Construction platform for mounting overhanging structure curtain wall and mounting method Download PDF

Info

Publication number
CN113445723A
CN113445723A CN202110843772.1A CN202110843772A CN113445723A CN 113445723 A CN113445723 A CN 113445723A CN 202110843772 A CN202110843772 A CN 202110843772A CN 113445723 A CN113445723 A CN 113445723A
Authority
CN
China
Prior art keywords
platform
overhanging
construction
installation
curtain wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110843772.1A
Other languages
Chinese (zh)
Inventor
祝胜
庄陆挺
程雪辰
龚军
冯宗义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Reclaim Construction Group Co ltd
Changjiang Institute of Survey Planning Design and Research Co Ltd
Original Assignee
Zhejiang Reclaim Construction Group Co ltd
Changjiang Institute of Survey Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Reclaim Construction Group Co ltd, Changjiang Institute of Survey Planning Design and Research Co Ltd filed Critical Zhejiang Reclaim Construction Group Co ltd
Priority to CN202110843772.1A priority Critical patent/CN113445723A/en
Publication of CN113445723A publication Critical patent/CN113445723A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/18Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/006Scaffold with cantilevered sections, e.g. to accommodate overhangs or recesses in the facade
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/007Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Movable Scaffolding (AREA)

Abstract

The invention provides a construction platform and an installation method for installing an overhanging structure curtain wall, wherein the construction platform for installing the overhanging structure curtain wall comprises a hanging platform, a connecting structure and a scaffold structure, wherein the hanging platform is suitable for being arranged below an overhanging structure; suspend in midair the platform and be located the ascending both ends of structure width direction of encorbelmenting and be equipped with the extension, scaffold puts up the structure and is suitable for the setting in extension department, and scaffold puts up the structure interval setting of encorbelmenting with the structure of encorbelmenting on the structure width direction of encorbelmenting. According to the invention, the suspension platform is arranged below the cantilever structure, so that the convenience of mounting and dismounting the construction platform is improved, the construction time for mounting the curtain wall for the cantilever structure is saved, the structure of the construction platform is simplified, and the cost of the construction platform is saved; moreover, the suspension platform is connected with the cantilever structure through the connecting structure and is provided with the scaffold structure, so that the stability of the construction platform for mounting the curtain wall of the cantilever structure and the construction safety of construction workers are improved.

