[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN110910276A - Power dispatching data integration system - Google Patents

Power dispatching data integration system Download PDF

Info

Publication number
CN110910276A
CN110910276A CN201911137750.2A CN201911137750A CN110910276A CN 110910276 A CN110910276 A CN 110910276A CN 201911137750 A CN201911137750 A CN 201911137750A CN 110910276 A CN110910276 A CN 110910276A
Authority
CN
China
Prior art keywords
unit
module
power
data integration
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911137750.2A
Other languages
Chinese (zh)
Inventor
陈卫
张建江
张永军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Zhonggong Electric Power Technology Co Ltd
Original Assignee
Hangzhou Zhonggong Electric Power Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Zhonggong Electric Power Technology Co Ltd filed Critical Hangzhou Zhonggong Electric Power Technology Co Ltd
Priority to CN201911137750.2A priority Critical patent/CN110910276A/en
Publication of CN110910276A publication Critical patent/CN110910276A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • G06Q30/0202Market predictions or forecasting for commercial activities

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Accounting & Taxation (AREA)
  • Development Economics (AREA)
  • Finance (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Primary Health Care (AREA)
  • Tourism & Hospitality (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a power dispatching data integration system. The power dispatching data integration system comprises: the device comprises an information acquisition module, a data integration analysis module, a data integration module and a data viewing module. The power dispatching data integration system provided by the invention is convenient for collecting data of power utilization conditions of users, can know the power utilization conditions and power utilization duration of each power consumer at different time intervals, can find whether the existing power dispatching quantity can be met or not by matching with the power dispatching conditions, can bring related information of power dispatching more intuitively, can collect the power utilization conditions and the power dispatching conditions of regions, is convenient for planning the power dispatching conditions of different regions of a city, is convenient for analyzing data, removes error and repeated information, ensures that the collection result is more accurate and error-free, realizes the integration of power dispatching data, and can be convenient for workers to dispatch the data and avoid data leakage by matching with the checking module.

