CN111861165A - Project management method, apparatus, computer equipment and storage medium - Google Patents
Project management method, apparatus, computer equipment and storage medium Download PDFInfo
- Publication number
- CN111861165A CN111861165A CN202010642283.5A CN202010642283A CN111861165A CN 111861165 A CN111861165 A CN 111861165A CN 202010642283 A CN202010642283 A CN 202010642283A CN 111861165 A CN111861165 A CN 111861165A
- Authority
- CN
- China
- Prior art keywords
- project
- information
- column
- split
- progress
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007726 management method Methods 0.000 title claims abstract description 53
- 238000000034 method Methods 0.000 claims abstract description 60
- 230000008569 process Effects 0.000 claims abstract description 35
- 238000013523 data management Methods 0.000 claims abstract description 16
- 230000008859 change Effects 0.000 claims description 63
- 238000012502 risk assessment Methods 0.000 claims description 39
- 238000004590 computer program Methods 0.000 claims description 26
- 238000004458 analytical method Methods 0.000 claims description 16
- 238000004519 manufacturing process Methods 0.000 abstract description 6
- 230000009897 systematic effect Effects 0.000 abstract description 5
- 238000010276 construction Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 8
- 230000004048 modification Effects 0.000 description 8
- 238000012986 modification Methods 0.000 description 8
- 238000011835 investigation Methods 0.000 description 6
- 230000007613 environmental effect Effects 0.000 description 5
- 230000004044 response Effects 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 238000007405 data analysis Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000001360 synchronised effect Effects 0.000 description 2
- 230000000007 visual effect Effects 0.000 description 2
- 238000001514 detection method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 238000005067 remediation Methods 0.000 description 1
- 238000013468 resource allocation Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
技术领域technical field
本发明属于项目管理技术领域,尤其涉及一种项目管理方法、装置、计算机设备和存储介质。The invention belongs to the technical field of project management, and in particular relates to a project management method, device, computer equipment and storage medium.
背景技术Background technique
项目,是人们通过努力,运用新的方法,将人力的、材料的和财务的资源组织起来,在给定的费用和时间约束规范内,完成一项独立的、一次性的工作任务,以期达到由数量和质量指标所限定的目标。A project is an independent, one-time work task completed by people through efforts, using new methods to organize human, material and financial resources, within a given cost and time constraint specification, in order to achieve Goals defined by quantitative and qualitative indicators.
目前,工厂或集团内部在对项目进行管理时,常需要人工对项目的资料进行登记、跟进、协调以及记录,从而实现对项目的管理。但是,此种管理方式存在诸多弊端,一方面因项目所包含的内容多而繁杂,人工记录极容易导致资料缺漏;另一方面,此种项目管理的方式需要耗费极大的人力及物力,且不利用对项目完成后的归档及数据分析,进而导致项目管理的效率低下,给生产造成极大不便。因此,实有必要设计一种项目管理方法、装置、计算机设备和存储介质。At present, when the factory or group manages the project, it is often necessary to manually register, follow up, coordinate and record the project data, so as to realize the management of the project. However, this management method has many drawbacks. On the one hand, because the project contains many and complicated contents, manual recording can easily lead to data omission; on the other hand, this project management method requires a lot of manpower and material resources, and Not using the archiving and data analysis after the project is completed will lead to low project management efficiency and cause great inconvenience to production. Therefore, it is necessary to design a project management method, apparatus, computer equipment and storage medium.
发明内容SUMMARY OF THE INVENTION
本发明的目的在于提供一种项目管理方法、装置、计算机设备和存储介质,旨在解决现有技术中对项目管理时候的管理效率低的技术问题。The purpose of the present invention is to provide a project management method, device, computer equipment and storage medium, aiming at solving the technical problem of low management efficiency in project management in the prior art.
为实现上述目的,本发明实施例提供一种项目管理方法,所述方法包括:To achieve the above object, an embodiment of the present invention provides a project management method, the method comprising:
获取项目的项目基本信息,并根据所述项目基本信息生成信息录入完成指令,所述信息录入完成指令用于提示用户项目的基本信息录入完成;Acquire basic project information of the project, and generate an information entry completion instruction according to the project basic information, and the information entry completion instruction is used to prompt the user that the entry of the basic information of the project is completed;
根据所述项目基本信息对项目进行拆分并获得项目拆分信息,并根据所述项目拆分信息生成项目拆分完成指令,所述项目拆分信息完成指令用于提示用户项目的拆分录入完成;The project is split according to the basic information of the project to obtain the project split information, and a project split completion instruction is generated according to the project split information, and the project split information completion instruction is used to prompt the user for the split entry of the project Finish;
获取所述项目拆分信息获取拆分后的各项目的项目进行状态信息,并根据所述项目进行状态信息获取项目整改信息;Obtain the project split information to obtain the project status information of the split projects, and obtain project rectification information according to the project status information;
根据所述项目整改信息获取项目进行过程中的项目进度更新信息;According to the project rectification information, obtain the project progress update information in the process of the project;
根据所述项目进度更新信息,获取项目资料管理数据。According to the project progress update information, project data management data is acquired.
可选地,所述方法还包括:Optionally, the method further includes:
获取项目存在的风险评估信息。Obtain risk assessment information for the existence of the project.
可选地,所述获取项目存在的风险评估信息,具体包括:Optionally, the obtaining of the risk assessment information existing in the project specifically includes:
获取风险评估界面,所述风险评估界面用于展示项目查勘内容栏、项目查勘结论栏和项目查勘风险源提示栏;Obtaining a risk assessment interface, where the risk assessment interface is used to display the project survey content column, the project survey conclusion column and the project survey risk source prompt column;
获取根据所述风险评估界面展示项目查勘内容栏、项目查勘结论栏和项目查勘风险源提示栏填写的风险内容;Obtain the risk content filled in according to the risk assessment interface to display the project survey content column, the project survey conclusion column and the project survey risk source prompt column;
根据所述风险内容生成风险评估报告。A risk assessment report is generated according to the risk content.
可选地,所述方法还包括:Optionally, the method further includes:
获取项目进行过程中的项目变更指令;Obtain project change instructions during the project process;
根据所述项目变更指令生成项目变更页面,所述项目变更页面用于展示变更项目栏、变更内容栏和变更原因栏;Generate a project change page according to the project change instruction, and the project change page is used to display the changed item column, the changed content column and the changed reason column;
获取根据所述项目变更页面展示的变更项目栏、变更内容栏和变更原因栏填写的变更内容;Obtain the change content filled in according to the change item column, change content column and change reason column displayed on the project change page;
根据所述变更内容生成项目变更登记表。An item change registration table is generated based on the change content.
可选地,所述方法还包括:对所述项目资料管理数据作权重分析设置操作并生成项目分析图像。Optionally, the method further includes: performing a weight analysis setting operation on the project data management data and generating a project analysis image.
可选地,所述权重分析设置操作包括:Optionally, the weight analysis setting operation includes:
获取权重设置指令;Get the weight setting instruction;
根据所述权重设置指令生成权重设置界面,所述权重设置界面用于展示权重设置项目以及对应的权重设置选项;Generate a weight setting interface according to the weight setting instruction, and the weight setting interface is used to display weight setting items and corresponding weight setting options;
获取根据所述权重设置界面展示的所述权重设置项目从所述权重设置选项中设置的目标设置选项;Obtain the target setting options set from the weight setting options according to the weight setting items displayed on the weight setting interface;
根据所述目标设置选项生成所述项目分析图像。The project analysis image is generated according to the target setting options.
