CN113605217A - Structure of bridge abutment and roadbed joint and construction method - Google Patents

Structure of bridge abutment and roadbed joint and construction method Download PDF

Info

Publication number
CN113605217A
CN113605217A CN202110772931.3A CN202110772931A CN113605217A CN 113605217 A CN113605217 A CN 113605217A CN 202110772931 A CN202110772931 A CN 202110772931A CN 113605217 A CN113605217 A CN 113605217A
Authority
CN
China
Prior art keywords
abutment
pipe
grouting
bridge
roadbed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110772931.3A
Other languages
Chinese (zh)
Other versions
CN113605217B (en
Inventor
张建国
姚辉
张路泽
郭佳逸
毛衡磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongxin Eco Environment Technology Co ltd
Original Assignee
Tongxin Eco Environment Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongxin Eco Environment Technology Co ltd filed Critical Tongxin Eco Environment Technology Co ltd
Priority to CN202110772931.3A priority Critical patent/CN113605217B/en
Publication of CN113605217A publication Critical patent/CN113605217A/en
Application granted granted Critical
Publication of CN113605217B publication Critical patent/CN113605217B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本申请涉及一种桥梁的桥台与路基结合处的结构及施工方法,涉及桥梁建筑技术领域;其包括若干个墩柱、设置于每一墩柱下端的承台、设置于每一墩柱上端的盖梁,以及设置于相邻两个承台之间的桥台;每一所述桥台两端均设置有延伸插板,所述承台上表面设置有供每一延伸插板插设的插槽,每一所述桥台靠近插槽处均设置有用于将延伸插板稳固插设于插槽内的固定组件;本申请具有加强桥台与盖梁之间连接稳固性,提高桥梁整体结构强度的效果。

Figure 202110772931

The present application relates to a structure and a construction method of a joint between an abutment and a roadbed of a bridge, and relates to the technical field of bridge construction. The cover beam, and the bridge platform arranged between two adjacent platforms; each of the two ends of the bridge platform is provided with an extension plate, and the upper surface of the platform is provided with an extension plate for each extension plate. Each of the bridge abutments near the slot is provided with a fixed component for stably inserting the extension board in the slot; the present application has the advantages of strengthening the connection stability between the bridge abutment and the cover beam, improving the bridge The effect of overall structural strength.

