CN112332297A - Method for determining temporary grounding device of construction line - Google Patents

Method for determining temporary grounding device of construction line Download PDF

Info

Publication number
CN112332297A
CN112332297A CN202011298596.XA CN202011298596A CN112332297A CN 112332297 A CN112332297 A CN 112332297A CN 202011298596 A CN202011298596 A CN 202011298596A CN 112332297 A CN112332297 A CN 112332297A
Authority
CN
China
Prior art keywords
line
grounding device
parameters
construction
temporary grounding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011298596.XA
Other languages
Chinese (zh)
Inventor
王振伟
张学平
孙向东
陈长才
杜增
崔锦瑞
崔影
丁晖
李慧奇
王炎炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Anhui Electric Power Co Ltd
Anhui Electric Power Engineering Supervision Co Ltd
Original Assignee
State Grid Anhui Electric Power Co Ltd
Anhui Electric Power Engineering Supervision Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Anhui Electric Power Co Ltd, Anhui Electric Power Engineering Supervision Co Ltd filed Critical State Grid Anhui Electric Power Co Ltd
Priority to CN202011298596.XA priority Critical patent/CN112332297A/en
Publication of CN112332297A publication Critical patent/CN112332297A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/10Complex mathematical operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/18Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2113/00Details relating to the application field
    • G06F2113/16Cables, cable trees or wire harnesses

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Computer Hardware Design (AREA)
  • Data Mining & Analysis (AREA)
  • Mathematical Physics (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Algebra (AREA)
  • Databases & Information Systems (AREA)
  • Software Systems (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a method for determining a temporary grounding device of a construction line, which comprises the steps of obtaining ground wire data, basic electric parameters of a live-line operation transmission line and the construction line, iron tower parameters and other electric basic parameters, inputting the obtained electric basic parameters in a CDEGS (compact data mining algorithm) and establishing a transmission line simulation model; and grounding both ends of the construction line, calculating electromagnetic induction current on the temporary grounding device according to the established simulation model, and selecting a proper temporary grounding device according to the magnitude of the electromagnetic induction current. If the calculated induced current is within the range of the rated current for a certain type of grounding device, then that type of grounding device can be selected. The invention accurately calculates the electromagnetic induction current on the temporary grounding device through simulation modeling, and determines the temporary grounding device of the construction line according to the calculated induction current, so as to make anti-induction electric measures and ensure the safety of constructors and equipment.

