CN112942309A - Grid type grouting reinforcement construction method for independent pile foundation - Google Patents

Grid type grouting reinforcement construction method for independent pile foundation Download PDF

Info

Publication number
CN112942309A
CN112942309A CN202110146699.2A CN202110146699A CN112942309A CN 112942309 A CN112942309 A CN 112942309A CN 202110146699 A CN202110146699 A CN 202110146699A CN 112942309 A CN112942309 A CN 112942309A
Authority
CN
China
Prior art keywords
grouting
foundation
grid
pile
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110146699.2A
Other languages
Chinese (zh)
Inventor
陈岩
张杨娟
刘志芳
高子明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jinjian Reinforcing Special Building Engineering Co ltd
Original Assignee
Shanxi Jinjian Reinforcing Special Building Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jinjian Reinforcing Special Building Engineering Co ltd filed Critical Shanxi Jinjian Reinforcing Special Building Engineering Co ltd
Priority to CN202110146699.2A priority Critical patent/CN112942309A/en
Publication of CN112942309A publication Critical patent/CN112942309A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention provides a grid type grouting reinforcement construction method for an independent pile foundation, belongs to the field of building construction, and provides a construction method suitable for foundation reinforcement of a long-span independent pile foundation. Through adopting grid formula slip casting reinforcement method to be under construction to adopt when carrying out the slip casting reinforcement to the pile foundation in every grid cell to form slowly from the extroversion inwards to the foundation and surround, until consolidating to the mode under independent foundation, form crowded density to the near-to-the-body soil body of pile foundation gradually, furthest reduces the disturbance to the foundation soil of pile, reduces the adverse effect that additional subsides and bring, constantly improves stake side frictional resistance and pile end bearing capacity. The method belongs to a construction method which does not affect production, does not excavate the ground, has small size of construction equipment, does not occupy space and has small dynamic and static construction operation.