Figure 202110772931

Description

Structure of bridge abutment and roadbed joint and construction method
Technical Field
The application relates to the technical field of bridge construction, in particular to a structure and a construction method of a joint of a bridge abutment and a roadbed of a bridge.
Background
The bridge is generally a structure erected on rivers, lakes and seas to enable vehicles, pedestrians and the like to smoothly pass through, and is suitable for the modern high-speed developed traffic industry.
A related Chinese patent with the publication number of CN207878252U discloses a prefabricated bridge girder, which comprises a plurality of pairs of prefabricated bridge piers vertically arranged, each pair of prefabricated bridge piers is erected with a prefabricated capping beam, a prefabricated girder section is erected vertically between the adjacent prefabricated capping beams, wherein the prefabricated girder section is formed by mutually splicing a plurality of parallel panels; during construction, the prefabricated capping beams are erected on each pair of prefabricated piers, and then the prefabricated beam sections are erected among the prefabricated capping beams, so that the construction of the bridge is realized.
In view of the above related technologies, the inventor considers that the connection structure between the two adjacent precast beam segments and the precast capping beam is not stable enough, and is prone to causing the relative position of the adjacent precast bridges to shift or even crack under the influence of vibration force of an external environment, such as an earthquake, which affects the safety of the use of the bridges, and thus needs to be improved.
Disclosure of Invention
In order to improve the technical problem that the structural stability of a prefabricated bridge is poor in the related art, the application provides a structure and a construction method of a bridge abutment and roadbed joint.
The application provides a pair of bridge abutment and structure of road bed junction of bridge adopts following technical scheme:
a structure at the joint of a bridge abutment and a roadbed of a bridge comprises a plurality of pier studs, bearing platforms arranged at the lower ends of the pier studs, a capping beam arranged at the upper end of each pier stud and a bridge abutment arranged between two adjacent bearing platforms; each abutment both ends all are provided with the extension picture peg, the cushion cap upper surface is provided with the slot that supplies each extension picture peg to insert the establishment, each the abutment is close to slot department and all is provided with the fixed subassembly that is used for firmly inserting the extension picture peg and locates in the slot.
Through adopting above-mentioned technical scheme, will extend the picture peg through fixed subassembly and firmly insert and locate the slot in to reduce the condition that the abutment squinted along its length direction, realize the firm connection of abutment and bent cap, also can reduce the condition that the skew appears in adjacent abutment position simultaneously.
Optionally, each abutment tip all is provided with a plurality of extension picture peg, and adjacent abutment is the extension picture peg of near each other crisscross inserting of slot of locating, and each the lateral wall of the extension picture peg in the slot is laminated each other.
By adopting the technical scheme, the contact area of the end parts of the adjacent bridge abutments is increased, and the connection tightness between the two adjacent bridge abutments is enhanced.
Optionally, fixed subassembly includes the apron, runs through to insert and locates apron wherein the slip casting pipe of one end to and run through to insert and locate the play thick liquid pipe of the apron other end, each extend the picture peg upper surface and all seted up and supply the apron to insert the breach of stepping down of establishing, each extend the picture peg end wall and all run through and seted up the slip casting hole, inside the offering of bent cap supplies the slip casting pipe to insert the first fixed orifices of establishing to and supply the slip casting pipe to insert the second fixed orifices of establishing, first fixed orifices, second fixed orifices, slip casting hole communicate each other.
Through adopting above-mentioned technical scheme, to slip casting pipe department injection cement mortar, cement mortar flows into first fixed orifices to full all slip casting holes, finally flow to second fixed orifices, when cement mortar flows to play thick liquid pipe mouth department, can stop the injection to cement mortar, after cement mortar solidifies the shaping, extend the picture peg and firmly insert and locate in the slot.
Optionally, each it all inserts and is equipped with the fender thick liquid pipe to extend the picture peg and be close to slip casting hole department, it slides along slip casting hole length direction to keep off the thick liquid pipe end wall, and is adjacent it laminates each other to keep off the thick liquid pipe end wall, bent cap inside is provided with and is used for driving each slide pipe and slides to the drive assembly of two adjacent extension picture peg seams department.
Through adopting above-mentioned technical scheme, drive each fender thick liquid pipe through drive assembly and slide along slip casting hole length direction to remove to the seam crossing of two adjacent extension picture pegs, then to the downthehole grout injection of slip casting, reduce the thick liquids and spill over from the seam crossing of two adjacent extension picture pegs, spill over to the abutment surface from the seam crossing of apron and the breach of stepping down again, and then aggravate constructor's clearance burden.
Optionally, a grouting cavity and a grout outlet cavity are formed in the bridge abutment, the grouting cavity is located between the first fixing hole and the slot, and the grouting cavity is located between the slot and the second fixing hole; the driving assembly comprises a sliding pipe inserted into the grouting chamber, one end of the sliding pipe is attached to the end wall of the grout blocking pipe close to the sliding pipe, a butt joint inclined plane is arranged at the other end of the sliding pipe, and the lower end of the grouting pipe is provided with a butt joint inclined plane matched with the butt joint inclined plane.