Description

Construction platform for mounting overhanging structure curtain wall and mounting method
Technical Field
The invention relates to the technical field of building construction, in particular to a construction platform and a mounting method for mounting a curtain wall of an overhanging structure.
Background
With the development of the water conservancy building industry in China, the appearance of buildings and related requirements matched with surrounding natural landscapes begin to be considered in the design stage of a plurality of water conservancy buildings, and curtain wall structures are adopted outside the water conservancy buildings in a plurality of cities at present, particularly on high-altitude overhanging parts such as corridors of the water conservancy buildings. For example, curtain wall installation at the high-altitude overhanging part of the corridor is generally carried out by erecting a construction platform, but the existing construction platform is generally erected and supported on the ground or hung in the air by a hanging basket, and the construction platform erected and supported on the ground increases the cost and the installation difficulty of the construction platform and is not suitable for curtain wall installation at the high-altitude overhanging part; for example, the construction platform of the hanging basket is difficult to keep stable, is not beneficial to the safety of construction workers, and is difficult to realize the standardized construction of the curtain wall.
Disclosure of Invention
The invention solves the problems that: how to reduce the cost and the installation degree of difficulty of construction platform, promote construction platform's stability.
In order to solve the above problems, the present invention provides a construction platform for mounting a curtain wall of an overhanging structure, which includes a hanging platform suitable for being disposed below the overhanging structure, a connecting structure suitable for connecting the hanging platform and the overhanging structure, and a scaffold structure; the platform that suspends in midair is located structure width direction's both ends of encorbelmenting are equipped with the extension, scaffold puts up the structure and is suitable for the setting and is in extension department, just scaffold puts up the structure width direction of encorbelmenting go up with the structure interval of encorbelmenting sets up.
Optionally, the suspension platform comprises a plurality of main beams and a plurality of secondary beams, the plurality of main beams are suitable for being arranged at intervals along the length direction of the cantilever structure, the plurality of secondary beams are suitable for being arranged at intervals along the width direction of the cantilever structure, and each secondary beam is suitable for connecting at least two main beams; the upper end of the connecting structure is suitable for being connected with the overhanging structure, and the lower end of the connecting structure is suitable for being connected with the main beam and/or the secondary beam.
Optionally, the scaffold structure includes even wall spare and in the structure width direction of encorbelmenting with the scaffold body that the structure interval of encorbelmenting set up, even wall spare is suitable for connecting the scaffold body with the structure of encorbelmenting.
Optionally, the connecting structure comprises a boom adapted to be vertically disposed between the suspended platform and the overhanging structure and connecting the lower end of the overhanging structure with the suspended platform.
Optionally, the connection structure further includes a diagonal draw bar, and the diagonal draw bar is adapted to connect the lower end of the cantilever structure and the extension portion.
Optionally, the connecting structure further comprises a connecting cable adapted to connect the upper end of the cantilever structure with the extension portion.
In order to solve the above problem, the present invention further provides a method for installing a construction platform for installing an overhanging structure curtain wall, which is suitable for installing the construction platform for installing an overhanging structure curtain wall on an overhanging structure, and includes:
assembling the suspension platform on the ground;
hoisting the suspension platform to the position below the cantilever structure;
a scaffold structure is mounted at the extension of the suspended platform.
Optionally, said assembling said suspended platform at ground level comprises:
a primary beam and a secondary beam connecting the suspended platform;
and laying templates on the main beam and the secondary beam.
Optionally, the hoisting the suspended platform to the lower side of the overhanging structure comprises:
hoisting the suspension platform to the position below the cantilever structure;
and connecting the suspension platform with the cantilever structure through a connecting structure.
Optionally, the hoisting the suspended platform to the lower side of the overhanging structure comprises:
sequentially hoisting a plurality of suspension platforms along the length direction of the cantilever structure below the cantilever structure;
connecting adjacent ones of the suspended platforms.
Compared with the prior art, the invention has the following beneficial effects: by arranging the suspension platform below the overhanging structure, on one hand, a standing construction space is provided for construction workers, and the arrangement of the scaffold structure on the suspension platform is facilitated; on the other hand, the suspension platform is convenient to hoist through machinery such as a crane, so that the mounting and dismounting convenience of the construction platform for mounting the curtain wall of the cantilever structure is improved, and the construction time for mounting the curtain wall of the cantilever structure is saved; on the other hand, the structure of the construction platform for installing the overhanging structure curtain wall is simplified, and the cost of the construction platform for installing the overhanging structure curtain wall is saved. Through set up connection structure in order to connect between hanging in midair the platform and the structure of encorbelmenting and hang the platform and encorbelment the structure, promoted and hung in midair the stability of being connected between platform and the structure of encorbelmenting and construction worker's construction safety nature, be convenient for realize the standardized construction of curtain. Moreover, the scaffold structure with a certain distance from the overhanging structure is arranged at the extending part of the overhanging platform, so that a construction worker can stably stand on the scaffold structure to install the curtain wall for the side wall of the overhanging structure, a sufficient space is provided for installing the curtain wall of the side wall of the overhanging structure, the safety of the construction worker is guaranteed, and the standardized construction of the curtain wall is convenient to realize.