Description

Grid type grouting reinforcement construction method for independent pile foundation
Technical Field
The invention relates to the technical field of building construction, in particular to a grid type grouting reinforcement construction method adopted after uneven settlement of an independent pile foundation.
Background
The foundation is the cradle of the building, and all the load of the building is transferred to the foundation by the foundation. Existing buildings are used for various reasons, such as: improper design, construction are not tight, the pipeline breaks, the ground is soaked, adjacent building construction causes disturbance etc. all probably exert an influence to the stability of current building foundation, lead to the ground to produce inhomogeneous settlement.
The independent column base is applied to large-span industrial factory building construction, is arranged in a net shape, adopts a pile foundation below the column base, and has relatively few pile foundation reinforcing methods. The large-span structure belongs to large-scale factory buildings and workshops mostly, large-scale equipment, precise instruments and other production systems are arranged indoors, when a main structure goes wrong, the whole production system can be influenced, but production stop is not required or intermittent production stop is less required, and the requirement on reinforcement construction is stricter. Particularly, for pile foundation reinforcement, the method is less in application, and under the condition that production is not affected or production environment is not allowed, reinforcement equipment needs to be miniaturized, space is not occupied, foundation excavation is not needed in construction operation, the ground is not damaged, and working dynamic and static states are small and vibration is not caused.
In view of the above situation, the invention provides a construction method suitable for foundation stabilization of a large-span independent pile foundation.
Disclosure of Invention
The invention provides a grid type grouting reinforcement construction method of an independent pile foundation, which is suitable for foundation reinforcement of a long-span independent pile foundation.
In order to solve the technical problems, the invention adopts the technical scheme that:
a grid grouting reinforcement construction method for an independent pile foundation comprises the following steps:
s1, carrying out various surveys on the foundation condition of the building to be reinforced: firstly, inquiring the existing construction data, and determining the structure type, the foundation type, the original geological exploration condition, the original foundation treatment condition and the building settlement and inclination condition of a building to be reinforced; secondly, performing supplementary investigation or drilling investigation on the foundation of the building to be reinforced again, finding out the disturbance reason of the building foundation, and determining the depth of a foundation soil bearing layer, the soft condition of the foundation and the water content condition in the foundation soil;
s2, determining a foundation reinforcement scheme: according to the investigation condition of S1, making a foundation grouting reinforcement construction scheme, wherein the foundation grouting reinforcement construction scheme comprises grouting hole plane arrangement, grouting hole depth and grouting amount of each hole;
s3, adopting a grid type grouting reinforcement method for construction:
the construction process comprises the following steps: drilling → intubation → sealing → grouting; when one layer is grouted, the column foundation is slowly surrounded from outside to inside until the layer is reinforced to be right below the independent column foundation, and the pile side frictional resistance and the pile end bearing capacity of the original pile foundation are continuously improved;
drilling: the drilling is mechanical drilling, the positions of grouting holes are determined one by one according to the requirements of a design construction drawing, and drilling is carried out, wherein the diameter of the formed hole is 50-70 mm;
inserting a tube: after the hole is formed, inserting a grouting pipe, wherein the grouting pipe is inserted twice, firstly inserting a DN32 pipe, uniformly distributing a plurality of grout outlet holes on the pipe wall, wherein the hole diameter is 6mm, the distance is 200 and 300mm, and the grout outlet holes are pasted by an adhesive tape to prevent the grout outlet holes from being blocked by soil; then, a small tube DN20 is inserted into the DN32 tube, and the tube wall is also distributed with a plurality of grout outlet holes, the aperture is 6mm, and the distance is 200 and 300 mm;
sealing holes: in order to ensure that the grout only invades into the foundation from the grouting pipe during grouting and does not overflow from a gap between the grouting pipe and a grouting hole, the gap between the DN32 pipe and the grouting hole is tightly filled, the filling material is determined according to the situation, the cement dry powder or the cement grout can be selected, and the hole sealing position is 2-3m away from the ground;