Through adopting above-mentioned technical scheme, when the slip casting pipe inserted in the slip casting cavity, the slip casting pipe was supported to the end wall that is close to butt inclined plane department and is pressed the slide, and butt inclined plane laminate mutually this moment, and the slide removes and supports to push away the slip casting pipe and remove to the seam crossing of two adjacent extension picture pegs towards the direction of keeping away from the slip casting pipe.
Optionally, the sidewall of the slip casting pipe is provided with a plurality of flow-assisting through holes in a penetrating manner.
Through adopting above-mentioned technical scheme, the setting of class of flowing aid through-hole can make cement mortar let in the slide pipe from first fixed orifices fast and moving to the slip casting downthehole, reduces because of slip casting pipe and slide pipe wall contact and lead to the condition that cement thick liquids remove slowly, improves the efficiency of construction.
Optionally, the driving assembly further comprises a sliding block fixedly connected to the outer side wall of the sliding pipe and the outer side wall of each slurry blocking pipe, the driving assembly further comprises a limiting spring welded to the side wall of each sliding block, the inner wall of the grouting cavity and the inner wall of the grouting hole are both provided with a sliding groove for the sliding block to insert, and the limiting spring is fixedly connected between the inner wall of the sliding groove and the side wall of the sliding block.
By adopting the technical scheme, when the limiting spring is in an initial state, the slurry blocking pipe is completely inserted into the grouting hole, the end wall of the slurry blocking pipe is flush with the end wall of the extension plug board, one end, far away from the butt joint inclined plane, of the sliding pipe is flush with the end wall of the sliding hole, one end, close to the butt joint inclined plane, of the sliding pipe is inserted into the first fixing hole, so that the sliding pipe and the slurry blocking pipe are fixed through the sliding block and the limiting spring, the slurry blocking pipe is stably inserted into the grouting hole, and the sliding pipe is stably inserted into the sliding hole.
Optionally, a support assembly is further arranged on the lower surface of each abutment, and the support assembly comprises a support frame, a triangular block arranged on the upper end surface of the support frame, and a support base arranged at the lower end of the support frame; one right-angle side of the triangular block is fixedly connected to the lower surface of the abutment, and the other right-angle side of the triangular block is attached to the side wall of the bent cap; the supporting base is fixedly connected to the upper surface of the bearing platform.
Through adopting above-mentioned technical scheme, the supporting role to the abutment can be strengthened in setting up of supporting component, realizes the firm connection of abutment and cushion cap, reduces the condition that leads to the pier to weaken to the support intensity of abutment because of the pier is damaged, improves bridge overall structure's stability.
Optionally, the upper surface of each bearing platform is symmetrically provided with a connecting rod, the lower surface of each supporting base is provided with a connecting groove for the connecting rod to be inserted, a capsule body containing glue is inserted into the butt-joint groove, and the side wall of the connecting rod is provided with a piercing rod for piercing the capsule body.
By adopting the technical scheme, when the abutment moves downwards and is placed between the two bearing platforms, the supporting base is placed on the upper surface of the bearing platform, the connecting rod is inserted into the connecting groove, the piercing rod pierces the capsule body, and the glue moves to the seam between the supporting base and the bearing platform, so that the fixed connection between the supporting base and the bearing platform is realized.
Optionally, a construction method adopted by a structure at a joint of a bridge abutment and a roadbed of a bridge includes the following steps:
s1, installing a bearing platform, pier studs and cover beams according to construction requirements, hanging the two bridge platforms above the bearing platform, enabling the extension inserting plates on the two bridge platforms to be inserted into the slots together, and covering the cover plates in the abdicating notches;
s2, cement mortar is injected into the grouting pipe, the cement mortar flows into the slip pipe and then flows into the slurry blocking pipe, finally flows into the slurry outlet pipe through the second fixing hole, grouting is stopped when the cement is fully injected to the upper pipe orifice of the slurry outlet pipe, and after the cement mortar is solidified and formed, the extension inserting plate is stably inserted into the inserting groove, so that connection of adjacent bridge abutments is achieved.
Through adopting above-mentioned technical scheme, realize being connected between abutment and the cushion cap through setting up extension picture peg and slot, then fix the position of extending the picture peg through the apron, come further through to the slip casting in the slot and will extend the picture peg and firmly insert and locate the slot in, realize two adjacent abutments and the firm connection of cushion cap.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the extending insertion plates are stably inserted into the slots through the fixing assemblies, so that the condition that the abutment deviates along the length direction of the abutment is reduced, the abutment and the cover beam are stably connected, and the condition that the positions of adjacent abutments deviate can be reduced;
2. cement mortar is injected into the grouting pipe, the cement mortar flows into the first fixing hole and fills all the grouting holes and finally flows into the second fixing hole, when the cement mortar flows to the pipe orifice of the grout outlet pipe, the injection of the cement mortar can be stopped, and after the cement mortar is solidified and formed, the extension inserting plate is stably inserted into the inserting groove;
3. the supporting effect to the abutment can be strengthened in supporting component's setting, realizes the firm connection of abutment and cushion cap, reduces the condition that leads to the pier to weaken the support intensity of abutment because of the pier is damaged, improves bridge overall structure's stability.
Drawings
Fig. 1 is a schematic view of a structure of a bridge abutment and roadbed combination of a bridge in the embodiment.