Drawings
FIG. 1 is a schematic structural diagram of a construction platform for installing a curtain wall of an overhanging structure, which is arranged on the overhanging structure in the embodiment of the invention;
FIG. 2 is a schematic structural diagram of another view angle when the construction platform for installing the curtain wall of the cantilever structure is arranged on the cantilever structure in the embodiment of the invention;
FIG. 3 is a flow chart of a method of installing a construction platform for installation of an overhanging structural curtain wall in an embodiment of the invention;
FIG. 4 is a sub-flowchart of FIG. 3;
FIG. 5 is another sub-flowchart of FIG. 3;
fig. 6 is yet another sub-flowchart of fig. 3.
Description of reference numerals:
1-suspended platform, 11-extension, 12-main beam; 2-connecting structure, 21-hanging rod, 22-diagonal draw bar, 23-connecting cable; 3-overhanging structure.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present invention comprehensible, embodiments accompanied with figures are described in detail below.
In the coordinate system XYZ provided herein, the X axis represents forward, the X axis represents backward, the Y axis represents forward, the Y axis represents leftward, the Z axis represents forward, and the Z axis represents backward.
With reference to fig. 1 and fig. 2, an embodiment of the present invention provides a construction platform for installing a curtain wall of an overhanging structure 3, including a suspension platform 1 adapted to be disposed below the overhanging structure 3, a connecting structure 2 adapted to connect the suspension platform 1 and the overhanging structure 3, and a scaffold structure; hang in midair platform 1 and be located the ascending both ends of 3 width direction of structure of encorbelmenting and be equipped with extension 11, scaffold puts up the structure and is suitable for the setting in extension 11 department, and scaffold puts up the structure 3 width direction of encorbelmenting and set up with the structure 3 interval of encorbelmenting.
In this embodiment, a construction platform for encorbelmenting 3 curtain installations of structure is applicable to the structure 3 of encorbelmenting of vestibule (shelter bridge), for example, the vestibule adopts the steel construction that is frame construction usually as the main part to install the curtain above that, a construction platform for encorbelmenting 3 curtain installations of structure then is used for providing the station for the constructor who encorbelments 3 installation curtain (for example glass curtain wall etc.) of structure, with the convenience and the security that promote the installation of the 3 curtain of structure of encorbelmenting. The construction platform for installing the curtain wall of the cantilever structure 3 comprises a suspension platform 1, wherein the suspension platform 1 is suitable for being arranged below the cantilever structure 3 (namely, the Z axis is reverse in figure 1) and has a certain distance with the lower end of the cantilever structure 3 (namely, the cantilever structure 3 is arranged at one end of the Z axis in figure 1) in the arrangement direction, so that a space for standing construction is provided for construction workers, and the suspension platform 1 is convenient to hoist the suspension platform 1 through machinery such as a crane. Suspend platform 1 in midair and be connected through connection structure 2 with structure 3 of encorbelmenting, specifically, connection structure 2 sets up and suspends platform 1 in midair and encorbelment between the structure 3 and its both ends respectively with suspend platform 1 and structure 3 of encorbelmenting and be connected to promote and suspend platform 1 in midair and the steadiness of being connected of structure 3 of encorbelmenting, guarantee the safety when construction worker constructs. On the width direction of structure 3 encorbelmenting (Y axle direction in fig. 1 promptly), the size of suspending platform 1 in midair is greater than the width of structure 3 encorbelmenting, and scaffold structure is then vertical setting (along Z axle direction setting in fig. 1 promptly) in the extension 11 department that suspends platform 1 and be located the structure 3 width direction of encorbelmenting both ends in midair to in order that construction workman stands steadily for the structural 3 lateral walls installation curtain of encorbelmenting of scaffold, guaranteed construction workman's safety and be convenient for realize the standardized construction of curtain. Moreover, scaffold structure and the 3 intervals of structure of encorbelmenting set up in the 3 width direction of structure of encorbelmenting, scaffold structure has the certain interval with the structure 3 of encorbelmenting on the 3 width direction of structure of encorbelmenting promptly, for the curtain installation of the 3 lateral walls of structure of encorbelmenting provides sufficient space.
In the prior art, curtain wall installation at a high-altitude overhanging part of a corridor is generally carried out by erecting a construction platform, but the existing construction platform is generally erected and supported on the ground or hung in the air by a hanging basket, and the construction platform erected and supported on the ground increases the cost and the installation difficulty of the construction platform and is not suitable for curtain wall installation at a higher high-altitude overhanging part; for example, the construction platform of the hanging basket is difficult to keep stable, is not beneficial to the safety of construction workers, and is difficult to realize the standardized construction of the curtain wall. In the embodiment, the suspension platform 1 is arranged below the overhanging structure 3, so that on one hand, a standing construction space is provided for construction workers, and the arrangement of the scaffold structure on the suspension platform 1 is facilitated; on the other hand, the suspension platform 1 is convenient to hoist the suspension platform 1 through