grouting: after the above processes are completed, grouting is performed from the outer side to the inner side in sequence according to the arrangement of the grid-type grouting holes, namely: firstly, constructing grid dividing holes: the grid dividing holes longitudinally and transversely divide the reinforced area into a plurality of grid units; secondly, sealing holes in the construction grids: in each grid unit, the periphery is sealed firstly; thirdly, constructing grid inner reinforcing holes: the grid inner reinforcing holes are used for carrying out centralized reinforcement on the pile foundation to be reinforced; and finally, constructing a supplementary filling hole: and after all the reinforcement is finished, filling the holes in the parts with larger gaps through the supplementary filling holes.
Optionally, when the grouting holes are arranged in a plane, the S2 is to firstly define each independent pile foundation in the range of 2.5-3m by 2.5-3m, and then divide the pile foundations into a plurality of transverse cloth hole patterns according to the residual size of the pile spacing to form a plurality of grid cells.
Optionally, a construction method of pouring one hole per pile is adopted during pile foundation grouting, and after all pile foundations are poured once, a second hole is poured in turn, and the like.
Optionally, during grouting, batch injection is performed by adopting a tube drawing grouting method, and if the grout injected into each hole is defined as 100%, the batch injection mode is that when 25% of grout is injected for the first time, a tube is drawn 1/4, 25% of grout is continuously injected, a tube is drawn 1/4, and the like until grouting is completed.
The invention has the beneficial effects that:
through adopting grid formula slip casting reinforcement method to be under construction to adopt when carrying out the slip casting reinforcement to the pile foundation in every grid cell to form slowly from the extroversion inwards to the foundation and surround, until consolidating to the mode under independent foundation, form crowded density to the near-to-the-body soil body of pile foundation gradually, furthest reduces the disturbance to the foundation soil of pile, reduces the adverse effect that additional subsides and bring, constantly improves stake side frictional resistance and pile end bearing capacity. The method belongs to a construction method which does not affect production, does not excavate the ground, has small size of construction equipment, does not occupy space and has small dynamic and static construction operation.
Drawings
Fig. 1 is a schematic view of a grid cell and grid dividing holes in the present invention.
Fig. 2 is a schematic view of closed cells in a grid according to the present invention.
Fig. 3 is a schematic view of reinforcement holes and refill holes in the grid of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples.
As shown in fig. 1, in this embodiment, a grid grouting reinforcement construction method for an independent pile foundation includes the following steps:
s1, carrying out various surveys on the foundation condition of the building to be reinforced: firstly, inquiring the existing construction data, and determining the structure type, the foundation type, the original geological exploration condition, the original foundation treatment condition and the building settlement and inclination condition of a building to be reinforced; and secondly, carrying out supplementary investigation or drilling investigation on the foundation of the building to be reinforced again, finding out the disturbance reason of the building foundation, and determining the depth of the bearing stratum of the foundation soil, the soft condition of the foundation and the water content condition in the foundation soil.
S2, determining a foundation reinforcement scheme: and formulating a foundation grouting reinforcement construction scheme according to the investigation condition of S1, wherein the foundation grouting reinforcement construction scheme comprises grouting hole plane arrangement, grouting hole depth and grouting amount of each hole.
S3, adopting a grid type grouting reinforcement method for construction:
the construction process comprises the following steps: drilling → intubation → sealing → grouting; when one layer is grouted, the column foundation is slowly surrounded from outside to inside until the layer is reinforced to be right below the independent column foundation, and the pile side frictional resistance and the pile end bearing capacity of the original pile foundation are continuously improved;
drilling: and the drilling is mechanical drilling, the positions of grouting holes are determined one by one according to the requirements of a design construction drawing, and the drilling is carried out, wherein the diameter of the formed hole is 50-70 mm.
Inserting a tube: after the hole is formed, inserting a grouting pipe, wherein the grouting pipe is inserted twice, firstly inserting a DN32 pipe, uniformly distributing a plurality of grout outlet holes on the pipe wall, wherein the hole diameter is 6mm, the distance is 200 and 300mm, and the grout outlet holes are pasted by an adhesive tape to prevent the grout outlet holes from being blocked by soil; then, a small tube DN20 is inserted into the DN32 tube, and the tube wall is also distributed with a plurality of slurry outlet holes, the aperture is 6mm, and the distance is 200-300 mm.
Sealing holes: in order to ensure that the grout only invades into the foundation from the grouting pipe during grouting and does not overflow from a gap between the grouting pipe and the grouting hole, the gap between the DN32 pipe and the grouting hole is tightly filled, the filling material is determined according to the situation, the cement dry powder or the cement grout can be selected, and the hole sealing position is 2-3m away from the ground.