Description

Method for determining temporary grounding device of construction line
Technical Field
The invention belongs to the technical field of high voltage of power systems, and particularly relates to a method for determining a temporary grounding device of a construction line.
Background
Along with the construction of high-voltage and ultra-high-voltage transmission line engineering, land resources are more and more tense, and dangers caused by induced voltage and induced current are more and more serious in the construction process of the transmission line. Therefore, in order to secure safety of constructors and equipment, it is necessary to research a method of determining a temporary grounding device of a construction line. How to improve the construction safety level of the transmission line has been paid increasing attention by people, and the downlead of the temporary grounding device of the transmission line lead is connected with the cross arm of the iron tower, and the temporary grounding device has the main function of limiting the level of the induced voltage on the transmission line lead within a certain range so as to reduce electric shock and personal accidents caused by the induced voltage. Undoubtedly, the rated current level of the temporary grounding device of the transmission line is an important index for selecting the temporary grounding device.
Therefore, in power transmission line construction, the induced voltage and the induced current level are key factors influencing the safety and reliability of construction, and the temporary grounding device arranged according to the requirement of construction safety has the important function of reducing the line induced voltage, so that the 'induced electricity prevention is considered to be grounded'.
In reality, the grounding device is mainly determined according to a universal grounding standard, and the temporary grounding device does not have adaptive changes for different soils, different geographic environments and different construction parallel conditions, so that the determined temporary grounding device has poor effect. Particularly, it is unclear how to use and assemble the grounding device according to local conditions in an area with high soil resistivity. Aiming at the model selection of the temporary grounding device in the actual use in the prior art, an effective solution is not provided at present.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provide a method for determining a temporary grounding device of a construction line, so that an anti-induction electric measure is made to ensure the safety of constructors and equipment.
A method of determining a temporary grounding device for a construction line, comprising the steps of:
step 1: acquiring basic electrical parameters including ground wire data, basic electrical parameters of live-line operation transmission lines and construction lines and iron tower parameters;
step 2: inputting the electrical basic parameters obtained in the step 1 into a CDEGS, and establishing a power transmission line simulation model;
and step 3: grounding both ends of the construction line, and calculating electromagnetic induction current on the temporary grounding device according to the simulation model;
and 4, step 4: and selecting a proper temporary grounding device according to the magnitude of the electromagnetic induction current.
Further, the ground wire data includes the ground wire model, the inner diameter, the outer diameter, the number of splits, the split spacing, and the sag.
Further, the basic electrical parameters of the live-line operation power transmission line and the construction line comprise the operation parameters of the live-line operation line, the radius, the split number, the phase sequence distribution and the soil resistivity along the live-line operation power transmission line and the construction line.
Further, the iron tower parameters include the type of the iron tower, the calling height, the span, the suspension point of the lead on the iron tower and the parameters.
Further, the operating line operating parameters include operating line voltage and current levels, and delivered power.
Further, in the step 4, if the calculated induced current is within the rated current range of a certain type of grounding device, the type of grounding device can be selected.
The invention has the beneficial effects that: the invention can overcome the defects of the prior art, accurately calculates the electromagnetic induction current on the temporary grounding device through simulation modeling, and determines the temporary grounding device of the construction line according to the calculated induction current, thereby making anti-induction electric measures and ensuring the safety of constructors and equipment.
Drawings
Fig. 1 is a flowchart of a method of determining a temporary grounding device of a construction line according to the present invention.
Detailed Description
The following describes in further detail embodiments of the present invention with reference to the accompanying drawings.
The invention provides a method for determining a temporary grounding device of a construction line, and referring to fig. 1, electromagnetic induction current on the temporary grounding device is subjected to simulation calculation by combining CDEGS software.
The CDEGS software is a set of engineering software package with powerful functions and high integration developed by SES company in Canada, and is tool software capable of accurately analyzing engineering problems such as grounding, electromagnetic field, electromagnetic interference and the like of a power system. According to the invention, the grounding working condition of the alternating current line during construction is combined with CDEGS software, factors such as line trend, sag, soil resistivity and the like are comprehensively considered, a temporary grounding device of the construction line is established, and the electromagnetic induction current on the temporary grounding device is more accurately calculated.
A method of determining a temporary grounding device for a construction line, comprising the steps of:
step 1: and acquiring electrical basic parameters.
The electrical basic parameters comprise ground wire data, basic electrical parameters of live-line operation transmission lines and construction lines, iron tower parameters, operation line operation parameters and the like.
The ground wire data comprises the ground wire model, the inner diameter, the outer diameter, the split number, the split distance and the sag; basic electrical parameters and iron tower parameters of live-line operation transmission lines and construction lines comprise radiuses, splitting numbers, phase sequence distribution, soil resistivity and iron tower types along the lines, breath height, span, suspension points of wires on the iron towers and parameters of the live-line operation transmission lines and the construction lines. The power transmission line data comprises the power transmission line model, the number of splits, the split spacing, the sag, the inner diameter, the outer diameter, the phase sequence, the height and the like. The operation parameters of the live operation line comprise voltage, current grade and transmission power of the operation line.
Step 2: the CDEGS was used to build a simulation model.
Selecting a HIFREQ module, setting a soil model, setting corresponding voltage and current excitation, setting conductor and coating types, and building a simulation model by using an SECAD (segmented alternating current) in CDEGS (compact disc integration software) according to the acquired parameters of the power transmission line, the grounding device, the resistivity of the soil along the power transmission line, the parameters of the iron tower and the like; when calculating the electromagnetic induction current, the established line model can be equivalent to a straight line segment of a cylindrical conductor, and the actual line is simulated by defining the diameter, resistivity, length and other parameters of the conductor. However, it should be noted that the surface or body-shaped metal facility cannot be simulated, so the HIFREQ module is only limited to modeling the line, and other devices such as transformers, lightning arresters, circuit breakers, etc. cannot be modeled. The sescd is a CAD graphical tool for creating, modifying and viewing complex grounded nets and above-ground metal objects. In HIFREQ, it is used to plot a network of wires.
And step 3: and calculating the electromagnetic induction current on the temporary grounding device.
And calculating the electromagnetic induction current on the temporary grounding device according to the simulation model. When calculating the electromagnetic induction current, both ends of the construction line need to be grounded.
And 4, step 4: and selecting a proper temporary grounding device according to the magnitude of the electromagnetic induction current.
And determining what type of construction line temporary grounding device is used according to the electromagnetic induction current obtained in the step 3. The model can be selected according to the existing temporary grounding device of the line if the calculated current is within the rated current range of the grounding device, and if not, the model is selected to be larger.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention are included in the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (6)

1. A method of determining a temporary grounding device for a construction line, comprising the steps of:
step 1: acquiring basic electrical parameters including ground wire data, basic electrical parameters of live-line operation transmission lines and construction lines and iron tower parameters;
step 2: inputting the electrical basic parameters obtained in the step 1 into a CDEGS, and establishing a power transmission line simulation model;
and step 3: grounding both ends of the construction line, and calculating electromagnetic induction current on the temporary grounding device according to the simulation model;
and 4, step 4: and selecting a proper temporary grounding device according to the magnitude of the electromagnetic induction current.
2. The method of claim 1, wherein the ground line data includes ground line model, inner diameter, outer diameter, number of splits, split spacing, sag.
3. The method for determining the temporary grounding device of the construction line according to claim 1, wherein the basic electrical parameters of the live-line operation transmission line and the construction line comprise operation parameters of the live-line operation line, the radius, the split number, the phase sequence distribution and the soil resistivity along the line of the live-line operation transmission line and the construction line.
4. The method for determining the temporary grounding device of the construction line according to claim 1, wherein the iron tower parameters of iron tower model, pitch, span, suspension point of the wire on the iron tower and parameters.
5. The method of determining a construction line temporary grounding arrangement of claim 3, wherein said operating line operating parameters include operating line voltage and current levels, delivered power.
6. The method for determining a temporary grounding device of a construction line according to claim 1, wherein in the step 4, if the calculated induced current is within a rated current range of a certain type of grounding device, the type of grounding device can be selected.
CN202011298596.XA 2020-11-19 2020-11-19 Method for determining temporary grounding device of construction line Pending CN112332297A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011298596.XA CN112332297A (en) 2020-11-19 2020-11-19 Method for determining temporary grounding device of construction line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011298596.XA CN112332297A (en) 2020-11-19 2020-11-19 Method for determining temporary grounding device of construction line