a crane, so that the mounting and dismounting convenience of a construction platform for mounting the curtain wall of the cantilever structure 3 is improved, and the construction time for mounting the curtain wall for the cantilever structure 3 is saved; on the other hand, the structure of the construction platform for installing the cantilever structure 3 curtain wall is simplified, and the cost of the construction platform for installing the cantilever structure 3 curtain wall is saved. Through set up connection structure 2 in order to connect between platform 1 and the structure 3 of encorbelmenting in midair between platform 1 and the structure 3 of encorbelmenting, promoted and suspended in midair the steadiness of being connected between platform 1 and the structure 3 of encorbelmenting and construction workman's construction safety nature, be convenient for realize the standardized construction of curtain. Moreover, the scaffold structure with a certain distance from the overhanging structure 3 (in the width direction of the overhanging structure 3) is arranged at the extending part 11 of the hanging platform 1, so that a construction worker can stably stand on the scaffold structure to install the curtain wall for the side wall of the overhanging structure 3, and a sufficient space is provided for the installation of the curtain wall of the side wall of the overhanging structure 3, thereby ensuring the safety of the construction worker and facilitating the standardized construction of the curtain wall.
Optionally, as shown in fig. 1 and 2, the suspension platform 1 includes a plurality of main beams 12 and secondary beams, the plurality of main beams 12 are suitable for being arranged at intervals along the length direction of the cantilever structure 3, the plurality of secondary beams are suitable for being arranged at intervals along the width direction of the cantilever structure 3, and each secondary beam is connected with at least two main beams 12; the upper end of the connecting structure 2 is adapted to be connected to the cantilever structure 3, and the lower end of the connecting structure 2 is adapted to be connected to the main beam 12 and/or the secondary beam.
In this embodiment, the main beams 12 of the suspended platform 1 are spaced along the length direction of the cantilever structure 3 (i.e. the X-axis direction in fig. 2), the secondary beams of the suspended platform 1 are spaced along the width direction of the cantilever structure 3 (for example, the secondary beams are perpendicular to the main beams 12), and the secondary beams are adapted to connect (for example, by welding) at least two main beams 12, so that the stability of the suspended platform 1 as a whole is improved by the connection between the main beams 12 and the secondary beams. The upper end of connection structure 2 (connection structure 2 is located the positive one end of Z axle in fig. 1 promptly) is connected on overhanging structure 3, and connection structure 2's lower extreme is then connected on girder 12 and/or secondary beam to promote the steadiness of hanging in midair between platform 1 and the overhanging structure 3 and be connected, guarantee the stability and the security of construction workman's construction.
In some embodiments, the main beams 12 are made of i-steel, and the secondary beams are made of light steel keels, so that the mass, cost and installation difficulty of the suspended platform 1 are reduced while the structural strength of the suspended platform 1 is ensured.
Optionally, the suspended platform 1 further comprises formworks adapted to be laid on the primary beams 12 and the secondary beams.
In this embodiment, templates (not shown) are laid on the main beams 12 and the secondary beams of the suspension platform 1, and a plurality of templates are fully laid on the suspension platform 1 to increase the bearing area of the suspension platform 1, on one hand, the safety of construction workers moving on the suspension platform 1 is improved; on the other hand, accidents (such as smashing people or buildings under the suspension platform 1) caused by falling of objects (such as construction materials and the like) on the suspension platform 1 are avoided.
Optionally, the scaffold structure includes even wall spare and the scaffold body that sets up with the structure 3 intervals of encorbelmenting in the structure 3 width direction of encorbelmenting, even wall spare is suitable for connecting the scaffold body and the structure 3 of encorbelmenting.
In this embodiment, scaffold structure's scaffold frame body (not shown in the figure) is preferably double scaffold to when guaranteeing to provide stable station for constructor, reduce the space that scaffold frame body occupy and alleviate scaffold frame body's weight, thereby alleviate the load that suspends platform 1 in midair, guarantee constructor's construction safety on the construction platform that is used for encorbelmenting the installation of structure 3 curtain. And the double-row-foot scaffold is arranged at intervals with the cantilever structure 3 in the width direction of the cantilever structure 3 so as to provide enough space for installing the curtain wall on the side wall of the cantilever structure 3. The wall connecting piece (not shown in the figure) of the scaffold structure is used for connecting the double-row scaffold and the overhanging structure 3, so that the double-row scaffold is arranged on the basis of the overhanging platform 1, the part of the overhanging platform 1 is far away from the overhanging structure 3 and the double-row scaffold through connection to ensure the stability of the upper end part of the double-row scaffold, the integral stability of the double-row scaffold is improved, and the construction safety of constructors on a construction platform for installing the 3-curtain wall of the overhanging structure is ensured.
In some embodiments, the distance between the scaffolding structure and the cantilever structure 3 in the width direction of the cantilever structure 3 is 30cm, the vertical rod longitudinal distance of the double-row scaffolding of the scaffolding structure is 0.6m, and the vertical rod transverse distance (row distance) is 1.5 m.
Optionally, there are two sets of scaffold bodies adapted to be arranged at two extensions 11 of the suspended platform 1, respectively.