Fig. 2 is a sectional view of a structure at a junction of an abutment and a roadbed of a bridge in an embodiment.
Fig. 3 is an enlarged schematic view of the structure of part a in fig. 2.
Fig. 4 is an exploded view of the structure used to embody the abutment-subgrade junction of a bridge in the example.
Fig. 5 is a sectional view for embodying the structure of the fixing member in the embodiment.
Description of reference numerals: 1. a bearing platform; 11. a connecting rod; 111. pricking a rod; 12. pier studs; 13. a capping beam; 131. a slot; 132. a first fixing hole; 135. a second fixing hole; 133. a grouting chamber; 134. a slurry outlet chamber; 14. an abutment; 141. an extension inserting plate; 141. grouting holes; 1411. a chute; 142. a slurry blocking pipe; 143. a abdication gap; 15. a drive assembly; 151. a slide pipe; 1511. butting the inclined planes; 152. a slider; 153. a limiting spring; 2. a fixing assembly; 21. a cover plate; 22. a grouting pipe; 221. a flow-aiding through hole; 222. abutting against the inclined plane; 23. a pulp outlet pipe; 3. a support assembly; 31. a support frame; 32. a triangular block; 33. a support base; 331. connecting grooves; 332. and (3) a capsule body.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
The embodiment of the application discloses a structure at the junction of a bridge abutment and a roadbed of a bridge. Referring to fig. 1 and 2, the structure at the junction between the abutment and the roadbed of the bridge comprises a plurality of bearing platforms 1, piers 12 vertically cast on the upper surface of each bearing platform 1, capping beams 13 vertically cast on the upper surface of each pier 12, and an abutment 14 arranged between two adjacent capping beams 13; the bearing platform 1, the pier stud 12, the cover beam 13 and the abutment 14 are all prefabricated by UHPC materials.
Referring to fig. 1 and 2, each abutment 14 lower surface all is provided with supporting component 3, and supporting component 3 is including being the support frame 31 of "X" shape, integrated into one piece in the three hornblocks 32 of support frame 31 upper end to and integrated into one piece in the support base 33 of support frame 31 lower extreme, and one of them right-angle side of each three hornblocks 32 all passes through bolt fixed connection in abutment 14 lower surface, and another right-angle side laminating of three hornblocks 32 is in cushion cap 1 lateral wall.
Referring to fig. 1 and 3, the lower surface of the supporting base 33 is attached to the upper surface of the platform 1, the connecting rods 11 are integrally formed on the upper surface of the platform 1 near each supporting base 33, the lower surface of the supporting base 33 is provided with a connecting groove 331 for the connecting rods 11 to be inserted, a capsule body 332 is inserted into the connecting groove 331, and the capsule body 332 comprises glue and a plastic film for containing the glue; the side wall of each connecting rod 11 is integrally formed with a piercing rod 111 for piercing the capsule body 332, when the supporting base 33 is attached to the upper surface of the platform 1, the connecting rod 11 is inserted into the connecting groove 331, and the piercing rod 111 pierces the capsule body 332, and the glue flows to the joint between the supporting base 33 and the platform 1, so as to fix the supporting base 33 and the platform 1.
Referring to fig. 4 and 5, a plurality of extension insertion plates 141 are respectively integrally formed on end walls at two ends of each bridge abutment 14, slots 131 are formed in the upper surface of the cover beam 13, the extension insertion plates 141 near two adjacent bridge abutments 14 are jointly inserted into the same slot 131, and the extension insertion plates 141 near the adjacent bridge abutments 14 are distributed in the slots 131 in a staggered manner; each extending insertion plate 141 end wall is provided with a grouting hole 141 along the length direction thereof in a penetrating manner, a slurry blocking pipe 142 is inserted at the position of each extending insertion plate 141 close to the grouting hole 141, and the slurry blocking pipe 142 end wall is flush with the extending insertion plate 141 end wall.
Referring to fig. 2 and 4, a fixing assembly 2 is arranged above the extension inserting plate 141, and the fixing assembly 2 comprises a cover plate 21, a grouting pipe 22 and a grout outlet pipe 23; the upper surface of the extension inserting plate 141 is provided with a yielding notch 143 for the cover plate 21 to be inserted, and when the cover plate 21 is inserted into the yielding notch 143, the upper surface of the cover plate 21 is flush with the upper surface of the abutment 14; two ends of the cover plate 21 extend to the outside of the bridge abutment 14, the grouting pipe 22 is inserted into one end of the cover plate 21 in a penetrating manner, and the grout outlet pipe 23 is inserted into the other end of the cover plate 21 in a penetrating manner.
Referring to fig. 5, the upper surface of the bent cap 13 is provided with a first fixing hole 132 for inserting the grouting pipe 22, the upper surface of the bent cap 13 is further provided with a second fixing hole 135 for inserting the grout outlet pipe 23, and the first fixing hole 132 and the second fixing hole 135 are both arranged along the vertical direction; a grouting chamber 133 is further formed in the cover beam 13, the grouting chamber 133 is located between the first fixing hole 132 and the slot 131, and the grouting chamber 133, the first fixing hole 132 and the slot 131 are communicated; the cover beam 13 is further provided with a slurry outlet chamber 134, the slurry outlet chamber 134 is located between the slot 131 and the second fixing hole 135, and the slurry outlet chamber 134, the second fixing hole 135 and the slot 131 are communicated.
Referring to fig. 5, the driving assembly 15 is disposed inside the capping beam 13, the driving assembly 15 includes a slide tube 151 inserted into the grouting chamber 133, fixedly welded to an outer sidewall of the slide tube 151, a sliding block 152 on the outer side wall of each grout blocking pipe 142, and a limit spring 153 welded on the side wall of each sliding block 152, wherein sliding grooves 1411 are formed in the inner wall of the grouting chamber 133 and the inner wall of each grouting hole 141, the sliding grooves 1411 are arranged along the length direction of the grouting holes 141, the sliding blocks 152 and the limit springs 153 are inserted into the sliding grooves 1411, and one end of the limiting spring 153 far away from the sliding block 152 is fixedly adhered to the inner wall of the sliding chute 1411, when the limiting spring 153 is in the initial state, the grout stop pipe 142 is completely inserted into the grouting hole 141, and two end walls of the grout stop pipe 142 are flush with the end walls of the extension insertion plate 141, one end of the sliding tube 151 is attached to the end wall of the slurry blocking tube 142 close to the sliding tube, and the other end of the sliding tube 151 is inserted into the first fixing hole 132.