Description

Power dispatching data integration system
Technical Field
The invention relates to the field of power dispatching, in particular to a power dispatching data integration system.
Background
The power dispatching is an effective management means which is adopted for ensuring safe and stable operation of a power grid, reliable external power supply and orderly operation of various power production works. The specific work content of power dispatching is that according to data information fed back by various information acquisition devices or information provided by monitoring personnel, the actual operation parameters of the power grid, such as voltage, current, frequency, load and the like, are combined, the development conditions of various production works are comprehensively considered, the safe and economic operation states of the power grid are judged, operation instructions are issued through a telephone or an automatic system, and field operators or automatic control systems are instructed to adjust, such as adjusting the output of a generator, adjusting load distribution, switching capacitors, reactors and the like, so that the continuous safe and stable operation of the power grid is ensured. With the continuous development of science and technology in recent years, modern monitoring and control means are continuously perfected, and the technical support of power dispatching is increasingly strong.
The power dispatching data is numerous and complicated, and the conventional power dispatching data integration system only integrates the power dispatching data without involving the power utilization conditions of users and regions, so that the integrated power data is not supported by the actual power utilization conditions, and the obtained result value is low.
Therefore, it is necessary to provide a power dispatching data integration system to solve the above technical problems.
Disclosure of Invention
The invention provides a power dispatching data integration system, which solves the problems that the power dispatching data is only integrated but the power utilization conditions of users and regions are not involved in the existing power dispatching data integration system, so that the integrated power data is not supported by the actual power utilization conditions, and the obtained result is low in value.
In order to solve the above technical problem, the present invention provides an electric power dispatching data integration system, including: the data integration and analysis system comprises an information acquisition module, a data integration and analysis module, a data integration module and a data viewing module, wherein the output end of the information acquisition module is connected with the input end of the data integration and analysis module, the output end of the data integration and analysis module is connected with the input end of the data integration module, and the output end of the data integration module is connected with the input end of the data viewing module.
Preferably, the information acquisition module comprises a user acquisition module and a region acquisition module.
Preferably, the user acquisition module comprises a user electricity consumption acquisition unit, a user electricity consumption time period acquisition unit, a user electricity consumption peak value acquisition unit, a user electricity consumption single valley value acquisition unit and a user electricity dispatching acquisition unit.
Preferably, the area collection module comprises an area power consumption collection unit, an area power consumption time period collection unit, an area power consumption high peak collection unit, an area power consumption single low valley collection unit and an area power dispatching collection unit.
Preferably, the data integration analysis module comprises an automatic summarization unit, an automatic clustering unit, a duplicate removal unit, an error checking unit and a backup unit.
Preferably, the data integration module includes a merging unit, a recording unit, a user electricity consumption recording unit, a user power scheduling recording unit, a region electricity consumption recording unit and a region power scheduling recording unit.
Preferably, the data viewing module comprises an identity authentication unit and a data display unit.
Compared with the related art, the power dispatching data integration system provided by the invention has the following beneficial effects:
the invention provides a power dispatching data integration system, which is characterized in that the output end of an information acquisition module is connected with the input of a data integration analysis module, the output end of the data integration analysis module is connected with the input of the data integration module, the output end of the data integration module is connected with the input of a data viewing module, the information acquisition module comprises a user acquisition module and a region acquisition module, the user acquisition module comprises a user power consumption acquisition unit, a user power consumption period acquisition unit, a user power consumption duration acquisition unit, a user power consumption peak value acquisition unit, a user single low valley value acquisition unit and a user power dispatching acquisition unit, so that data acquisition can be conveniently carried out on the user power consumption condition, the power consumption condition and the power consumption duration of each power consumer in different periods can be known, and the power dispatching condition is matched, whether the current power dispatching amount can be met or not can be found, the specific power utilization requirement of a user is met, the relevant information of power dispatching is brought more visually, the area acquisition module comprises an area power utilization acquisition unit, an area power utilization period acquisition unit, an area power utilization duration acquisition unit, an area power utilization high peak value acquisition unit, an area single low valley value acquisition unit and an area power dispatching acquisition unit, the power utilization condition and the power dispatching condition of the areas can be acquired, the power dispatching condition of different areas of a city can be conveniently planned, the data integration analysis module comprises an automatic summary unit, an automatic clustering unit, a duplication removing unit, an error checking unit and a backup unit, data analysis is facilitated, errors and repeated information are removed, the acquisition result is more accurate, and the data integration module comprises a merging unit, Recording unit, user power consumption recording unit, user power scheduling recording unit, area power consumption recording unit and area power scheduling recording unit, the module is looked over to the data includes authentication unit and data display unit, realizes the integration to power scheduling data to the cooperation is looked over the module and can be convenient for the staff and carry out the transfer of data and avoid data to reveal simultaneously.
Drawings
FIG. 1 is a system schematic block diagram of a preferred embodiment of a power dispatching data integration system provided by the present invention;
FIG. 2 is a schematic block diagram of a system of the information collection module shown in FIG. 1;
FIG. 3 is a schematic block diagram of a system for integrating and analyzing data shown in FIG. 1;
FIG. 4 is a system schematic block diagram of the data integration module shown in FIG. 1;
FIG. 5 is a system schematic block diagram of the data viewing module shown in FIG. 1.
Reference numbers in the figures: 1. an information acquisition module 11, a user acquisition module 111, a user electricity consumption acquisition unit 112, a user electricity consumption time period acquisition unit 113, a user electricity consumption time period acquisition unit 114, a user electricity consumption peak value acquisition unit 115, a user electricity consumption single valley value acquisition unit 116, a user electricity scheduling acquisition unit 12, a region acquisition module 121, a region electricity consumption acquisition unit 122, a region electricity consumption time period acquisition unit 123, a region electricity consumption time period acquisition unit 124, a region electricity consumption peak value acquisition unit 125, a region electricity consumption single valley value acquisition unit 126, a region electricity scheduling acquisition unit 2, a data integration analysis module 21, an automatic summarization unit 22, an automatic clustering unit 23, a deduplication unit 24, an error checking unit 25, a backup unit 3, a data integration module 31, a merging unit 32 and a recording unit, 33. the system comprises a user power utilization recording unit 34, a user power dispatching recording unit 35, a region power utilization recording unit 36, a region power dispatching recording unit 4, a data checking module 41, an identity verification unit 42 and a data display unit.
Detailed Description
The invention is further described with reference to the following figures and embodiments.
Please refer to fig. 1, fig. 2, fig. 3, fig. 4 and fig. 5 in combination, wherein fig. 1 is a system schematic block diagram of a preferred embodiment of a power dispatching data integration system according to the present invention; FIG. 2 is a schematic block diagram of a system of the information collection module shown in FIG. 1; FIG. 3 is a schematic block diagram of a system for integrating and analyzing data shown in FIG. 1; FIG. 4 is a system schematic block diagram of the data integration module shown in FIG. 1; FIG. 5 is a system schematic block diagram of the data viewing module shown in FIG. 1. A power scheduling data integration system, comprising: information acquisition module 1, data integration analysis module 2, data integration module 3 and data look up module 4, information acquisition module 1's output with the connection of data integration analysis module 2's input, data integration analysis module 2's output with the connection of data integration module 3's input, data integration module 3's output with the connection of data look up module 4's input.
The information acquisition module 1 comprises a user acquisition module 11 and a region acquisition module 12.
The user acquisition module 11 includes a user power consumption acquisition unit 111, a user power consumption time period acquisition unit 112, a user power consumption time period acquisition unit 113, a user power consumption peak value acquisition unit 114, a user power consumption single valley value acquisition unit 115, and a user power scheduling acquisition unit 116.
The area collection module 12, the area collection module 12 includes an area power consumption collection unit 121, an area power consumption time period collection unit 122, an area power consumption time period collection unit 123, an area power consumption peak collection unit 124, an area power consumption single valley collection unit 125 and an area power scheduling collection unit 126.
The data integration analysis module 2 comprises an automatic summarization unit 21, an automatic clustering unit 22, a deduplication unit 23, an error checking unit 24 and a backup unit 25.
The data integration module 3 includes a merging unit 31, a recording unit 32, a user electricity recording unit 33, a user power scheduling recording unit 34, a region electricity recording unit 35, and a region power scheduling recording unit 36.
The data viewing module 4 includes an authentication unit 41 and a data display unit 42.
Compared with the related art, the power dispatching data integration system provided by the invention has the following beneficial effects:
through the connection of the output of the information acquisition module 1 and the input of the data integration analysis module 2, the output of the data integration analysis module 2 is connected with the input of the data integration module 3, the output of the data integration module 3 is connected with the input of the data viewing module 4, the information acquisition module 1 comprises a user acquisition module 11 and a region acquisition module 12, the user acquisition module 11 comprises a user electricity consumption acquisition unit 111, a user electricity consumption time period acquisition unit 112, a user electricity consumption time period acquisition unit 113, a user electricity consumption high peak value acquisition unit 114, a user electricity consumption single low valley value acquisition unit 115 and a user electricity scheduling acquisition unit 116, is convenient for acquiring data of user electricity consumption conditions, can know the electricity consumption conditions and electricity consumption times of each electricity consumer in different time periods, and is matched with the condition of electricity scheduling, the area collection module 12, the area collection module 12 includes an area power consumption collection unit 121, an area power consumption time period collection unit 122, an area power consumption time period collection unit 123, an area power consumption peak value collection unit 124, an area single low valley value collection unit 125, and an area power scheduling collection unit 126, can collect the area power consumption condition and the power scheduling condition, and is convenient for planning the power scheduling condition of different areas of the city, the data integration analysis module 2 includes an automatic summarization unit 21, an automatic clustering unit 22, a deduplication unit 23, an error checking unit 24, and a backup unit 25, which is convenient for analyzing data, removing errors and repeated information, and making the collection result more accurate, the data integration module 3 comprises a merging unit 31, a recording unit 32, a user electricity utilization recording unit 33, a user power dispatching recording unit 34, a region electricity utilization recording unit 35 and a region power dispatching recording unit 36, the data checking module 4 comprises an identity verification unit 41 and a data display unit 42, the integration of power dispatching data is achieved, and the data can be conveniently called by workers and meanwhile data leakage is avoided through cooperation of the checking module.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes, which are made by using the contents of the present specification and the accompanying drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (7)