In this embodiment, two sets of vertical settings of scaffold body are hanging in midair that platform 1 is located two extensions 11 departments at the structure 3 width direction of encorbelmenting upward both ends to in the installation of the structure 3 two lateral walls department curtain of encorbelmenting. And two sets of scaffold bodies form a relatively confined environment with hanging platform 1 in midair to guarantee the security of construction workman when being used for encorbelmenting the construction platform of 3 curtain installations of structure.
Optionally, as shown in fig. 1 and 2, the scaffolding structure further comprises a safety net adapted to be hung on a side of the double row of scaffolding remote from the cantilever structure 3.
In this embodiment, keep away from the one side of encorbelmenting structure 3 at double scaffold and fill to hang and have the safety net (not shown in the figure) for the building engineering scene of curtain installation provides safety protection, plays the cushioning effect for falling of the people or the thing of building scene, avoids the occurence of failure.
In some embodiments, the security mesh employs a closed mesh security mesh.
Alternatively, as shown in fig. 1 and 2, the connecting structure 2 comprises a boom 21, the boom 21 being adapted to be vertically disposed between the suspended platform 1 and the cantilever structure 3 and to connect the lower end of the cantilever structure 3 with the suspended platform 1.
The jib 21 (for example, flat steel jib 21) of connection structure 2 is suitable for vertical setting, and the structure of encorbelmenting 3 is connected to the upper end of jib 21, and the main beam 12 and/or the secondary beam of platform 1 are suspended in midair in the lower extreme connection of jib 21, so to hang platform 1 in midair below the structure of encorbelmenting 3 steadily, guarantee the stability and the security of construction workman's construction.
In some embodiments, the hanger bar 21 is detachably connected to the overhanging structure 3 to further enhance the convenience of mounting and dismounting the construction platform for curtain wall mounting of the overhanging structure 3. For example, the upper ends of the two booms 21 are clamped to steel structural beams at the lower end of the cantilever structure 3 and connected by fasteners, and the lower ends of the two booms 21 are clamped to main beams 12 of the suspended platform 1 and connected by fasteners, so as to suspend the suspended platform 1 below the cantilever structure 3. Further, the joint of the suspension rod 21 and the overhanging structure 3 and the suspended platform 1 connected by the fastener is further provided with a reinforcing plate (or reinforcing steel bar) to improve the stability of the connection of the suspension rod 21 and the overhanging structure 3 and the suspended platform 1.
Optionally, as shown in fig. 1 and 2, the connecting structure 2 further includes a diagonal draw bar 22, and the diagonal draw bar 22 is adapted to connect the lower end of the cantilever structure 3 and the extending portion 11.
The diagonal draw bar 22 is used for connecting the lower end of the overhanging structure 3 and the extending part 11, so as to further improve the stability of the connection between the suspended platform 1 and the overhanging structure 3 on the basis that the suspended platform 1 and the overhanging structure 3 are connected through the suspension rod 21. And because scaffold structure sets up in extension 11 department, the bearing capacity of extension 11 has been promoted to diagonal draw 22 with being connected of extension 11, has further guaranteed the stable setting of scaffold structure in extension 11 department, has guaranteed constructor's the safety of being under construction on scaffold structure. Moreover, the diagonal draw bar 22 simultaneously supports the extending portion 11 of the suspended platform 1, so as to prevent the extending portion 11 at the other end of the suspended platform 1 from tilting (wherein, the connecting portion of the guide rod and the suspended platform 1 is used as a fulcrum) when the load of the extending portion 11 at one end of the suspended platform 1 is large, thereby ensuring the stability of the suspended platform 1.
In some embodiments, the diagonal draw bars 22 are made of i-steel, and the diagonal draw bars 22 are connected with the cantilever structure 3 and the suspension platform 1 by welding.
Optionally, as shown in fig. 1 and 2, the connecting structure 2 further includes a connecting cable 23, and the connecting cable 23 is adapted to connect the upper end of the cantilever structure 3 with the extension 11.
The connecting cable 23 (for example, a steel wire rope) is used for connecting the upper end of the overhanging structure 3 (that is, the overhanging structure 3 is located at the forward end of the Z axis in fig. 1) and the extension portion 11, so that on the basis that the overhanging platform 1 and the overhanging structure 3 are connected through the suspension rod 21 and the diagonal draw bar 22, the stability of connection between the overhanging platform 1 and the overhanging structure 3 and the bearing capacity of the extension portion 11 are further improved, the stable arrangement of the scaffold structure at the extension portion 11 is ensured, and the construction safety of constructors on the scaffold structure is ensured.
With reference to fig. 1 to 3, another embodiment of the present invention provides an installation method of a construction platform for installing a curtain wall of an overhanging structure 3, which is suitable for installing the above construction platform for installing a curtain wall of an overhanging structure 3 on an overhanging structure 3, and includes the following steps:
step S100, assembling the suspension platform 1 on the ground;
s200, hoisting the suspension platform 1 to the position below the cantilever structure 3;
step S300, mounting the scaffold structure at the extension portion 11 of the suspended platform 1.