可选地,所述根据所述项目整改信息获取项目进行过程中的项目进度更新信息,具体包括:Optionally, the obtaining of the project progress update information in the process of the project according to the project rectification information specifically includes:
获取根据所述项目整改信息中展示的整改项目的进度更新指令;Obtain the progress update instruction of the rectification project displayed in the project rectification information;
根据所述进度更新指令生成进度更新界面,所述进度更新界面用于展示进度更新内容填写栏目;A progress update interface is generated according to the progress update instruction, and the progress update interface is used to display the progress update content and fill in the column;
获取根据所述进度更新内容填写栏目填写的进度内容;Obtain the progress content filled in the column filled in according to the progress update content;
根据所述进度内容生成所述项目进度更新信息。The project progress update information is generated according to the progress content.
本发明实施例还提供一种项目管理装置,所述装置包括:The embodiment of the present invention also provides a project management device, the device includes:
基本信息获取模块,用于获取项目的项目基本信息,并根据所述项目基本信息生成信息录入完成指令,所述信息录入完成指令用于提示用户项目的基本信息录入完成;a basic information acquisition module, configured to acquire basic project information of a project, and generate an information entry completion instruction according to the project basic information, and the information entry completion instruction is used to prompt the user that the entry of the basic information of the project is completed;
拆分信息获取模块,用于根据所述项目基本信息对项目进行拆分并获得项目拆分信息,并根据所述项目拆分信息生成项目拆分完成指令,所述项目拆分信息完成指令用于提示用户项目的拆分录入完成;The splitting information obtaining module is used to split the project according to the basic information of the project and obtain the project splitting information, and generate the project splitting completion instruction according to the project splitting information, and the project splitting information completion instruction uses To prompt the user that the split entry of the project is completed;
进行状态信息获取模块,用于获取所述项目拆分信息获取拆分后的各项目的项目进行状态信息,并根据所述项目进行状态信息获取项目整改信息;A status information acquisition module is used to acquire the item split information to obtain the item status information of the split items, and to obtain project rectification information according to the item status information;
进度信息获取模块,用于根据所述项目整改信息获取项目进行过程中的项目进度更新信息;a progress information acquisition module, configured to acquire project progress update information in the process of the project according to the project rectification information;
资料数据获取模块,用于根据所述项目进度更新信息,获取项目资料管理数据。The data acquisition module is used for updating information according to the project progress and acquiring project data management data.
本发明实施例还提供一种计算机设备,包括存储器和处理器,所述存储器存储有计算机程序,所述处理器执行所述计算机程序时实现上述方法的步骤。An embodiment of the present invention further provides a computer device, including a memory and a processor, where the memory stores a computer program, and the processor implements the steps of the above method when executing the computer program.
本发明实施例还提供一种计算机可读存储介质,其上存储有计算机程序,所述计算机程序被处理器执行时实现上述的方法的步骤。Embodiments of the present invention further provide a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the foregoing method are implemented.
本发明实施例提供的项目管理方法、装置、计算机设备和存储介质中的上述一个或多个技术方案至少具有如下技术效果之一:The above-mentioned one or more technical solutions in the project management method, device, computer equipment, and storage medium provided by the embodiments of the present invention have at least one of the following technical effects:
本发明依次通过获取项目的项目基本信息,并根据所述项目基本信息生成信息录入完成指令,所述信息录入完成指令用于提示用户项目的基本信息录入完成;根据所述项目基本信息对项目进行拆分并获得项目拆分信息,并根据所述项目拆分信息生成项目拆分完成指令,所述项目拆分信息完成指令用于提示用户项目的拆分录入完成;获取所述项目拆分信息获取拆分后的各项目的项目进行状态信息,并根据所述项目进行状态信息获取项目整改信息;根据所述项目整改信息获取项目进行过程中的项目进度更新信息;根据所述项目进度更新信息,获取项目资料管理数据;从而实现了在有限的资源约束下,运用系统的观点、方法和理论,对项目涉及的基本信息、拆分信息、整改信息、进度更新信息以及项目资料的系统化管理,节省人工成本,提高生产效率。The present invention sequentially obtains the project basic information of the project, and generates an information entry completion instruction according to the project basic information, and the information entry completion instruction is used to prompt the user that the entry of the basic information of the project is completed; Splitting and obtaining project splitting information, and generating a project splitting completion instruction according to the project splitting information, the project splitting information completing instruction is used to prompt the user that the project splitting entry is completed; acquiring the project splitting information Obtain the project progress status information of the split projects, and obtain project rectification information according to the project progress status information; obtain project progress update information in the process of the project according to the project rectification information; update information according to the project progress , to obtain project data management data; thus realizing the systematic management of basic information, split information, rectification information, progress update information and project data involved in the project under limited resource constraints, using systematic viewpoints, methods and theories , save labor costs and improve production efficiency.
附图说明Description of drawings
为了更清楚地说明本发明实施例中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the technical solutions in the embodiments of the present invention more clearly, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the drawings in the following description are only for the present invention. In some embodiments, for those of ordinary skill in the art, other drawings can also be obtained according to these drawings without any creative effort.
图1为本发明实施例提供的项目管理方法的流程图;1 is a flowchart of a project management method provided by an embodiment of the present invention;
图2为本发明实施例提供的项目管理方法中步骤S810-S830的流程图;2 is a flowchart of steps S810-S830 in the project management method provided by an embodiment of the present invention;
图3为本发明实施例提供的项目管理方法中风险评估界面的结构框图;3 is a structural block diagram of a risk assessment interface in a project management method provided by an embodiment of the present invention;
图4为本发明实施例提供的项目管理方法中步骤S710-S740的流程图;FIG. 4 is a flowchart of steps S710-S740 in the project management method provided by an embodiment of the present invention;
图5为本发明实施例提供的项目管理方法中项目变更页面的结构框图;5 is a structural block diagram of a project change page in the project management method provided by an embodiment of the present invention;
图6为本发明实施例提供的项目管理方法中步骤S910-S940的流程图;6 is a flowchart of steps S910-S940 in the project management method provided by an embodiment of the present invention;
图7为本发明实施例提供的项目管理方法中权重设置界面的结构框图;7 is a structural block diagram of a weight setting interface in a project management method provided by an embodiment of the present invention;
图8为本发明实施例提供的项目管理方法中步骤S410-S440的流程图;8 is a flowchart of steps S410-S440 in the project management method provided by an embodiment of the present invention;
图9为本发明实施例提供的项目管理方法中进度更新界面的结构框图;9 is a structural block diagram of a progress update interface in a project management method provided by an embodiment of the present invention;
图10为本发明实施例提供的项目管理装置的结构框图;10 is a structural block diagram of a project management device provided by an embodiment of the present invention;
图11为本发明一个实施例提供的计算机设备的内部结构图。FIG. 11 is an internal structural diagram of a computer device according to an embodiment of the present invention.
具体实施方式Detailed ways
下面详细描述本发明的实施例,所述实施例的示例在附图中示出,其中自始至终相同或类似的标号表示相同或类似的元件或具有相同或类似功能的元件。下面通过参考附图描述的实施例是示例性的,旨在用于解释本发明的实施例,而不能理解为对本发明的限制。The following describes in detail the embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein the same or similar reference numerals refer to the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary, and are intended to be used to explain the embodiments of the present invention, and should not be construed as limiting the present invention.
