CN111570229A - Roller coating process for UV roller color primer and water-based white finish - Google Patents
Roller coating process for UV roller color primer and water-based white finish Download PDFInfo
- Publication number
- CN111570229A CN111570229A CN202010454514.XA CN202010454514A CN111570229A CN 111570229 A CN111570229 A CN 111570229A CN 202010454514 A CN202010454514 A CN 202010454514A CN 111570229 A CN111570229 A CN 111570229A
- Authority
- CN
- China
- Prior art keywords
- flat door
- conveying belt
- curing
- station
- speed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D—PROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D7/00—Processes, other than flocking, specially adapted for applying liquids or other fluent materials to particular surfaces or for applying particular liquids or other fluent materials
- B05D7/06—Processes, other than flocking, specially adapted for applying liquids or other fluent materials to particular surfaces or for applying particular liquids or other fluent materials to wood
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D—PROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D3/00—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
- B05D3/02—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by baking
- B05D3/0254—After-treatment
- B05D3/0263—After-treatment with IR heaters
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D—PROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D3/00—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
- B05D3/06—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by exposure to radiation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D—PROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D3/00—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
- B05D3/12—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by mechanical means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D—PROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D7/00—Processes, other than flocking, specially adapted for applying liquids or other fluent materials to particular surfaces or for applying particular liquids or other fluent materials
- B05D7/50—Multilayers
- B05D7/56—Three layers or more
- B05D7/58—No clear coat specified
- B05D7/584—No clear coat specified at least some layers being let to dry, at least partially, before applying the next layer
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D—PROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D7/00—Processes, other than flocking, specially adapted for applying liquids or other fluent materials to particular surfaces or for applying particular liquids or other fluent materials
- B05D7/50—Multilayers
- B05D7/56—Three layers or more
- B05D7/58—No clear coat specified
- B05D7/586—No clear coat specified each layer being cured, at least partially, separately
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Wood Science & Technology (AREA)
- Physics & Mathematics (AREA)
- Plasma & Fusion (AREA)
- Mechanical Engineering (AREA)
- Coating Apparatus (AREA)
Abstract
The invention discloses a roller coating process of UV roller color primer and water-based white finish, which comprises a UV primer process and a water-based finish process; the UV primer process is a primer spraying and curing process with multiple processes, the obtained UV primer flat door has high adhesion, the water-based finish process is a roller coating primer and white surface process with multiple processes, and a flat door with good flatness can be obtained by matching with a drying process, so that the requirements are met, the preparation process is simple, the time is short, and the requirements of the existing roller coating process can be met.
Description
Technical Field
The invention relates to the field of paint processes, in particular to a roller coating process of a UV roller color primer and a water-based white finish.
Background
The surface of the existing wooden door is painted so as to protect the wooden door and improve the aesthetic property of the wooden door. The existing painting operation generally adopts a roller coating process to improve the production efficiency. The surface of the door plate of the wooden door is firstly polished before the roller is painted with paint, then a paint film is formed on the surface of the door plate by the roller painting, and then the paint film is fixed on the surface of the door plate after being dried and solidified. A thin paint film is formed on the surface of the door panel in the roll coating process, however, the surface of the door panel is provided with a plurality of fine grooves, and after the paint film is coated on the surface of the door panel, part of the paint can flow into the grooves, so that a plurality of fine grooves are formed after the paint film is dried and cured, and a frosted surface is formed on the surface of the paint film.
Disclosure of Invention
The invention aims to provide a roller coating process of a UV roller color primer and a water-based white finish paint aiming at the defects in the prior art, so as to solve the problems in the prior art.
The technical problem solved by the invention can be realized by adopting the following technical scheme:
a roller coating process of UV roller color primer and water-based white finish comprises a UV primer process and a water-based finish process;
the UV primer process comprises the following steps:
s1, sanding: the flat door passes through a sanding station through a conveying belt, and sanding operation is carried out on the flat door by a sander, wherein the speed of the conveying belt is 10-15 m/min; the abrasive belt adopts 240#/320 #;
s2, attaching a bottom: the flat door passes through a bottom attaching station through a conveying belt, a double-roller putty roller coater is adopted to spray UV (ultraviolet) primer on the flat door, the speed of the conveying belt is 14-16 m/min, and the coating quantity is 13 +/-2 g/square meter;
s3, semi-curing: the flat door passes through a semi-curing station through a conveyer belt, and a double-lamp curing machine is adopted to carry out semi-curing operation on the flat door, wherein the speed of the conveyer belt is 14-16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s4, primary primer spraying: the flat door passes through a spraying station through a conveying belt, and UV sanding transparent primer is sprayed on the flat door by adopting a double-roller coater, wherein the speed of the conveying belt is 14-16 m/min, and the coating quantity is 25 +/-5 g/square meter;
s5, full curing: semi-curing the flat door by using a double-lamp curing machine, wherein the speed of a conveyor belt is 14-16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s6, sanding: the flat door passes through a sanding station through a conveying belt, and sanding operation is carried out on the flat door by a sander, wherein the speed of the conveying belt is 16-24 m/min; the abrasive belt adopts 320#/400 #;
s7, sand detection: manually adopting 400# sponge sand blocks on two sides of the conveying belt to carry out corner treatment on the flat door;
s8, putty: the flat door passes through a putty station through a conveying belt, and a double-roller putty roller coater is adopted to carry out putty operation on the flat door, wherein the speed of the conveying belt is 14-16 m/min, and the coating quantity is 35 +/-5 g/square meter;
s9, semi-curing: the flat door passes through a semi-curing station through a conveyer belt, and a double-lamp curing machine is adopted to carry out semi-curing operation on the flat door, wherein the speed of the conveyer belt is 14-16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s10, secondary primer spraying: the flat door passes through a spraying station through a conveying belt, and UV sanding transparent primer is sprayed on the flat door by adopting a double-roller coater, wherein the speed of the conveying belt is 14-16 m/min, and the coating quantity is 25 +/-5 g/square meter;
s11, semi-curing: the flat door passes through a semi-curing station through a conveyer belt, and a double-lamp curing machine is adopted to carry out semi-curing operation on the flat door, wherein the speed of the conveyer belt is 14-16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s12, three times of primer spraying: the flat door passes through a spraying station through a conveying belt, and UV sanding transparent primer is sprayed on the flat door by adopting a double-roller coater, wherein the speed of the conveying belt is 14-16 m/min, and the coating quantity is 25 +/-5 g/square meter;
s13, semi-curing: the flat door passes through a semi-curing station through a conveyer belt, and a double-lamp curing machine is adopted to carry out semi-curing operation on the flat door, wherein the speed of the conveyer belt is 14-16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s14, three times of primer spraying: the flat door passes through a spraying station through a conveying belt, and UV sanding transparent primer is sprayed on the flat door by adopting a double-roller coater, wherein the speed of the conveying belt is 14-16 m/min, and the coating quantity is 25 +/-5 g/square meter;
s15, full curing: semi-curing the flat door by using a double-lamp curing machine, wherein the speed of a conveyor belt is 14-16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s16, sanding: the flat door passes through a sanding station through a conveying belt, and sanding operation is carried out on the flat door by a sander, wherein the speed of the conveying belt is 14-16 m/min; the abrasive belt adopts 400#/600 #;
s17, sand detection: manually adopting 400# sponge sand blocks on two sides of the conveying belt to carry out corner treatment on the flat door;
the water-based finish paint process comprises the following steps:
s18, sanding/dedusting: the flat door passes through a sanding/dust removing station through a conveying belt, and sanding/dust removing operation is carried out on the flat door by adopting a special-shaped sanding machine/dust removing machine;
s19, roller painting of a transition primer: the flat door passes through a spraying station through a conveying belt, and a double-roller coater is adopted to spray transition primer on the surface of the flat door, wherein the coating quantity is 7 +/-2 g/square meter;
s20, drying: the flat door passes through a drying station through a conveyer belt, and a dryer is adopted to dry the flat door, wherein the speed of the conveyer belt is 10-15 m/min; the drying temperature is 120-140 ℃;
s21, roller coating of a white surface: the flat door passes through a spraying station through a conveying belt, and white finish paint is sprayed on the surface of the flat door by adopting a double-roller coater, wherein the coating quantity is 25-30g per square meter;
s22, leveling: the flat door passes through a leveling station through a conveying belt, and an infrared leveling machine is adopted to perform leveling operation on the plate, wherein the speed of the conveying belt is 10-15 m/min; the leveling temperature is 40 ℃;
s23, drying: the flat door passes through a drying station through a conveyer belt, and a dryer is adopted to dry the flat door, wherein the speed of the conveyer belt is 10-15 m/min; the drying temperature is 120-140 ℃;
s24, roller coating of a white surface: the flat door passes through a spraying station through a conveying belt, and white finish paint is sprayed on the surface of the flat door by adopting a double-roller coater, wherein the coating quantity is 25-30g per square meter;
s25, drying: the flat door passes through a drying station through a conveying belt, and is dried for 10 minutes by adopting a three-dimensional dryer at the temperature of 25 +/-5 ℃; drying for 20 minutes at the temperature of 40 +/-5 ℃; cooling for 10 minutes at the temperature of 25 +/-5 ℃;
s26, checking: and (4) manually inspecting the surface of the flat door.
Compared with the prior art, the invention has the beneficial effects that:
the UV primer process is a primer spraying and curing process with multiple processes, the obtained UV primer flat door has high adhesion, the water-based finish process is a roller coating primer and white surface process with multiple processes, and a flat door with good flatness can be obtained by matching with a drying process, so that the requirements are met, the preparation process is simple, the time is short, and the requirements of the existing roller coating process can be met.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the invention easy to understand, the invention is further described with the specific embodiments.
The invention relates to a roller coating process of UV roller color primer and water-based white finish, which comprises a UV primer process and a water-based finish process;
the UV primer process comprises the following steps:
s1, sanding: the flat door passes through a sanding station through a conveying belt, and sanding operation is carried out on the flat door by a sander, wherein the speed of the conveying belt is 10-15 m/min; the abrasive belt adopts 240#/320 #;
s2, attaching a bottom: the flat door passes through a bottom attaching station through a conveying belt, a double-roller putty roller coater is adopted to spray UV (ultraviolet) primer on the flat door, the speed of the conveying belt is 14-16 m/min, and the coating quantity is 13 +/-2 g/square meter;
s3, semi-curing: the flat door passes through a semi-curing station through a conveyer belt, and a double-lamp curing machine is adopted to carry out semi-curing operation on the flat door, wherein the speed of the conveyer belt is 14-16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s4, primary primer spraying: the flat door passes through a spraying station through a conveying belt, and UV sanding transparent primer is sprayed on the flat door by adopting a double-roller coater, wherein the speed of the conveying belt is 14-16 m/min, and the coating quantity is 25 +/-5 g/square meter;
s5, full curing: semi-curing the flat door by using a double-lamp curing machine, wherein the speed of a conveyor belt is 14-16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s6, sanding: the flat door passes through a sanding station through a conveying belt, and sanding operation is carried out on the flat door by a sander, wherein the speed of the conveying belt is 16-24 m/min; the abrasive belt adopts 320#/400 #;
s7, sand detection: manually adopting 400# sponge sand blocks on two sides of the conveying belt to carry out corner treatment on the flat door;
s8, putty: the flat door passes through a putty station through a conveying belt, and a double-roller putty roller coater is adopted to carry out putty operation on the flat door, wherein the speed of the conveying belt is 14-16 m/min, and the coating quantity is 35 +/-5 g/square meter;
s9, semi-curing: the flat door passes through a semi-curing station through a conveyer belt, and a double-lamp curing machine is adopted to carry out semi-curing operation on the flat door, wherein the speed of the conveyer belt is 14-16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s10, secondary primer spraying: the flat door passes through a spraying station through a conveying belt, and UV sanding transparent primer is sprayed on the flat door by adopting a double-roller coater, wherein the speed of the conveying belt is 14-16 m/min, and the coating quantity is 25 +/-5 g/square meter;
s11, semi-curing: the flat door passes through a semi-curing station through a conveyer belt, and a double-lamp curing machine is adopted to carry out semi-curing operation on the flat door, wherein the speed of the conveyer belt is 14-16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s12, three times of primer spraying: the flat door passes through a spraying station through a conveying belt, and UV sanding transparent primer is sprayed on the flat door by adopting a double-roller coater, wherein the speed of the conveying belt is 14-16 m/min, and the coating quantity is 25 +/-5 g/square meter;
s13, semi-curing: the flat door passes through a semi-curing station through a conveyer belt, and a double-lamp curing machine is adopted to carry out semi-curing operation on the flat door, wherein the speed of the conveyer belt is 14-16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s14, three times of primer spraying: the flat door passes through a spraying station through a conveying belt, and UV sanding transparent primer is sprayed on the flat door by adopting a double-roller coater, wherein the speed of the conveying belt is 14-16 m/min, and the coating quantity is 25 +/-5 g/square meter;
s15, full curing: semi-curing the flat door by using a double-lamp curing machine, wherein the speed of a conveyor belt is 14-16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s16, sanding: the flat door passes through a sanding station through a conveying belt, and sanding operation is carried out on the flat door by a sander, wherein the speed of the conveying belt is 14-16 m/min; the abrasive belt adopts 400#/600 #;
s17, sand detection: manually adopting 400# sponge sand blocks on two sides of the conveying belt to carry out corner treatment on the flat door;
the water-based finish paint process comprises the following steps:
s18, sanding/dedusting: the flat door passes through a sanding/dust removing station through a conveying belt, and sanding/dust removing operation is carried out on the flat door by adopting a special-shaped sanding machine/dust removing machine;
s19, roller painting of a transition primer: the flat door passes through a spraying station through a conveying belt, and a double-roller coater is adopted to spray transition primer on the surface of the flat door, wherein the coating quantity is 7 +/-2 g/square meter;
s20, drying: the flat door passes through a drying station through a conveyer belt, and a dryer is adopted to dry the flat door, wherein the speed of the conveyer belt is 10-15 m/min; the drying temperature is 120-140 ℃;
s21, roller coating of a white surface: the flat door passes through a spraying station through a conveying belt, and white finish paint is sprayed on the surface of the flat door by adopting a double-roller coater, wherein the coating quantity is 25-30g per square meter;
s22, leveling: the flat door passes through a leveling station through a conveying belt, and an infrared leveling machine is adopted to perform leveling operation on the plate, wherein the speed of the conveying belt is 10-15 m/min; the leveling temperature is 40 ℃;
s23, drying: the flat door passes through a drying station through a conveyer belt, and a dryer is adopted to dry the flat door, wherein the speed of the conveyer belt is 10-15 m/min; the drying temperature is 120-140 ℃;
s24, roller coating of a white surface: the flat door passes through a spraying station through a conveying belt, and white finish paint is sprayed on the surface of the flat door by adopting a double-roller coater, wherein the coating quantity is 25-30g per square meter;
s25, drying: the flat door passes through a drying station through a conveying belt, and is dried for 10 minutes by adopting a three-dimensional dryer at the temperature of 25 +/-5 ℃; drying for 20 minutes at the temperature of 40 +/-5 ℃; cooling for 10 minutes at the temperature of 25 +/-5 ℃;
s26, checking: and (4) manually inspecting the surface of the flat door.
Example 1
A roller coating process of UV roller color primer and water-based white finish comprises a UV primer process and a water-based finish process;
the UV primer process comprises the following steps:
s1, sanding: the flat door passes through a sanding station through a conveying belt, and sanding operation is carried out on the flat door by adopting a sander, wherein the speed of the conveying belt is 10 m/min; the abrasive belt adopts 240 #;
s2, attaching a bottom: the flat door passes through a bottom attaching station through a conveying belt, a double-roller putty roller coater is adopted to spray UV (ultraviolet) primer on the flat door, the speed of the conveying belt is 14 m/min, and the coating quantity is 11 g/square meter;
s3, semi-curing: the flat door passes through a semi-curing station through a conveyer belt, and a double-lamp curing machine is adopted to carry out semi-curing operation on the flat door, wherein the speed of the conveyer belt is 14 m/min, and the energy of a gallium lamp is set to be 4 KW;
s4, primary primer spraying: the flat door passes through a spraying station through a conveying belt, and UV sanding transparent primer is sprayed on the flat door by adopting a double-roller coater, wherein the speed of the conveying belt is 14 m/min, and the coating quantity is 20 g/square meter;
s5, full curing: semi-curing the flat door by using a double-lamp curing machine, wherein the speed of a conveyor belt is 14 m/min, and the energy of a gallium lamp is set to be 4 KW;
s6, sanding: the flat door passes through a sanding station through a conveying belt, and sanding operation is carried out on the flat door by adopting a sander, wherein the speed of the conveying belt is 16 m/min; the abrasive belt adopts 320 #;
s7, sand detection: manually adopting 400# sponge sand blocks on two sides of the conveying belt to carry out corner treatment on the flat door;
s8, putty: the flat door passes through a putty station through a conveying belt, and a double-roller putty roller coater is adopted to carry out putty operation on the flat door, wherein the speed of the conveying belt is 14 m/min, and the coating quantity is 30 g/square meter;
s9, semi-curing: the flat door passes through a semi-curing station through a conveyer belt, and a double-lamp curing machine is adopted to carry out semi-curing operation on the flat door, wherein the speed of the conveyer belt is 14 m/min, and the energy of a gallium lamp is set to be 4 KW;
s10, secondary primer spraying: the flat door passes through a spraying station through a conveying belt, and UV sanding transparent primer is sprayed on the flat door by adopting a double-roller coater, wherein the speed of the conveying belt is 14 m/min, and the coating quantity is 20 g/square meter;
s11, semi-curing: the flat door passes through a semi-curing station through a conveyer belt, and a double-lamp curing machine is adopted to carry out semi-curing operation on the flat door, wherein the speed of the conveyer belt is 14 m/min, and the energy of a gallium lamp is set to be 4 KW;
s12, three times of primer spraying: the flat door passes through a spraying station through a conveying belt, and UV sanding transparent primer is sprayed on the flat door by adopting a double-roller coater, wherein the speed of the conveying belt is 14 m/min, and the coating quantity is 20 g/square meter;
s13, semi-curing: the flat door passes through a semi-curing station through a conveyer belt, and a double-lamp curing machine is adopted to carry out semi-curing operation on the flat door, wherein the speed of the conveyer belt is 14 m/min, and the energy of a gallium lamp is set to be 4 KW;
s14, three times of primer spraying: the flat door passes through a spraying station through a conveying belt, and UV sanding transparent primer is sprayed on the flat door by adopting a double-roller coater, wherein the speed of the conveying belt is 14 m/min, and the coating quantity is 20 g/square meter;
s15, full curing: semi-curing the flat door by using a double-lamp curing machine, wherein the speed of a conveyor belt is 14 m/min, and the energy of a gallium lamp is set to be 4 KW;
s16, sanding: the flat door passes through a sanding station through a conveying belt, and sanding operation is carried out on the flat door by a sander, wherein the speed of the conveying belt is 14 m/min; the abrasive belt adopts a No. 400;
s17, sand detection: manually adopting 400# sponge sand blocks on two sides of the conveying belt to carry out corner treatment on the flat door;
the water-based finish paint process comprises the following steps:
s18, sanding/dedusting: the flat door passes through a sanding/dust removing station through a conveying belt, and sanding/dust removing operation is carried out on the flat door by adopting a special-shaped sanding machine/dust removing machine;
s19, roller painting of a transition primer: the flat door passes through a spraying station through a conveying belt, and a double-roller coater is adopted to spray transition primer on the surface of the flat door, wherein the coating quantity is 5g per square meter;
s20, drying: the flat door passes through a drying station through a conveying belt, and a dryer is adopted to dry the flat door, wherein the speed of the conveying belt is 10 m/min; the drying temperature is 120 ℃;
s21, roller coating of a white surface: the flat door passes through a spraying station through a conveying belt, and white finish paint is sprayed on the surface of the flat door by adopting a double-roller coater, wherein the coating quantity is 25g per square meter;
s22, leveling: enabling the flat door to pass through a leveling station through a conveying belt, and performing leveling operation on the plate by adopting an infrared leveling machine, wherein the speed of the conveying belt is 10 m/min; the leveling temperature is 40 ℃;
s23, drying: the flat door passes through a drying station through a conveying belt, and a dryer is adopted to dry the flat door, wherein the speed of the conveying belt is 10 m/min; the drying temperature is 120 ℃;
s24, roller coating of a white surface: the flat door passes through a spraying station through a conveying belt, and white finish paint is sprayed on the surface of the flat door by adopting a double-roller coater, wherein the coating quantity is 25g per square meter;
s25, drying: the flat door passes through a drying station through a conveying belt, and is dried for 10 minutes by a three-dimensional dryer at the temperature of 20 ℃; drying for 20 minutes at 35 ℃; cooling for 10 minutes at 20 ℃;
s26, checking: and (4) manually inspecting the surface of the flat door.
Example 2
A roller coating process of UV roller color primer and water-based white finish comprises a UV primer process and a water-based finish process;
the UV primer process comprises the following steps:
s1, sanding: the flat door passes through a sanding station through a conveying belt, and sanding operation is carried out on the flat door by adopting a sander, wherein the speed of the conveying belt is 15 m/min; the abrasive belt adopts 320 #;
s2, attaching a bottom: the flat door passes through a bottom attaching station through a conveying belt, a double-roller putty roller coater is adopted to spray UV (ultraviolet) primer on the flat door, the speed of the conveying belt is 16 m/min, and the coating quantity is 15 g/square meter;
s3, semi-curing: the flat door passes through a semi-curing station through a conveyer belt, and a double-lamp curing machine is adopted to perform semi-curing operation on the flat door, wherein the speed of the conveyer belt is 16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s4, primary primer spraying: the flat door passes through a spraying station through a conveying belt, and UV sanding transparent primer is sprayed on the flat door by adopting a double-roller coater, wherein the speed of the conveying belt is 16 m/min, and the coating quantity is 30 g/square meter;
s5, full curing: semi-curing the flat door by using a double-lamp curing machine, wherein the speed of a conveyor belt is 16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s6, sanding: the flat door passes through a sanding station through a conveying belt, and sanding operation is carried out on the flat door by adopting a sander, wherein the speed of the conveying belt is 24 m/min; the abrasive belt adopts a No. 400;
s7, sand detection: manually adopting 400# sponge sand blocks on two sides of the conveying belt to carry out corner treatment on the flat door;
s8, putty: the flat door passes through a putty station through a conveying belt, and a double-roller putty roller coater is adopted to carry out putty operation on the flat door, wherein the speed of the conveying belt is 16 m/min, and the coating quantity is 40 g/square meter;
s9, semi-curing: the flat door passes through a semi-curing station through a conveyer belt, and a double-lamp curing machine is adopted to perform semi-curing operation on the flat door, wherein the speed of the conveyer belt is 16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s10, secondary primer spraying: the flat door passes through a spraying station through a conveying belt, and UV sanding transparent primer is sprayed on the flat door by adopting a double-roller coater, wherein the speed of the conveying belt is 16 m/min, and the coating quantity is 30 g/square meter;
s11, semi-curing: the flat door passes through a semi-curing station through a conveyer belt, and a double-lamp curing machine is adopted to perform semi-curing operation on the flat door, wherein the speed of the conveyer belt is 16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s12, three times of primer spraying: the flat door passes through a spraying station through a conveying belt, and UV sanding transparent primer is sprayed on the flat door by adopting a double-roller coater, wherein the speed of the conveying belt is 16 m/min, and the coating quantity is 30 g/square meter;
s13, semi-curing: the flat door passes through a semi-curing station through a conveyer belt, and a double-lamp curing machine is adopted to perform semi-curing operation on the flat door, wherein the speed of the conveyer belt is 16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s14, three times of primer spraying: the flat door passes through a spraying station through a conveying belt, and UV sanding transparent primer is sprayed on the flat door by adopting a double-roller coater, wherein the speed of the conveying belt is 16 m/min, and the coating quantity is 30 g/square meter;
s15, full curing: semi-curing the flat door by using a double-lamp curing machine, wherein the speed of a conveyor belt is 16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s16, sanding: the flat door passes through a sanding station through a conveying belt, and sanding operation is carried out on the flat door by adopting a sander, wherein the speed of the conveying belt is 16 m/min; the abrasive belt adopts a pattern of 600 #;
s17, sand detection: manually adopting 400# sponge sand blocks on two sides of the conveying belt to carry out corner treatment on the flat door;
the water-based finish paint process comprises the following steps:
s18, sanding/dedusting: the flat door passes through a sanding/dust removing station through a conveying belt, and sanding/dust removing operation is carried out on the flat door by adopting a special-shaped sanding machine/dust removing machine;
s19, roller painting of a transition primer: the flat door passes through a spraying station through a conveying belt, and a double-roller coater is adopted to spray transition primer on the surface of the flat door, wherein the coating quantity is 9g per square meter;
s20, drying: the flat door passes through a drying station through a conveyer belt, and a dryer is adopted to dry the flat door, wherein the speed of the conveyer belt is 15 m/min; the drying temperature is 140 ℃;
s21, roller coating of a white surface: the flat door passes through a spraying station through a conveying belt, and white finish paint is sprayed on the surface of the flat door by adopting a double-roller coater, wherein the coating quantity is 30g per square meter;
s22, leveling: enabling the flat door to pass through a leveling station through a conveying belt, and performing leveling operation on the plate by adopting an infrared leveling machine, wherein the speed of the conveying belt is 15 m/min; the leveling temperature is 40 ℃;
s23, drying: the flat door passes through a drying station through a conveyer belt, and a dryer is adopted to dry the flat door, wherein the speed of the conveyer belt is 15 m/min; the drying temperature is 140 ℃;
s24, roller coating of a white surface: the flat door passes through a spraying station through a conveying belt, and white finish paint is sprayed on the surface of the flat door by adopting a double-roller coater, wherein the coating quantity is 30g per square meter;
s25, drying: the flat door passes through a drying station through a conveying belt, and is dried for 10 minutes by a three-dimensional dryer at the temperature of 30 ℃; drying for 20 minutes at the temperature of 45 ℃; cooling for 10 minutes at 30 ℃;
s26, checking: and (4) manually inspecting the surface of the flat door.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (1)
1. A roller coating process of UV roller color primer and water-based white finish is characterized by comprising a UV primer process and a water-based finish process;
the UV primer process comprises the following steps:
s1, sanding: the flat door passes through a sanding station through a conveying belt, and sanding operation is carried out on the flat door by a sander, wherein the speed of the conveying belt is 10-15 m/min; the abrasive belt adopts 240#/320 #;
s2, attaching a bottom: the flat door passes through a bottom attaching station through a conveying belt, a double-roller putty roller coater is adopted to spray UV (ultraviolet) primer on the flat door, the speed of the conveying belt is 14-16 m/min, and the coating quantity is 13 +/-2 g/square meter;
s3, semi-curing: the flat door passes through a semi-curing station through a conveyer belt, and a double-lamp curing machine is adopted to carry out semi-curing operation on the flat door, wherein the speed of the conveyer belt is 14-16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s4, primary primer spraying: the flat door passes through a spraying station through a conveying belt, and UV sanding transparent primer is sprayed on the flat door by adopting a double-roller coater, wherein the speed of the conveying belt is 14-16 m/min, and the coating quantity is 25 +/-5 g/square meter;
s5, full curing: semi-curing the flat door by using a double-lamp curing machine, wherein the speed of a conveyor belt is 14-16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s6, sanding: the flat door passes through a sanding station through a conveying belt, and sanding operation is carried out on the flat door by a sander, wherein the speed of the conveying belt is 16-24 m/min; the abrasive belt adopts 320#/400 #;
s7, sand detection: manually adopting 400# sponge sand blocks on two sides of the conveying belt to carry out corner treatment on the flat door;
s8, putty: the flat door passes through a putty station through a conveying belt, and a double-roller putty roller coater is adopted to carry out putty operation on the flat door, wherein the speed of the conveying belt is 14-16 m/min, and the coating quantity is 35 +/-5 g/square meter;
s9, semi-curing: the flat door passes through a semi-curing station through a conveyer belt, and a double-lamp curing machine is adopted to carry out semi-curing operation on the flat door, wherein the speed of the conveyer belt is 14-16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s10, secondary primer spraying: the flat door passes through a spraying station through a conveying belt, and UV sanding transparent primer is sprayed on the flat door by adopting a double-roller coater, wherein the speed of the conveying belt is 14-16 m/min, and the coating quantity is 25 +/-5 g/square meter;
s11, semi-curing: the flat door passes through a semi-curing station through a conveyer belt, and a double-lamp curing machine is adopted to carry out semi-curing operation on the flat door, wherein the speed of the conveyer belt is 14-16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s12, three times of primer spraying: the flat door passes through a spraying station through a conveying belt, and UV sanding transparent primer is sprayed on the flat door by adopting a double-roller coater, wherein the speed of the conveying belt is 14-16 m/min, and the coating quantity is 25 +/-5 g/square meter;
s13, semi-curing: the flat door passes through a semi-curing station through a conveyer belt, and a double-lamp curing machine is adopted to carry out semi-curing operation on the flat door, wherein the speed of the conveyer belt is 14-16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s14, three times of primer spraying: the flat door passes through a spraying station through a conveying belt, and UV sanding transparent primer is sprayed on the flat door by adopting a double-roller coater, wherein the speed of the conveying belt is 14-16 m/min, and the coating quantity is 25 +/-5 g/square meter;
s15, full curing: semi-curing the flat door by using a double-lamp curing machine, wherein the speed of a conveyor belt is 14-16 m/min, and the energy of a gallium lamp is set to be 4 KW;
s16, sanding: the flat door passes through a sanding station through a conveying belt, and sanding operation is carried out on the flat door by a sander, wherein the speed of the conveying belt is 14-16 m/min; the abrasive belt adopts 400#/600 #;
s17, sand detection: manually adopting 400# sponge sand blocks on two sides of the conveying belt to carry out corner treatment on the flat door;
the water-based finish paint process comprises the following steps:
s18, sanding/dedusting: the flat door passes through a sanding/dust removing station through a conveying belt, and sanding/dust removing operation is carried out on the flat door by adopting a special-shaped sanding machine/dust removing machine;
s19, roller painting of a transition primer: the flat door passes through a spraying station through a conveying belt, and a double-roller coater is adopted to spray transition primer on the surface of the flat door, wherein the coating quantity is 7 +/-2 g/square meter;
s20, drying: the flat door passes through a drying station through a conveyer belt, and a dryer is adopted to dry the flat door, wherein the speed of the conveyer belt is 10-15 m/min; the drying temperature is 120-140 ℃;
s21, roller coating of a white surface: the flat door passes through a spraying station through a conveying belt, and white finish paint is sprayed on the surface of the flat door by adopting a double-roller coater, wherein the coating quantity is 25-30g per square meter;
s22, leveling: the flat door passes through a leveling station through a conveying belt, and an infrared leveling machine is adopted to perform leveling operation on the plate, wherein the speed of the conveying belt is 10-15 m/min; the leveling temperature is 40 ℃;
s23, drying: the flat door passes through a drying station through a conveyer belt, and a dryer is adopted to dry the flat door, wherein the speed of the conveyer belt is 10-15 m/min; the drying temperature is 120-140 ℃;
s24, roller coating of a white surface: the flat door passes through a spraying station through a conveying belt, and white finish paint is sprayed on the surface of the flat door by adopting a double-roller coater, wherein the coating quantity is 25-30g per square meter;
s25, drying: the flat door passes through a drying station through a conveying belt, and is dried for 10 minutes by adopting a three-dimensional dryer at the temperature of 25 +/-5 ℃; drying for 20 minutes at the temperature of 40 +/-5 ℃; cooling for 10 minutes at the temperature of 25 +/-5 ℃;
s26, checking: and (4) manually inspecting the surface of the flat door.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010454514.XA CN111570229A (en) | 2020-05-26 | 2020-05-26 | Roller coating process for UV roller color primer and water-based white finish |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010454514.XA CN111570229A (en) | 2020-05-26 | 2020-05-26 | Roller coating process for UV roller color primer and water-based white finish |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111570229A true CN111570229A (en) | 2020-08-25 |
Family
ID=72117826
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010454514.XA Pending CN111570229A (en) | 2020-05-26 | 2020-05-26 | Roller coating process for UV roller color primer and water-based white finish |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111570229A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113731774A (en) * | 2021-08-26 | 2021-12-03 | 江山欧派门业股份有限公司 | Production process of efficient baking varnish cabinet body |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2514763A1 (en) * | 2004-08-04 | 2006-02-04 | Masterbrand Cabinets, Inc. | Product comprising a thin-film radiation-cured coating on a three-dimensional substrate |
EP0849004B1 (en) * | 1996-12-19 | 2006-03-22 | Rohm And Haas Company | Coating substrates |
CN105457873A (en) * | 2015-11-09 | 2016-04-06 | 江苏海田技术有限公司 | Environment-friendly coating method for producing wooden doors and furniture |
CN106076779A (en) * | 2016-08-26 | 2016-11-09 | 成都四通瑞坤家具有限公司 | A kind of wood furniture production technology |
CN106563629A (en) * | 2016-11-14 | 2017-04-19 | 首都航天机械公司 | Primer for polytrifluorochloroethylene and metallic matrix thermoplastic pressing pretreatment and preparation method of primer |
CN107159540A (en) * | 2017-05-12 | 2017-09-15 | 宁波凤凰杰仑木业股份有限公司 | The white real closed water paint coating process of Russian birch door-plate |
-
2020
- 2020-05-26 CN CN202010454514.XA patent/CN111570229A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0849004B1 (en) * | 1996-12-19 | 2006-03-22 | Rohm And Haas Company | Coating substrates |
CA2514763A1 (en) * | 2004-08-04 | 2006-02-04 | Masterbrand Cabinets, Inc. | Product comprising a thin-film radiation-cured coating on a three-dimensional substrate |
CN105457873A (en) * | 2015-11-09 | 2016-04-06 | 江苏海田技术有限公司 | Environment-friendly coating method for producing wooden doors and furniture |
CN106076779A (en) * | 2016-08-26 | 2016-11-09 | 成都四通瑞坤家具有限公司 | A kind of wood furniture production technology |
CN106563629A (en) * | 2016-11-14 | 2017-04-19 | 首都航天机械公司 | Primer for polytrifluorochloroethylene and metallic matrix thermoplastic pressing pretreatment and preparation method of primer |
CN107159540A (en) * | 2017-05-12 | 2017-09-15 | 宁波凤凰杰仑木业股份有限公司 | The white real closed water paint coating process of Russian birch door-plate |
Non-Patent Citations (3)
Title |
---|
中国防腐蚀技术协会: "《防腐蚀业技术标准汇编》", 12 December 2003, 中国物资出版社 * |
邳春生: "现代复合木门生产工艺及发展趋势", 《中国人造板》 * |
陈江平: "UV+水性透明有色涂装工艺与配方设计要领", 《涂装工艺》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113731774A (en) * | 2021-08-26 | 2021-12-03 | 江山欧派门业股份有限公司 | Production process of efficient baking varnish cabinet body |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105013685A (en) | Automobile bumper spraying process | |
CN103206060B (en) | A kind of preparation method of calcium silicate decorative plate | |
CN103537420B (en) | Coating agent brushing and spraying process for wooden door | |
CN109909137A (en) | A kind of plate timber UV coating construction process | |
CN105478310A (en) | Half-open UV coating construction process of veneer elastic finishing paint | |
CN109453967A (en) | A kind of coating process of improved automotive air outlet panel | |
CN102416373B (en) | High gloss coating process of surface of plastic substrate | |
CN111570229A (en) | Roller coating process for UV roller color primer and water-based white finish | |
CN111570232A (en) | Roller coating process for UV primer and water-based finish paint | |
CN106362916A (en) | Spraying technology utilizing LED lamp for curing | |
CN111545434A (en) | Roller coating process for water-based primer and water-based finish | |
CN110721887A (en) | Vacuum spraying method for UV primer of wooden product and UV primer-painted wooden product | |
CN113019860A (en) | UV film-coating bright surface-cleaning coating construction process for decorative plate | |
CN109909133A (en) | A kind of rubber wood timber antique effect UV coating construction process | |
CN107297315A (en) | The coating process of high-elastic wear-resistant elastomeric material | |
CN105478324A (en) | Half-open UV coating construction process of veneer elastic primer | |
CN111570230A (en) | Roller coating process for UV primer and UV finishing coat | |
CN108311358A (en) | A kind of cabinet plate surface coating process | |
CN111570231A (en) | Vacuum spraying process of UV primer and UV finishing coat | |
CN102615033B (en) | Construction method for making imitated wood grains on metal workpiece by aid of baking paint for metal | |
CN105855146A (en) | Surface treatment method for bathroom hardware | |
CN105032732A (en) | Furniture antiquing technology application method | |
CN104826783A (en) | Wooden board spraying process | |
CN109909135A (en) | A kind of rubber wood moulding UV transparent priming coating construction process | |
CN106694343A (en) | Melamine board forward-reverse-roller UV solid color primer coating construction process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200825 |