In this embodiment, the installation method of the construction platform for installing the overhanging structure 3 curtain wall is suitable for installing the construction platform for installing the overhanging structure 3 curtain wall below the overhanging structure 3, so as to provide a station for a construction worker installing the curtain wall (such as a glass curtain wall) on the overhanging structure 3, and improve the convenience and safety of installing the overhanging structure 3 curtain wall. Before installation and construction, reasonable arrangement is carried out in advance, specifically, construction drawings are designed according to the on-site cantilever structure 3, a construction area is confirmed (so as to avoid influencing other construction areas), selection of building materials is determined (for example, the sizes and materials of the main beam 12, the secondary beam, the suspender 21 and the like are determined), stress measurement and calculation are carried out on the whole construction platform to form a calculation book, corresponding experts are organized to demonstrate stress of the suspension platform, and the demonstration can be implemented through the method so as to ensure the stability of the construction platform for installing the cantilever structure 3 curtain wall and the construction safety of construction workers. During installation construction, the suspension platform 1 is assembled on the ground in step S100, so that the assembly difficulty and cost of the suspension platform 1 are reduced, and the construction safety of construction workers is ensured. Thereafter, in step S200, the suspended platform 1 is hoisted to the lower side of the cantilever structure 3 by the crane prepared in advance, so that the suspended platform 1 is hoisted, and the stability of the suspended platform 1 is ensured. Then, a scaffold structure is installed at the extension 11 of the suspended platform 1 for a construction worker to stand on the scaffold structure to install a curtain wall for the sidewall of the cantilever structure 3, through step S300. Like this, accomplish the installation that is used for the construction platform of encorbelmenting structure 3 curtain installation with the mounting method through the construction platform that is used for the installation of encorbelment structure 3 curtain, make the installation that is used for the construction platform of encorbelmenting structure 3 curtain installation go on in order and rationally, reduced the installation degree of difficulty and the cost of the construction platform that is used for the installation of the structure 3 curtain of encorbelmenting, the convenience of the construction platform installation that is used for the installation of the structure 3 curtain of encorbelmenting has been promoted, the construction cycle of the construction platform installation that is used for the installation of the structure 3 curtain of encorbelmenting has been shortened, the stability of the construction platform that is used for the installation of the structure 3 curtain of encorbelmenting has been guaranteed, be convenient for realizing the standardized construction of curtain.
In some embodiments, the mounting of the scaffolding structure on the extension 11 of the suspended platform 1 includes erection of a scaffolding body, connection of the scaffolding body to the suspended structure 3 by wall connectors, full hanging of a safety net outside the scaffolding body, and the like.
Optionally, as shown in fig. 1-4 in combination, assembling the suspended platform 1 on the ground comprises the following steps:
step S110, connecting a main beam 12 and a secondary beam of the suspension platform 1;
and S120, laying templates on the main beams 12 and the secondary beams.
In this way, through step S110 and step S120, the connection (for example, welding connection) of the main beam 12 and the secondary beam and the laying of the template on the main beam 12 and the secondary beam are completed on the ground, so that the construction of the suspension platform 1 is completed, a stable suspension platform 1 is formed, and the stability of the suspension platform 1 and the safety of construction when the suspension platform 1 is hoisted in the subsequent step are improved.
Optionally, as shown in fig. 1-3 and 5, hoisting the suspended platform 1 to the lower part of the cantilever structure 3 includes the following steps:
step S210, hoisting the suspension platform 1 to the position below the cantilever structure 3;
and S220, connecting the suspension platform 1 with the cantilever structure 3 through the connecting structure 2.
In this way, through steps S210 and S220, the suspension platform 1 is lifted to the lower side of the cantilever structure 3 by the crane, and the construction worker completes the connection of the suspension platform 1 and the cantilever structure 3 by using the connection structure 2, thereby completing the lifting of the suspension platform 1 below the cantilever structure 3. The suspension platform 1 and the cantilever structure 3 are connected through a suspension rod 21, a diagonal draw bar 22, a connecting cable 23 and the like, so that the stability of connection between the suspension platform 1 and the cantilever structure 3 is ensured.
Optionally, as shown in fig. 1-3 and 6, hoisting the suspended platform 1 to the lower part of the cantilever structure 3 includes:
step S230, sequentially hoisting a plurality of suspension platforms 1 along the length direction of the cantilever structure 3 below the cantilever structure 3;
and step S240, connecting the adjacent suspended platforms 1.
In this way, through the steps S230 and S240, the plurality of suspended platforms 1 are sequentially hoisted to the lower side of the cantilever structure 3 along the length direction of the cantilever structure 3, and the adjacent suspended platforms 1 are connected, thereby completing the hoisting of the integral suspended platform 1. Wherein, through adopting a plurality of platforms 1 of suspending in midair to hoist in proper order, reduced the degree of difficulty and the risk of suspending in midair of platform 1, the security when having promoted the construction platform installation that is used for the installation of the 3 curtain of structure of encorbelmenting. Moreover, the installation of the construction platform for installing the cantilever structure 3 curtain wall can be orderly and reasonably carried out, the installation difficulty and the cost of the construction platform for installing the cantilever structure 3 curtain wall are reduced, the convenience for installing the construction platform for installing the cantilever structure 3 curtain wall is improved, the construction period for installing the construction platform for installing the cantilever structure 3 curtain wall is shortened, the stability of the construction platform for installing the cantilever structure 3 curtain wall is ensured, and the standardized construction of the curtain wall is convenient to realize.
Although the present disclosure has been described above, the scope of the present disclosure is not limited thereto. Various changes and modifications may be effected therein by one of ordinary skill in the pertinent art without departing from the spirit and scope of the present disclosure, and these changes and modifications are intended to be within the scope of the present disclosure.