以下描述中,为了说明而不是为了限定,提出了诸如特定系统结构、技术之类的具体细节,以便透彻理解本申请实施例。然而,本领域的技术人员应当清楚,在没有这些具体细节的其它实施例中也可以实现本申请。在其它情况中,省略对众所周知的系统、装置、电路以及方法的详细说明,以免不必要的细节妨碍本申请的描述。In the following description, for the purpose of illustration rather than limitation, specific details such as a specific system structure and technology are set forth in order to provide a thorough understanding of the embodiments of the present application. However, it will be apparent to those skilled in the art that the present application may be practiced in other embodiments without these specific details. In other instances, detailed descriptions of well-known systems, devices, circuits, and methods are omitted so as not to obscure the description of the present application with unnecessary detail.
应当理解,当在本申请说明书和所附权利要求书中使用时,术语“包括”指示所描述特征、整体、步骤、操作、元素和/或组件的存在,但并不排除一个或多个其它特征、整体、步骤、操作、元素、组件和/或其集合的存在或添加。It is to be understood that, when used in this specification and the appended claims, the term "comprising" indicates the presence of the described feature, integer, step, operation, element and/or component, but does not exclude one or more other The presence or addition of features, integers, steps, operations, elements, components and/or sets thereof.
还应当理解,在本申请说明书和所附权利要求书中使用的术语“和/或”是指相关联列出的项中的一个或多个的任何组合以及所有可能组合,并且包括这些组合。It will also be understood that, as used in this specification and the appended claims, the term "and/or" refers to and including any and all possible combinations of one or more of the associated listed items.
如在本申请说明书和所附权利要求书中所使用的那样,术语“如果”可以依据上下文被解释为“当...时”或“一旦”或“响应于确定”或“响应于检测到”。类似地,短语“如果确定”或“如果检测到[所描述条件或事件]”可以依据上下文被解释为意指“一旦确定”或“响应于确定”或“一旦检测到[所描述条件或事件]”或“响应于检测到[所描述条件或事件]”。As used in the specification of this application and the appended claims, the term "if" may be contextually interpreted as "when" or "once" or "in response to determining" or "in response to detecting ". Similarly, the phrases "if it is determined" or "if the [described condition or event] is detected" may be interpreted, depending on the context, to mean "once it is determined" or "in response to the determination" or "once the [described condition or event] is detected. ]" or "in response to detection of the [described condition or event]".
另外,在本申请说明书和所附权利要求书的描述中,术语“第一”、“第二”、“第三”等仅用于区分描述,而不能理解为指示或暗示相对重要性。In addition, in the description of the specification of the present application and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the description, and should not be construed as indicating or implying relative importance.
在本申请说明书中描述的参考“一个实施例”或“一些实施例”等意味着在本申请的一个或多个实施例中包括结合该实施例描述的特定特征、结构或特点。由此,在本说明书中的不同之处出现的语句“在一个实施例中”、“在一些实施例中”、“在其他一些实施例中”、“在另外一些实施例中”等不是必然都参考相同的实施例,而是意味着“一个或多个但不是所有的实施例”,除非是以其他方式另外特别强调。术语“包括”、“包含”、“具有”及它们的变形都意味着“包括但不限于”,除非是以其他方式另外特别强调。References in this specification to "one embodiment" or "some embodiments" and the like mean that a particular feature, structure or characteristic described in connection with the embodiment is included in one or more embodiments of the present application. Thus, appearances of the phrases "in one embodiment," "in some embodiments," "in other embodiments," "in other embodiments," etc. in various places in this specification are not necessarily All refer to the same embodiment, but mean "one or more but not all embodiments" unless specifically emphasized otherwise. The terms "including", "including", "having" and their variants mean "including but not limited to" unless specifically emphasized otherwise.
在本发明的一个实施例中,如图1所示,提供一种项目管理方法,所述方法包括:In an embodiment of the present invention, as shown in FIG. 1, a project management method is provided, and the method includes:
步骤S100:获取项目的项目基本信息,并根据所述项目基本信息生成信息录入完成指令,所述信息录入完成指令用于提示用户项目的基本信息录入完成;Step S100: Acquire basic project information of the project, and generate an information entry completion instruction according to the project basic information, and the information entry completion instruction is used to prompt the user that the entry of the basic information of the project is completed;
本步骤中所述获取所述项目基本信息,是为了汇总一个项目基本的信息。具体地,所述项目信息包括:项目编号、项目名称、项目内容、项目进度、项目状态、查看异常栏、立项日期、计划开工日期、实际开工日期、设计单位、施工单位以及验收日期。The purpose of acquiring the basic information of the project in this step is to summarize the basic information of a project. Specifically, the project information includes: project number, project name, project content, project progress, project status, viewing exception column, project establishment date, planned start date, actual start date, design unit, construction unit, and acceptance date.
如此,通过对上述信息的录入,将项目的基本信息的进行统计与汇总,提高项目管理效率。In this way, through the input of the above information, the basic information of the project is counted and summarized, and the project management efficiency is improved.
进一步地,用户完成对所述项目基本信息的录入后,点击“立即提交”后,显示“提交完成”,即生成所述信息录入完成指令。Further, after the user completes the entry of the basic information of the project, and clicks "Submit Now", "Submit Complete" is displayed, that is, the information entry completion instruction is generated.
步骤S200:根据所述项目基本信息对项目进行拆分并获得项目拆分信息,并根据所述项目拆分信息生成项目拆分完成指令,所述项目拆分信息完成指令用于提示用户项目的拆分录入完成;Step S200: Split the project according to the basic project information and obtain the project splitting information, and generate a project splitting completion instruction according to the project splitting information, and the project splitting information completion instruction is used to prompt the user of the project Split entry completed;
本步骤中,在实际项目进行中,长需要将各个项目分包给其他供应商,拆分后需要进行统计,故通过对项目拆分信息的获取,以保证项目统计数据的完整性。In this step, during the actual project progress, each project needs to be subcontracted to other suppliers, and statistics need to be performed after the split, so the integrity of the project statistical data is ensured by obtaining the project split information.
具体的,所述项目拆分信息包括拆分项目编号、拆分项目名称、拆分项目内容、拆分项目进度、拆分项目状态、拆分查看异常栏和拆分立项日期。Specifically, the project splitting information includes the splitting project number, the splitting project name, the splitting project content, the splitting project progress, the splitting project status, the splitting view exception bar, and the splitting project establishment date.
步骤S300:获取所述项目拆分信息获取拆分后的各项目的项目进行状态信息,并根据所述项目进行状态信息获取项目整改信息;Step S300: obtaining the project split information to obtain the project progress status information of the split projects, and obtain project rectification information according to the project progress status information;
具体地,当拆分项目后,需要对拆分项目进行项目跟进,以获取项目的进行状态信息,同时根据所述项目进行状态信息来判断项目是否需要整改。Specifically, after the project is split, it is necessary to follow up the split project to obtain the progress status information of the project, and at the same time, it is determined whether the project needs to be rectified according to the project progress status information.
进一步地,当项目阶段性或整体完工,若发生项目施工质量,如做工、观感等不符合客户要求,不符合施工规范、使用要求等,故需要对不符合要求部分进行翻工,即项目整改。Further, when the project is completed in stages or as a whole, if the construction quality of the project, such as workmanship, appearance, etc., does not meet customer requirements, construction specifications, usage requirements, etc., it is necessary to renovate the parts that do not meet the requirements, that is, project rectification. .
所述项目整改信息至少包括整改内容、整改单位、整改原因以及跟进人和处罚信息。如此,实现了对项目整改信息的统计与管理,提高项目管理效率。The project rectification information at least includes rectification content, rectification unit, rectification reason, and follow-up and punishment information. In this way, the statistics and management of project rectification information are realized, and the project management efficiency is improved.
