CN113052420A - Project feasibility evaluation method based on simulation intelligence - Google Patents
Project feasibility evaluation method based on simulation intelligence Download PDFInfo
- Publication number
- CN113052420A CN113052420A CN201911383121.8A CN201911383121A CN113052420A CN 113052420 A CN113052420 A CN 113052420A CN 201911383121 A CN201911383121 A CN 201911383121A CN 113052420 A CN113052420 A CN 113052420A
- Authority
- CN
- China
- Prior art keywords
- acquisition
- data
- data analysis
- server
- report
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Development Economics (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Operations Research (AREA)
- Marketing (AREA)
- Game Theory and Decision Science (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a project feasibility evaluation method based on simulation intelligence, which comprises the following steps: step one, configuring acquisition configuration information to a data terminal through an acquisition control server and issuing the acquisition configuration information to a corresponding data terminal; step two, calling an acquisition tool by the data terminal in the step one during application running, acquiring parameter information of acquisition parameters according to acquisition configuration information, and uploading the acquired parameter information to the data analysis server; analyzing the uploaded parameter information corresponding to each acquisition parameter through the data analysis server in the second step to obtain a data analysis result; step four, sending the data analysis result of the step three to the report generation server; and step five, generating a data report according to the data analysis result by the report generating server in the step four. The invention can timely acquire the requirements and/or habits of the user through the data report, realize project evaluation and better meet the requirements of the user.
Description
Technical Field
The invention relates to a project feasibility evaluation method based on simulation intelligence, and belongs to the technical field of project evaluation.
Background
Project Evaluation is that in direct investment activities, on the basis of feasibility research on investment projects, comprehensive technical and economic demonstration and Evaluation are carried out on plans, designs and implementation schemes of the Project to be invested from the perspective of the whole enterprise, so that the future development prospect of the investment projects is determined.
Different encounters require different collected application data for project quality assessment. Therefore, developers of the service platform need to set different application data acquisition schemes according to different projects. Specifically, a service platform developer needs to set acquisition parameters of each application according to a project provided by a service platform, perform data acquisition on each application according to the set acquisition parameters, and generate a project report of the service platform to know the requirements of the project. However, the number of applications installed on the intelligent terminal is generally large, so that the number of application data to be collected is large, and the data collection formats of the service platforms are difficult to unify.
In order to solve the technical problems, a new technical scheme is especially provided.
Disclosure of Invention
The invention aims to provide a project feasibility evaluation method based on simulation intelligence to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: a project feasibility assessment method based on simulation intelligence, the method comprising the steps of:
step one, configuring acquisition configuration information to a data terminal through an acquisition control server and issuing the acquisition configuration information to a corresponding data terminal;
step two, calling an acquisition tool by the data terminal in the step one during application running, acquiring parameter information of acquisition parameters according to acquisition configuration information, and uploading the acquired parameter information to the data analysis server;
analyzing the uploaded parameter information corresponding to each acquisition parameter through the data analysis server in the second step to obtain a data analysis result;
step four, sending the data analysis result of the step three to the report generation server;
and step five, generating a data report according to the data analysis result by the report generating server in the step four.
Preferably, the collection tool is a collection tool installed in a data terminal.
Preferably, the report generation server is configured to obtain custom event information of a custom event corresponding to an application from the project management page.
Preferably, the custom event information includes, but is not limited to, event information event attributes and event names.
Compared with the prior art, the invention has the beneficial effects that: the acquisition tool acquires parameter information of different acquisition parameters in the data terminal in application operation, uploads the parameter information to the data analysis server, and performs data analysis according to statistical requirements, so that a data report of a corresponding project is generated, the user's requirements and/or habits and the like can be timely known through the data report, project evaluation is realized, and the user requirements are better met.
Drawings
FIG. 1 is a flow chart of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to the attached drawings of the specification, the invention provides a technical scheme that: a project feasibility assessment method based on simulation intelligence, the method comprising the steps of:
step one, configuring acquisition configuration information to a data terminal through an acquisition control server and issuing the acquisition configuration information to a corresponding data terminal;
step two, calling an acquisition tool by the data terminal in the step one during application running, acquiring parameter information of acquisition parameters according to acquisition configuration information, and uploading the acquired parameter information to the data analysis server;
analyzing the uploaded parameter information corresponding to each acquisition parameter through the data analysis server in the second step to obtain a data analysis result;
step four, sending the data analysis result of the step three to the report generation server;
and step five, generating a data report according to the data analysis result by the report generating server in the step four.
Preferably, the collection tool is a collection tool installed in a data terminal.
Preferably, the report generation server is configured to obtain custom event information of a custom event corresponding to an application from the project management page.
Preferably, the custom event information includes, but is not limited to, event information event attributes and event names.
The application of the invention is generally divided into individual user application and enterprise-level application on the object-oriented basis, and mainly comprises xap and appx of iOS (such as synchronous push, etc.), Android (such as AirDroid, Baidu application, etc.) and windows phone on the system classification of the mobile terminal.