Grouting: after the above processes are completed, grouting is performed from the outer side to the inner side in sequence according to the arrangement of the grid-type grouting holes, namely: firstly, constructing grid dividing holes: (hole represented by "●" in FIG. 1): the grid dividing holes longitudinally and transversely divide the reinforced area into a plurality of grid units; secondly, the holes are sealed in the construction grid (the holes are marked by the solid tangle-solidup in figure 2): in each grid unit, the periphery is firstly sealed; third, reinforcement holes (holes denoted by "●" in fig. 3) in the construction grid: the grid inner reinforcing holes are used for carrying out centralized reinforcement on the pile foundation to be reinforced; finally, a supplementary filling hole (hole indicated by "∘" in fig. 3) was constructed: and after all the reinforcement is finished, filling the holes in the parts with larger gaps through the supplementary filling holes.
Grouting is carried out through the sequence, the traditional thought of 'where to sink and reinforce' is changed, and a method of avoiding heavy and reducing light is adopted to reinforce the soft foundation soil in areas such as channels, open grounds, small loads and the like at the periphery of the pile body, so that the compaction is formed on the soil body close to the pile foundation, the disturbance to the pile foundation soil is reduced to the maximum extent, and the adverse effect caused by additional settlement is reduced.
After the grid type grouting holes are grouted, the weak soil around the pile body or the soil body wetted by water is subjected to the compaction action of the grout to generate large physical changes, and the pile body is sealed. At the moment, the pile foundation is subjected to high-pressure grouting, and the method has the following advantages due to the totally closed reason: (1) slurry loss can be effectively avoided; (2) the more the soil body is squeezed, the more the soil body is compacted under the action of high pressure; (3) the bearing capacity of the pile end and the friction resistance of the pile side are rapidly improved and tend to be stable.
Optionally, the S2 forms the grid cells by first enclosing each independent pile foundation (the structure represented by the hexagon in fig. 1) in the range of 2.5-3m by 2.5-3m and then dividing the pile foundation into several cross-directional hole patterns according to the residual space between the piles when the grouting holes are arranged in a plane.
Optionally, a construction method of pouring one hole per pile is adopted during pile foundation grouting, and after all pile foundations are poured once, a second hole is poured in turn, and the like. The purpose is to make the injected slurry play a role of early coagulation by delaying time, thereby not only preventing additional sedimentation caused by continuous injection and ensuring safety, but also not hindering production efficiency and ensuring construction period.
Optionally, during grouting, batch injection is performed by adopting a tube drawing grouting method, and if the grout injected into each hole is defined as 100%, the batch injection mode is that when 25% of grout is injected for the first time, a tube is drawn 1/4, 25% of grout is continuously injected, a tube is drawn 1/4, and the like until grouting is completed.
According to the embodiment of the invention, the ground of a large-scale factory building is reinforced and surrounds each independent pile foundation to form compaction of soil bodies around the pile foundation. And then the pile foundation is directly grouted and reinforced, thereby avoiding slurry loss and controlling additional settlement. The construction method does not directly reinforce the places with problems, but avoids the weight and lightens the weight, and the principle of reinforcing the ground (non-important areas) and then reinforcing the foundation (important positions) is adopted to reinforce. Through grid type grouting, the properties of soil bodies around the pile foundation are improved, and meanwhile the effect of later grouting centralized reinforcement of the pile foundation is multiplied.
The method provided by the embodiment of the invention adopts a grid type grouting method, firstly, a reinforcing area is divided into a plurality of small areas of grid units by longitudinal and transverse grouting construction, and then, layer-by-layer grouting construction is adopted for each grid unit from outside to inside until the foundation of each pile foundation is reinforced. The drilling depth of each grouting hole is drilled below the pile end, the grouting amount is injected to saturation, the soft layer of the foundation is completely eliminated, and the grouting hole plays a good role in the pile end. And the grid mode is adopted to firstly reinforce the ground foundation of the large-scale factory building and enable the ground foundation to surround each independent column foundation, so that the compaction of soil bodies around the pile foundation is formed, and the side frictional resistance of the pile is greatly improved.
It will be understood that the above embodiments are merely exemplary embodiments taken to illustrate the principles of the present invention, which is not limited thereto. It will be apparent to those skilled in the art that various modifications and improvements can be made without departing from the spirit and substance of the invention, and these modifications and improvements are also considered to be within the scope of the invention.