步骤S400:根据所述项目整改信息获取项目进行过程中的项目进度更新信息;Step S400: Acquire project progress update information during project progress according to the project rectification information;
步骤S500:根据所述项目进度更新信息,获取项目资料管理数据。Step S500: Acquire project data management data according to the project progress update information.
本步骤中,所述项目资料管理数据包括开工检查表、客户满意度、施工进度表、现场巡查表、施工变更表、组织框架图以及完工检查表。通过上述表格切实反映了项目施行过程中的各阶段数据情况,从而实现对项目涉及的全部工作进行有效地管理。In this step, the project data management data includes a start-up checklist, customer satisfaction, a construction schedule, an on-site inspection sheet, a construction change sheet, an organizational frame chart, and a completion checklist. The above tables effectively reflect the data at each stage in the project implementation process, so as to effectively manage all the work involved in the project.
本发明依次通过获取项目的项目基本信息,并根据所述项目基本信息生成信息录入完成指令,所述信息录入完成指令用于提示用户项目的基本信息录入完成;根据所述项目基本信息对项目进行拆分并获得项目拆分信息,并根据所述项目拆分信息生成项目拆分完成指令,所述项目拆分信息完成指令用于提示用户项目的拆分录入完成;获取所述项目拆分信息获取拆分后的各项目的项目进行状态信息,并根据所述项目进行状态信息获取项目整改信息;根据所述项目整改信息获取项目进行过程中的项目进度更新信息;根据所述项目进度更新信息,获取项目资料管理数据;从而实现了在有限的资源约束下,运用系统的观点、方法和理论,对项目涉及的基本信息、拆分信息、整改信息、进度更新信息以及项目资料的系统化管理,节省人工成本,提高生产效率。The present invention sequentially obtains the project basic information of the project, and generates an information entry completion instruction according to the project basic information, and the information entry completion instruction is used to prompt the user that the entry of the basic information of the project is completed; Splitting and obtaining project splitting information, and generating a project splitting completion instruction according to the project splitting information, the project splitting information completing instruction is used to prompt the user that the project splitting entry is completed; acquiring the project splitting information Obtain the project progress status information of the split projects, and obtain project rectification information according to the project progress status information; obtain project progress update information in the process of the project according to the project rectification information; update information according to the project progress , to obtain project data management data; thus realizing the systematic management of basic information, split information, rectification information, progress update information and project data involved in the project under limited resource constraints, using systematic viewpoints, methods and theories , save labor costs and improve production efficiency.
在本发明的一个实施例中,所述方法还包括:In one embodiment of the present invention, the method further includes:
获取项目存在的风险评估信息。Obtain risk assessment information for the existence of the project.
具体的,项目在进行过程中,必然会存在危险源。本步骤中,通过获取项目存在的风险评估信息,以用于提示项目工程人员项目进行过程中可能存在的风险源,从而为项目工程人员在进行项目过程中的安全提供了保障,提高了安全性。Specifically, in the course of the project, there will inevitably be sources of danger. In this step, by obtaining the risk assessment information existing in the project, it is used to remind the project engineer of the possible risk sources in the process of the project, thereby providing a guarantee for the safety of the project engineer during the project process and improving the safety. .
具体地,如图2-图3所示,所述获取项目存在的风险评估信息,具体包括:Specifically, as shown in FIGS. 2-3 , the obtaining of the risk assessment information existing in the project specifically includes:
步骤S810:获取风险评估界面,所述风险评估界面用于展示项目查勘内容栏、项目查勘结论栏和项目查勘风险源提示栏;Step S810: obtaining a risk assessment interface, where the risk assessment interface is used to display the project survey content column, the project survey conclusion column and the project survey risk source prompt column;
项目工程人员在获取所述风险评估信息时,需要对项目即将实施的内容进行查勘,以获取项目的实际项目情况,即获取项目查勘内容;接着根据查勘到的实际项目情况做情况分析,从而得到项目查勘的结论;同时,亦能获取项目查勘过程中的风险源。最后,项目工程人员开始对获得的信息进行登记。即,获取风险评估界面,并在所述风险评估界面上展示的所述项目查勘内容栏、所述项目查勘结论栏和所述项目查勘风险源提示栏填写相应的内容,即实现了本步骤:获取风险评估界面,所述风险评估界面用于展示项目查勘内容栏、项目查勘结论栏和项目查勘风险源提示栏。When the project engineers obtain the risk assessment information, they need to investigate the content to be implemented in the project to obtain the actual project situation of the project, that is, to obtain the project investigation content; The conclusion of the project investigation; at the same time, the risk source in the project investigation process can also be obtained. Finally, the project engineers began to register the obtained information. That is, obtaining the risk assessment interface, and filling in the corresponding content in the project survey content column, the project survey conclusion column, and the project survey risk source prompt column displayed on the risk assessment interface, thus realizing this step: A risk assessment interface is obtained, where the risk assessment interface is used to display a project survey content column, a project survey conclusion column, and a project survey risk source prompt column.
进一步地,所述项目查勘风险源提示栏亦可以设置为供用户选择的选择项,点击“选择风险源”,从而使用户从预存的风险源中选择与具体项目相关联的风险源,进而节省时间,提高项目工作管理效率。Further, the project exploration risk source prompt column can also be set as an option for the user to choose, click "Select Risk Source", so that the user can select the risk source associated with the specific project from the pre-stored risk sources, thereby saving time and improve project work management efficiency.
步骤S820:获取根据所述风险评估界面展示项目查勘内容栏、项目查勘结论栏和项目查勘风险源提示栏填写的风险内容;Step S820: obtaining the risk content filled in according to the risk assessment interface to display the project survey content column, the project survey conclusion column, and the project survey risk source prompt column;
本步骤中,项目工程人员在所述风险评估界面中展示的项目查勘内容栏、项目查勘结论栏和项目查勘风险源提示栏填写相应内容,从而获得所述风险内容。In this step, the project engineer fills in the corresponding content in the project investigation content column, the project investigation conclusion column and the project investigation risk source prompt column displayed in the risk assessment interface, so as to obtain the risk content.
步骤S830:根据所述风险内容生成风险评估报告。Step S830: Generate a risk assessment report according to the risk content.
如此,通过步骤S810-步骤S830,实现了对项目进行过程中的风险项的登记、录入以及报告生成,较之现有技术中依靠项目工程人员的经验来规避风险,本发明通过获取风险评估信息,并通过可视化的风险评估报告提高了项目管理的高效性的同时,又给项目工程人员在施工过程中提供了风险项的参考,极大提高了安全性能。In this way, through steps S810-S830, the registration, entry and report generation of the risk items in the process of the project are realized. Compared with the prior art relying on the experience of project engineers to avoid risks, the present invention obtains risk assessment information by obtaining risk assessment information. , and improve the efficiency of project management through the visual risk assessment report, and at the same time provide the project engineers with the reference of risk items in the construction process, which greatly improves the safety performance.
在本发明的一个实施例中,如图4-图5所示,所述方法还包括:In an embodiment of the present invention, as shown in FIGS. 4-5 , the method further includes:
步骤S710:获取项目进行过程中的项目变更指令;Step S710: obtaining a project change instruction in the process of project progress;
本步骤中,项目变更产生的原位是因客户需求,或设计漏项等原因,工程出现变动,需新增工程量,或在原有工程量增加或扣减。故,实际项目施工过程中,常常需要对项目进行变更。In this step, the original position of the project change is due to customer requirements or design omissions, etc., the project has changed, and the amount of work needs to be added, or the original amount of work is increased or deducted. Therefore, in the actual project construction process, it is often necessary to make changes to the project.