And calling an acquisition tool when the application is started and initialized, wherein the acquisition tool needs to acquire parameter information in each acquisition parameter in the application according to the acquisition configuration information when the acquisition tool is adopted to acquire the application data. And after acquiring the parameter information of each acquisition parameter in the application acquired by the acquisition tool, judging whether the condition capable of uploading is met, if so, compressing the parameter information by the acquisition tool according to a preset algorithm and uploading the compressed parameter information to a data analysis server.
The acquisition tool acquires parameter information of different acquisition parameters in the data terminal in application operation, uploads the parameter information to the data analysis server, and performs data analysis according to statistical requirements, so that a data report of a corresponding project is generated, the requirements and/or habits of a user can be timely known through the data report, the project evaluation is realized, and the requirements of the user are better met.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (4)
1. A project feasibility assessment method based on simulation intelligence is characterized in that: the method comprises the following steps:
step one, configuring acquisition configuration information to a data terminal through an acquisition control server and issuing the acquisition configuration information to a corresponding data terminal;
step two, calling an acquisition tool by the data terminal in the step one during application running, acquiring parameter information of acquisition parameters according to acquisition configuration information, and uploading the acquired parameter information to the data analysis server;
analyzing the uploaded parameter information corresponding to each acquisition parameter through the data analysis server in the second step to obtain a data analysis result;
step four, sending the data analysis result of the step three to the report generation server;
and step five, generating a data report according to the data analysis result by the report generating server in the step four.
2. The simulation intelligence-based project feasibility assessment method of claim 1, wherein: the acquisition tool is an acquisition tool installed in the data terminal.
3. The simulation intelligence-based project feasibility assessment method of claim 1, wherein: and the report generation server is used for acquiring the custom event information of the custom event corresponding to the application from the project management page.
4. The simulation intelligence-based project feasibility assessment method of claim 3, wherein: the custom event information includes, but is not limited to, event information event attributes and event names.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911383121.8A CN113052420A (en) | 2019-12-28 | 2019-12-28 | Project feasibility evaluation method based on simulation intelligence |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911383121.8A CN113052420A (en) | 2019-12-28 | 2019-12-28 | Project feasibility evaluation method based on simulation intelligence |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113052420A true CN113052420A (en) | 2021-06-29 |
Family
ID=76507135
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911383121.8A Pending CN113052420A (en) | 2019-12-28 | 2019-12-28 | Project feasibility evaluation method based on simulation intelligence |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113052420A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115422777A (en) * | 2022-10-08 | 2022-12-02 | 广州鑫广源电力设计有限公司 | Feasibility analysis method and system for electric power design project |
-
2019
- 2019-12-28 CN CN201911383121.8A patent/CN113052420A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115422777A (en) * | 2022-10-08 | 2022-12-02 | 广州鑫广源电力设计有限公司 | Feasibility analysis method and system for electric power design project |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106951694B (en) | Adaptive modeling method for online monitoring system of secondary equipment of power system | |
CN112698953A (en) | Power grid intelligent operation and detection platform based on micro-service | |
CN110830437B (en) | Data compression method, device, equipment and storage medium for high-frequency service data | |
CN102955977A (en) | Energy efficiency service method based on cloud technology and energy efficiency service platform thereof | |
CN103325074B (en) | Power system real-time data processing method | |
CN111861424A (en) | Industrial management platform and industrial management system | |
CN102789219A (en) | Energy management system | |
CN108537422A (en) | Security risk early warning system and method | |
CN113852204B (en) | Transformer substation three-dimensional panoramic monitoring system and method based on digital twinning | |
CN107632827A (en) | The generation method and device of the installation kit of application | |
CN114860833A (en) | Data center platform applied to digital twin hydraulic engineering and data processing method | |
CN113688490A (en) | Network co-construction sharing processing method, device, equipment and storage medium | |
CN103151840A (en) | Communication method and device of IEC (international electrotechnical commission) 61850 system and non-IEC 61850 system | |
CN111046000A (en) | Government data exchange sharing oriented security supervision metadata organization method | |
CN104660438A (en) | Problem positioning processing method and device | |
CN113283824A (en) | Comprehensive management method and system for intelligent park data | |
CN113052420A (en) | Project feasibility evaluation method based on simulation intelligence | |
CN104881739A (en) | Marketing and distribution data consistency verification method based on IEC61970-61968 CIM standard | |
CN107577769A (en) | A kind of method for digging and system for measuring expert data | |
CN102014414A (en) | Network optimization intelligent decision wizard system and automatic analysis method | |
CN103247087A (en) | City distribution network graphical intelligent anti-misoperation system and method of system | |
CN111311079A (en) | Comprehensive energy-using service system for large users | |
CN116703114A (en) | Classified storage method, system, device and medium for power dispatching data | |
CN100579032C (en) | Performance data automated management system and method | |
CN111949246A (en) | Method and device for creating new energy power industry application |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20210629 |