Claims (4)

1. A grid grouting reinforcement construction method for an independent pile foundation is characterized by comprising the following steps:
s1, carrying out various surveys on the foundation condition of the building to be reinforced: firstly, inquiring the existing construction data, and determining the structure type, the foundation type, the original geological exploration condition, the original foundation treatment condition and the building settlement and inclination condition of a building to be reinforced; secondly, performing supplementary investigation or drilling investigation on the foundation of the building to be reinforced again, finding out the disturbance reason of the building foundation, and determining the depth of a foundation soil bearing layer, the soft condition of the foundation and the water content condition in the foundation soil;
s2, determining a foundation reinforcement scheme: according to the investigation condition of S1, making a foundation grouting reinforcement construction scheme, wherein the foundation grouting reinforcement construction scheme comprises grouting hole plane arrangement, grouting hole depth and grouting amount of each hole;
s3, adopting a grid type grouting reinforcement method for construction:
the construction process comprises the following steps: drilling → intubation → sealing → grouting; when one layer is grouted, the column foundation is slowly surrounded from outside to inside until the layer is reinforced to be right below the independent column foundation, and the pile side frictional resistance and the pile end bearing capacity of the original pile foundation are continuously improved;
drilling: the drilling is mechanical drilling, the positions of grouting holes are determined one by one according to the requirements of a design construction drawing, and drilling is carried out, wherein the diameter of the formed hole is 50-70 mm;
inserting a tube: after the hole is formed, inserting a grouting pipe, wherein the grouting pipe is inserted twice, firstly inserting a DN32 pipe, uniformly distributing a plurality of grout outlet holes on the pipe wall, wherein the hole diameter is 6mm, the distance is 200 and 300mm, and the grout outlet holes are pasted by an adhesive tape to prevent the grout outlet holes from being blocked by soil; then, a small tube DN20 is inserted into the DN32 tube, and the tube wall is also distributed with a plurality of grout outlet holes, the aperture is 6mm, and the distance is 200 and 300 mm;
sealing holes: in order to ensure that the grout only invades into the foundation from the grouting pipe during grouting and does not overflow from a gap between the grouting pipe and a grouting hole, the gap between the DN32 pipe and the grouting hole is tightly filled, the filling material is determined according to the situation, the cement dry powder or the cement grout can be selected, and the hole sealing position is 2-3m away from the ground;
grouting: after the above processes are completed, grouting is performed from the outer side to the inner side in sequence according to the arrangement of the grid-type grouting holes, namely: firstly, constructing grid dividing holes: the grid dividing holes longitudinally and transversely divide the reinforced area into a plurality of grid units; secondly, sealing holes in the construction grids: in each grid unit, the periphery is sealed firstly; thirdly, constructing grid inner reinforcing holes: the grid inner reinforcing holes are used for carrying out centralized reinforcement on the pile foundation to be reinforced; and finally, constructing a supplementary filling hole: and after all the reinforcement is finished, filling the holes in the parts with larger gaps through the supplementary filling holes.
2. The grid grouting reinforcement construction method for the independent pile foundations according to claim 1, wherein in the grouting hole plane arrangement, each independent pile foundation is firstly encircled within the range of 2.5-3m by 2.5-3m, and then is divided into a plurality of longitudinal hole patterns according to the residual sizes of the pile spaces to form a plurality of grid cells in the S2 mode.
3. The grid-type grouting reinforcement construction method for the independent pile foundation according to claim 1 or 2, characterized in that a construction method of injecting one hole per pile is adopted during pile foundation grouting, and after all pile foundations are injected once, the second hole is injected in turn, and the like.
4. A grid-type grouting construction method for an independent pile foundation according to any one of claims 1 to 3, characterized in that during grouting, the grouting is performed in batches by a pipe-pulling grouting method, and if the grout injected into each hole is defined as 100%, the batch grouting is performed in a manner that when 25% of grout is injected for the first time, the pipe is pulled out 1/4, the grouting is continued for 25%, the pipe is pulled out 1/4, and so on until the grouting is completed.
CN202110146699.2A 2021-02-03 2021-02-03 Grid type grouting reinforcement construction method for independent pile foundation Pending CN112942309A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110146699.2A CN112942309A (en) 2021-02-03 2021-02-03 Grid type grouting reinforcement construction method for independent pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110146699.2A CN112942309A (en) 2021-02-03 2021-02-03 Grid type grouting reinforcement construction method for independent pile foundation

Publications (1)

Publication Number Publication Date
CN112942309A true CN112942309A (en) 2021-06-11

Family

ID=76241918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110146699.2A Pending CN112942309A (en) 2021-02-03 2021-02-03 Grid type grouting reinforcement construction method for independent pile foundation

Country Status (1)

Country Link
CN (1) CN112942309A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115059056A (en) * 2022-07-05 2022-09-16 中铁三局集团广东建设工程有限公司 Method for reinforcing bridge pile foundation in karst area
CN115680490A (en) * 2023-01-05 2023-02-03 山西冶金岩土工程勘察有限公司 Cast-in-place pile grooving device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006336294A (en) * 2005-06-02 2006-12-14 Fujita Corp Reinforcing method of pile head section
CN101487274A (en) * 2009-02-23 2009-07-22 北京交通大学 Slip-casting lifting method for city tunnel passing through existing buildings
CN102162255A (en) * 2011-04-07 2011-08-24 西安建筑科技大学 Method for reinforcing existing pile foundation in collapsed loess area by slip casting
CN109487777A (en) * 2018-11-12 2019-03-19 山西晋建加固特种建筑工程有限公司 A method of a reinforcing deep soft soil foundation of filling the span of a man's arms is formed using slip casing by pressure
CN111794118A (en) * 2020-07-28 2020-10-20 中建七局交通建设有限公司 Construction method suitable for bridge pile foundation under loess fracture cave-in condition