具体地,获取所述项目变更指令,是指当用户输入的指令与所述项目变更指令相匹配时,即为获取所述项目变更指令。Specifically, acquiring the item modification instruction refers to acquiring the item modification instruction when the instruction input by the user matches the item modification instruction.
步骤S720:根据所述项目变更指令生成项目变更页面,所述项目变更页面用于展示变更项目栏、变更内容栏和变更原因栏;Step S720: generating a project change page according to the project change instruction, where the project change page is used to display the changed item column, the changed content column and the changed reason column;
具体地,所述变更项目栏用于供用户根据实际情况填写变更项目名称。Specifically, the change item column is used for the user to fill in the name of the change item according to the actual situation.
所述变更内容栏用于供用户填写变更项目的具体变更内容。The modification content column is used for the user to fill in the specific modification content of the modification item.
所述变更原因栏用于供用户填写项目变更的具体原因。The change reason column is used for the user to fill in the specific reason for the project change.
进一步地,所述项目变更页面还包括变更日期、计划开工日期、实际开工日期和预计完成日期。Further, the project change page further includes the change date, the planned start date, the actual start date and the expected completion date.
步骤S730:获取根据所述项目变更页面展示的变更项目栏、变更内容栏和变更原因栏填写的变更内容;Step S730: Obtain the changed content filled in according to the changed item column, the changed content column and the changed reason column displayed on the project change page;
步骤S740:根据所述变更内容生成项目变更登记表。Step S740: Generate an item change registration table according to the change content.
本步骤中,用户多次登记后,所述项目变更登记表的数量便包含多个项目变更内容,从而在实现项目变更信息的可视化管理的同时,亦实现了项目变更的统计与汇总,以方便后续对项目完成后的数据总结与处理。In this step, after the user has registered for many times, the number of the item change registration form includes multiple item change contents, so that while realizing the visual management of the item change information, the statistics and summarization of the item change are also realized, so as to facilitate the Subsequent summarization and processing of data after the project is completed.
如此,通过步骤S710-S740,实现了对项目变更的可视化高效率管理,提高项目管理的管理效率。In this way, through steps S710-S740, the visualized and efficient management of project changes is realized, and the management efficiency of project management is improved.
在本发明的一个实施例中,如图6-图7所示,所述方法还包括:对所述项目资料管理数据作权重分析设置操作并生成项目分析图像。In an embodiment of the present invention, as shown in FIGS. 6-7 , the method further includes: performing a weight analysis setting operation on the project data management data and generating a project analysis image.
本步骤中,通过所述项目分析图像,从而获取项目整个过程中的各项参数信息的占比与数据。以便于对项目的总结与数据处理,且采用图像形式,更便于用户直观清晰的获取所需数据。In this step, the image is analyzed through the project, so as to obtain the proportion and data of each parameter information in the whole process of the project. In order to facilitate the summary of the project and data processing, and in the form of images, it is more convenient for users to obtain the required data intuitively and clearly.
可选地,所述权重分析设置操作包括:Optionally, the weight analysis setting operation includes:
步骤S910:获取权重设置指令;Step S910: obtaining a weight setting instruction;
用户需要对对报修的各项目作权重设置时,便输入权重设置指令。When the user needs to set the weight of each item to be repaired, he or she can input the weight setting instruction.
步骤S920:根据所述权重设置指令生成权重设置界面,所述权重设置界面用于展示权重设置项目以及对应的权重设置选项;Step S920: generating a weight setting interface according to the weight setting instruction, where the weight setting interface is used to display weight setting items and corresponding weight setting options;
其中,所述权重设置项目用于显示可以设置权重的各项目。具体地,如图7所示,所述权重设置项目可以设置为以下几项,如“可靠性”、“安全性”、“环保”、“节能”以及“成本”。其中,所述“可靠性”、所述“安全性”、所述“环保”、所述“节能”以及所述“成本”右侧的为权重设置选项,亦可以理解为所述权重设置选项为所占权重比例。Wherein, the weight setting item is used to display each item for which weight can be set. Specifically, as shown in FIG. 7 , the weight setting items can be set to the following items, such as “reliability”, “safety”, “environmental protection”, “energy saving” and “cost”. Among them, the "reliability", the "safety", the "environmental protection", the "energy saving" and the right side of the "cost" are weight setting options, which can also be understood as the weight setting options is the weight ratio.
进一步地,“安全性”为具体项目实行过程中的安全系数,由项目工程人员根据实际项目进展情况来录入信息;“环保”为具体项目施行过程中的环保系数;“节能”为具体项目施行过程中的节能系数;“成本”为具体项目施行过程中的具体成本。Further, "safety" is the safety factor during the implementation of a specific project, and the project engineers input information according to the actual project progress; "environmental protection" is the environmental protection factor during the implementation of the specific project; "energy saving" is the implementation of the specific project. The energy saving coefficient in the process; "cost" is the specific cost in the implementation process of the specific project.
步骤S930:获取根据所述权重设置界面展示的所述权重设置项目从所述权重设置选项中设置的目标设置选项;Step S930: obtaining the target setting options set from the weight setting options according to the weight setting items displayed on the weight setting interface;
具体地,用户在所述权重设置选项栏可以手动输入所占权重比例,如本实施例中,“可靠性”权重设置为20;“安全性”权重设置为10;“环保”权重设置为20;“节能”权重设置为20以及“成本”权重设置为20。Specifically, the user can manually input the weight ratio in the weight setting option bar. For example, in this embodiment, the weight of "reliability" is set to 20; the weight of "security" is set to 10; the weight of "environmental protection" is set to 20 ; The "Energy Saving" weight is set to 20 and the "Cost" weight is set to 20.
步骤S940:根据所述目标设置选项生成所述项目分析图像。Step S940: Generate the item analysis image according to the target setting option.
实际生产过程中,项目完成之后,必然需要对项目施行过程中的数据进行分析,以获取项目施行过程中的技术协作、工艺流程、资源配置以及相应设备配置的情况,从而综合评价项目投资的经济效益和社会效益。而,不同生产商对项目实行过程中所关注的重点均不同,故需要设置不同的权重来进行不同比例的分析。In the actual production process, after the project is completed, it is necessary to analyze the data during the project implementation process to obtain the technical cooperation, technological process, resource allocation and corresponding equipment configuration during the project implementation process, so as to comprehensively evaluate the economics of project investment. benefits and social benefits. However, different manufacturers pay different attention to the project implementation process, so it is necessary to set different weights to carry out analysis of different proportions.
故,本实施例中,通过所述步骤S910至所述步骤S940,可以实现对项目施行过程中的各数据分析时的权重设置,进而保证对数据处理的可调性以及灵活应变性,进而适应不同客户需求,应用范围广。Therefore, in this embodiment, through the step S910 to the step S940, the weight setting of each data analysis in the project implementation process can be realized, thereby ensuring the adjustability and flexibility of the data processing, and then adapting to the Different customer needs, a wide range of applications.
另,通过所述步骤S910至所述步骤S940后生成所述项目分析图像,更容易项目工程人员了解建设投资费用,进而分析资金来源和偿还办法,从而估算生产成本并评价工程效果,大大提高了项目管理效率。In addition, by generating the project analysis image after the step S910 to the step S940, it is easier for the project engineer to understand the construction investment cost, and then analyze the source of funds and the repayment method, thereby estimating the production cost and evaluating the project effect, which greatly improves the efficiency of the project. Project management efficiency.