Referring to fig. 2 and 4, the end wall of the slide pipe 151 near the first fixing hole 132 is provided with a butt inclined surface 1511, the lower end of the grouting pipe 22 is provided with a butt inclined surface 222 attached to the butt inclined surface 1511, and the sidewall of the grouting pipe 22 near the lower end is provided with a plurality of flow assisting through holes 221 in a penetrating manner; when the grouting pipe 22 is inserted into the first fixing hole 132, the abutting inclined surface 1511 is attached to the abutting inclined surface 222, at this time, the grouting pipe 22 abuts against the sliding pipe 151, so that the sliding pipe 151 moves towards the direction close to the slot 131, the sliding pipe 151 abuts against the slurry blocking pipe 142 in contact with the sliding pipe, the limiting spring 153 deforms, all the slurry blocking pipes 142 move towards the position close to the slurry outlet chamber 134 in sequence, the slurry blocking pipes 142 move to the joint of the adjacent extension insertion plates 141, the slurry blocking pipes 142 close to the slurry outlet chamber 134 move into the slurry outlet chamber 134, and the slurry outlet pipes 23 are inserted into the second fixing holes 135.
A construction method adopted by a structure at a joint of a bridge abutment and a roadbed of a bridge comprises the following steps:
s1, installing the bearing platform 1, the pier stud 12 and the cover beam 13 according to construction requirements, hanging the two abutment platforms 14 above the bearing platform 1, enabling the extension inserting plates 141 on the two abutment platforms 14 to be inserted into the inserting grooves 131 together, and covering the cover plate 21 in the abdicating notch 143;
s2, cement mortar is injected into the grouting pipe 22, flows into the sliding pipe 151, then flows into the grout blocking pipe 142, and finally flows into the grout outlet pipe 23 through the second fixing hole 135, grouting is stopped when cement is grouted to the upper pipe orifice of the grout outlet pipe 23, and after the cement mortar is solidified and formed, the extension inserting plate 141 is stably inserted into the inserting groove 131, so that connection of adjacent bridge abutments 14 is achieved.
The implementation principle of the structure at the junction of the bridge abutment and the roadbed of the bridge is as follows: firstly, installing bearing platforms 1, piers 12 and capping beams 13 according to construction requirements, then hoisting an abutment 14 between two bearing platforms 1 by using a hoisting tool, so that an extension inserting plate 141 is inserted into an inserting groove 131, a supporting frame 31 is inserted between two adjacent piers 12 at the moment, and a supporting base 33 is fixedly adhered to the upper surface of the bearing platform 1; then, the extension inserting plate 141 on the other bridge abutment 14 is inserted into the slot 131, and at this time, the adjacent extension inserting plates 141 are inserted into the slot 131 in a staggered manner;
then, the cover plate 21 is covered in the abdicating notch 143, cement mortar is injected into the grouting pipe 22, the cement mortar flows out through the flow-aiding through hole 221 and flows into the sliding pipe 151, then flows into the grout blocking pipe 142 from the sliding pipe 151, and finally flows into the grout outlet pipe 23 through the second fixing hole 135, when the cement grout is filled to the upper nozzle of the grout outlet pipe 23, grouting is stopped, and after the cement mortar is solidified and formed, the extension inserting plate 141 is stably inserted into the inserting groove 131, so that stable connection of the adjacent bridge abutment 14 is realized.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1.一种桥梁的桥台与路基结合处的结构,包括若干个墩柱(12)、设置于每一墩柱(12)下端的承台(1)、设置于每一墩柱(12)上端的盖梁(13),以及设置于相邻两个承台(1)之间的桥台(14);其特征在于:每一所述桥台(14)两端均设置有延伸插板(141),所述承台(1)上表面设置有供每一延伸插板(141)插设的插槽(131),每一所述桥台(14)靠近插槽(131)处均设置有用于将延伸插板(141)稳固插设于插槽(131)内的固定组件(2)。1. A structure at the junction of an abutment and a roadbed of a bridge, comprising a plurality of pier columns (12), a cap (1) arranged at the lower end of each pier column (12), and a support platform (1) arranged at each pier column (12) A cover beam (13) at the upper end, and an abutment (14) arranged between two adjacent platforms (1); it is characterized in that: both ends of each of the bridge abutments (14) are provided with extension inserts (141), the upper surface of the support platform (1) is provided with a slot (131) for inserting each extension board (141), and each of the bridge platforms (14) is close to the slot (131). A fixing component (2) for firmly inserting the extension board (141) into the slot (131) is provided. 2.根据权利要求1所述的一种桥梁的桥台与路基结合处的结构,其特征在于:每一所述桥台(14)端部均设置有若干个延伸插板(141),相邻桥台(14)相互靠近处的延伸插板(141)交错插设于插槽(131)内,且每一所述插槽(131)内的延伸插板(141)的侧壁相互贴合。2. The structure at the junction between the abutment and the roadbed of a bridge according to claim 1, wherein the end of each abutment (14) is provided with a plurality of extension inserts (141), corresponding to the The extension boards (141) adjacent to the bridge abutments (14) that are close to each other are inserted in the slots (131) alternately, and the side walls of the extension boards (141) in each of the slots (131) are attached to each other combine. 3.根据权利要求2所述的一种桥梁的桥台与路基结合处的结构,其特征在于:所述固定组件(2)包括盖板(21)、贯穿插设于盖板(21)其中一端的注浆管(22),以及贯穿插设于盖板(21)另一端的出浆管(23);每一所述延伸插板(141)上表面均开设有供盖板(21)插设的让位缺口(143),每一所述延伸插板(141)端壁均贯穿开设有注浆孔(141),所述盖梁(13)内部开设有供注浆管(22)插设的第一固定孔(132),以及供出浆管(23)插设的第二固定孔(135),所述第一固定孔(132)、第二固定孔(135)、注浆孔(141)相互连通。3. The structure at the junction between the abutment and the roadbed of a bridge according to claim 2, wherein the fixing assembly (2) comprises a cover plate (21), which is inserted through the cover plate (21). A grouting pipe (22) at one end, and a grouting pipe (23) inserted through the other end of the cover plate (21); a cover plate (21) is provided on the upper surface of each of the extended insert plates (141) In the insertion gap (143), a grouting hole (141) is formed through the end wall of each of the extending inserts (141), and a grouting pipe (22) is provided inside the cover beam (13) A first fixing hole (132) inserted, and a second fixing hole (135) inserted into the slurry feeding and discharging pipe (23), the first fixing hole (132), the second fixing hole (135), the grouting hole (141) communicate with each other. 