1. A power scheduling data integration system, comprising: the device comprises an information acquisition module (1), a data integration analysis module (2), a data integration module (3) and a data viewing module (4), and is characterized in that the output end of the information acquisition module (1) is connected with the input of the data integration analysis module (2), the output end of the data integration analysis module (2) is connected with the input of the data integration module (3), and the output end of the data integration module (3) is connected with the input of the data viewing module (4).
2. The power scheduling data integration system according to claim 1, wherein the information collection module (1) includes a user collection module (11) and a region collection module (12).
3. The power dispatching data integration system of claim 2, wherein the user collection module (11) comprises a user power consumption collection unit (111), a user power consumption time period collection unit (112), a user power consumption time period collection unit (113), a user power consumption peak collection unit (114), a user power consumption single valley collection unit (115) and a user power dispatching collection unit (116).
4. The power scheduling data integration system according to claim 2, wherein the region collection module (12) comprises a region power consumption collection unit (121), a region power consumption time period collection unit (122), a region power consumption time period collection unit (123), a region power consumption peak collection unit (124), a region single valley collection unit (125), and a region power scheduling collection unit (126).
5. The power scheduling data integration system according to claim 1, wherein the data integration analysis module (2) comprises an automatic summarization unit (21), an automatic clustering unit (22), a deduplication unit (23), an error checking unit (24) and a backup unit (25).
6. The power dispatching data integration system of claim 1, wherein the data integration module (3) comprises a merging unit (31), a recording unit (32), a user power utilization recording unit (33), a user power dispatching recording unit (34), a region power utilization recording unit (35) and a region power dispatching recording unit (36).
7. The power scheduling data integration system according to claim 1, wherein the data viewing module (4) comprises an authentication unit (41) and a data display unit (42).
CN201911137750.2A 2019-11-04 2019-11-04 Power dispatching data integration system Pending CN110910276A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911137750.2A CN110910276A (en) 2019-11-04 2019-11-04 Power dispatching data integration system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911137750.2A CN110910276A (en) 2019-11-04 2019-11-04 Power dispatching data integration system