在本发明的一个实施例中,如图8-图9所示,所述根据所述项目整改信息获取项目进行过程中的项目进度更新信息,具体包括:In an embodiment of the present invention, as shown in FIG. 8-FIG. 9, the acquisition of the project progress update information in the process of the project according to the project rectification information specifically includes:
步骤S410:获取根据所述项目整改信息中展示的整改项目的进度更新指令;Step S410: obtaining a progress update instruction of the rectification project displayed in the project rectification information;
步骤S420:根据所述进度更新指令生成进度更新界面,所述进度更新界面用于展示进度更新内容填写栏目;Step S420: generating a progress update interface according to the progress update instruction, and the progress update interface is used to display the progress update content and fill in the column;
具体地,所述项目更新内容栏目包括实际开始时间栏、实际完成时间栏以及整改进度栏;其中,实际开始时间栏用于供用户填写开始时间,实际完成时间栏用于供用户填写完成时间,整改进度栏用于供用户设置用户进度百分比。Specifically, the item update content column includes an actual start time column, an actual completion time column and a rectification progress column; wherein, the actual start time column is used for the user to fill in the start time, and the actual completion time column is used for the user to fill in the completion time, The remediation progress bar is for the user to set the user progress percentage.
步骤S430:获取根据所述进度更新内容填写栏目填写的进度内容;Step S430: obtaining the progress content filled in the column according to the progress update content;
步骤S440:根据所述进度内容生成所述项目进度更新信息。Step S440: Generate the project progress update information according to the progress content.
具体地,所述步骤S440中,所述项目进度更新信息可以采用表格形式或者图文形式,以直观展示项目更新信息。Specifically, in the step S440, the project progress update information may be in the form of a table or a graphic form, so as to visually display the project update information.
如此,通过步骤S410-S440,能够实现对项目整改后的项目进度的信息的获取,从而使用户能够及时了解到项目整改后的项目更新信息,进而提高了项目进展过程中的实时进度更新。In this way, through steps S410-S440, the information of the project progress after the project rectification can be obtained, so that the user can know the project update information after the project rectification in time, thereby improving the real-time progress update in the project progress process.
在本发明的一个实施例中,如图10所示,本发明实施例还提供一种项目管理装置,所述装置包括:In an embodiment of the present invention, as shown in FIG. 10 , an embodiment of the present invention further provides a project management device, the device includes:
基本信息获取模块10,用于获取项目的项目基本信息,并根据所述项目基本信息生成信息录入完成指令,所述信息录入完成指令用于提示用户项目的基本信息录入完成;The basic
拆分信息获取模块20,用于根据所述项目基本信息对项目进行拆分并获得项目拆分信息,并根据所述项目拆分信息生成项目拆分完成指令,所述项目拆分信息完成指令用于提示用户项目的拆分录入完成;The splitting
进行状态信息获取模块30,用于获取所述项目拆分信息获取拆分后的各项目的项目进行状态信息,并根据所述项目进行状态信息获取项目整改信息;The execution status
进度信息获取模块40,用于根据所述项目整改信息获取项目进行过程中的项目进度更新信息;The progress
资料数据获取模块50,用于根据所述项目进度更新信息,获取项目资料管理数据。The
进一步地,本发明所述项目管理装置实现了对项目从开始到结束进行有效管控、协调和统筹,包括了项目信息、风险评估、项目拆分、项目整改、项目变更、进度更新、资料管理。Further, the project management device of the present invention realizes effective management, control, coordination and overall planning of the project from start to finish, including project information, risk assessment, project splitting, project rectification, project modification, progress update, and data management.
在一个实施例中,提供了一种计算机设备,该计算机设备可以是终端,其内部结构图可以如图11所示。该计算机设备包括通过系统总线连接的处理器、存储器、网络接口、显示屏和输入装置。其中,该计算机设备的处理器用于提供计算和控制能力。该计算机设备的存储器包括非易失性存储介质、内存储器。该非易失性存储介质存储有操作系统和计算机程序。该内存储器为非易失性存储介质中的操作系统和计算机程序的运行提供环境。该计算机设备的网络接口用于与外部的终端通过网络连接通信。该计算机程序被处理器执行时以实现一种风险测评方法。该计算机设备的显示屏可以是液晶显示屏或者电子墨水显示屏,该计算机设备的输入装置可以是显示屏上覆盖的触摸层,也可以是计算机设备外壳上设置的按键、轨迹球或触控板,还可以是外接的键盘、触控板或鼠标等。In one embodiment, a computer device is provided, and the computer device may be a terminal, and its internal structure diagram may be as shown in FIG. 11 . The computer equipment includes a processor, memory, a network interface, a display screen, and an input device connected by a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium, an internal memory. The nonvolatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the execution of the operating system and computer programs in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external terminal through a network connection. The computer program, when executed by the processor, implements a risk assessment method. The display screen of the computer equipment may be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer equipment may be a touch layer covered on the display screen, or a button, a trackball or a touchpad set on the shell of the computer equipment , or an external keyboard, trackpad, or mouse.
本领域技术人员可以理解,图11中示出的结构,仅仅是与本申请方案相关的部分结构的框图,并不构成对本申请方案所应用于其上的计算机设备的限定,具体的计算机设备可以包括比图中所示更多或更少的部件,或者组合某些部件,或者具有不同的部件布置。Those skilled in the art can understand that the structure shown in FIG. 11 is only a block diagram of a partial structure related to the solution of the present application, and does not constitute a limitation on the computer equipment to which the solution of the present application is applied. Include more or fewer components than shown in the figures, or combine certain components, or have a different arrangement of components.
在本发明的一个实施例中,还提供一种计算机设备,包括存储器和处理器,所述存储器存储有计算机程序,所述处理器执行所述计算机程序时实现以下步骤:获取项目的项目基本信息,并根据所述项目基本信息生成信息录入完成指令,所述信息录入完成指令用于提示用户项目的基本信息录入完成;根据所述项目基本信息对项目进行拆分并获得项目拆分信息,并根据所述项目拆分信息生成项目拆分完成指令,所述项目拆分信息完成指令用于提示用户项目的拆分录入完成;获取所述项目拆分信息获取拆分后的各项目的项目进行状态信息,并根据所述项目进行状态信息获取项目整改信息;根据所述项目整改信息获取项目进行过程中的项目进度更新信息;根据所述项目进度更新信息,获取项目资料管理数据。In an embodiment of the present invention, a computer device is also provided, including a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the processor implements the following steps: acquiring basic project information of a project , and generate an information entry completion instruction according to the basic information of the project, the information entry completion instruction is used to prompt the user that the entry of the basic information of the project is completed; split the project according to the basic information of the project and obtain the project split information, and A project splitting completion instruction is generated according to the item splitting information, and the project splitting information completion instruction is used to prompt the user that the split entry of the project is completed; status information, and obtain project rectification information according to the project progress status information; obtain project progress update information during the project progress according to the project rectification information; obtain project data management data according to the project progress update information.
本发明另一实施例中,所述处理器执行所述计算机程序时还实现以下步骤:获取风险评估界面,所述风险评估界面用于展示项目查勘内容栏、项目查勘结论栏和项目查勘风险源提示栏;获取根据所述风险评估界面展示项目查勘内容栏、项目查勘结论栏和项目查勘风险源提示栏填写的风险内容;根据所述风险内容生成风险评估报告。In another embodiment of the present invention, the processor further implements the following steps when executing the computer program: acquiring a risk assessment interface, where the risk assessment interface is used to display a project survey content column, a project survey conclusion column, and a project survey risk source Prompt column; obtain the risk content filled in according to the risk assessment interface to display the project survey content column, the project survey conclusion column and the project survey risk source prompt column; generate a risk assessment report according to the risk content.
本发明另一实施例中,所述处理器执行所述计算机程序时还实现以下步骤:获取项目进行过程中的项目变更指令;根据所述项目变更指令生成项目变更页面,所述项目变更页面用于展示变更项目栏、变更内容栏和变更原因栏;获取根据所述项目变更页面展示的变更项目栏、变更内容栏和变更原因栏填写的变更内容;根据所述变更内容生成项目变更登记表。In another embodiment of the present invention, the processor further implements the following steps when executing the computer program: acquiring a project change instruction in the process of project progress; generating a project change page according to the project change instruction, and the project change page uses Display the changed item column, the changed content column and the change reason column; obtain the changed content filled in according to the changed item column, the changed content column and the changed reason column displayed on the project change page; and generate the project change registration form according to the changed content.
本发明另一实施例中,所述处理器执行所述计算机程序时还实现以下步骤:获取权重设置指令;根据所述权重设置指令生成权重设置界面,所述权重设置界面用于展示权重设置项目以及对应的权重设置选项;获取根据所述权重设置界面展示的所述权重设置项目从所述权重设置选项中设置的目标设置选项;根据所述目标设置选项生成所述项目分析图像。In another embodiment of the present invention, the processor further implements the following steps when executing the computer program: acquiring a weight setting instruction; generating a weight setting interface according to the weight setting instruction, and the weight setting interface is used to display weight setting items and corresponding weight setting options; acquiring the target setting options set from the weight setting options according to the weight setting items displayed on the weight setting interface; generating the item analysis image according to the target setting options.
本发明另一实施例中,所述处理器执行所述计算机程序时还实现以下步骤:获取根据所述项目整改信息中展示的整改项目的进度更新指令;根据所述进度更新指令生成进度更新界面,所述进度更新界面用于展示进度更新内容填写栏目;获取根据所述进度更新内容填写栏目填写的进度内容;根据所述进度内容生成所述项目进度更新信息。In another embodiment of the present invention, when the processor executes the computer program, the processor further implements the following steps: acquiring a progress update instruction of the rectification item displayed in the item rectification information; generating a progress update interface according to the progress update instruction , the progress update interface is used to display the progress update content filling column; obtain the progress content filled in the progress update content filling column; and generate the project progress update information according to the progress content.
本发明实施例还提供一种计算机可读存储介质,其上存储有计算机程序,所述计算机程序被处理器执行时实现以下步骤:获取项目的项目基本信息,并根据所述项目基本信息生成信息录入完成指令,所述信息录入完成指令用于提示用户项目的基本信息录入完成;根据所述项目基本信息对项目进行拆分并获得项目拆分信息,并根据所述项目拆分信息生成项目拆分完成指令,所述项目拆分信息完成指令用于提示用户项目的拆分录入完成;获取所述项目拆分信息获取拆分后的各项目的项目进行状态信息,并根据所述项目进行状态信息获取项目整改信息;根据所述项目整改信息获取项目进行过程中的项目进度更新信息;根据所述项目进度更新信息,获取项目资料管理数据。Embodiments of the present invention further provide a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented: acquiring basic project information of a project, and generating information according to the basic project information An entry completion instruction is used to prompt the user that the entry of the basic information of the project is completed; the project is split according to the project basic information to obtain the project split information, and the project split information is generated according to the project split information. A division completion instruction, the item division information completion instruction is used to prompt the user that the division entry of the item is completed; obtain the item division information to obtain the item progress status information of each item after the division, and according to the item progress status The information obtains project rectification information; according to the project rectification information, the project progress update information in the process of the project is obtained; according to the project progress update information, the project data management data is obtained.
本发明另一实施例中,所述计算机程序被处理器执行时实现以下步骤:获取风险评估界面,所述风险评估界面用于展示项目查勘内容栏、项目查勘结论栏和项目查勘风险源提示栏;获取根据所述风险评估界面展示项目查勘内容栏、项目查勘结论栏和项目查勘风险源提示栏填写的风险内容;根据所述风险内容生成风险评估报告。In another embodiment of the present invention, when the computer program is executed by the processor, the following steps are implemented: obtaining a risk assessment interface, where the risk assessment interface is used to display a project survey content column, a project survey conclusion column, and a project survey risk source prompt column Obtain the risk content filled in according to the risk assessment interface to display the project survey content column, the project survey conclusion column and the project survey risk source prompt column; and generate a risk assessment report according to the risk content.
本发明另一实施例中,所述计算机程序被处理器执行时实现以下步骤:获取项目进行过程中的项目变更指令;根据所述项目变更指令生成项目变更页面,所述项目变更页面用于展示变更项目栏、变更内容栏和变更原因栏;获取根据所述项目变更页面展示的变更项目栏、变更内容栏和变更原因栏填写的变更内容;根据所述变更内容生成项目变更登记表。In another embodiment of the present invention, when the computer program is executed by the processor, the following steps are implemented: acquiring a project change instruction in the process of the project; generating a project change page according to the project change instruction, and the project change page is used for displaying Change item column, change content column and change reason column; obtain the change content filled in according to the change item column, change content column and change reason column displayed on the project change page; generate a project change registration form according to the change content.
本发明另一实施例中,所述计算机程序被处理器执行时实现以下步骤:获取权重设置指令;根据所述权重设置指令生成权重设置界面,所述权重设置界面用于展示权重设置项目以及对应的权重设置选项;获取根据所述权重设置界面展示的所述权重设置项目从所述权重设置选项中设置的目标设置选项;根据所述目标设置选项生成所述项目分析图像。In another embodiment of the present invention, when the computer program is executed by the processor, the following steps are implemented: obtaining a weight setting instruction; generating a weight setting interface according to the weight setting instruction, and the weight setting interface is used to display the weight setting items and corresponding the weight setting options; obtain the target setting options set from the weight setting options according to the weight setting items displayed on the weight setting interface; generate the item analysis image according to the target setting options.
本发明另一实施例中,所述计算机程序被处理器执行时实现以下步骤:获取根据所述项目整改信息中展示的整改项目的进度更新指令;根据所述进度更新指令生成进度更新界面,所述进度更新界面用于展示进度更新内容填写栏目;获取根据所述进度更新内容填写栏目填写的进度内容;根据所述进度内容生成所述项目进度更新信息。In another embodiment of the present invention, when the computer program is executed by the processor, the following steps are implemented: obtaining a progress update instruction according to the rectification item displayed in the item rectification information; generating a progress update interface according to the progress update instruction, so that the The progress update interface is used to display the progress update content filling column; obtain the progress content filled in the progress update content filling column; generate the project progress update information according to the progress content.
本领域普通技术人员可以理解实现上述实施例方法中的全部或部分流程,是可以通过计算机程序来指令相关的硬件来完成,所述的计算机程序可存储于一非易失性计算机可读取存储介质中,该计算机程序在执行时,可包括如上述各方法的实施例的流程。其中,本申请所提供的各实施例中所使用的对存储器、存储、数据库或其它介质的任何引用,均可包括非易失性和/或易失性存储器。非易失性存储器可包括只读存储器(ROM)、可编程ROM(PROM)、电可编程ROM(EPROM)、电可擦除可编程ROM(EEPROM)或闪存。易失性存储器可包括随机存取存储器(RAM)或者外部高速缓冲存储器。作为说明而非局限,RAM以多种形式可得,诸如静态RAM(SRAM)、动态RAM(DRAM)、同步DRAM(SDRAM)、双数据率SDRAM(DDRSDRAM)、增强型SDRAM(ESDRAM)、同步链路(Synchlink)DRAM(SLDRAM)、存储器总线(Rambus)直接RAM(RDRAM)、直接存储器总线动态RAM(DRDRAM)、以及存储器总线动态RAM(RDRAM)等。Those of ordinary skill in the art can understand that all or part of the processes in the methods of the above embodiments can be implemented by instructing relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage In the medium, when the computer program is executed, it may include the processes of the above-mentioned method embodiments. Wherein, any reference to memory, storage, database or other medium used in the various embodiments provided in this application may include non-volatile and/or volatile memory. Nonvolatile memory may include read only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM), or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in various forms such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous chain Road (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), etc.
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention shall be included in the protection of the present invention. within the range.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010642283.5A CN111861165A (en) | 2020-07-06 | 2020-07-06 | Project management method, apparatus, computer equipment and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010642283.5A CN111861165A (en) | 2020-07-06 | 2020-07-06 | Project management method, apparatus, computer equipment and storage medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111861165A true CN111861165A (en) | 2020-10-30 |
Family
ID=73152292
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010642283.5A Pending CN111861165A (en) | 2020-07-06 | 2020-07-06 | Project management method, apparatus, computer equipment and storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111861165A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113887931A (en) * | 2021-09-29 | 2022-01-04 | 中核核电运行管理有限公司 | Digital visual management system and method for personnel behavior track |
JP7422265B1 (en) | 2023-10-20 | 2024-01-25 | 株式会社日立社会情報サービス | Information processing device and information processing method |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040098300A1 (en) * | 2002-11-19 | 2004-05-20 | International Business Machines Corporation | Method, system, and storage medium for optimizing project management and quality assurance processes for a project |
CN103679544A (en) * | 2012-11-27 | 2014-03-26 | 江苏省电力公司南京供电公司 | Comprehensive assessment method for running of intelligent power distribution network |
US20140229212A1 (en) * | 2011-09-19 | 2014-08-14 | Sandy MacElheron | Method and system for managing construction projects |
CN104896651A (en) * | 2014-03-05 | 2015-09-09 | 珠海格力电器股份有限公司 | Method and system for analyzing air conditioner operation data |
CN106910044A (en) * | 2017-02-27 | 2017-06-30 | 努比亚技术有限公司 | Project process based reminding method and system |
CN107798477A (en) * | 2017-11-01 | 2018-03-13 | 国网天津市电力公司 | A kind of distribution network planning project implementation operating method |
CN109359125A (en) * | 2018-08-27 | 2019-02-19 | 中铁建工集团有限公司 | A kind of progress fine-grained management method and its system for construction project |
CN109840748A (en) * | 2017-11-29 | 2019-06-04 | 镇江市新创计算机系统集成有限公司 | A kind of project management system and method |
CN110322147A (en) * | 2019-07-04 | 2019-10-11 | 四川元丰建设项目管理有限公司 | A kind of Project Supervision approaches to IM and system |
CN110865747A (en) * | 2019-11-05 | 2020-03-06 | 广东优世联合控股集团股份有限公司 | Project management method, device, medium and electronic equipment |
CN111142992A (en) * | 2019-12-07 | 2020-05-12 | 广东优世联合控股集团股份有限公司 | Interface switching method, device, medium and electronic equipment |
CN111369158A (en) * | 2019-12-30 | 2020-07-03 | 中铁四局集团有限公司 | BIM-based informatization quality management method and system |
-
2020
- 2020-07-06 CN CN202010642283.5A patent/CN111861165A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040098300A1 (en) * | 2002-11-19 | 2004-05-20 | International Business Machines Corporation | Method, system, and storage medium for optimizing project management and quality assurance processes for a project |
US20140229212A1 (en) * | 2011-09-19 | 2014-08-14 | Sandy MacElheron | Method and system for managing construction projects |
CN103679544A (en) * | 2012-11-27 | 2014-03-26 | 江苏省电力公司南京供电公司 | Comprehensive assessment method for running of intelligent power distribution network |
CN104896651A (en) * | 2014-03-05 | 2015-09-09 | 珠海格力电器股份有限公司 | Method and system for analyzing air conditioner operation data |
CN106910044A (en) * | 2017-02-27 | 2017-06-30 | 努比亚技术有限公司 | Project process based reminding method and system |
CN107798477A (en) * | 2017-11-01 | 2018-03-13 | 国网天津市电力公司 | A kind of distribution network planning project implementation operating method |
CN109840748A (en) * | 2017-11-29 | 2019-06-04 | 镇江市新创计算机系统集成有限公司 | A kind of project management system and method |
CN109359125A (en) * | 2018-08-27 | 2019-02-19 | 中铁建工集团有限公司 | A kind of progress fine-grained management method and its system for construction project |
CN110322147A (en) * | 2019-07-04 | 2019-10-11 | 四川元丰建设项目管理有限公司 | A kind of Project Supervision approaches to IM and system |
CN110865747A (en) * | 2019-11-05 | 2020-03-06 | 广东优世联合控股集团股份有限公司 | Project management method, device, medium and electronic equipment |
CN111142992A (en) * | 2019-12-07 | 2020-05-12 | 广东优世联合控股集团股份有限公司 | Interface switching method, device, medium and electronic equipment |
CN111369158A (en) * | 2019-12-30 | 2020-07-03 | 中铁四局集团有限公司 | BIM-based informatization quality management method and system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113887931A (en) * | 2021-09-29 | 2022-01-04 | 中核核电运行管理有限公司 | Digital visual management system and method for personnel behavior track |
JP7422265B1 (en) | 2023-10-20 | 2024-01-25 | 株式会社日立社会情報サービス | Information processing device and information processing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Waldman et al. | Embodied carbon in construction materials: a framework for quantifying data quality in EPDs | |
Rigby et al. | Convergent contemporary software peer review practices | |
Trietsch et al. | PERT 21: Fitting PERT/CPM for use in the 21st century | |
US9026984B2 (en) | Integrated design application system | |
US8296724B2 (en) | Software defect forecasting system | |
US9542160B2 (en) | System and method for software development report generation | |
CN109800445A (en) | The processing method and system of the visualization auxiliary assessment of bids are realized based on BIM technology | |
CN108874660A (en) | A kind of application testing method and device | |
WO2017063389A1 (en) | Document generation method and device | |
CN111861165A (en) | Project management method, apparatus, computer equipment and storage medium | |
EP3113016A1 (en) | Tracing dependencies between development artifacts in a development project | |
Poh et al. | Integrated duration–cost influence network for modelling risk impacts on construction tasks | |
Jones | Software cost estimating methods for large projects | |
US20150089481A1 (en) | Methods, systems and computer-readable media for quantifying a bug detection efficiency of a bug prediction technique | |
CN113342249A (en) | Content management method, device, equipment and storage medium capable of previewing in real time | |
JP4845625B2 (en) | Risk calculation program | |
Gupta et al. | SCQAM: a scalable structured code quality assessment method for industrial software | |
CN111079991A (en) | Service index prediction method, device, equipment and storage medium | |
Snee | A practical approach to data mining: I have all these data; now what should I do? | |
Uranga et al. | A multiple regression imputation method with application to sensitivity analysis under intermittent missingness | |
KR20210133418A (en) | Method and server for providing commercial real estate information | |
Armario et al. | Project estimation with NDT | |
Kukec et al. | Guidelines for development of application for procedure implementation of public procurement | |
JP3155791U (en) | Building support apparatus and method | |
Ferens | Software support cost models: quo vadis? |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20201030 |