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006336294A (en) * 2005-06-02 2006-12-14 Fujita Corp Reinforcing method of pile head section
CN101487274A (en) * 2009-02-23 2009-07-22 北京交通大学 Slip-casting lifting method for city tunnel passing through existing buildings
CN102162255A (en) * 2011-04-07 2011-08-24 西安建筑科技大学 Method for reinforcing existing pile foundation in collapsed loess area by slip casting
CN109487777A (en) * 2018-11-12 2019-03-19 山西晋建加固特种建筑工程有限公司 A method of a reinforcing deep soft soil foundation of filling the span of a man's arms is formed using slip casing by pressure
CN111794118A (en) * 2020-07-28 2020-10-20 中建七局交通建设有限公司 Construction method suitable for bridge pile foundation under loess fracture cave-in condition

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张校甫等: "复杂地质浅埋隧道袖阀管地表注浆加固技术", 《施工技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115059056A (en) * 2022-07-05 2022-09-16 中铁三局集团广东建设工程有限公司 Method for reinforcing bridge pile foundation in karst area
CN115059056B (en) * 2022-07-05 2023-12-01 中铁三局集团广东建设工程有限公司 Method for reinforcing bridge pile foundation in karst area
CN115680490A (en) * 2023-01-05 2023-02-03 山西冶金岩土工程勘察有限公司 Cast-in-place pile grooving device

Similar Documents

Publication Publication Date Title
CN101591904A (en) The reinforcement means of grouting following drainage prepressing type drainage body composite pile foundation
CN105201001B (en) Composite seepage-proofing structure of large karst cave in karst region and construction method thereof
CN103233454A (en) Processing method of soaking, vacuum preloading and slurry injecting for sand piles of collapsible loess foundation
CN110387896B (en) Foundation pit dewatering well design method
CN112942309A (en) Grid type grouting reinforcement construction method for independent pile foundation
CN104947650B (en) Grouting behind shaft or drift lining closed reinforcing method after sand drain piling prepressing
CN111074899A (en) Grouting method for karst caves with different filling types
CN105064157A (en) Treatment method of settlement of high-speed railway roadbeds in soft-soil areas
CN107299650B (en) A kind of remote open caisson casting method for correcting error
CN109487777B (en) Method for reinforcing deep soft soil foundation by adopting pressure grouting to form combined anchor pile
WO2020248429A1 (en) Method for strengthening and lifting high-rise building having raft foundation
Waruwu et al. Settlement estimation of peat reinforced with bamboo grid under embankment
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN112081157B (en) Construction method for forming reinforced composite pile foundation by high-rise building retreating type grouting
CN208201874U (en) A kind of open-cell cloth bag grouting structure
CN101793027A (en) Core-grouted static pressure anchor rod pile
CN215758963U (en) Microorganism induction calcium carbonate deposits grit composite pile reinforced structure
CN108914911A (en) A kind of stratum prestress advanced excavation stability control method
CN112081158B (en) Construction method for forming reinforced composite pile foundation by advanced grouting of high-rise building
CN113174933A (en) Microorganism-induced calcium carbonate precipitation gravel composite pile reinforcing structure and construction method
CN217378957U (en) Miniature pile supporting arrangement structure for reinforcing slag pile body side slope
CN106917402A (en) A kind of CFG pile precast piles head and CFG pile construction methods
CN201635072U (en) Centrally grouted static-pressured anchor pile former
CN205898629U (en) Country rock high pressure consolidation grouting encloses effect testing arrangement that blocks water
Wang et al. Effect of cantilever soldier pile foundation excavation closing to an existing composite foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210611

RJ01 Rejection of invention patent application after publication