4.根据权利要求3所述的一种桥梁的桥台与路基结合处的结构,其特征在于:每一所述延伸插板(141)靠近注浆孔(141)处均插设有挡浆管(142),所述挡浆管(142)沿注浆孔(141)长度方向滑移,且相邻所述挡浆管(142)端壁相互贴合,所述盖梁(13)内部设置有用于驱动每一滑管(151)滑移至相邻两个延伸插板(141)接缝处的驱动组件(15)。4. The structure of the junction between the abutment and the roadbed of the bridge according to claim 3, characterized in that: each of the extending inserts (141) is provided with a grout block near the grouting hole (141). A pipe (142), the slurry retaining pipe (142) slides along the length direction of the grouting hole (141), and the end walls of the adjacent slurry retaining pipes (142) are attached to each other, and the inside of the cover beam (13) A driving assembly (15) is provided for driving each sliding pipe (151) to slide to the joint of two adjacent extension inserting boards (141). 5.根据权利要求4所述的一种桥梁的桥台与路基结合处的结构,其特征在于:所述桥台(14)内开设有注浆腔室(133)和出浆腔室(134),所述注浆腔室(133)位于第一固定孔(132)与插槽(131)之间,所述注浆腔室(133)位于插槽(131)与第二固定孔(135)之间;所述驱动组件(15)包括插设于注浆腔室(133)内的滑管(151),所述滑管(151)其中一端贴合于与之相靠近处的挡浆管(142)端壁,所述滑管(151)另一端设置有对接斜面(1511),所述注浆管(22)下端设置有与对接斜面(1511)相适配抵接斜面(222)。5. The structure of the junction between the abutment and the roadbed of a bridge according to claim 4, wherein the abutment (14) is provided with a grouting chamber (133) and a grouting chamber (134) ), the grouting chamber (133) is located between the first fixing hole (132) and the slot (131), and the grouting chamber (133) is located between the slot (131) and the second fixing hole (135) ); the drive assembly (15) includes a sliding pipe (151) inserted in the grouting chamber (133), one end of the sliding pipe (151) is attached to the slurry blocking near it The end wall of the pipe (142), the other end of the sliding pipe (151) is provided with a butt slope (1511), and the lower end of the grouting pipe (22) is provided with an abutment slope (222) that matches the butt slope (1511). . 6.根据权利要求5所述的一种桥梁的桥台与路基结合处的结构,其特征在于:所述注浆管(22)侧壁贯穿开设有若干个助流通孔(221)。6 . The structure of the joint between the abutment and the roadbed of the bridge according to claim 5 , wherein a plurality of flow-assisting holes ( 221 ) are formed through the side wall of the grouting pipe ( 22 ). 7 . 7.根据权利要求6所述的一种桥梁的桥台与路基结合处的结构,其特征在于:所述驱动组件(15)还包括固定连接于滑管(151)外侧壁、每一挡浆管(142)外侧壁的滑块(152),所述驱动组件(15)还包括焊接于每一滑块(152)侧壁的限位弹簧(153),所述注浆腔室(133)内壁,以及注浆孔(141)内壁均开设有供滑块(152)插设的滑槽(1411),所述限位弹簧(153)固定连接于滑槽(1411)内壁与滑块(152)侧壁之间。7. The structure at the junction between the abutment and the roadbed of a bridge according to claim 6, characterized in that: the drive assembly (15) further comprises: The sliding block (152) on the outer side wall of the pipe (142), the driving assembly (15) further comprises a limit spring (153) welded on the side wall of each sliding block (152), the grouting chamber (133) The inner wall and the inner wall of the grouting hole (141) are provided with a chute (1411) for inserting the slider (152), and the limit spring (153) is fixedly connected to the inner wall of the chute (1411) and the slider (152). ) between the side walls. 8.根据权利要求1所述的一种桥梁的桥台与路基结合处的结构,其特征在于:每一所述桥台(14)下表面还设置有支撑组件(3),所述支撑组件(3)包括支撑架(31),设置于支撑架(31)上端面的三角块(32),以及设置于支撑架(31)下端的支撑底座(33);所述三角块(32)其中一个直角边固定连接于桥台(14)下表面,所述三角块(32)另一直角边贴合于盖梁(13)侧壁;所述支撑底座(33)固定连接于承台(1)上表面。8. The structure at the junction between the abutment and the roadbed of a bridge according to claim 1, characterized in that: the lower surface of each abutment (14) is further provided with a support assembly (3), the support assembly (3) comprising a support frame (31), a triangular block (32) arranged on the upper end surface of the support frame (31), and a support base (33) arranged at the lower end of the support frame (31); the triangular block (32) wherein One right-angled side is fixedly connected to the lower surface of the abutment (14), and the other right-angled side of the triangular block (32) is attached to the side wall of the cover beam (13); the supporting base (33) is fixedly connected to the bearing platform (1) ) on the top surface. 9.根据权利要求8所述的一种桥梁的桥台与路基结合处的结构,其特征在于:每一所述承台(1)上表面对称设置有连接杆(11),每一所述支撑底座(33)下表面均开设有供连接杆(11)插设的连接槽(331),所述对接槽内插设有装盛有胶水的胶囊体(332),所述连接杆(11)侧壁设置有用于刺破胶囊体(332)的刺杆(111)。9. The structure at the junction between the abutment and the roadbed of a bridge according to claim 8, characterized in that: a connecting rod (11) is symmetrically arranged on the upper surface of each of the bearing platforms (1), and each of the The lower surface of the support base (33) is provided with a connecting groove (331) for inserting the connecting rod (11), a capsule body (332) containing glue is inserted in the butting groove, and the connecting rod (11) ) The side wall is provided with a thorn (111) for piercing the capsule body (332). 10.根据权利要求1-7任一所述的一种桥梁的桥台与路基结合处的结构所采用的施工方法,包括如下步骤:10. The construction method adopted by the structure at the junction of the abutment of a bridge and the roadbed according to any one of claims 1-7, comprising the steps: S1、根据施工要求安装承台(1)、墩柱(12)以及盖梁(13),将两个桥台(14)吊设至承台(1)上方,使得两个桥台(14)上的延伸插板(141)共同插设于插槽(131)内,再将盖板(21)盖合在让位缺口(143)内;S1. Install the cap (1), the pier column (12) and the cover beam (13) according to the construction requirements, and hoist the two abutments (14) above the cap (1), so that the two abutments (14) The extension boards (141) on the top are jointly inserted into the slots (131), and then the cover plates (21) are covered in the vacant gaps (143); S2、向注浆管(22)内注入水泥砂浆,水泥砂浆经流入滑管(151)内,再流入挡浆管(142)内,最后经第二固定孔(135)流入出浆管(23),当水泥上浆充盈至出浆管(23)上管口时停止注浆,待水泥砂浆凝固成型之后,从而使得延伸插板(141)稳固插设于插槽(131)内,实现相邻桥台(14)的连接。S2. Inject cement mortar into the grouting pipe (22), the cement mortar flows into the sliding pipe (151), then flows into the grout blocking pipe (142), and finally flows into the grout outlet pipe (23) through the second fixing hole (135). ), stop grouting when the cement sizing is filled to the upper nozzle of the slurry outlet pipe (23), and after the cement mortar is solidified and formed, the extension insert plate (141) is stably inserted in the slot (131), and the adjacent Connection of abutments (14).
CN202110772931.3A 2021-07-08 2021-07-08 Structure of bridge abutment and roadbed joint and construction method Active CN113605217B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110772931.3A CN113605217B (en) 2021-07-08 2021-07-08 Structure of bridge abutment and roadbed joint and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110772931.3A CN113605217B (en) 2021-07-08 2021-07-08 Structure of bridge abutment and roadbed joint and construction method

Publications (2)

Publication Number Publication Date
CN113605217A true CN113605217A (en) 2021-11-05
CN113605217B CN113605217B (en) 2023-03-21

Family

ID=78304223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110772931.3A Active CN113605217B (en) 2021-07-08 2021-07-08 Structure of bridge abutment and roadbed joint and construction method

Country Status (1)

Country Link
CN (1) CN113605217B (en)

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06264517A (en) * 1993-03-16 1994-09-20 Ozawa Concrete Kogyo Kk Connection structure of plate material
FR2815651A1 (en) * 2000-10-24 2002-04-26 Pierre Dequet Bridge module comprises upper and lower platforms separated by support columns, with upper platform connected to columns by mounting rails
CN205205654U (en) * 2015-12-04 2016-05-04 郑州大学 Seam construction of precast concrete festival segmentation bridge
CN205839569U (en) * 2016-07-22 2016-12-28 中铁第四勘察设计院集团有限公司 Precast body wet seam attachment structure
CN107237329A (en) * 2017-06-12 2017-10-10 武汉大学 Grouting device and grouting method
CN108867309A (en) * 2018-09-18 2018-11-23 赵文富 A kind of assembled steel bridge
CN109440623A (en) * 2018-11-20 2019-03-08 湖南工业大学 The interim splicing structure of concrete segment precast bridge
CN110761463A (en) * 2019-12-03 2020-02-07 中冶建筑研究总院有限公司 Full-prefabricated assembled floor
CN210421082U (en) * 2019-06-26 2020-04-28 王兵 Bridge pile foundation reinforced structure
CN111733697A (en) * 2019-11-25 2020-10-02 湖南工业大学 Prefabricated Assembled Laminated Panel Construction
CN111980169A (en) * 2020-09-03 2020-11-24 青岛理工大学 Assembly type shear wall lock inserting and connecting device and application and using method thereof
CN112376391A (en) * 2020-10-26 2021-02-19 上海市政工程设计研究总院(集团)有限公司 Assembly type hydrophilic plank road and construction method
CN212670274U (en) * 2020-06-01 2021-03-09 湖南大学 Cast-in-place joint structure of ultra-high performance concrete beam-slab with embedded reinforcing steel plate
CN212926718U (en) * 2020-06-23 2021-04-09 中国建筑标准设计研究院有限公司 Prefabricated horizontal grouting sleeve connecting wall unit and wall
CN112761068A (en) * 2021-01-12 2021-05-07 湖南中路华程桥梁科技股份有限公司 T-shaped wet joint structure between prefabricated plates of UHPC bridge floor