Claims (10)

1. A construction platform for mounting a curtain wall of an overhanging structure is characterized by comprising a hanging platform (1) suitable for being arranged below the overhanging structure (3), a connecting structure (2) suitable for connecting the hanging platform (1) with the overhanging structure (3) and a scaffold structure; suspend platform (1) in midair and be located structure (3) the ascending both ends of width direction of encorbelmenting are equipped with extension (11), scaffold puts up the structure and is suitable for the setting and is in extension (11) department, just scaffold puts up the structure (3) the width direction of encorbelmenting on with structure (3) the interval sets up encorbelmenting.
2. A construction platform for the mounting of curtain walls of overhanging structures according to claim 1, characterized in that the suspension platform (1) comprises main beams (12) and secondary beams, a plurality of said main beams (12) being adapted to be arranged at intervals along the length direction of the overhanging structure (3), a plurality of said secondary beams being adapted to be arranged at intervals along the width direction of the overhanging structure (3), and each of said secondary beams being adapted to connect at least two of said main beams (12); the upper end of connection structure (2) is suitable for connecting structure (3) encorbelments, the lower extreme of connection structure (2) is suitable for connecting girder (12) and/or secondary beam.
3. Construction platform for the curtain-wall installation of overhanging structures according to claim 1 or 2, characterized in that the scaffolding structure comprises wall-connecting pieces adapted to connect the scaffolding body and the overhanging structure (3) and scaffolding bodies arranged at a distance from the overhanging structure (3) in the width direction of the overhanging structure (3).
4. Construction platform for the curtain-wall installation of overhanging structures according to claim 1 or 2, characterized in that the connection structure (2) comprises a boom (21), the boom (21) being adapted to be vertically arranged between the overhanging platform (1) and the overhanging structure (3) and to connect the lower end of the overhanging structure (3) with the overhanging platform (1).
5. Construction platform for the installation of curtain walls of overhanging structures according to claim 4, characterized in that said connection structure (2) further comprises diagonal braces (22), said diagonal braces (22) being suitable for connecting the lower end of the overhanging structure (3) with said extensions (11).
6. Construction platform for the curtain wall installation of overhanging structures according to claim 4, characterized in that the connection structure (2) further comprises a connecting cable adapted to connect the upper end of the overhanging structure (3) with the extension (11).
7. A method for mounting a construction platform for the installation of an overhanging structural curtain wall, suitable for mounting on an overhanging structure (3) a construction platform for the installation of an overhanging structural curtain wall according to any one of claims 1 to 6, comprising:
assembling the suspension platform (1) on the ground;
hoisting the suspension platform (1) to the position below the cantilever structure (3);
a scaffold structure is mounted at the extension (11) of the suspended platform (1).
8. Method for the installation of a construction platform for the installation of curtain walls of overhanging structures according to claim 7, characterized in that said assembling at ground level of the suspended platform (1) comprises:
a primary beam (12) and a secondary beam connecting the suspended platform (1);
and laying templates on the main beams (12) and the secondary beams.
9. Method for the installation of a construction platform for the installation of curtain walls of overhanging structures according to claim 7, characterized in that said hoisting of the platform (1) to below the overhanging structure (3) comprises:
hoisting the suspension platform (1) to the position below the cantilever structure (3);
and connecting the suspension platform (1) with the cantilever structure (3) through a connecting structure (2).
10. Method for the installation of a construction platform for the installation of curtain walls of overhanging structures according to claim 7, characterized in that said hoisting of the platform (1) to below the overhanging structure (3) comprises:
sequentially hoisting a plurality of suspension platforms (1) along the length direction of the cantilever structure (3) below the cantilever structure (3);
connecting adjacent said suspension platforms (1).
CN202110843772.1A 2021-07-26 2021-07-26 Construction platform for mounting overhanging structure curtain wall and mounting method Pending CN113445723A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110843772.1A CN113445723A (en) 2021-07-26 2021-07-26 Construction platform for mounting overhanging structure curtain wall and mounting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110843772.1A CN113445723A (en) 2021-07-26 2021-07-26 Construction platform for mounting overhanging structure curtain wall and mounting method