Publications (1)

Publication Number Publication Date
CN110910276A true CN110910276A (en) 2020-03-24

Family

ID=69817958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911137750.2A Pending CN110910276A (en) 2019-11-04 2019-11-04 Power dispatching data integration system

Country Status (1)

Country Link
CN (1) CN110910276A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111654110A (en) * 2020-06-15 2020-09-11 武汉群泰自动化工程有限公司 Energy monitoring system applied to factory power distribution system
CN111769558A (en) * 2020-07-15 2020-10-13 国网河北省电力有限公司衡水供电分公司 Power supply switching system for supplying power to load

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014023378A (en) * 2012-07-23 2014-02-03 Toyota Home Kk Power management system
CN104574207A (en) * 2014-12-31 2015-04-29 国家电网公司 Regional power grid electric quantity analyzing and counting system
CN106446217A (en) * 2016-09-30 2017-02-22 广州特道信息科技有限公司 High-speed big data integration system
CN109067000A (en) * 2018-09-28 2018-12-21 盛隆电气集团有限公司 One kind matching electricity consumption intelligence load monitoring system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014023378A (en) * 2012-07-23 2014-02-03 Toyota Home Kk Power management system
CN104574207A (en) * 2014-12-31 2015-04-29 国家电网公司 Regional power grid electric quantity analyzing and counting system
CN106446217A (en) * 2016-09-30 2017-02-22 广州特道信息科技有限公司 High-speed big data integration system
CN109067000A (en) * 2018-09-28 2018-12-21 盛隆电气集团有限公司 One kind matching electricity consumption intelligence load monitoring system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111654110A (en) * 2020-06-15 2020-09-11 武汉群泰自动化工程有限公司 Energy monitoring system applied to factory power distribution system
CN111654110B (en) * 2020-06-15 2023-10-13 武汉群泰自动化工程有限公司 Energy monitoring system applied to factory power distribution system
CN111769558A (en) * 2020-07-15 2020-10-13 国网河北省电力有限公司衡水供电分公司 Power supply switching system for supplying power to load

Similar Documents

Publication Publication Date Title
CN101534021B (en) Multimode data acquisitions and processing method applied to power automation system
CN112307003B (en) Power grid data multidimensional auxiliary analysis method, system, terminal and readable storage medium
CN103389473A (en) Double-path real-time signal power supply monitoring device and control method
CN110910276A (en) Power dispatching data integration system
CN108171362A (en) Power supply facilities breakdown repair method, system and terminal device
CN110048509A (en) A kind of substation inspection system and method based on MR intelligent safety helmet
CN110083640A (en) A kind of recognition methods of platform area and device based on power failure data
CN104680612A (en) Automatic IT equipment inspection method
CN105303316A (en) National power grid distribution network fault processing system
CN104835311B (en) A kind of power information collecting device data transmission performance analysis system
CN105117984A (en) Data analysis-based power grid lean management system
CN204719225U (en) A kind of Watthour meter remote monitors check system automatically
CN111461359A (en) Transformer substation protection information and fixed value management and control system
CN104765348A (en) Energy amount measuring system
CN112100223A (en) Power grid enterprise power equipment marketing and distribution run-through data acquisition and processing method
CN108564261A (en) Method, apparatus and computer equipment are determined based on the power information of work ticket
CN205263229U (en) Communication power monitoring devices
JP4181689B2 (en) Remote automatic diagnosis system for power consumption
CN106228316A (en) A kind of synchronism line loss statistical system
CN110262351A (en) A kind of configuration method
CN112614017B (en) Power failure information management system, power failure information management method, and storage medium
CN108736572A (en) Power equipment intelligence control platform
CN115097797A (en) Distributed energy cloud management and control system based on internet
CN208156088U (en) A kind of warning device based on power quality index monitoring
CN208654244U (en) A kind of three-phase electric energy mass-synchrometer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200324

RJ01 Rejection of invention patent application after publication