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06264517A (en) * 1993-03-16 1994-09-20 Ozawa Concrete Kogyo Kk Connection structure of plate material
FR2815651A1 (en) * 2000-10-24 2002-04-26 Pierre Dequet Bridge module comprises upper and lower platforms separated by support columns, with upper platform connected to columns by mounting rails
CN205205654U (en) * 2015-12-04 2016-05-04 郑州大学 Seam construction of precast concrete festival segmentation bridge
CN205839569U (en) * 2016-07-22 2016-12-28 中铁第四勘察设计院集团有限公司 Precast body wet seam attachment structure
CN107237329A (en) * 2017-06-12 2017-10-10 武汉大学 Grouting device and grouting method
CN108867309A (en) * 2018-09-18 2018-11-23 赵文富 A kind of assembled steel bridge
CN109440623A (en) * 2018-11-20 2019-03-08 湖南工业大学 The interim splicing structure of concrete segment precast bridge
CN210421082U (en) * 2019-06-26 2020-04-28 王兵 Bridge pile foundation reinforced structure
CN111733697A (en) * 2019-11-25 2020-10-02 湖南工业大学 Prefabricated Assembled Laminated Panel Construction
CN110761463A (en) * 2019-12-03 2020-02-07 中冶建筑研究总院有限公司 Full-prefabricated assembled floor
CN212670274U (en) * 2020-06-01 2021-03-09 湖南大学 Cast-in-place joint structure of ultra-high performance concrete beam-slab with embedded reinforcing steel plate
CN212926718U (en) * 2020-06-23 2021-04-09 中国建筑标准设计研究院有限公司 Prefabricated horizontal grouting sleeve connecting wall unit and wall
CN111980169A (en) * 2020-09-03 2020-11-24 青岛理工大学 Assembly type shear wall lock inserting and connecting device and application and using method thereof
CN112376391A (en) * 2020-10-26 2021-02-19 上海市政工程设计研究总院(集团)有限公司 Assembly type hydrophilic plank road and construction method
CN112761068A (en) * 2021-01-12 2021-05-07 湖南中路华程桥梁科技股份有限公司 T-shaped wet joint structure between prefabricated plates of UHPC bridge floor

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
葛继平等: "预制拼装盖梁施工方式对比分析", 《应用技术学报》 *

Also Published As

Publication number Publication date
CN113605217B (en) 2023-03-21

Similar Documents

Publication Publication Date Title
CN109083003B (en) A pier top connection structure for prefabricated bridge piers and its construction method
CN108442237B (en) Structure for rapid splicing of prefabricated bridge pier and prefabricated bearing platform and construction method of structure
KR101713863B1 (en) the rigid connection structure between precast concrete column and precast concrete beam using the temporary bracket installing precast concrete column, the modular system using the same
CN109837994A (en) A kind of Prefabricated reinforced concrete is whole to pour building structure and its construction method
CN106836268A (en) Column foundation and foundation structure of building
KR101638093B1 (en) Rahmen using hinge type pc wall and method for constructing the same
JP2018135678A (en) Support column installation structure and guard fence
KR101569882B1 (en) Precast pier construction method with enlarged base block
CN113605217A (en) Structure of bridge abutment and roadbed joint and construction method
KR101606439B1 (en) Spacer for fixing between truss girder and deck plate combine
CN212271444U (en) A hanging-pull assembly stairwell structure
CN219430563U (en) Construction structure of splicing system of highway reconstruction and expansion bridge
JP2002206209A (en) Bridge with upper and lower integrated structure and its construction method
JP5423911B2 (en) Construction method of viaduct column-beam joint, viaduct
KR101124337B1 (en) A construct for a bicycle track or a sidewalk, and constructing method of it
CN213709140U (en) Pier is assembled in prefabrication through steel bar grout bellows coupling
JP4636538B2 (en) Construction method of precast reinforced concrete buildings
CN212743203U (en) High-strength concrete prefabricated staircase
JP2004324340A (en) Steel shell for footing foundation, bridge structure, bridge construction method, and three-dimensional intersection bridge construction method
JP3914457B2 (en) Joining method of precast panel zone and lower column member
CN113338486A (en) Assembled steel-concrete frame shear wall building system
KR101807093B1 (en) Branch girder structure
CN105908755A (en) Deep foundation pit supporting structure adopting steel pipe temporary strut
CN105442856B (en) A kind of multi-angle gross ton position casing construction method of installation
KR102824821B1 (en) Column joint apparatus with corrugated inner wall and reinforced module and modular pier using same

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Structure and construction method of the joint between the bridge abutment and the roadbed of a bridge

Granted publication date: 20230321

Pledgee: Zhejiang Tailong Commercial Bank Co.,Ltd. Ningbo Fenghua sub branch

Pledgor: Tongxin Eco-environment Technology Co.,Ltd.

Registration number: Y2025980002212