type foundation of bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111200709.2A CN113846567B (en) 2021-10-15 2021-10-15 Method for quickly constructing underwater pile-column type foundation of bridge

Publications (2)

Publication Number Publication Date
CN113846567A CN113846567A (en) 2021-12-28
CN113846567B true CN113846567B (en) 2023-02-21

Family

ID=78978482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111200709.2A Active CN113846567B (en) 2021-10-15 2021-10-15 Method for quickly constructing underwater pile-column type foundation of bridge

Country Status (1)

Country Link
CN (1) CN113846567B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114892698B (en) * 2022-06-13 2024-05-17 中国海洋大学 Assembled template for asymmetric double-inclined-pile cast-in-situ bearing platform and construction method
CN115492141B (en) * 2022-10-21 2024-01-30 中铁二院工程集团有限责任公司 Steel suspended box cofferdam structure, bottom plate thereof and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101775809A (en) * 2010-01-15 2010-07-14 中铁大桥局集团第五工程有限公司 Construction method of marine self-floating type steel soleplate single-wall suspension box cofferdam and single-wall suspension box cofferdam
JP2015014157A (en) * 2013-07-05 2015-01-22 株式会社横山基礎工事 Pier construction method
CN108035372A (en) * 2017-11-14 2018-05-15 中铁二十二局哈尔滨铁路建设集团有限责任公司 A kind of method using drilling platform gooseneck suspension steel lifted trunk
CN109295982A (en) * 2018-11-15 2019-02-01 中国二十二冶集团有限公司 The construction method of binder steel jacket box in water
CN113152472A (en) * 2021-04-07 2021-07-23 中交路桥建设有限公司 Structure and method for lowering steel cofferdam by using steel pipe pile of drilling platform
CN113216231A (en) * 2021-04-28 2021-08-06 湖南常德路桥建设集团有限公司 Hanging box cofferdam structure and deepwater bearing platform construction method applying same

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101775809A (en) * 2010-01-15 2010-07-14 中铁大桥局集团第五工程有限公司 Construction method of marine self-floating type steel soleplate single-wall suspension box cofferdam and single-wall suspension box cofferdam
JP2015014157A (en) * 2013-07-05 2015-01-22 株式会社横山基礎工事 Pier construction method
CN108035372A (en) * 2017-11-14 2018-05-15 中铁二十二局哈尔滨铁路建设集团有限责任公司 A kind of method using drilling platform gooseneck suspension steel lifted trunk
CN109295982A (en) * 2018-11-15 2019-02-01 中国二十二冶集团有限公司 The construction method of binder steel jacket box in water
CN113152472A (en) * 2021-04-07 2021-07-23 中交路桥建设有限公司 Structure and method for lowering steel cofferdam by using steel pipe pile of drilling platform
CN113216231A (en) * 2021-04-28 2021-08-06 湖南常德路桥建设集团有限公司 Hanging box cofferdam structure and deepwater bearing platform construction method applying same

Also Published As

Publication number Publication date
CN113846567A (en) 2021-12-28

Similar Documents

Publication Publication Date Title
CN112832416A (en) Assembled RCS frame-RECC shear force wall mixed structure system
CN113846567B (en) Method for quickly constructing underwater pile-column type foundation of bridge
CN112177012A (en) Precast concrete non-primary support system with lattice columns for foundation pit engineering and construction method
KR101263370B1 (en) Precast end-block with girder connection member and bridge construction method using ths same
CN113279582A (en) Hanging construction method for overhanging and hanging type cast-in-place plate
CN113152505B (en) Construction method of local bottom-sealing underwater super-large scale bearing platform combined box enclosure structure
CN101492918B (en) Beam column node for base pit engineering of topdown construction method
CN101294382B (en) Deep foundation pit steel reinforced concrete fender post, producing and embedding method thereof
CN212453690U (en) Rectangular steel pipe concrete column mounting device
CN218894452U (en) Novel supporting structure for sealing post-cast strip of top plate
CN217151462U (en) Precast shear wall structure is connected to steel pipe concrete row column formula
CN113738157B (en) Temporary supports on two sides of post-cast strip of building and method for constructing constructional column by using temporary supports
CN215290989U (en) Connecting structure of precast concrete tubular pile column and hollow floor or flat floor
CN214739012U (en) Assembled double-connecting-beam combined shear wall component and connecting structure thereof
CN215167163U (en) Shear structure and maintenance structure integrated prefabricated hoisting wallboard unit
CN212026598U (en) Structure system suitable for assembled steel structure building
CN213836666U (en) Precast concrete non-primary support system with lattice columns for foundation pit engineering
CN114837350A (en) Equal cast-in-place prefabricated vertical component connecting structure and construction method
CN108468278B (en) Integral-lowering underwater bearing platform construction structure
CN201172825Y (en) Beam column joint in base pit engineering for reverse method
CN112854603A (en) Connecting structure of precast concrete tubular pile column and hollow floor or flat floor
CN114319583B (en) Connection structure of prefabricated frame beam and prefabricated frame column
CN216108617U (en) Structure system of prefabricated reinforced concrete beam of underground station
CN217601232U (en) A operation platform for construction of bridge aquatic pier stud
CN214459579U (en) Pedestrian overpass pier for rapid construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant