[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN110932321A - 一种含储能新能源场站有功控制方法 - Google Patents

一种含储能新能源场站有功控制方法 Download PDF

Info

Publication number
CN110932321A
CN110932321A CN201911269040.5A CN201911269040A CN110932321A CN 110932321 A CN110932321 A CN 110932321A CN 201911269040 A CN201911269040 A CN 201911269040A CN 110932321 A CN110932321 A CN 110932321A
Authority
CN
China
Prior art keywords
station
new energy
power
output
energy station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911269040.5A
Other languages
English (en)
Inventor
孙玉明
陈晓东
刘方
郭晓静
赵发平
饶钰
朱莉莉
佘彦杰
平静洋
刘然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Henan Electric Power Company Luanchuan County Power Supply Co
State Grid Corp of China SGCC
Luoyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
State Grid Henan Electric Power Company Luanchuan County Power Supply Co
State Grid Corp of China SGCC
Luoyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Henan Electric Power Company Luanchuan County Power Supply Co, State Grid Corp of China SGCC, Luoyang Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical State Grid Henan Electric Power Company Luanchuan County Power Supply Co
Priority to CN201911269040.5A priority Critical patent/CN110932321A/zh
Publication of CN110932321A publication Critical patent/CN110932321A/zh
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/48Controlling the sharing of the in-phase component

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

一种含储能新能源场站有功控制方法,掌握新能源场站的实际出力及运行情况,对制约各层级响应速度的原因进行分析;对比常规机组参与的长周期持续调频过程,找出各新能源机组参与电网一次调频必需的基本条件,并得出区域内场站的限电总需求;获取区域内场站的限电总需求,并根据限电量控制各场站的有功功率输出;对储能装置进行限电输出配置;基于实时运行、预测和分析数据,对新能源场站有功功率输进行实时控制,使各场站有功功率输出不超过对应的限电量,在发生一些小概率、高风险的事件时,各场站通过其各自的控制方法进行功率输出控制。该方法能提升新能源场站的有功控制能力,增强其参与系统频率调节的灵活性。

Description

一种含储能新能源场站有功控制方法
技术领域
本发明属于电力故障诊断技术领域,具体涉及一种含储能新能源场站有功控制方法。
背景技术
近年来,随着可再生能源利用技术的成熟,越来越多的新能源得到了广泛的利用,像风电、光伏均已实现了并网运行,高比例的新能源并网和高度电力电子化成为了未来电网的重要特征。但由于新能源发电设备不具备响应系统频率变化的惯量和一次调频能力,导致电力系统的自适应能力会遭受一定的冲击。尤其在发生一些小概率、高风险的事件时,系统会出现大功率的缺额,电网频率变化也会更加明显,对电网运行的安全稳定造成了较为严重的威胁。传统发电机组与新能源场站暂态过程中所表现出的差异更是有待研究。
此前,电网中电源绝大部分是汽轮发电机组(火电、燃气、核电厂等)和水轮发电机组等具有大惯量的同步发电机组,在故障发生后,由于常规机组的大惯量以及机组本身的调频能力,可使得电网的频率保持相对稳定。而光伏、风电大规模接入后新能源发电设备不具备响应系统频率变化的惯量和一次调频能力,甚至在运行过程中还会对电网造成二次功率冲击。
而储能作为一种能够将电能进行存储和转移的装置,通过与新能源场站联合运行,在一定程度上减少了新能源出力的不确定性,平抑新能源场站有功波动,不但可减小风电场的弃风,还可参与电网的辅助服务,增强新能源并网的“友好度”。
因而,研究新能源场站运行特性,并挖掘其与储能系统配合参与系统调频的能力是十分必要的。
发明内容
针对上述现有技术存在的问题,本发明提供一种含储能新能源场站有功控制方法,该方法能提升新能源场站的有功控制能力,增强其参与系统频率调节的灵活性。
为了实现上述目的,本发明提供一种含储能新能源场站有功控制方法,包括以下步骤:
步骤一:选取区域电网内的风电/光伏集群,掌握新能源场站的实际出力及运行情况,对制约各层级响应速度的原因进行分析;
步骤二:基于新能源场站出力特性,对比常规机组参与的长周期持续调频过程,找出各新能源机组参与电网一次调频必需的基本条件,并得出区域内场站的限电总需求;
步骤三:获取区域内场站的限电总需求,对各场站的关键技术指标进行分析,并形成各指标的计算方法,将多个指标进行综合评价,计算出各场站的限电量,并根据限电量控制各场站的有功功率输出;同时,对储能装置进行限电输出配置;
步骤四:基于实时运行、预测和分析数据,对新能源场站有功功率输进行实时控制,使各场站有功功率输出不超过对应的限电量,在发生一些小概率、高风险的事件时,各场站通过其各自的控制方法进行功率输出控制。
在步骤一中,分析的内容包括新能源场站单机、场站级和系统级的各层级动态调节能力。
在步骤三中的指标包括新能源场站稳定调节次数、新能源场站出力稳态波动性、新能源场站限电量和新能源场站未完成交易电量。
本申请提供的方法基于新能源实际运行数据厂站动态调节能力实时评估技术,分析新能源场站动态调节特性,在新能源场站动态调节能力分析的基础上,通过进一步分析并提升其控制系统有功调节潜力,形成系统层-场群层-机组层的有功-频率控制框架,提升新能源场站参与系统有功调节的速度。本发明提升了新能源场站的有功控制能力,增强其参与系统频率调节的灵活性。
具体实施方式
下面对本发明作进一步说明。
本发明提供了一种含储能新能源场站有功控制方法,包括以下步骤:
步骤一:选取区域电网内的风电/光伏集群,掌握新能源场站的实际出力及运行情况,对制约各层级响应速度的原因进行分析;
步骤二:基于新能源场站出力特性,对比常规机组参与的长周期持续调频过程,找出各新能源机组参与电网一次调频必需的基本条件,并得出区域内场站的限电总需求;
步骤三:获取区域内场站的限电总需求,对各场站的关键技术指标进行分析,并形成各指标的计算方法,将多个指标进行综合评价,计算出各场站的限电量,并根据限电量控制各场站的有功功率输出;同时,对储能装置进行限电输出配置;
步骤四:基于实时运行、预测和分析数据,对新能源场站有功功率输进行实时控制,使各场站有功功率输出不超过对应的限电量,在发生一些小概率、高风险的事件时,各场站通过其各自的控制方法进行功率输出控制。
在步骤一中,分析的内容包括新能源场站单机、场站级和系统级的各层级动态调节能力。
在步骤三中的指标包括新能源场站稳定调节次数、新能源场站出力稳态波动性、新能源场站限电量和新能源场站未完成交易电量。
本申请提供的方法基于新能源实际运行数据厂站动态调节能力实时评估技术,分析新能源场站动态调节特性,在新能源场站动态调节能力分析的基础上,通过进一步分析并提升其控制系统有功调节潜力,形成系统层-场群层-机组层的有功-频率控制框架,提升新能源场站参与系统有功调节的速度。本发明提升了新能源场站的有功控制能力,增强其参与系统频率调节的灵活性。

Claims (3)

1.一种含储能新能源场站有功控制方法,其特征在于,包括以下步骤:
步骤一:选取区域电网内的风电/光伏集群,掌握新能源场站的实际出力及运行情况,对制约各层级响应速度的原因进行分析;
步骤二:基于新能源场站出力特性,对比常规机组参与的长周期持续调频过程,找出各新能源机组参与电网一次调频必需的基本条件,并得出区域内场站的限电总需求;
步骤三:获取区域内场站的限电总需求,对各场站的关键技术指标进行分析,并形成各指标的计算方法,将多个指标进行综合评价,计算出各场站的限电量,并根据限电量控制各场站的有功功率输出;同时,对储能装置进行限电输出配置;
步骤四:基于实时运行、预测和分析数据,对新能源场站有功功率输进行实时控制,使各场站有功功率输出不超过对应的限电量,在发生一些小概率、高风险的事件时,各场站通过其各自的控制方法进行功率输出控制。
2.根据权利要求1所述的一种医院复杂环境室内定位方法,其特征在于,在步骤一中,分析的内容包括新能源场站单机、场站级和系统级的各层级动态调节能力。
3.根据权利要求1或2所述的一种医院复杂环境室内定位方法,其特征在于,在步骤三中的指标包括新能源场站稳定调节次数、新能源场站出力稳态波动性、新能源场站限电量和新能源场站未完成交易电量。
CN201911269040.5A 2019-12-11 2019-12-11 一种含储能新能源场站有功控制方法 Pending CN110932321A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911269040.5A CN110932321A (zh) 2019-12-11 2019-12-11 一种含储能新能源场站有功控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911269040.5A CN110932321A (zh) 2019-12-11 2019-12-11 一种含储能新能源场站有功控制方法

Publications (1)

Publication Number Publication Date
CN110932321A true CN110932321A (zh) 2020-03-27

Family

ID=69858988

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911269040.5A Pending CN110932321A (zh) 2019-12-11 2019-12-11 一种含储能新能源场站有功控制方法

Country Status (1)

Country Link
CN (1) CN110932321A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112531740A (zh) * 2020-12-04 2021-03-19 国网河南省电力公司洛阳供电公司 一种基于新能源场站的动态调节有功速度的测试方法
CN113452090A (zh) * 2021-06-16 2021-09-28 华能澜沧江水电股份有限公司 一种水火风光储多能互补集成电源的有功功率控制方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104156887A (zh) * 2014-08-14 2014-11-19 国家电网公司 一种基于电网约束的区域新能源开发规模及布局分析方法
WO2017045698A1 (en) * 2015-09-14 2017-03-23 Abb Schweiz Ag Power plant ramp rate control
CN107196349A (zh) * 2017-05-04 2017-09-22 国电南瑞科技股份有限公司 一种电力市场环境下发电权交易的新能源有功控制方法
CN107749644A (zh) * 2017-11-29 2018-03-02 国电联合动力技术有限公司 一种风电场参与一次调频的智能控制方法及其控制系统
CN108108888A (zh) * 2017-12-18 2018-06-01 国网冀北电力有限公司 风力发电及光伏发电的有功指令协同控制方法及装置
CN108808744A (zh) * 2018-06-01 2018-11-13 国网冀北电力有限公司电力科学研究院 有储能参与的新能源发电系统的有功协调控制方法及系统
KR20190004587A (ko) * 2017-07-04 2019-01-14 주식회사 케이티 신재생 발전소에서 발생되는 전력의 출력 변동을 제어하는 시스템, 에너지 저장 장치 및 방법
CN109245150A (zh) * 2018-08-24 2019-01-18 中国电力科学研究院有限公司 一种用于风电集群的功率分配方法及系统
CN109494810A (zh) * 2017-09-12 2019-03-19 国网吉林省电力有限公司 间歇性能源电站调度评价方法及该评价的限电分配方法
CN109636228A (zh) * 2018-12-21 2019-04-16 云南电网有限责任公司电力科学研究院 一种新能源场站限电时段有功分配方法

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104156887A (zh) * 2014-08-14 2014-11-19 国家电网公司 一种基于电网约束的区域新能源开发规模及布局分析方法
WO2017045698A1 (en) * 2015-09-14 2017-03-23 Abb Schweiz Ag Power plant ramp rate control
CN107196349A (zh) * 2017-05-04 2017-09-22 国电南瑞科技股份有限公司 一种电力市场环境下发电权交易的新能源有功控制方法
KR20190004587A (ko) * 2017-07-04 2019-01-14 주식회사 케이티 신재생 발전소에서 발생되는 전력의 출력 변동을 제어하는 시스템, 에너지 저장 장치 및 방법
CN109494810A (zh) * 2017-09-12 2019-03-19 国网吉林省电力有限公司 间歇性能源电站调度评价方法及该评价的限电分配方法
CN107749644A (zh) * 2017-11-29 2018-03-02 国电联合动力技术有限公司 一种风电场参与一次调频的智能控制方法及其控制系统
CN108108888A (zh) * 2017-12-18 2018-06-01 国网冀北电力有限公司 风力发电及光伏发电的有功指令协同控制方法及装置
CN108808744A (zh) * 2018-06-01 2018-11-13 国网冀北电力有限公司电力科学研究院 有储能参与的新能源发电系统的有功协调控制方法及系统
CN109245150A (zh) * 2018-08-24 2019-01-18 中国电力科学研究院有限公司 一种用于风电集群的功率分配方法及系统
CN109636228A (zh) * 2018-12-21 2019-04-16 云南电网有限责任公司电力科学研究院 一种新能源场站限电时段有功分配方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
施贵荣 等: "大规模集群可再生能源有功分层协调控制策略", 《电网技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112531740A (zh) * 2020-12-04 2021-03-19 国网河南省电力公司洛阳供电公司 一种基于新能源场站的动态调节有功速度的测试方法
CN112531740B (zh) * 2020-12-04 2022-12-13 国网河南省电力公司洛阳供电公司 一种基于新能源场站的动态调节有功速度的测试方法
CN113452090A (zh) * 2021-06-16 2021-09-28 华能澜沧江水电股份有限公司 一种水火风光储多能互补集成电源的有功功率控制方法

Similar Documents

Publication Publication Date Title
CN104092241B (zh) 一种考虑备用需求的风电消纳能力分析方法
CN103855721B (zh) 风电场监控系统接入电网调度系统的系统及信息交换方法
CN109245176B (zh) 计及风险的含大规模风电的互联电网机组组合方法
CN103296701A (zh) 一种风电场有功功率控制方法
CN110932321A (zh) 一种含储能新能源场站有功控制方法
Gao et al. Wind power dispatch supporting technologies and its implementation
Sun et al. Review on pumped storage power station in high proportion renewable energy power system
CN105914798B (zh) 一种基于全网同时间断面的风电场无功优化运行控制方法
CN110429645B (zh) 一种光伏电站有功功率变化率控制方法、系统及存储介质
Zhang et al. Research on frequency regulation strategy based on model predictive control for wind-hydro-storage complementary microgrid
Liu et al. Transitioning to a New Power System with High Renewable Penetration in the Context of China’s Carbon Peak and Neutrality: Challenges and Key Technologies
Habib et al. Demand and application of energy storage technology in renewable energy power system
CN111313466A (zh) 一种基于风力优先调节的送端电网agc优化调控方法及系统
CN113991647B (zh) 一种面向频率响应容量规划的电力系统随机生产模拟方法
CN110458314B (zh) 一种用于电网日前潮流预报的负荷预测数据分解方法
Wang et al. Rapid Evaluation Technology of Grid Planning Scheme for Power Systems with High Proportion Renewable Energy Based on Plant Commitment
Li et al. Economic dispatch of wind-thermal power system with MW and ramp rate dependent generator costs
Li et al. Capacity configuration ratio optimization method of power system with high permeability of wind and photovoltaic power generation
Yu et al. Summary of research on power forecasting technology of new energy generation
Li et al. Study on grid planning method considering multiple energy access
Zhao et al. Key Technology of Integrated Power Generation System containing Wind/Solar/Hydro/Thermal and Energy Storage
Liu et al. A Power Grid Capacity Margin Model and Calculation Method Considering the Interaction of Source-Load-Storage
Li et al. Optimization of energy storage configuration for error compensation of wind power prediction
Qi et al. Engineering measurement method of new energy consumption based on multi-constraint analysis
Hong et al. Assessment and enhancement of frequency regulation capability of modern power systems considering thermal power dynamic conditions

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200327