Publications (1)

Publication Number Publication Date
CN112332297A true CN112332297A (en) 2021-02-05

Family

ID=74320819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011298596.XA Pending CN112332297A (en) 2020-11-19 2020-11-19 Method for determining temporary grounding device of construction line

Country Status (1)

Country Link
CN (1) CN112332297A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114709782A (en) * 2022-04-11 2022-07-05 国网陕西省电力有限公司电力科学研究院 Method for reducing potential difference in transformer substation grounding network caused by impact current

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104810632A (en) * 2015-04-29 2015-07-29 宗伟 Method and device for determining grounding device of transmission line tower
CN108984959A (en) * 2018-08-14 2018-12-11 国网安徽省电力有限公司 The emulated computation method of newly-built DC power transmission line inductive voltage and current based on PSCAD
CN109002648A (en) * 2018-08-20 2018-12-14 国网安徽省电力有限公司 The emulated computation method of construction line inductive voltage and current based on CDEGS

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104810632A (en) * 2015-04-29 2015-07-29 宗伟 Method and device for determining grounding device of transmission line tower
CN108984959A (en) * 2018-08-14 2018-12-11 国网安徽省电力有限公司 The emulated computation method of newly-built DC power transmission line inductive voltage and current based on PSCAD
CN109002648A (en) * 2018-08-20 2018-12-14 国网安徽省电力有限公司 The emulated computation method of construction line inductive voltage and current based on CDEGS

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114709782A (en) * 2022-04-11 2022-07-05 国网陕西省电力有限公司电力科学研究院 Method for reducing potential difference in transformer substation grounding network caused by impact current
CN114709782B (en) * 2022-04-11 2024-04-05 国网陕西省电力有限公司电力科学研究院 Method for reducing potential difference in transformer substation grounding grid caused by impact current

Similar Documents

Publication Publication Date Title
KR101997434B1 (en) Apparatus and Method of Evaluating Performance for Lightning Protection In Distribution Lines
CN109635360B (en) Lightning stroke risk assessment method and device based on cascade simulation
Farkoush et al. Reducing the effect of lightning on step and touch voltages in a grounding grid using a nature-inspired genetic algorithm with ATP-EMTP
Volpov et al. Application of local environmental data to the lightning performance assessment of the IECo transmission-line network
Taha et al. Estimation performance of the lightning protection system in an urban 110​ kV grounding grid substation
CN111931348B (en) Method and system for automatically evaluating risk of induced lightning flashover of 10kV distribution network tower
CN111597697A (en) Extra-high voltage same-tower double-circuit line arrester arrangement optimization method
CN112332297A (en) Method for determining temporary grounding device of construction line
Bedoui et al. Probabilistic evaluation of the substation performance under incoming lightning surges
CN104810632A (en) Method and device for determining grounding device of transmission line tower
CN105321027A (en) Lightning protection method and apparatus for power transmission line
Cetin et al. Analysis of transmission line electromagnetic interference on touch and step voltages on buried gas pipeline under different shielding and resistivity conditions
Shwehdi et al. EMF Analysis for a 380kV Transmission OHL in the Vicinity of Buried Pipelines
Alipio et al. Lightning performance of transmission lines partially protected by surge arresters considering typical Brazilian conditions
Shafaei et al. Probabilistic evaluation of lightning performance of overhead transmission lines, considering non-vertical strokes
CN112395788A (en) Personal safety accurate evaluation method for distribution network neutral point grounding type reconstruction
CN110532690B (en) Method for determining number of shielding grids of power transmission line
Abdullah HVAC interference assessment on a buried gas pipeline
Elmghairbi et al. Potential rise and safety voltages of wind turbine earthing systems under transient conditions
Daly et al. Lightning protection of substations using EMT modelling
CN111062609A (en) Method for evaluating lightning damage risk of power transmission line tower
CN104682305A (en) Method for differentiated lightning protection of urban 10 kV distribution line
Al-Badi et al. Simulation of electromagnetic coupling on pipelines close to overhead transmission lines: A parametric study
Ellithy et al. Determining the electromagnetic interference effects on pipelines built in power transmission lines right-of-way
CN104682304A (en) Suburb 10kV power distribution line differentiated lightning-protection method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210205

RJ01 Rejection of invention patent application after publication