Publications (1)

Publication Number Publication Date
CN113445723A true CN113445723A (en) 2021-09-28

Family

ID=77817278

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110843772.1A Pending CN113445723A (en) 2021-07-26 2021-07-26 Construction platform for mounting overhanging structure curtain wall and mounting method

Country Status (1)

Country Link
CN (1) CN113445723A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113931430A (en) * 2021-12-01 2022-01-14 中国十七冶集团有限公司 High-altitude overhanging structure curtain wall installation and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864859A (en) * 2012-10-19 2013-01-09 上海市机械施工有限公司 Curtain wall steel support structure, construction method thereof and lifting device for construction
CN103206075A (en) * 2013-04-26 2013-07-17 中国化学工程第三建设有限公司 Suspension platform for construction of steel reinforced concrete cantilever structure
CN203145425U (en) * 2013-03-21 2013-08-21 浙江大学城市学院 Binding type cable crane truss cantilever scaffold
CN205777438U (en) * 2016-05-31 2016-12-07 上海建工五建集团有限公司 A kind of suspension type steel platform legs hand cradle basis
CN106481058A (en) * 2016-10-25 2017-03-08 钟贵洪 A kind of swinging scaffold
CN215564320U (en) * 2021-07-26 2022-01-18 浙江省围海建设集团股份有限公司 A construction platform for encorbelmenting structure curtain installation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864859A (en) * 2012-10-19 2013-01-09 上海市机械施工有限公司 Curtain wall steel support structure, construction method thereof and lifting device for construction
CN203145425U (en) * 2013-03-21 2013-08-21 浙江大学城市学院 Binding type cable crane truss cantilever scaffold
CN103206075A (en) * 2013-04-26 2013-07-17 中国化学工程第三建设有限公司 Suspension platform for construction of steel reinforced concrete cantilever structure
CN205777438U (en) * 2016-05-31 2016-12-07 上海建工五建集团有限公司 A kind of suspension type steel platform legs hand cradle basis
CN106481058A (en) * 2016-10-25 2017-03-08 钟贵洪 A kind of swinging scaffold
CN215564320U (en) * 2021-07-26 2022-01-18 浙江省围海建设集团股份有限公司 A construction platform for encorbelmenting structure curtain installation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113931430A (en) * 2021-12-01 2022-01-14 中国十七冶集团有限公司 High-altitude overhanging structure curtain wall installation and construction method
CN113931430B (en) * 2021-12-01 2023-01-10 中国十七冶集团有限公司 High-altitude overhanging structure curtain wall installation and construction method

Similar Documents

Publication Publication Date Title
CN101672102B (en) Steel structural overhead ceiling construction platform
CN103291076B (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN201221193Y (en) High altitude packway ceiling construction operating platform
CN101177959A (en) Curtain wall unit hanging equipment and construction method thereof
CN103669845A (en) High-altitude long-span overhung cornice formwork supporting system and constructing method thereof
CN110562868B (en) Hoisting construction method for unit type glass curtain wall of super high-rise building
CN201598820U (en) Single-point suspension external hanging rack
CN105649314A (en) Suspension platform for high and long-span corridor construction
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN101892736A (en) High altitude moving hanging basket construction method
CN101503908B (en) Construction method for spacing suspension cable structural template support platform
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN211923476U (en) Electric hoist lifting system attached to lifting scaffold
CN115538792A (en) Residential building machine installation construction method and structure
CN205134919U (en) Modularization suspension type steel tubes clamps scaffold operation platform
CN215564320U (en) A construction platform for encorbelmenting structure curtain installation
CN113445723A (en) Construction platform for mounting overhanging structure curtain wall and mounting method
CN211597658U (en) Movable overhanging scaffold
CN212406038U (en) Lower hanging construction platform module of high-altitude large-cantilever steel roof truss
CN215291319U (en) Multi-point elevator shaft construction lifting platform
CN103743581A (en) Internal climbing tower crane test platform device and test method
CN209742334U (en) Steel construction vestibule bottom curtain construction platform
CN211920714U (en) Support system of pull-up and pull-down type external hanging self-climbing tower crane
CN216339062U (en) Auxiliary assembly for mounting bridge diaphragm beam template
CN111764623A (en) Lower hanging construction platform module of high-altitude large-cantilever steel roof truss and construction method

Legal Events